Block 0072, lot 008
2200 Leavenworth St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 6
- Units
- 36
- Rooms
- 48 bathrooms
- Building
- 37,932 sq ft
- Lot
- 8,594 sq ft
- Zoning
- RM2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
41 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Jul 2026 | 2200 Leavenworth St | Redlog Flooring Services Corp | repairs for sf facade maintenece ordinance: scrape loose paint off windows, fire escape ladders. remove and patch walls with concrete, prime and paint, street facing. entire bldg.Details
repairs for sf facade maintenece ordinance: scrape loose paint off windows, fire escape ladders. remove and patch walls with concrete, prime and paint, street facing. entire bldg. | $100,000 |
| Jan 7, 2026 | Completed final sign-off Feb 2026 | 2200 Leavenworth St | Hue & Cry Security System | as builts in ref to 202102044068. added annunciator, smoke at top of stairs, updated device location for gateways. updated panel model to accomodate all devices. moved power supply from 3/f to 1/f.Details
as builts in ref to 202102044068. added annunciator, smoke at top of stairs, updated device location for gateways. updated panel model to accomodate all devices. moved power supply from 3/f to 1/f. | |
| Jun 15, 2023 | Completed final sign-off Sep 2023 | 2200 Leavenworth St | Brighter Bay Builders Inc | unit 505: rehabilitate e kitchen, rehabilitate 2 baths, install washer and dryerDetails
unit 505: rehabilitate e kitchen, rehabilitate 2 baths, install washer and dryer | $70,000 |
| Feb 23, 2023 | Completed final sign-off Jul 2023 | 2200 Leavenworth St | Brighter Bay Builders Inc | unit 205: rehabilitate (e) kitchen, rehabilitate (e) two bathroom. install washer and dryer.Details
unit 205: rehabilitate (e) kitchen, rehabilitate (e) two bathroom. install washer and dryer. | $43,000 |
| Oct 13, 2022 | Never finaled issued Oct 2022, no final | 2200 Leavenworth St | Brighter Bay Builders Inc | convert existing kitchen to bedroom, relocatte kitchen, rehabilitate existing bathroom, install washer and dryer.Details
convert existing kitchen to bedroom, relocatte kitchen, rehabilitate existing bathroom, install washer and dryer. | $32,000 |
| Jun 28, 2022 | Completed final sign-off Jan 2023 | 2200 Leavenworth St | Hon's Construction Inc. | unit #501: 1) convert extg dining and kitchen to study. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install second bathroom. 5)install washer and dryer.Details
unit #501: 1) convert extg dining and kitchen to study. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install second bathroom. 5)install washer and dryer. | $48,000 |
| Jun 27, 2022 | Completed final sign-off Jan 2023 | 2200 Leavenworth St | Hon's Construction Inc. | unit 305 3rd fl - rehabilitate (e) kitchen & bathrooms; install washer & gas dryer.Details
unit 305 3rd fl - rehabilitate (e) kitchen & bathrooms; install washer & gas dryer. | $42,000 |
| Dec 23, 2021 | Completed final sign-off Aug 2022 | 2200 Leavenworth St | Hon's Construction Inc. | unit 102: convert (e) kitchen/dining to bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryerDetails
unit 102: convert (e) kitchen/dining to bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryer | $32,000 |
| Nov 23, 2021 | Completed final sign-off May 2022 | 2200 Leavenworth St | Hon's Construction Inc. | unit 404 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom and install washer & dyrerDetails
unit 404 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom and install washer & dyrer | $42,000 |
| Jul 20, 2021 | Completed final sign-off Apr 2022 | 2200 Leavenworth St | Hon's Construction Inc. | unit 206- remodel kitchen, rehabilitate (e) bathrooom. install washer/dryerDetails
unit 206- remodel kitchen, rehabilitate (e) bathrooom. install washer/dryer | $48,000 |
| Jul 8, 2021 | Completed final sign-off Feb 2022 | 2200 Leavenworth St | Hon's Construction Inc. | convert e kitchen and dining to bedroom. relocate kitchen, rehabilitate e bath. install washer dryerDetails
convert e kitchen and dining to bedroom. relocate kitchen, rehabilitate e bath. install washer dryer | $40,000 |
| Feb 4, 2021 | Completed final sign-off Feb 2026 | 2200 Leavenworth St | Hue & Cry Security System | upgrade system like for like with additions of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1. wls repeaters, addition of remote pls to pwr cell unit, remote annunciator on ground flor, pulls, smokes, notification in common areas.Details
upgrade system like for like with additions of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1. wls repeaters, addition of remote pls to pwr cell unit, remote annunciator on ground flor, pulls, smokes, notification in common areas. | $104,048 |
| Dec 30, 2020 | Completed final sign-off Oct 2021 | 2200 Leavenworth St | Hon's Construction Inc. | unit 301: convert existing kitchen to bedroom relocate kitchen rehabilitate existing bathroom install second bathroom install washer/dryer.Details
unit 301: convert existing kitchen to bedroom relocate kitchen rehabilitate existing bathroom install second bathroom install washer/dryer. | $45,000 |
| Dec 14, 2020 | Completed final sign-off Aug 2021 | 2200 Leavenworth St | Hon's Construction Inc. | unit #104: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryer.Details
unit #104: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryer. | $40,000 |
| Dec 14, 2020 | Completed final sign-off Jun 2021 | 2200 Leavenworth St | Hon's Construction Inc. | #303: revision to no-plan pa# 202011058257: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryer.Details
#303: revision to no-plan pa# 202011058257: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryer. | $40,000 |
| Nov 5, 2020 | Completed final sign-off Jul 2021 | 2200 Leavenworth St | Hon's Construction Inc. | unit# 303 - remodel bathroom and kitchen, no structural change, no walls relocated.Details
unit# 303 - remodel bathroom and kitchen, no structural change, no walls relocated. | $24,000 |
| Nov 5, 2020 | Completed final sign-off Aug 2021 | 2200 Leavenworth St | Hon's Construction Inc. | unit #402: 1)convert extg kitchen to "study". 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom. 5) install washer and dryer.Details
unit #402: 1)convert extg kitchen to "study". 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom. 5) install washer and dryer. | $40,000 |
| Nov 5, 2020 | Completed final sign-off Jul 2021 | 2200 Leavenworth St | Hon's Construction Inc. | apt 204: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a.Details
apt 204: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a. | $40,000 |
| Sep 27, 2020 | Completed final sign-off Jun 2021 | 2200 Leavenworth St | Hon's Construction Inc. | apt 302: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install new 2nd bathroom, install washer/dryer.Details
apt 302: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install new 2nd bathroom, install washer/dryer. | $40,000 |
| Sep 27, 2020 | Completed final sign-off Aug 2021 | 2200 Leavenworth St | Hon's Construction Inc. | apt 405: convert (e) dining room to den, rehab (e) kitchen & (e) bathrooms, install washer/dryer.Details
apt 405: convert (e) dining room to den, rehab (e) kitchen & (e) bathrooms, install washer/dryer. | $40,000 |
| Aug 6, 2020 | Completed final sign-off Mar 2021 | 2200 Leavenworth St | Hon's Construction Inc. | #401: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom. 5)install washer and dryer.Details
#401: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom. 5)install washer and dryer. | $46,000 |
| May 14, 2020 | Completed final sign-off Sep 2020 | 2200 Leavenworth St | United California Glass And Door | unit 403: remove/replace (5) non-visible to the public row windows inkind. to comply with nov #202027782 dated 4/14/2020.Details
unit 403: remove/replace (5) non-visible to the public row windows inkind. to comply with nov #202027782 dated 4/14/2020. | $12,213 |
| May 13, 2020 | Completed final sign-off Feb 2021 | 2200 Leavenworth St | Hon's Construction Inc. | unit 604: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 604: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $25,000 |
| Mar 6, 2020 | Never finaled issued Oct 2020, no final | 2200 Leavenworth St | Hon's Construction Inc. | #403: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install wasyer & dryer.Details
#403: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install wasyer & dryer. | $40,000 |
| Mar 2, 2020 | Never finaled issued Nov 2020, no final | 2200 Leavenworth St | Hon's Construction Inc. | unit 306 - convert (e) dining room to den; rehabilitate (e) kitchen and bathrooms, install washer & dryerDetails
unit 306 - convert (e) dining room to den; rehabilitate (e) kitchen and bathrooms, install washer & dryer | $45,000 |
| Dec 12, 2019 | Completed final sign-off Dec 2020 | 2200 Leavenworth St | Hon's Construction Inc. | convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install 2nd bathroom, install washier & dryerDetails
convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install 2nd bathroom, install washier & dryer | $42,000 |
| Nov 27, 2019 | Never finaled issued Jan 2020, no final | 2200 Leavenworth St | Hon's Construction Inc. | unit 606 - rehabilitate (e) kitchen and bathroom; install washer & dryerDetails
unit 606 - rehabilitate (e) kitchen and bathroom; install washer & dryer | $45,000 |
| Oct 21, 2019 | Completed final sign-off Aug 2020 | 2200 Leavenworth St | Hon's Construction Inc. | to comply w/ n.o.v 201988421. demo of plaster in units 105, 406 and 503. all work in unit 105 under pa#2019-1017-4781, all work in unit 406 under pa#2019-1017-4780,all work in unit 503 under pa#2019-0926-2821Details
to comply w/ n.o.v 201988421. demo of plaster in units 105, 406 and 503. all work in unit 105 under pa#2019-1017-4781, all work in unit 406 under pa#2019-1017-4780,all work in unit 503 under pa#2019-0926-2821 | |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 2200 Leavenworth St | Hon's Construction Inc. | apt 105 - to partially comply with nov 2019-88421. convert existing kitchen to bedroom, relocate kitchen; rehabilitate (e) bathrooms; install washer/dryer. maher n/a.Details
apt 105 - to partially comply with nov 2019-88421. convert existing kitchen to bedroom, relocate kitchen; rehabilitate (e) bathrooms; install washer/dryer. maher n/a. | $40,000 |
| Oct 17, 2019 | Completed final sign-off Jul 2020 | 2200 Leavenworth St | Hon's Construction Inc. | apt 506 - rehabilitate (e) kitchen and bathrooms; install washer/dryer. maher n/a.Details
apt 506 - rehabilitate (e) kitchen and bathrooms; install washer/dryer. maher n/a. | $43,000 |
| Oct 17, 2019 | Completed final sign-off Aug 2020 | 2200 Leavenworth St | Hon's Construction Inc. | apt 406 - comply with nov 201988421 (partial); rehabilitate (e) kitchen and bathrooms; install washer/dryer; install den, maher n/a.Details
apt 406 - comply with nov 201988421 (partial); rehabilitate (e) kitchen and bathrooms; install washer/dryer; install den, maher n/a. | $40,000 |
| Oct 2, 2019 | Expired or cancelled cancelled Oct 2019 | 2200 Leavenworth St | Hon's Construction Inc. | demo to comply w/ n.o.v 201988421Details
demo to comply w/ n.o.v 201988421 | $6,500 |
| Sep 26, 2019 | Completed final sign-off Aug 2020 | 2200 Leavenworth St | Hon's Construction Inc. | #503 - convert (e) kitchen to bedroom. relocate kitchen rehabilitation (e) bathroom install w/dDetails
#503 - convert (e) kitchen to bedroom. relocate kitchen rehabilitation (e) bathroom install w/d | $40,000 |
| Aug 22, 2016 | Completed final sign-off Sep 2016 | 2200 Leavenworth St | North Beach Construction | work in unit 505: partial kitchen remodel as follows: remove countertop and the tile backsplash. install new countertop and new tile backsplash. plumbing and electrical by others.Details
work in unit 505: partial kitchen remodel as follows: remove countertop and the tile backsplash. install new countertop and new tile backsplash. plumbing and electrical by others. | $5,000 |
| Aug 16, 2016 | Completed final sign-off Oct 2016 | 2200 Leavenworth St | Velox Construction | repair fire & water damage at common area hallway. 1st fl to 6th fl. insulation and sheetrock, to comply with violation #201609742, 201607991, 201623411Details
repair fire & water damage at common area hallway. 1st fl to 6th fl. insulation and sheetrock, to comply with violation #201609742, 201607991, 201623411 | $50,000 |
| Aug 26, 2014 | Never finaled issued Aug 2014, no final | 2200 Leavenworth St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Oct 16, 2013 | Never finaled issued Dec 2013, no final | 2200 Leavenworth St | Security Engineers Inc | as built emergency fire alarm panel replacement submittal. ref apl# 2013-09-17-6998.Details
as built emergency fire alarm panel replacement submittal. ref apl# 2013-09-17-6998. | |
| Sep 17, 2013 | Completed final sign-off Dec 2013 | 2200 Leavenworth St | Security Engineers Inc | emergency replacement of fire alarm control panel. none funtioning system. as built plans are required with riser diagram sequence of operator and equipment list sep. permit, ( provide to fire inspector at time of inspection).Details
emergency replacement of fire alarm control panel. none funtioning system. as built plans are required with riser diagram sequence of operator and equipment list sep. permit, ( provide to fire inspector at time of inspection). | $2,000 |
| Jan 28, 2010 | Completed final sign-off May 2010 | 2200 Leavenworth St | North Beach Const. | unit #205 - remodel kitchen as follows: remove (e) cabinets, lath& plaster on walls, sheetrock, tape & install new cabinets & appliances, electrical & plumbing by others, no structural work. at least 50% lighting to be high efficacy (by wattage)Details
unit #205 - remodel kitchen as follows: remove (e) cabinets, lath& plaster on walls, sheetrock, tape & install new cabinets & appliances, electrical & plumbing by others, no structural work. at least 50% lighting to be high efficacy (by wattage) | $20,000 |
| May 12, 2009 | Completed final sign-off Jul 2009 | 2200 Leavenworth St | North Beach Const. | work @ unit# 302 only. remove sink base cabinet. patch, sheetrock walls. install new sink base & wall cabinets. total of 3 cabinets. install new countertops. no structrual work. electrical & plumbing by others.Details
work @ unit# 302 only. remove sink base cabinet. patch, sheetrock walls. install new sink base & wall cabinets. total of 3 cabinets. install new countertops. no structrual work. electrical & plumbing by others. | $15,000 |
| Jul 12, 2001 | Expired or cancelled expired Jul 2002 | 2200 Leavenworth St | Kelly Roofing Inc | reroofingDetails
reroofing | $66,895 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.