Block 0271, lot 016
510 Stockton St
- City’s use
- Multi-Family Residential
- Built
- 1920
- Stories
- 4
- Units
- 16
- Rooms
- 16 bathrooms
- Building
- 13,752 sq ft
- Lot
- 4,400 sq ft
- Zoning
- RM4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2025 | Completed final sign-off Sep 2025 | 510 Stockton St | G T M Works Llc Dba Greentree Maint | unit# 15: install one new clothes washer and dryer at the 5th floor. no structural work.Details
unit# 15: install one new clothes washer and dryer at the 5th floor. no structural work. | $5,000 |
| Apr 28, 2021 | Completed final sign-off Sep 2021 | 510 Stockton St | Ps2 Inc | apt 5: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 5: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Apr 12, 2021 | Completed final sign-off Sep 2021 | 510 Stockton St | Ps2 Inc | apt 3: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 3: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Mar 29, 2021 | Never finaled issued Feb 2023, no final | 510 Stockton St | Grizzly Builders Inc. | addition of two (2) accessory dwelling units (adu) per ordinances 162-16, to an existing sixteen (16) unit building for a total of 18 units. the new proposed dwelling units are located within the existing building envelope at the first floor.Details
addition of two (2) accessory dwelling units (adu) per ordinances 162-16, to an existing sixteen (16) unit building for a total of 18 units. the new proposed dwelling units are located within the existing building envelope at the first floor. | $146,000 |
| Mar 11, 2021 | Completed final sign-off Dec 2021 | 510 Stockton St | Au Electric Corporation/Aec Alarms | upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa72. install low frequency sounders in sleeping areas & replace smoke, pull station & horn/strobe (like for like). 17 unit bldg. 1 unit @ ground fl, 4 units per/2, 3, 4 fl contact info: roger tsai (408)780-5848; email: rt11..Details
upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa72. install low frequency sounders in sleeping areas & replace smoke, pull station & horn/strobe (like for like). 17 unit bldg. 1 unit @ ground fl, 4 units per/2, 3, 4 fl contact info: roger tsai (408)780-5848; email: rt11.. | $35,000 |
| Mar 3, 2021 | Completed final sign-off May 2021 | 510 Stockton St | Ps2 Inc | apt 9: revision to pa202009023342 - removal of non-load bearing partition between kitchen & living room (open kitchen).Details
apt 9: revision to pa202009023342 - removal of non-load bearing partition between kitchen & living room (open kitchen). | |
| Mar 3, 2021 | Completed final sign-off May 2021 | 510 Stockton St | Ps2 Inc | apt 11: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen).Details
apt 11: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen). | |
| Mar 3, 2021 | Completed final sign-off May 2021 | 510 Stockton St | Ps2 Inc | apt 7: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen).Details
apt 7: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen). | |
| Oct 16, 2020 | Completed final sign-off May 2021 | 510 Stockton St | Ps2 Inc | apt 7: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 7: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Oct 16, 2020 | Completed final sign-off Jan 2021 | 510 Stockton St | Ps2 Inc | apt 6: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 6: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 510 Stockton St | Ps2 Inc | apt 9: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 9: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 510 Stockton St | Ps2 Inc | apt 2: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 2: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Sep 2, 2020 | Completed final sign-off Jan 2021 | 510 Stockton St | Ps2 Inc | apt 12: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 12: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $40,000 |
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 510 Stockton St | Ps2 Inc | apt 8: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 8: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 510 Stockton St | Ps2 Inc | apt 11: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet.Details
apt 11: remodel of unit-demo and replace kitchen cabinets, countertops, backsplash, patch/refinish hardwood, patch/paint all walls, new blinds, new electrical & plumbing fixtures and appliances. install washer/dryer in existing closet. | $45,000 |
| Jul 27, 2020 | Never finaled issued Jul 2020, no final | 510 Stockton St | street spaceDetails
street space | ||
| Nov 2, 2010 | Completed final sign-off Nov 2010 | 510 Stockton St | repair fire proofing with approved materials (hc 1001(m),809; fire alarm maintenance, boiler maintenance and certification, , to comply with nov, 201063689 dtd. 8-23-10Details
repair fire proofing with approved materials (hc 1001(m),809; fire alarm maintenance, boiler maintenance and certification, , to comply with nov, 201063689 dtd. 8-23-10 | $1,300 | |
| Feb 17, 2010 | Completed final sign-off Mar 2010 | 510 Stockton St | Bay Alarm Company | to obtain final inspection for work approved under app #200612210400 all work is complete.Details
to obtain final inspection for work approved under app #200612210400 all work is complete. | |
| Feb 11, 2010 | Never finaled issued Feb 2010, no final | 510 Stockton St | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 21, 2006 | Expired or cancelled expired Apr 2009 | 510 Stockton St | Bay Alarm Company | upgrade existing fire alarm system with a new facu and new devices because of chronic trouble conditions.Details
upgrade existing fire alarm system with a new facu and new devices because of chronic trouble conditions. | $17,250 |
| Nov 15, 2001 | Expired or cancelled expired Mar 2002 | 510 Stockton St | sidewalk repairDetails
sidewalk repair |