Jamie Mastro
- Listed as
- architect, engineer
- Firm
- Cm Architects
- Based in
- Oakland
- On San Francisco permits
- May 2018 to Apr 2024
86 permits since 2000 (architect on 84 permits, engineer on 2 permits): 37 completed, 6 in progress, 26 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2024 | Completed final sign-off Nov 2024 | 737 Pine St | Wickman Development And Construction | revision to permit 202012100754. remove from scope: the proposed partition walls, slab and steps within storage rooms.Details
revision to permit 202012100754. remove from scope: the proposed partition walls, slab and steps within storage rooms. | |
| Sep 19, 2023 | Completed final sign-off Jan 2024 | 505 Garfield St | Maximo Construction | rev to pa#2021-0929-9456; relocate proposed bathroom including minor changes to proposed elevationsDetails
rev to pa#2021-0929-9456; relocate proposed bathroom including minor changes to proposed elevations | |
| Feb 9, 2023 | Expired or cancelled cancelled May 2026 | 512 Grant Av | Axel8 Construction | revision to pa 2022-0420-2637 convert part of single proposed tenant space into an add'l (n) tenant shell space for fuure use as limited restaurant b occupancy and convert (e) non accessible toilet to accessible toilet. limited restaurant under separate permitDetails
revision to pa 2022-0420-2637 convert part of single proposed tenant space into an add'l (n) tenant shell space for fuure use as limited restaurant b occupancy and convert (e) non accessible toilet to accessible toilet. limited restaurant under separate permit | $3,000 |
| Dec 7, 2022 | Completed final sign-off Feb 2024 | 4356 California St | J P F Construction | accessible business entrance compliance. abe# 202205160835. barrier removal only.Details
accessible business entrance compliance. abe# 202205160835. barrier removal only. | $10,000 |
| Dec 7, 2022 | Never finaled filed Dec 2022, never issued | 1320 Ocean Av | to comply with compliant 202014812 - legalize build out of multiple b occupancy tenant spaces within the existing envelope, including chages to facade and stair at rear yard. mep deferred.Details
to comply with compliant 202014812 - legalize build out of multiple b occupancy tenant spaces within the existing envelope, including chages to facade and stair at rear yard. mep deferred. | $300,000 | |
| Oct 25, 2022 | Completed final sign-off Jan 2024 | 351 Louisburg St | Werner's General Contractor Inc | add (1) adu at the 3/f - unit 351b (761 sf) & (1) junior adu located at the 1/f - unit 351a (500 sf), resulting in a change of occupancy. both within (e) building envelope of single family structure per ca state government code sect. 65852.2 & sect. 65852.22 to comply w/ complait #201937931.Details
add (1) adu at the 3/f - unit 351b (761 sf) & (1) junior adu located at the 1/f - unit 351a (500 sf), resulting in a change of occupancy. both within (e) building envelope of single family structure per ca state government code sect. 65852.2 & sect. 65852.22 to comply w/ complait #201937931. | $25,000 |
| May 11, 2022 | Never finaled issued Jun 2022, no final | 563 Webster St | S L M Development Inc. | revision to pa# 201608104638. including removal of toilet room serving commercial space. provide plumbing fixture count for future tenant improvement at commercial.Details
revision to pa# 201608104638. including removal of toilet room serving commercial space. provide plumbing fixture count for future tenant improvement at commercial. | |
| Apr 27, 2022 | Completed final sign-off Feb 2024 | 113 Newman St | Spectrum Development Co. | convert (e) covered patio at front of property into (n) bathroom and enlarge (e) bedroom. add (n) deck to remodeled bedroomDetails
convert (e) covered patio at front of property into (n) bathroom and enlarge (e) bedroom. add (n) deck to remodeled bedroom | $31,000 |
| Apr 21, 2022 | Completed final sign-off Sep 2022 | 278 Joost Av | Spectrum Development Co. | conversion of garage/storage to bedroom, bathroom, laundry.Details
conversion of garage/storage to bedroom, bathroom, laundry. | $60,000 |
| Jan 31, 2022 | Completed final sign-off Sep 2023 | 264 Missouri St | Axel8 Construction | interior remodel of unit 264 and 266 within envelope of the existing building. improvement of eero route at basement level. voluntary strengthning upper two levels by addings plywood shearwall.Details
interior remodel of unit 264 and 266 within envelope of the existing building. improvement of eero route at basement level. voluntary strengthning upper two levels by addings plywood shearwall. | $80,000 |
| Jan 25, 2022 | Expired or cancelled cancelled Jan 2026 | 77 Winfield St | (n) door & (n) window in place of (e) windows facing rear yard. infill of (e) foor to rear yard, addition of steps and area drawin in rear yard.Details
(n) door & (n) window in place of (e) windows facing rear yard. infill of (e) foor to rear yard, addition of steps and area drawin in rear yard. | $4,000 | |
| Nov 12, 2021 | Completed final sign-off Mar 2022 | 2044 Fillmore St | Axel8 Construction | revision to 202108267167: new lighting plan for t.i. on 2nd/fDetails
revision to 202108267167: new lighting plan for t.i. on 2nd/f | $16,000 |
| Nov 9, 2021 | Completed final sign-off Jan 2023 | 1888 Clement St | Sgdm Llc | revision to bpa# 201910023383 to correct the (e) + (p) occupancy classifications and use classification stated in pts for pa# 201910023383 and to correct type of construction to type vb. create exit separation. add security gate.Details
revision to bpa# 201910023383 to correct the (e) + (p) occupancy classifications and use classification stated in pts for pa# 201910023383 and to correct type of construction to type vb. create exit separation. add security gate. | |
| Oct 20, 2021 | Completed final sign-off Jan 2024 | 411 Burnett Av | expansion of deck @ 1/f & 2/f levelDetails
expansion of deck @ 1/f & 2/f level | $20,000 | |
| Oct 6, 2021 | Completed final sign-off Jun 2023 | 540 Junipero Serra Bl | M Rivera Construction Inc. | legalization of an one story horizontal addition of an (e) unconditioned sunroom @ rear of building in conjunction w/planning application 2021003961varDetails
legalization of an one story horizontal addition of an (e) unconditioned sunroom @ rear of building in conjunction w/planning application 2021003961var | $15,000 |
| Sep 29, 2021 | Completed final sign-off Jan 2024 | 505 Garfield St | Maximo Construction | single story addition within rear yard, to an existing single family dwelling. renovation of existing kitchen and deck on the roof of single story addition.Details
single story addition within rear yard, to an existing single family dwelling. renovation of existing kitchen and deck on the roof of single story addition. | $110,000 |
| Sep 28, 2021 | Completed final sign-off Mar 2022 | 2044 Fillmore St | Axel8 Construction | rev to pa 202108267167. t.i. to (e) tenant space at 2/f. no change to legal non-conforming accessory massage not greater than 300sf established per mb020035 in april 2002 to (e) wellness station. no exterior changes.Details
rev to pa 202108267167. t.i. to (e) tenant space at 2/f. no change to legal non-conforming accessory massage not greater than 300sf established per mb020035 in april 2002 to (e) wellness station. no exterior changes. | |
| Sep 23, 2021 | Expired or cancelled withdrawn Oct 2021 | 505 Garfield St | construct new 2-story-over-basement single family dwellingDetails
construct new 2-story-over-basement single family dwelling | $110,000 | |
| Jul 22, 2021 | Never finaled issued Oct 2021, no final | 441 Ulloa St | G&C Construction Services Inc. | addition of habitable rooms at the garage level within the (e) structure. the new habitabl rooms are to include a laundry room and master suite including a master bath. addition of new deck in rear yard.Details
addition of habitable rooms at the garage level within the (e) structure. the new habitabl rooms are to include a laundry room and master suite including a master bath. addition of new deck in rear yard. | $55,000 |
| Jun 7, 2021 | Never finaled filed Jun 2021, never issued | 142 Ellert St | addition of one (1) accsessory dwelling units to an existing rear yard structure per government code section 65852.2.the proposed adu is located at the first floor within the existing envelope of the rear structure.Details
addition of one (1) accsessory dwelling units to an existing rear yard structure per government code section 65852.2.the proposed adu is located at the first floor within the existing envelope of the rear structure. | $51,900 | |
| May 10, 2021 | Never finaled issued Mar 2023, no final | 1342 Mason St | B M D C Llc | addition of one (1) accessory dwelling unit (adu), per state law, to an existing seven (7) unit building; total of 8 units. the proposed adu will be located within existing building envelope at the ground floor.Details
addition of one (1) accessory dwelling unit (adu), per state law, to an existing seven (7) unit building; total of 8 units. the proposed adu will be located within existing building envelope at the ground floor. | $70,000 |
| Mar 29, 2021 | Never finaled issued Feb 2023, no final | 510 Stockton St | Grizzly Builders Inc. | addition of two (2) accessory dwelling units (adu) per ordinances 162-16, to an existing sixteen (16) unit building for a total of 18 units. the new proposed dwelling units are located within the existing building envelope at the first floor.Details
addition of two (2) accessory dwelling units (adu) per ordinances 162-16, to an existing sixteen (16) unit building for a total of 18 units. the new proposed dwelling units are located within the existing building envelope at the first floor. | $146,000 |
| Mar 11, 2021 | Completed final sign-off Oct 2021 | 678 Moscow St | Spectrum Development Co. | addition of new full bathroom within existing ground floor envelope.Details
addition of new full bathroom within existing ground floor envelope. | $5,000 |
| Feb 19, 2021 | Completed final sign-off Oct 2022 | 211 Cornwall St | M Rivera Construction Inc. | addition of two (2) accsessory dwelling units to an existing twelve (12) unit building per ordinance 162-16 for a total of fourteen (14) units. the two (2) proposed dwellings are located within the existing building envelope at the first floor.Details
addition of two (2) accsessory dwelling units to an existing twelve (12) unit building per ordinance 162-16 for a total of fourteen (14) units. the two (2) proposed dwellings are located within the existing building envelope at the first floor. | $163,000 |
| Feb 16, 2021 | Completed final sign-off Mar 2023 | 1569 Wallace Av | A M Rocca Inc. | tenant improvement including proposed use for cannabis manufacturing facility. interior remodel, addition of ada bathroom, stairs & addition of mezzanine. removal of existing bathroom, kitchnette, and office. m.e.p. deferred.Details
tenant improvement including proposed use for cannabis manufacturing facility. interior remodel, addition of ada bathroom, stairs & addition of mezzanine. removal of existing bathroom, kitchnette, and office. m.e.p. deferred. | $80,000 |
| Feb 4, 2021 | Never finaled issued Jun 2021, no final | 3600 20th St | Mendez-Ortiz Contractors | addition of common laundry room at basement level.Details
addition of common laundry room at basement level. | $20,000 |
| Dec 11, 2020 | Never finaled issued Jun 2022, no final | 2252 Clement St | Odysseus Builders | #2252: to comply with accessible business entrance program per ord 51-16. barrier removal. (shares plan with pa# 202012110858)Details
#2252: to comply with accessible business entrance program per ord 51-16. barrier removal. (shares plan with pa# 202012110858) | $3,000 |
| Dec 11, 2020 | Completed final sign-off Mar 2025 | 2254 Clement St | Odysseus Builders | #2254: to comply with accessible business entrance program per ord 51-16. barrier removal. (shares plan with pa# 202012110857)Details
#2254: to comply with accessible business entrance program per ord 51-16. barrier removal. (shares plan with pa# 202012110857) | $10,000 |
| Dec 10, 2020 | Completed final sign-off Nov 2024 | 737 Pine St | Wickman Development And Construction | addition of six (6) accessory dwelling units (adu), to an existing forty (40) unit building for a total of 46 units per ordinance 162-16. the proposed adus are located within the existing building envelope at the 1st floor.Details
addition of six (6) accessory dwelling units (adu), to an existing forty (40) unit building for a total of 46 units per ordinance 162-16. the proposed adus are located within the existing building envelope at the 1st floor. | $427,500 |
| Dec 2, 2020 | Never finaled filed Dec 2020, never issued | 2288 Fulton St | addition of two (2) accessory dwelling units (adu), to an existing six (6) unit building for a total of eight (8) units per ordinance 162-16. the proposed adus are located at the basement level within the existing building envelope.Details
addition of two (2) accessory dwelling units (adu), to an existing six (6) unit building for a total of eight (8) units per ordinance 162-16. the proposed adus are located at the basement level within the existing building envelope. | $120,000 | |
| Nov 21, 2020 | Never finaled issued Mar 2021, no final | 563 Webster St | Axel8 Construction, Rei Build Up Construction Corp | barrier removal only in compliance with oridinance no 51-16 at commercial tenant space: 801 hayes st.Details
barrier removal only in compliance with oridinance no 51-16 at commercial tenant space: 801 hayes st. | $18,000 |
| Nov 20, 2020 | Expired or cancelled expired May 2026 | 366 Collingwood St | Rock Construction And Consulting Inc | enlarge (e) decks sewing units 366 & 368Details
enlarge (e) decks sewing units 366 & 368 | $100,000 |
| Nov 20, 2020 | Completed final sign-off Nov 2024 | 737 Pine St | Wickman Development And Construction | conversion of part of (e) boiler equipment room to (n) laundry room at basement level. relocation of laundry machine from 1st fl to (n) laundry room at basement level.Details
conversion of part of (e) boiler equipment room to (n) laundry room at basement level. relocation of laundry machine from 1st fl to (n) laundry room at basement level. | $30,000 |
| Nov 20, 2020 | Never finaled issued Apr 2022, no final | 1624 Sacramento St | Wickman Development And Construction | addition of two (2) accsessory dwelling units to an existing fifteen (15) unit building per ordinance 162-16 for a total of seventeen (17) units. the two (2) proposed dwellings are located within the existing building envelope at the first floor.Details
addition of two (2) accsessory dwelling units to an existing fifteen (15) unit building per ordinance 162-16 for a total of seventeen (17) units. the two (2) proposed dwellings are located within the existing building envelope at the first floor. | $128,700 |
| Nov 18, 2020 | Completed final sign-off Jun 2022 | 573 Pennsylvania Av | Curran & Associates General Contractors | revision to pa 202002184746. remodel of lower unit. (n) windows and door at rear facade. new windows at south facade. interior remodel of kitchen, living room, bedroom and bath. addition of 1 bedroom.Details
revision to pa 202002184746. remodel of lower unit. (n) windows and door at rear facade. new windows at south facade. interior remodel of kitchen, living room, bedroom and bath. addition of 1 bedroom. | $47,550 |
| Nov 13, 2020 | Never finaled filed Nov 2020, never issued | 1217 Kearny St | addition of one (1) accessory dwelling unit at the 1st floor within existing building envelope to an existing five (5) unit building for a total of six (6) units per ordinance 43-14, and 162-16.Details
addition of one (1) accessory dwelling unit at the 1st floor within existing building envelope to an existing five (5) unit building for a total of six (6) units per ordinance 43-14, and 162-16. | $69,700 | |
| Nov 3, 2020 | Never finaled filed Nov 2020, never issued | 830 Capp St | addition of one (1) accessory dwelling unit (adu), to an existing five (5) unit building for a total of six (6). the proposed dwelling unit is located at the first floor within the existing building envelope.Details
addition of one (1) accessory dwelling unit (adu), to an existing five (5) unit building for a total of six (6). the proposed dwelling unit is located at the first floor within the existing building envelope. | $75,700 | |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 2614 Gough St | additon of 1 accessory dwelling unit per ordinance 162-16 to an (e) 6-unit building to be located in (e) envelope of the first floor.Details
additon of 1 accessory dwelling unit per ordinance 162-16 to an (e) 6-unit building to be located in (e) envelope of the first floor. | $80,800 | |
| Oct 13, 2020 | Expired or cancelled cancelled Nov 2024 | 1025 Sutter St | addition of two (2) accsessory dwelling units to an existing nineteen (19) unit building per ordinance 162-16 for a total of twenty one (21) units. the two (2) proposed dwellings are located within the existing building envelope at the basement level. **maher n/a**Details
addition of two (2) accsessory dwelling units to an existing nineteen (19) unit building per ordinance 162-16 for a total of twenty one (21) units. the two (2) proposed dwellings are located within the existing building envelope at the basement level. **maher n/a** | $115,000 | |
| Oct 3, 2020 | Never finaled filed Oct 2020, never issued | 6130 Geary Bl | addition of one (1) accessory dwelling unit (adu), to an existing five (5) unit building per ordinance 162-16. the proposed adu is located at the basement level within the existing building envelope, as well as under a room supported by columns within the required rear yard.Details
addition of one (1) accessory dwelling unit (adu), to an existing five (5) unit building per ordinance 162-16. the proposed adu is located at the basement level within the existing building envelope, as well as under a room supported by columns within the required rear yard. | $79,100 | |
| Sep 16, 2020 | In progress issued Feb 2024 | 845 Waller St | Rod Heisler Construction | addition of three (3) accessory dwelling units (adus) per ordinance 162-16, to an existing five (5) unit building for a total of eight (8) units in conjunction with a seismic retrofit per ordinance 95-17. conversion of the east garage space at ground level into two stories, creating a new basementDetails
addition of three (3) accessory dwelling units (adus) per ordinance 162-16, to an existing five (5) unit building for a total of eight (8) units in conjunction with a seismic retrofit per ordinance 95-17. conversion of the east garage space at ground level into two stories, creating a new basement | $224,700 |
| Sep 8, 2020 | In progress issued Dec 2023 | 3323 26th St | Spectrum Development Co. | addition of 2 adu to (e) 2 unit building per oridinance 162-16. total of 4 units. 2 (n) adu located within (e) building envelope at the basement level.Details
addition of 2 adu to (e) 2 unit building per oridinance 162-16. total of 4 units. 2 (n) adu located within (e) building envelope at the basement level. | $115,000 |
| Sep 8, 2020 | Never finaled filed Sep 2020, never issued | 1266 18th Av | addition of 1 adu per ordinance 162-16 to the (e) 9 units. total of 10 units. the new proposed dwelling unit is located within the (e) building envelope on the 1/f.Details
addition of 1 adu per ordinance 162-16 to the (e) 9 units. total of 10 units. the new proposed dwelling unit is located within the (e) building envelope on the 1/f. | $49,500 | |
| Sep 8, 2020 | Never finaled filed Sep 2020, never issued | 867 Oak St | addition of two (2) accsessory dwelling units to an existing six (6) unit building per ordanance 162-16 for a total of eight (8) units. the two (2) proposed dwellings are located within the existing building envelope at the first floor.Details
addition of two (2) accsessory dwelling units to an existing six (6) unit building per ordanance 162-16 for a total of eight (8) units. the two (2) proposed dwellings are located within the existing building envelope at the first floor. | $146,200 | |
| Sep 1, 2020 | Never finaled filed Sep 2020, never issued | 39 Fair Oaks St | addition of 5 accessory dwelling units per ordinance 162-16. four of the proposed dwellling units are located within the existing bldg @ the ground level & one dwelling unit at the floor above the ground level.Details
addition of 5 accessory dwelling units per ordinance 162-16. four of the proposed dwellling units are located within the existing bldg @ the ground level & one dwelling unit at the floor above the ground level. | $293,100 | |
| Feb 24, 2020 | In progress issued Sep 2024 | 1921 Lake St | Spectrum Development Co. | addition of one (1) accessory dwelling unit per ordinance 162-16 to an existing four (4) unit bldg for total of five(5) units. the one(1) proposed dwelling unit is located within the existing bldg envelope at the 1st fl. ref# 2020-0218-4716 for ab-094 seismic retrofit.Details
addition of one (1) accessory dwelling unit per ordinance 162-16 to an existing four (4) unit bldg for total of five(5) units. the one(1) proposed dwelling unit is located within the existing bldg envelope at the 1st fl. ref# 2020-0218-4716 for ab-094 seismic retrofit. | $77,200 |
| Feb 18, 2020 | Completed final sign-off Jun 2022 | 573 Pennsylvania Av | Curran & Associates General Contractors | installation of roof deck, new rear yard access stair. new windows at rear facade, interior remodel including kitchen remodel, addition of on full bath and one half bath.Details
installation of roof deck, new rear yard access stair. new windows at rear facade, interior remodel including kitchen remodel, addition of on full bath and one half bath. | $120,000 |
| Feb 18, 2020 | In progress issued Sep 2024 | 1921 Lake St | retrofit per ab-094.Details
retrofit per ab-094. | $54,000 | |
| Jan 23, 2020 | Expired or cancelled cancelled Nov 2024 | 1950 Jones St | addition of one dwelling unit w/ 2-bedrooms per ord# 162-16. add (n) deck to (e) 6 unit bldg(7th unit approved under pa#201606149934) for a total 8 unit bldg. proposed unit is within (e) bldg envelope @ basement. deck located @ outdoor open space. ref soft story pa# 2019-1226-0711.Details
addition of one dwelling unit w/ 2-bedrooms per ord# 162-16. add (n) deck to (e) 6 unit bldg(7th unit approved under pa#201606149934) for a total 8 unit bldg. proposed unit is within (e) bldg envelope @ basement. deck located @ outdoor open space. ref soft story pa# 2019-1226-0711. | $102,900 | |
| Jan 23, 2020 | Never finaled issued Feb 2020, no final | 33 Buena Vista Tr | Gartan Construction | remodel of (e) dwelling unit #33 including kitchen remodel replacement of vanity sink & cab, replacement of tile @ bath & w/c, (n) opening @ (e) load bearing wall & replacement windows @ rear of bldgDetails
remodel of (e) dwelling unit #33 including kitchen remodel replacement of vanity sink & cab, replacement of tile @ bath & w/c, (n) opening @ (e) load bearing wall & replacement windows @ rear of bldg | $30,000 |
| Jan 3, 2020 | Expired or cancelled cancelled Dec 2022 | 333 Webster St | addition of one adu dwelling unit(w/ one bedroom) per ord# 162-16 to (e) 6 unit bldg for a total of 7 units per ord# 162-16. the proposed adu is located within (e) envelope at grd flr.Details
addition of one adu dwelling unit(w/ one bedroom) per ord# 162-16 to (e) 6 unit bldg for a total of 7 units per ord# 162-16. the proposed adu is located within (e) envelope at grd flr. | $60,500 | |
| Jan 3, 2020 | Completed final sign-off Apr 2023 | 140 Page St | Sgdm Llc | addition of 3 dwelling units per ord# 162-16. all 3 proposed one-bedroom units are located within (e) building envelope @ the 1st flr.Details
addition of 3 dwelling units per ord# 162-16. all 3 proposed one-bedroom units are located within (e) building envelope @ the 1st flr. | $198,400 |
| Dec 18, 2019 | Completed final sign-off Jun 2025 | 2951 San Bruno Av | Hbm Construction Inc | convert ground flr retail & rear covered parking to (4) new accessory dwelling units; replace (e) 1st flr retail entries & windows w/ new adu entries per ordinance 162-16. enclose rear covered parking for new adu.Details
convert ground flr retail & rear covered parking to (4) new accessory dwelling units; replace (e) 1st flr retail entries & windows w/ new adu entries per ordinance 162-16. enclose rear covered parking for new adu. | $225,000 |
| Dec 12, 2019 | Expired or cancelled cancelled Dec 2022 | 3649 18th St | addition of dwelling untis per ord162-16 within existing envelope. existing 14 unit bldg adding 2 units for a total of 16 dwelling unitsDetails
addition of dwelling untis per ord162-16 within existing envelope. existing 14 unit bldg adding 2 units for a total of 16 dwelling units | $126,900 | |
| Dec 12, 2019 | Never finaled filed Dec 2019, never issued | 153 Clayton St | addition of new dwelling units per ord 162-16, located with in existing envelope. existing 4 unit bldg, addiing 4 units for a total of 8 dwelling. cross ref 201912099035.Details
addition of new dwelling units per ord 162-16, located with in existing envelope. existing 4 unit bldg, addiing 4 units for a total of 8 dwelling. cross ref 201912099035. | $200,000 | |
| Dec 9, 2019 | Expired or cancelled cancelled Nov 2022 | 153 Clayton St | voluntary seismic retrofit per ab-094. cross ref 201912129433.Details
voluntary seismic retrofit per ab-094. cross ref 201912129433. | $58,000 | |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 701 Guerrero St | Sgdm Llc | compliance with accessible business entrance program ord 51-16 entrances serving 701 & 703 guerrero, barrier removal onlyDetails
compliance with accessible business entrance program ord 51-16 entrances serving 701 & 703 guerrero, barrier removal only | $15,855 |
| Nov 25, 2019 | Completed final sign-off Feb 2022 | 6134 Geary Bl | Sgdm Llc | to comply with the accessible business entry program. barrier removal only. install power door operator at entry.Details
to comply with the accessible business entry program. barrier removal only. install power door operator at entry. | $11,355 |
| Nov 6, 2019 | Expired or cancelled expired Jan 2026 | 1656 Sacramento St | Axel8 Construction | addition of (2) dwelling units to an (e) (12) unit bldg for a total of (14) units per ordinance 162-16. the proposed adu's are located within the (e) building envelope at the ground level.Details
addition of (2) dwelling units to an (e) (12) unit bldg for a total of (14) units per ordinance 162-16. the proposed adu's are located within the (e) building envelope at the ground level. | $101,500 |
| Oct 25, 2019 | Never finaled issued Nov 2021, no final | 1532 Larkin St | Sgdm Llc | addition of 3 dwelling units(adu's) per ordinance162-16 for a total of 9 dwelling units.Details
addition of 3 dwelling units(adu's) per ordinance162-16 for a total of 9 dwelling units. | $223,100 |
| Oct 25, 2019 | Expired or cancelled withdrawn Mar 2023 | 262 12th Av | addition of 2 dwelling units(adu's) per ordinance162-16. the two proposed dwelling units are located within the existing building envelope at the ground floor for a total of 8 dwelling units. ref bpa# 2019-1023-5376.Details
addition of 2 dwelling units(adu's) per ordinance162-16. the two proposed dwelling units are located within the existing building envelope at the ground floor for a total of 8 dwelling units. ref bpa# 2019-1023-5376. | $136,000 | |
| Oct 16, 2019 | Completed final sign-off Dec 2021 | 816 Shotwell St | Damian Torres | addition of one adu to an existing three unit building for a total of four dwelling units per ord no. 162-16. the proposed adu's are located within the existing building envelope at the ground level.Details
addition of one adu to an existing three unit building for a total of four dwelling units per ord no. 162-16. the proposed adu's are located within the existing building envelope at the ground level. | $108,500 |
| Sep 13, 2019 | Completed final sign-off Jan 2021 | 269 Avila St | Alli Construction Inc | revision to 201805240036 revise layout of proposed dwelling unit to eliminate separation btw sleeping & living rm. revise bath layout, laundry/closet layout & bike parking location and patio doors unit aDetails
revision to 201805240036 revise layout of proposed dwelling unit to eliminate separation btw sleeping & living rm. revise bath layout, laundry/closet layout & bike parking location and patio doors unit a | |
| Aug 30, 2019 | Never finaled issued Oct 2020, no final | 2386 Lombard St | Pacific Engineering & Construction Inc. | to comply with the accessible business entrance program: barrier removal only in compliance with ordinance no. 50-16 at commercial tenant spaces: 2386 lombard street. accessible business entrance program per ordinance 51-16.Details
to comply with the accessible business entrance program: barrier removal only in compliance with ordinance no. 50-16 at commercial tenant spaces: 2386 lombard street. accessible business entrance program per ordinance 51-16. | $2,500 |
| Aug 30, 2019 | Never finaled issued Aug 2020, no final | 201 Clement St | Pacific Engineering & Construction Inc. | to comply with the accessible business entry program. barrier removal only in compliance with ordinance no. 50-16 at commercial tenant spaces: 201 and 201a clement street. accessible business entrance program per ordinance 51-16. add strips to bottom of existing store front doors.Details
to comply with the accessible business entry program. barrier removal only in compliance with ordinance no. 50-16 at commercial tenant spaces: 201 and 201a clement street. accessible business entrance program per ordinance 51-16. add strips to bottom of existing store front doors. | $6,000 |
| Aug 19, 2019 | Completed final sign-off Feb 2020 | 3214 Balboa St | Allied Teamwork Construction Co | revision to pa 2018-1211-7957 including modification of proposed steps serving existing units & unit to be legalized; revision of fire rated assemblies, and revision of utility room accessDetails
revision to pa 2018-1211-7957 including modification of proposed steps serving existing units & unit to be legalized; revision of fire rated assemblies, and revision of utility room access | |
| Aug 19, 2019 | Completed final sign-off Aug 2020 | 2907 16th St | Lsr Maintenance Llc | ti - cafe/bakery to occupy existing tenant shell spaceDetails
ti - cafe/bakery to occupy existing tenant shell space | $70,000 |
| Aug 8, 2019 | Completed final sign-off Dec 2021 | 816 Shotwell St | Damian Torres | unit #1: relocation of kitchen, bathrm remodel, addition of bathrm. unit #2: relocation of kitchen, relocation of bathrm, conversion of storage room to home office/renovation of office, removal of 2nd story deck, addition of 2nd story deck, landing & stairs, removal of entry at 1st fl. (n) windowsDetails
unit #1: relocation of kitchen, bathrm remodel, addition of bathrm. unit #2: relocation of kitchen, relocation of bathrm, conversion of storage room to home office/renovation of office, removal of 2nd story deck, addition of 2nd story deck, landing & stairs, removal of entry at 1st fl. (n) windows | $105,000 |
| Jun 26, 2019 | Expired or cancelled cancelled Aug 2023 | 80 Museum Wy | legalization of (1) unauthorzed dwelling unit within an existing (2) dwelling unit building for a total of (3) units per ordinance 43-14.Details
legalization of (1) unauthorzed dwelling unit within an existing (2) dwelling unit building for a total of (3) units per ordinance 43-14. | $170,000 | |
| Jun 14, 2019 | Completed final sign-off Mar 2021 | 1630 Filbert St | Sgdm Llc | revision to pa #201901170623. unit #1 - unit remodel - add washer/dryer, add half bath, add window at rear. unit #5 - unit remodel - add washer/dryer, add bedroom.Details
revision to pa #201901170623. unit #1 - unit remodel - add washer/dryer, add half bath, add window at rear. unit #5 - unit remodel - add washer/dryer, add bedroom. | $20,000 |
| May 24, 2019 | Completed final sign-off Dec 2020 | 3800 22nd St | Sgdm Llc | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. refer to pa#201812037255 for residential.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. refer to pa#201812037255 for residential. | $30,000 |
| May 1, 2019 | Expired or cancelled cancelled Jan 2025 | 3370 18th St | Axel8 Construction | tenant improvement to comply with nov #201939791. legalize 3 floors for storage.Details
tenant improvement to comply with nov #201939791. legalize 3 floors for storage. | $65,000 |
| May 1, 2019 | Completed final sign-off Mar 2021 | 2909 16th St | Lsr Maintenance Llc | tenant improvement restaurant to occupy (e) tenant shell space.Details
tenant improvement restaurant to occupy (e) tenant shell space. | $138,865 |
| Mar 20, 2019 | In progress issued Aug 2024 | 4331 19th St | addition of deck at grade under 3 feet in height at rear and porch cover @ rear yard. porch cover is for units #4333 and #4331Details
addition of deck at grade under 3 feet in height at rear and porch cover @ rear yard. porch cover is for units #4333 and #4331 | $1,779 | |
| Mar 20, 2019 | In progress issued Aug 2024 | 4333 19th St | private rear roof deck for unit 4333 on 3rd floor (88 s.f.)Details
private rear roof deck for unit 4333 on 3rd floor (88 s.f.) | $1,779 | |
| Mar 1, 2019 | Expired or cancelled cancelled May 2025 | 49 Walter St | addition of (1) adu w/in (e) envelope per ordinance 162-16, to an (e) (6) unit building for a total of (7) dwelling units. the adu is located at the ground flr.Details
addition of (1) adu w/in (e) envelope per ordinance 162-16, to an (e) (6) unit building for a total of (7) dwelling units. the adu is located at the ground flr. | $57,000 | |
| Feb 26, 2019 | Never finaled issued Mar 2019, no final | 2905 16th St | Astorga Construction Inc | revision to 200911040520. revise facad entry addition of 1 exit to each proposed tenant spaceDetails
revision to 200911040520. revise facad entry addition of 1 exit to each proposed tenant space | |
| Jan 7, 2019 | Completed final sign-off Nov 2020 | 328 Pennsylvania Av | Gary Liu | addition of two adus to an (e) 8 unit bldg fo a total of 10 units within (e) envelope per ord 162-16Details
addition of two adus to an (e) 8 unit bldg fo a total of 10 units within (e) envelope per ord 162-16 | $136,100 |
| Jan 7, 2019 | Never finaled issued Feb 2020, no final | 1306 California St | Hbm Construction Inc, Ibs Usa Inc. | addition of one adu to an (e) 6 unit bldg within (e) envelope per ord- 162-16 for a total of 7 dwellingsDetails
addition of one adu to an (e) 6 unit bldg within (e) envelope per ord- 162-16 for a total of 7 dwellings | $85,300 |
| Jan 7, 2019 | Completed final sign-off Aug 2021 | 349 Fillmore St | addition of one adu to an (e) 12 unit bldg within (e) envelope for a total of delling units per ord. 162-16**maher n/a**Details
addition of one adu to an (e) 12 unit bldg within (e) envelope for a total of delling units per ord. 162-16**maher n/a** | $144,600 | |
| Dec 11, 2018 | Completed final sign-off Feb 2020 | 3214 Balboa St | Allied Teamwork Construction Co | legalization (ul) of (1) unauthorized dwelling unit per ordinance 43-14 in an (e) 2-units building. total -> (3) dwelling units.Details
legalization (ul) of (1) unauthorized dwelling unit per ordinance 43-14 in an (e) 2-units building. total -> (3) dwelling units. | $52,750 |
| Sep 28, 2018 | Expired or cancelled cancelled Feb 2023 | 810 Central Av | A M Rocca Inc. | addition of one dwelling unit(adu) to (e) tree dwelling unit bldg w/in envelope for total of four dwelling units per 162-16. (1 bedroom & 1 bath)Details
addition of one dwelling unit(adu) to (e) tree dwelling unit bldg w/in envelope for total of four dwelling units per 162-16. (1 bedroom & 1 bath) | $89,000 |
| Aug 22, 2018 | Expired or cancelled cancelled Nov 2022 | 1075 Ofarrell St | addition of 2 adu (1 studio unit & 1 one bedroom unit) to (e) 12 units building for total of 14 units per ordinance# 162-16 within (e) envelope @ ground floor.Details
addition of 2 adu (1 studio unit & 1 one bedroom unit) to (e) 12 units building for total of 14 units per ordinance# 162-16 within (e) envelope @ ground floor. | $114,000 | |
| Jun 27, 2018 | Never finaled issued Jan 2019, no final | 1656 Sacramento St | Axel8 Construction | comply w/ord 54-16 accessible business entranceDetails
comply w/ord 54-16 accessible business entrance | $13,200 |
| May 24, 2018 | Expired or cancelled expired Sep 2022 | 1637 Clay St | addition of (2) adu within building envelope at ground floor. per ordinance 162-16Details
addition of (2) adu within building envelope at ground floor. per ordinance 162-16 | $80,000 | |
| May 24, 2018 | Completed final sign-off Jan 2021 | 269 Avila St | Alli Construction Inc | addition of accesory dwelling unit per ordinance 162-16. **maher n/a**Details
addition of accesory dwelling unit per ordinance 162-16. **maher n/a** | $78,000 |