Damian Torres
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Feb 2020
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2020 | Completed final sign-off Dec 2021 | 816 Shotwell St | revision to app#201910285760. add plywood and bolting at ground floor. add additional floor joists over unit #3 living room.Details
revision to app#201910285760. add plywood and bolting at ground floor. add additional floor joists over unit #3 living room. | $40,000 |
| Feb 20, 2020 | Completed final sign-off Dec 2021 | 816 Shotwell St | revision to app#201908088329. revise window at north facadeDetails
revision to app#201908088329. revise window at north facade | |
| Oct 16, 2019 | Completed final sign-off Dec 2021 | 816 Shotwell St | addition of one adu to an existing three unit building for a total of four dwelling units per ord no. 162-16. the proposed adu's are located within the existing building envelope at the ground level.Details
addition of one adu to an existing three unit building for a total of four dwelling units per ord no. 162-16. the proposed adu's are located within the existing building envelope at the ground level. | $108,500 |
| Aug 8, 2019 | Completed final sign-off Dec 2021 | 816 Shotwell St | unit #1: relocation of kitchen, bathrm remodel, addition of bathrm. unit #2: relocation of kitchen, relocation of bathrm, conversion of storage room to home office/renovation of office, removal of 2nd story deck, addition of 2nd story deck, landing & stairs, removal of entry at 1st fl. (n) windowsDetails
unit #1: relocation of kitchen, bathrm remodel, addition of bathrm. unit #2: relocation of kitchen, relocation of bathrm, conversion of storage room to home office/renovation of office, removal of 2nd story deck, addition of 2nd story deck, landing & stairs, removal of entry at 1st fl. (n) windows | $105,000 |
| May 7, 2018 | Completed final sign-off Jul 2018 | 1790 San Jose Av | to comply with nov 201716471, remove sign brackets & patch holes to original conditionDetails
to comply with nov 201716471, remove sign brackets & patch holes to original condition | $500 |
| Nov 17, 2017 | Completed final sign-off Jul 2018 | 372 Capp St | bathroom fire repair - repair fire damage on ceiling, and shower wall, new insulation, new drywall, shower surround tile, bathrooom floor , new bath vanity, medicine cab.Details
bathroom fire repair - repair fire damage on ceiling, and shower wall, new insulation, new drywall, shower surround tile, bathrooom floor , new bath vanity, medicine cab. | $15,000 |
| Sep 8, 2017 | Completed final sign-off Oct 2018 | 310 Richland Av | front bldg - remove external stairs within proeprty line not required second egress.Details
front bldg - remove external stairs within proeprty line not required second egress. | $500 |
| Sep 1, 2017 | Completed final sign-off Aug 2018 | 310 Richland Av | rear bldg - kitchen remodel, no walls modified: replace cabinets & counters. upgrade electrical, add d/w. in-kind, no changes to wall layout.Details
rear bldg - kitchen remodel, no walls modified: replace cabinets & counters. upgrade electrical, add d/w. in-kind, no changes to wall layout. | $25,000 |
| Jun 7, 2017 | Expired or cancelled cancelled Mar 2026 | 603 San Jose Av | remodel kitchen - new cabinets, new countertop; remodel bathroom - shower. remove 2 walls per plan on the 2nd floor. remove 2 windows replace with twoDetails
remodel kitchen - new cabinets, new countertop; remodel bathroom - shower. remove 2 walls per plan on the 2nd floor. remove 2 windows replace with two | $45,000 |
| Apr 13, 2017 | Completed final sign-off May 2018 | 611 28th St | remove old kitchen. replace with new kitchen cabinets, new counter top, new appliances. remove old tile and bath and replace with new bth with new tile surround.Details
remove old kitchen. replace with new kitchen cabinets, new counter top, new appliances. remove old tile and bath and replace with new bth with new tile surround. | $28,000 |
| Aug 23, 2016 | Completed final sign-off Nov 2016 | 3537 17th St | kitchen remodel- remove plaster, replace with new drywall, insulation, new cabinets, new counter tops, tile backsplash. no walls moved, removed, added or infilled. all existing layouts to remoain unchanged.Details
kitchen remodel- remove plaster, replace with new drywall, insulation, new cabinets, new counter tops, tile backsplash. no walls moved, removed, added or infilled. all existing layouts to remoain unchanged. | $25,000 |
| Aug 16, 2016 | Never finaled issued Apr 2017, no final | 1828 15th St | compliance w/ mandatory soft story retrofit program, iebc 2012 app a4Details
compliance w/ mandatory soft story retrofit program, iebc 2012 app a4 | $40,000 |
| Jan 21, 2015 | Completed final sign-off Mar 2018 | 281 Harvard St | reroofing. t.i. #201310229868 under the same contractor.Details
reroofing. t.i. #201310229868 under the same contractor. | $6,500 |
| Sep 25, 2014 | Completed final sign-off Feb 2015 | 261 Bradford St | bathroom replacement of plumbing fixtures @ (e) locations; kitchen replacement of cabinets, appliances and plumbing @ (e) locations.Details
bathroom replacement of plumbing fixtures @ (e) locations; kitchen replacement of cabinets, appliances and plumbing @ (e) locations. | $9,500 |
| Oct 22, 2013 | Never finaled issued Jun 2014, no final | 281 Harvard St | change of use. remodel of (e) single-family residence to preschool, including construction of (n) restrooms, (n) wheelchair lift, (n) deck.Details
change of use. remodel of (e) single-family residence to preschool, including construction of (n) restrooms, (n) wheelchair lift, (n) deck. | $60,000 |