Back to bathroom remodel contractors
Damian Torres
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Feb 2020
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2017 | Completed final sign-off Jul 2018 | 372 Capp St | bathroom fire repair - repair fire damage on ceiling, and shower wall, new insulation, new drywall, shower surround tile, bathrooom floor , new bath vanity, medicine cab.Details
bathroom fire repair - repair fire damage on ceiling, and shower wall, new insulation, new drywall, shower surround tile, bathrooom floor , new bath vanity, medicine cab. | $15,000 |
| Jun 7, 2017 | Expired or cancelled cancelled Mar 2026 | 603 San Jose Av | remodel kitchen - new cabinets, new countertop; remodel bathroom - shower. remove 2 walls per plan on the 2nd floor. remove 2 windows replace with twoDetails
remodel kitchen - new cabinets, new countertop; remodel bathroom - shower. remove 2 walls per plan on the 2nd floor. remove 2 windows replace with two | $45,000 |
| Apr 13, 2017 | Completed final sign-off May 2018 | 611 28th St | remove old kitchen. replace with new kitchen cabinets, new counter top, new appliances. remove old tile and bath and replace with new bth with new tile surround.Details
remove old kitchen. replace with new kitchen cabinets, new counter top, new appliances. remove old tile and bath and replace with new bth with new tile surround. | $28,000 |
| Sep 25, 2014 | Completed final sign-off Feb 2015 | 261 Bradford St | bathroom replacement of plumbing fixtures @ (e) locations; kitchen replacement of cabinets, appliances and plumbing @ (e) locations.Details
bathroom replacement of plumbing fixtures @ (e) locations; kitchen replacement of cabinets, appliances and plumbing @ (e) locations. | $9,500 |