North Beach Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Jul 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2022 | Completed final sign-off Dec 2022 | 340 San Jose Av | work to be on rear deck remove damaged and dryrot to deck, stairs and hand railing replace with pressure treted wood as needed. less than 50% needs repairs.Details
work to be on rear deck remove damaged and dryrot to deck, stairs and hand railing replace with pressure treted wood as needed. less than 50% needs repairs. | $19,000 |
| Feb 13, 2019 | Completed final sign-off Sep 2019 | 376 Magellan Av | remodel (e) ground level bathroom, enlarge bath & closet and cabinets, (e) heating & ventilation to remain unchanged, add elec outlets, and lights, new wall and fl. finishesDetails
remodel (e) ground level bathroom, enlarge bath & closet and cabinets, (e) heating & ventilation to remain unchanged, add elec outlets, and lights, new wall and fl. finishes | $7,500 |
| Aug 22, 2016 | Completed final sign-off Sep 2016 | 2200 Leavenworth St | work in unit 505: partial kitchen remodel as follows: remove countertop and the tile backsplash. install new countertop and new tile backsplash. plumbing and electrical by others.Details
work in unit 505: partial kitchen remodel as follows: remove countertop and the tile backsplash. install new countertop and new tile backsplash. plumbing and electrical by others. | $5,000 |
| Jan 31, 2001 | Completed final sign-off May 2001 | 155 Laidley St | permit to final sork under app 9913180 kit rmdl final 9924224 rmdl/instl replacement furnace forcedDetails
permit to final sork under app 9913180 kit rmdl final 9924224 rmdl/instl replacement furnace forced | |
| Oct 26, 2000 | Completed final sign-off Nov 2000 | 2510 39th Av | renewal of application 9911441 for final inspectionDetails
renewal of application 9911441 for final inspection |