Block 0256, lot 002
645 Stockton St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 10
- Units
- 69
- Rooms
- 70 bathrooms
- Building
- 58,129 sq ft
- Lot
- 9,556 sq ft
- Zoning
- RM4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
65 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2026 | In progress issued Jul 2026 | 645 Stockton St | Halyard Inc | fire alarm system upgrade to comply with sffc 1103.7.6.1 in partially sprinklered building.Details
fire alarm system upgrade to comply with sffc 1103.7.6.1 in partially sprinklered building. | $5,000 |
| Apr 18, 2022 | Completed final sign-off Sep 2022 | 645 Stockton St | Axel8 Construction | unit #403: rehab (e) kitchen & bathroom. install washer / dryer.Details
unit #403: rehab (e) kitchen & bathroom. install washer / dryer. | $18,000 |
| Mar 10, 2022 | Completed final sign-off Jul 2022 | 645 Stockton St | Axel8 Construction | unit 807: revision to pa# 202111152385: convert (e) living rm to bedroom . rehab (e) kitchen & bath. install washer/ dryerDetails
unit 807: revision to pa# 202111152385: convert (e) living rm to bedroom . rehab (e) kitchen & bath. install washer/ dryer | |
| Dec 27, 2021 | Completed final sign-off Jul 2022 | 645 Stockton St | Axel8 Construction | unit 303 - rehabilitate existing kitchen; rehabilitate bathroom; install washer/dryerDetails
unit 303 - rehabilitate existing kitchen; rehabilitate bathroom; install washer/dryer | $36,000 |
| Dec 27, 2021 | Completed final sign-off Jul 2022 | 645 Stockton St | Axel8 Construction | unit 502 - convert existing living room to bedroom; rehabilitate (e) kitchen; rehabilitate existing bathroom; install washer/dryerDetails
unit 502 - convert existing living room to bedroom; rehabilitate (e) kitchen; rehabilitate existing bathroom; install washer/dryer | $40,000 |
| Nov 15, 2021 | Completed final sign-off Jul 2022 | 645 Stockton St | Axel8 Construction | unit 807: convert (e) living rm to bedroom (switch living rm w/ bedroom). rehab (e) kitchen & bath. install washer/ dryerDetails
unit 807: convert (e) living rm to bedroom (switch living rm w/ bedroom). rehab (e) kitchen & bath. install washer/ dryer | $36,000 |
| Aug 19, 2021 | Completed final sign-off Mar 2022 | 645 Stockton St | Ps2 Inc | unit #704: convert (e) dining to bedroom. rehab (e) kitchen and bath. install washer and dryer.Details
unit #704: convert (e) dining to bedroom. rehab (e) kitchen and bath. install washer and dryer. | $32,000 |
| Aug 16, 2021 | Never finaled issued Aug 2021, no final | 645 Stockton St | Ps2 Inc | unit #701: administrative permit to correct wrong floor plan on pa# 202011128696.Details
unit #701: administrative permit to correct wrong floor plan on pa# 202011128696. | |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 645 Stockton St | Ps2 Inc | apt 701: rev to pa202011128096: remodel kitchen by add non-load bearing wall. new fixture layout in (e) bathroom. maher n/aDetails
apt 701: rev to pa202011128096: remodel kitchen by add non-load bearing wall. new fixture layout in (e) bathroom. maher n/a | |
| May 19, 2021 | Never finaled issued May 2021, no final | 645 Stockton St | Ps2 Inc | apt 1004: rev to pa 202105190591. add new load barring walls.Details
apt 1004: rev to pa 202105190591. add new load barring walls. | |
| Nov 12, 2020 | Completed final sign-off Sep 2021 | 645 Stockton St | Ps2 Inc | apt 1004: demo and install cabinets, counter tops, backsplash, patch and refinished floors. patch and paint walls, new blinds, new lightin fixtures, new appliances, electrical upgrades (subpanel).install washer/dryer into (e) closet. no walls moved,infilled,modified.layout remain unchanged.maher n/aDetails
apt 1004: demo and install cabinets, counter tops, backsplash, patch and refinished floors. patch and paint walls, new blinds, new lightin fixtures, new appliances, electrical upgrades (subpanel).install washer/dryer into (e) closet. no walls moved,infilled,modified.layout remain unchanged.maher n/a | $48,000 |
| Nov 12, 2020 | Completed final sign-off Sep 2021 | 645 Stockton St | Ps2 Inc | apt 701: demo and install cabinets, counter tops, backsplash, patch and refinished floors. patch and paint walls, new blinds, new lightin fixtures, new appliances, electrical upgrades (subpanel). install washer/dryer into (e) closet. maher n/aDetails
apt 701: demo and install cabinets, counter tops, backsplash, patch and refinished floors. patch and paint walls, new blinds, new lightin fixtures, new appliances, electrical upgrades (subpanel). install washer/dryer into (e) closet. maher n/a | $48,000 |
| May 28, 2020 | Completed final sign-off Nov 2020 | 645 Stockton St | Axel8 Construction | unit #705: rehabilitate existing kitchen and existing bathroom. install washer/dryer. all remodel work in-kind.Details
unit #705: rehabilitate existing kitchen and existing bathroom. install washer/dryer. all remodel work in-kind. | $35,000 |
| May 28, 2020 | Completed final sign-off Oct 2020 | 645 Stockton St | Axel8 Construction | unit #806: repair plumbing lines. install washer/dryerDetails
unit #806: repair plumbing lines. install washer/dryer | $10,000 |
| Jan 17, 2020 | Completed final sign-off Oct 2020 | 645 Stockton St | Axel8 Construction | #404 on 4th fl: rehabilitate (e) kitchen and (e) bathroom. install washer & dryer. maher naDetails
#404 on 4th fl: rehabilitate (e) kitchen and (e) bathroom. install washer & dryer. maher na | $35,000 |
| Dec 19, 2019 | Expired or cancelled cancelled Jan 2026 | 645 Stockton St | unit 806 - relocate bedroom, rehabilitate (e) kitchen & bathroom, install washer & dryerDetails
unit 806 - relocate bedroom, rehabilitate (e) kitchen & bathroom, install washer & dryer | $40,000 | |
| Dec 19, 2019 | Completed final sign-off Oct 2020 | 645 Stockton St | Axel8 Construction | unit 505 - convert (e) living room to 2 bedrooms; relocate living room, rehabilitation (e) kitchen & (e) bathroom; install washer & dryerDetails
unit 505 - convert (e) living room to 2 bedrooms; relocate living room, rehabilitation (e) kitchen & (e) bathroom; install washer & dryer | $40,000 |
| Nov 26, 2019 | Completed final sign-off Oct 2020 | 645 Stockton St | Axel8 Construction | unit # 405; convert (e) dining room to bedroom, rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washier & dryer n/a maherDetails
unit # 405; convert (e) dining room to bedroom, rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washier & dryer n/a maher | $35,000 |
| Nov 22, 2019 | Completed final sign-off Nov 2021 | 645 Stockton St | Au Electric Corporation/Aec Alarms | upgrade existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72.Details
upgrade existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72. | $40,000 |
| Jul 17, 2019 | Never finaled issued Sep 2019, no final | 645 Stockton St | Caslez Construction Inc | apt #902 - convert part of living room to bedroom. rehabiliatae (e) kitchen & (e) bathroom. install w/d.Details
apt #902 - convert part of living room to bedroom. rehabiliatae (e) kitchen & (e) bathroom. install w/d. | $33,000 |
| Jun 24, 2019 | Never finaled issued Sep 2019, no final | 645 Stockton St | Caslez Construction Inc | unit 201. relocate kitchen, rehab (e) bathroom, install washer & dryer.Details
unit 201. relocate kitchen, rehab (e) bathroom, install washer & dryer. | $37,000 |
| Mar 19, 2019 | Never finaled issued Apr 2019, no final | 645 Stockton St | Hammer Down Construction Co | rehabilitate e kitchen, bath, washer dryerDetails
rehabilitate e kitchen, bath, washer dryer | $25,000 |
| Jan 30, 2019 | Completed final sign-off Aug 2019 | 645 Stockton St | Casman Construction Inc | unit 302 - relocate bedroom and living room, rehabilitate (e) kitchen and bathroom. install washer/dryer. maher n/a.Details
unit 302 - relocate bedroom and living room, rehabilitate (e) kitchen and bathroom. install washer/dryer. maher n/a. | $38,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 645 Stockton St | street spaceDetails
street space | ||
| Aug 9, 2018 | Completed final sign-off Mar 2019 | 645 Stockton St | D-Finity Construction Inc | convert existing dining to bedroom, rehabilitate existing kitchen and bathroom. install washer/dryer. all work is non-structural only.Details
convert existing dining to bedroom, rehabilitate existing kitchen and bathroom. install washer/dryer. all work is non-structural only. | $30,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 645 Stockton St | street spaceDetails
street space | ||
| Mar 23, 2018 | Never finaled issued Mar 2018, no final | 645 Stockton St | street spaceDetails
street space | ||
| Mar 22, 2018 | Never finaled issued Mar 2018, no final | 645 Stockton St | Rain Defense | repair 100 square feet of front façade in-kind, located at top floor. inspect rest of façade and repair in-kind as needed. same materials and same design(s).Details
repair 100 square feet of front façade in-kind, located at top floor. inspect rest of façade and repair in-kind as needed. same materials and same design(s). | $8,000 |
| Mar 21, 2018 | Completed final sign-off Jul 2018 | 645 Stockton St | Liang's Remodeling Inc. | unit #906: recommencement and completion of work approved under app#201605066815Details
unit #906: recommencement and completion of work approved under app#201605066815 | |
| Feb 12, 2018 | Completed final sign-off Aug 2018 | 645 Stockton St | Hon's Construction Inc. | unit #508: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3) install washer and dryer.Details
unit #508: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3) install washer and dryer. | $29,000 |
| Jan 3, 2018 | Completed final sign-off Apr 2018 | 645 Stockton St | Fault Line Plumbing Inc | basement: add 2 sprinklers over trash cans off 3' main. maher naDetails
basement: add 2 sprinklers over trash cans off 3' main. maher na | $8,000 |
| Nov 16, 2016 | Expired or cancelled cancelled Jan 2026 | 645 Stockton St | replace slab on grade of lobby with metal deckDetails
replace slab on grade of lobby with metal deck | $12,000 | |
| May 31, 2016 | Completed final sign-off May 2017 | 645 Stockton St | 1-10th flr: evacuation maps maher naDetails
1-10th flr: evacuation maps maher na | $7,500 | |
| May 26, 2016 | Never finaled issued Jun 2016, no final | 645 Stockton St | Liang's Remodeling Inc. | unit #906: revision to permit 201605066815; revise plan layout; maher n/aDetails
unit #906: revision to permit 201605066815; revise plan layout; maher n/a | |
| May 6, 2016 | Never finaled issued May 2016, no final | 645 Stockton St | Liang's Remodeling Inc. | #906- remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a ordinance #155-13Details
#906- remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a ordinance #155-13 | $30,000 |
| Mar 1, 2016 | Completed final sign-off Jul 2016 | 645 Stockton St | Palmera Construction Co | remodel unit 602 @ 6th floor, remodel existing bathroom, convert exsting living into bedroom, remodel existng kitchen; add washer and dryer. maher naDetails
remodel unit 602 @ 6th floor, remodel existing bathroom, convert exsting living into bedroom, remodel existng kitchen; add washer and dryer. maher na | $25,000 |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 645 Stockton St | B-Side Inc. | #407, #506- replace 6 windows with clearstory windows in bedrooms, replace counter tops. replace bathroom walls and floors. n/a ordinance#155-13Details
#407, #506- replace 6 windows with clearstory windows in bedrooms, replace counter tops. replace bathroom walls and floors. n/a ordinance#155-13 | $20,000 |
| Nov 13, 2014 | Never finaled issued Nov 2014, no final | 645 Stockton St | C&M Development & Construction Inc | remodel 401. relocate kitchen fixutres. remodel (e) bathroom in kind. add washer.dryer. compliance with maher ordinance no. 155-13 not required.Details
remodel 401. relocate kitchen fixutres. remodel (e) bathroom in kind. add washer.dryer. compliance with maher ordinance no. 155-13 not required. | $10,000 |
| Jul 30, 2014 | Never finaled issued Jul 2014, no final | 645 Stockton St | Construction Depot Inc | unit #1001 remodel kitchen - replace counter top, sink, faucet. remodel bathroom - replace all finishes.Details
unit #1001 remodel kitchen - replace counter top, sink, faucet. remodel bathroom - replace all finishes. | $15,000 |
| Jul 7, 2014 | Never finaled issued Jul 2014, no final | 645 Stockton St | street spaceDetails
street space | ||
| Jun 3, 2014 | Never finaled issued Jun 2014, no final | 645 Stockton St | C&M Development & Construction Inc | unit #903 - remove/add interior non-bearing wall. remodel bath, relocate kitchen, new washer/dryer, lighting to remodelled areas. n/a maher ordinance 155-13Details
unit #903 - remove/add interior non-bearing wall. remodel bath, relocate kitchen, new washer/dryer, lighting to remodelled areas. n/a maher ordinance 155-13 | $35,000 |
| May 22, 2014 | Never finaled issued May 2014, no final | 645 Stockton St | Construction Depot Inc | remodel of kitchen, cabinets, counter, sink, faucet, tile. remodel bathroom, vanity, cabinet, sink, toilet, tile, mirror. no wall alteration or modification.Details
remodel of kitchen, cabinets, counter, sink, faucet, tile. remodel bathroom, vanity, cabinet, sink, toilet, tile, mirror. no wall alteration or modification. | $26,000 |
| May 12, 2014 | Never finaled issued May 2014, no final | 645 Stockton St | Malagic Construction | unit 802 - replace old kitchen cabinets with new; new countertop , new tile floor, new bathtile floor, tub surround tile; no structural work; comply with cec150k)_ 8. compliance with ordinance 155-13 not required.Details
unit 802 - replace old kitchen cabinets with new; new countertop , new tile floor, new bathtile floor, tub surround tile; no structural work; comply with cec150k)_ 8. compliance with ordinance 155-13 not required. | $10,000 |
| Jan 21, 2014 | Never finaled issued Jan 2014, no final | 645 Stockton St | #1007 & penthouse- replace entrance gate on stair of penthouse w/1-hr fire rated wall. expand stairs out into #1007 & shift #1007 entrance over. new 20 min rated doors, new guardrail on penthouse flr. #1007:remove add int non-bearing walls, remodel bath,relocate kitchen to living,add washer/dryerDetails
#1007 & penthouse- replace entrance gate on stair of penthouse w/1-hr fire rated wall. expand stairs out into #1007 & shift #1007 entrance over. new 20 min rated doors, new guardrail on penthouse flr. #1007:remove add int non-bearing walls, remodel bath,relocate kitchen to living,add washer/dryer | $45,000 | |
| Jan 21, 2014 | Never finaled issued Mar 2014, no final | 645 Stockton St | Apex Construction & Maintenance Inc. | unit #306 - add/remove interior non-bearing walls. remodel bath, relocate kitchen to (e) closet, add new washer/dryer, new lighting plan for modified spaces.Details
unit #306 - add/remove interior non-bearing walls. remodel bath, relocate kitchen to (e) closet, add new washer/dryer, new lighting plan for modified spaces. | $40,000 |
| Jan 7, 2014 | Never finaled issued Apr 2014, no final | 645 Stockton St | Apex Construction & Maintenance Inc. | unit #604: add/remove interior non-bearing walls, remodel bath, relocate kitchen to (e) closet, add new washer/dryer, new lighting plan for modified spaces.Details
unit #604: add/remove interior non-bearing walls, remodel bath, relocate kitchen to (e) closet, add new washer/dryer, new lighting plan for modified spaces. | $40,000 |
| Aug 8, 2013 | Never finaled issued Sep 2013, no final | 645 Stockton St | D S Management Inc Dba Metrocon Builders | unit #702: all work in unit 702, add/remove interior non-bearing walls, remodel (e) bath & kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer, new lighting plan for modified spacesDetails
unit #702: all work in unit 702, add/remove interior non-bearing walls, remodel (e) bath & kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer, new lighting plan for modified spaces | $36,000 |
| Aug 8, 2013 | Never finaled issued Oct 2013, no final | 645 Stockton St | D S Management Inc Dba Metrocon Builders | unit #204: add/remove interior non-bearing walls, remodel bath, relocate kitchen to (e) closet, add (n) washer/dryer, new lighting plan for modified spacesDetails
unit #204: add/remove interior non-bearing walls, remodel bath, relocate kitchen to (e) closet, add (n) washer/dryer, new lighting plan for modified spaces | $36,000 |
| Aug 8, 2013 | Never finaled issued Sep 2013, no final | 645 Stockton St | D S Management Inc Dba Metrocon Builders | unit #1002: add/remove interior non -bearing walls, remodel (e) bath and kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer; new lighting plan for modified spacesDetails
unit #1002: add/remove interior non -bearing walls, remodel (e) bath and kitchen, convert (e) living into (n) bedrm, add (n) washer/dryer; new lighting plan for modified spaces | $36,000 |
| Jul 10, 2013 | Never finaled issued Aug 2013, no final | 645 Stockton St | Pre Wire Electrical, D S Management Inc Dba Metrocon Builders | all work in #808- add new washer/dryer, add/remove interior non-bearing walls, remodel bath, new lighting plan for modified spaces, relocate kitchen to (e) closet, convrt (e) dining room into (n) bedroom.Details
all work in #808- add new washer/dryer, add/remove interior non-bearing walls, remodel bath, new lighting plan for modified spaces, relocate kitchen to (e) closet, convrt (e) dining room into (n) bedroom. | $35,000 |
| Jun 28, 2013 | Never finaled issued Jul 2013, no final | 645 Stockton St | D S Management Inc Dba Metrocon Builders | 11th floor- all work done in #1101: remove /add interior walls, relocate kitchen to (e) dining, relcoate bath to (e) master bedroom closet, remodel bath, new washer/dryer, convert home office into (n) bedroom, new lighting modified spaces.Details
11th floor- all work done in #1101: remove /add interior walls, relocate kitchen to (e) dining, relcoate bath to (e) master bedroom closet, remodel bath, new washer/dryer, convert home office into (n) bedroom, new lighting modified spaces. | $150,000 |
| May 31, 2013 | Expired or cancelled cancelled Jan 2026 | 645 Stockton St | all work @unit 407 - remodel kitchen & bath, remove add interior walls, new lighting plan for modified space, new washer/dryer.Details
all work @unit 407 - remodel kitchen & bath, remove add interior walls, new lighting plan for modified space, new washer/dryer. | $30,000 | |
| Apr 12, 2013 | Completed final sign-off Oct 2013 | 645 Stockton St | Schoepp Construction Inc | all work done in unit 501 - relocate kitchen to (e) dining. remove/add interior walls. remodel bathroom. new lighting to modified spaces, new washer/dryer.Details
all work done in unit 501 - relocate kitchen to (e) dining. remove/add interior walls. remodel bathroom. new lighting to modified spaces, new washer/dryer. | $35,000 |
| Jan 24, 2013 | Never finaled issued Jan 2013, no final | 645 Stockton St | Schoepp Construction Inc | unit 402. remodel kitchen, add/remove interior walls (non bearing) renovate bath, add washer/dryer. new lighting planDetails
unit 402. remodel kitchen, add/remove interior walls (non bearing) renovate bath, add washer/dryer. new lighting plan | $16,000 |
| Jan 8, 2013 | Completed final sign-off May 2013 | 645 Stockton St | Schoepp Construction Inc | work in unit#202. (n) washer/dryer. remodel kitchen, relocate stove. remove/add interior walls. (n) lighting plan for modified spaces.Details
work in unit#202. (n) washer/dryer. remodel kitchen, relocate stove. remove/add interior walls. (n) lighting plan for modified spaces. | $12,000 |
| Jan 8, 2013 | Completed final sign-off Jun 2013 | 645 Stockton St | Schoepp Construction Inc | work in unit#503. revision to appl. #201211214661 - add (n) washer/dryer. relocate kitchen to (e) closet. remodel bathroom. remove/add interior non-bearing walls. (n) lighting plan for modified spaces.Details
work in unit#503. revision to appl. #201211214661 - add (n) washer/dryer. relocate kitchen to (e) closet. remodel bathroom. remove/add interior non-bearing walls. (n) lighting plan for modified spaces. | $12,000 |
| Nov 21, 2012 | Never finaled issued Nov 2012, no final | 645 Stockton St | Schoepp Construction Inc | unit #503-remodel kitchen & 2 bathrooms-countertop, cabients & sink. bathroom-toilet, vanity & sinkDetails
unit #503-remodel kitchen & 2 bathrooms-countertop, cabients & sink. bathroom-toilet, vanity & sink | $22,500 |
| Jan 17, 2012 | Completed final sign-off Apr 2012 | 645 Stockton St | Liberty Fire Systems Inc | fire sprinkler main piping and fire pump replacement using the existing 3" fire service and existing double detector check valve assmbly backflow preventer.Details
fire sprinkler main piping and fire pump replacement using the existing 3" fire service and existing double detector check valve assmbly backflow preventer. | $20,000 |
| Oct 21, 2008 | Completed final sign-off Nov 2008 | 645 Stockton St | In-House Development | #200 #1003- revision to pa# 2008-0509-1717-add partition walls for office/study space for unit #200 and 1003Details
#200 #1003- revision to pa# 2008-0509-1717-add partition walls for office/study space for unit #200 and 1003 | $35,000 |
| May 9, 2008 | Completed final sign-off Nov 2008 | 645 Stockton St | In-House Development | kitchen adn bath remodel in each unit. #200 & #1003. new electrical panel and hot & cold coater supply gfi's & fluorescent lighting. no structural work no doors or window added or removed.Details
kitchen adn bath remodel in each unit. #200 & #1003. new electrical panel and hot & cold coater supply gfi's & fluorescent lighting. no structural work no doors or window added or removed. | $35,000 |
| May 9, 2008 | Completed final sign-off Nov 2008 | 645 Stockton St | In-House Development | renew pa#200709061892 and increase valuation of work per correction noteice dated 04/30/08.Details
renew pa#200709061892 and increase valuation of work per correction noteice dated 04/30/08. | $17,000 |
| Sep 14, 2007 | Never finaled issued Sep 2007, no final | 645 Stockton St | street space permitDetails
street space permit | ||
| Sep 6, 2007 | Never finaled issued Sep 2007, no final | 645 Stockton St | On-Site Maintenance | penthouse-kitchen/bathroom remodel in kind. no structural changes. no window door or wall alteration.kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3'min. from pl. & bldg. opening.Details
penthouse-kitchen/bathroom remodel in kind. no structural changes. no window door or wall alteration.kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3'min. from pl. & bldg. opening. | $23,000 |
| Apr 27, 2004 | Expired or cancelled expired May 2008 | 645 Stockton St | California Constrution Co | reroofingDetails
reroofing | $8,000 |
| Aug 14, 2000 | Expired or cancelled expired Dec 2000 | 645 Stockton St | sidewalk repairDetails
sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.