Back to kitchen remodel contractors
Terra Nova Industries
- Based in
- Walnut Creek
- On San Francisco permits
- Feb 2000 to Apr 2026
- Last 24 months
- 11 permits filed
340 permits since 2000: 231 completed, 8 in progress, 78 never finaled, 23 expired or cancelled.
Of the 78 never-finaled permits, 4 are 3 to 5 years old, 21 are 5 to 10 years old, 53 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
38 kitchen remodel permits: 23 completed, 1 in progress, 10 never finaled, 4 expired or cancelled. Typically 65 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2022 | Never finaled issued Mar 2022, no final | 950 Market St | to complete work under addenda s-11. new permit for 950 market hotel phase 2. kitchen food services equipment. permit 2016-0208-9004-s11 will be performed and completed under p.a. 202203039143 (this permit) plans and scope did not change, plan set for referance only to original permit. 2016020890.Details
to complete work under addenda s-11. new permit for 950 market hotel phase 2. kitchen food services equipment. permit 2016-0208-9004-s11 will be performed and completed under p.a. 202203039143 (this permit) plans and scope did not change, plan set for referance only to original permit. 2016020890. | |
| Feb 8, 2021 | Never finaled issued Sep 2021, no final | 200 Van Ness Av | g/f -interior renovation of 1,850 sq/ft restaurant space on g/f of new sf conservatory of music bowes hall ((ref. pa# 2017-05-05-5847). interior improvement includes new wall, floor & ceiling finishes, new commercial kitchen, new bar & lighting throughout. fire sprinkler defer submittal.Details
g/f -interior renovation of 1,850 sq/ft restaurant space on g/f of new sf conservatory of music bowes hall ((ref. pa# 2017-05-05-5847). interior improvement includes new wall, floor & ceiling finishes, new commercial kitchen, new bar & lighting throughout. fire sprinkler defer submittal. | $283,900 |
| Sep 30, 2020 | In progress issued Aug 2025 | 2765 Hyde St | repair damaged structural members.repair damages in 2/f & 3/f apts, replace fire/smoke alarm. renovate restaurant kitchen, bar plumbing & applicatons. renovate hvac system.new unisex ada restroom, remodel (e) womens resetroom for ada compliance. remodel mens restroom. replace & add handrails.Details
repair damaged structural members.repair damages in 2/f & 3/f apts, replace fire/smoke alarm. renovate restaurant kitchen, bar plumbing & applicatons. renovate hvac system.new unisex ada restroom, remodel (e) womens resetroom for ada compliance. remodel mens restroom. replace & add handrails. | $825,000 |
| Aug 6, 2020 | Expired or cancelled withdrawn May 2023 | 599 Skyline Bl | interior remodel of (e) restaurant w/ new kitchen & bar, grease hood, walk-in cooler, warewashing station, dishwashing hood and associated mep-removal of structural columns & associated structural work- new floor, wall & ceiling finishes and new lighting & hvac in dining spaces.Details
interior remodel of (e) restaurant w/ new kitchen & bar, grease hood, walk-in cooler, warewashing station, dishwashing hood and associated mep-removal of structural columns & associated structural work- new floor, wall & ceiling finishes and new lighting & hvac in dining spaces. | $4,500,000 |
| Jun 30, 2020 | Expired or cancelled cancelled May 2023 | 599 Skyline Bl | per ab-017, area of work to remian closed during demolition. scope of work includes demo of: (e) non-load bearing partitions & ceilings, (e)floor and wall finishes, (e) kitchen and bar equipments.Details
per ab-017, area of work to remian closed during demolition. scope of work includes demo of: (e) non-load bearing partitions & ceilings, (e)floor and wall finishes, (e) kitchen and bar equipments. | $20,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 140 Ellis St | revision to pa#2019-0107-97154: relocate all proposed new mech equipment to high roof. no work at low roof. (n) 2-hour rated shaft from basement kitchen to 2nd flr lightwell. (n) structural framing at ground floor, mezzanine, 2nd flr, and roof. electrical revisions. (e) storefront entrance to remainDetails
revision to pa#2019-0107-97154: relocate all proposed new mech equipment to high roof. no work at low roof. (n) 2-hour rated shaft from basement kitchen to 2nd flr lightwell. (n) structural framing at ground floor, mezzanine, 2nd flr, and roof. electrical revisions. (e) storefront entrance to remain | |
| Oct 7, 2019 | Completed final sign-off Dec 2021 | 49 Stevenson St | tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.Details
tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom. | $230,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 140 Ellis St | revision to app#201901241189. removed all nw mechanical equipment from low roof. route nw exhaust & makeup air ducts to nw equipment at high roof. new 2 hour rated shaft from basement kitchen to 2nd flr light well. minor revision to below slab ductwork routing. no changes to mech equipment.n/a mahDetails
revision to app#201901241189. removed all nw mechanical equipment from low roof. route nw exhaust & makeup air ducts to nw equipment at high roof. new 2 hour rated shaft from basement kitchen to 2nd flr light well. minor revision to below slab ductwork routing. no changes to mech equipment.n/a mah | |
| Mar 1, 2019 | Completed final sign-off Jan 2021 | 1000 03rd St | t.i. for (n) restaurant brewery on ground fl. of (e) residential tower, scope inclues interior partitions, interior dining room finishes (n) lighting, kitchen & brewery equipmentDetails
t.i. for (n) restaurant brewery on ground fl. of (e) residential tower, scope inclues interior partitions, interior dining room finishes (n) lighting, kitchen & brewery equipment | $950,000 |
| Dec 21, 2017 | Never finaled issued Mar 2018, no final | 131 Steuart St | interior t.i of restaurant. finishes and minor reconfiguration to include updated mep & kitchen. n/a for maher.Details
interior t.i of restaurant. finishes and minor reconfiguration to include updated mep & kitchen. n/a for maher. | $400,000 |
| Jun 5, 2017 | Never finaled issued Jun 2017, no final | 920 North Point St | phase 2: waxman's restaurant interior t.i.- to renovate existing bar space with new bar and equip, add new booth and banquet seating areas. phase 1 demising j.bird is under sep. permit. waxman's and j.bird are owned by same entity and will utilize (e) kitchen, (e) ada/unisex restroom to remain.Details
phase 2: waxman's restaurant interior t.i.- to renovate existing bar space with new bar and equip, add new booth and banquet seating areas. phase 1 demising j.bird is under sep. permit. waxman's and j.bird are owned by same entity and will utilize (e) kitchen, (e) ada/unisex restroom to remain. | $125,382 |
| Mar 23, 2017 | Completed final sign-off Apr 2018 | 644 Broadway | tenant improvement of a banquet room & kitchen with associated lobby on the 3rd floor of an (e) building no structural work will be done.Details
tenant improvement of a banquet room & kitchen with associated lobby on the 3rd floor of an (e) building no structural work will be done. | $500,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2018 | 580 Hayes St | #2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning.Details
#2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning. | $250,000 |
| Nov 8, 2016 | Completed final sign-off Jun 2017 | 1266 09th Av | interior renovation t.i. for cafe. new partitions, ceilings, lighting, kitchen equip & food service line, finishes. reuse (e) mechanical system. (non structural) fire supression, fire alarm & signage under separate permits.Details
interior renovation t.i. for cafe. new partitions, ceilings, lighting, kitchen equip & food service line, finishes. reuse (e) mechanical system. (non structural) fire supression, fire alarm & signage under separate permits. | $227,000 |
| Jun 8, 2016 | Completed final sign-off Apr 2018 | 16 West Portal Av | non structural interior demolition of fixtures, finishes, light fixtures, kitchen equipment. accessibility features will be provided in subsequent building permit per sfbc ab-017.Details
non structural interior demolition of fixtures, finishes, light fixtures, kitchen equipment. accessibility features will be provided in subsequent building permit per sfbc ab-017. | $8,000 |
| Mar 22, 2016 | Completed final sign-off Jan 2018 | 111 Mason St | interior renovations of tourist hotel at ground fl and basement. add new bar, dining room, upgrade kitchen, new limited access elevator from ground floor to basementDetails
interior renovations of tourist hotel at ground fl and basement. add new bar, dining room, upgrade kitchen, new limited access elevator from ground floor to basement | $550,000 |
| Nov 12, 2015 | Completed final sign-off Dec 2016 | 781 Mission St | interior remodel of a new restaurant, remodeling front kitchen line and dining with existing restrooms to remain, exterior consists of new seating on existing patio. new ocupant load of 77 persons.Details
interior remodel of a new restaurant, remodeling front kitchen line and dining with existing restrooms to remain, exterior consists of new seating on existing patio. new ocupant load of 77 persons. | $132,000 |
| Jul 30, 2015 | Never finaled issued Aug 2015, no final | 1355 Market St | revision to app#201312194586. reduce mezzanine by 320 sq ft adjust layout of mezz. and kitchen, add brewery equipment. remove employee restroom. add fire resisitant paint detail. added kitchen and hood drawings. n/a for the maherDetails
revision to app#201312194586. reduce mezzanine by 320 sq ft adjust layout of mezz. and kitchen, add brewery equipment. remove employee restroom. add fire resisitant paint detail. added kitchen and hood drawings. n/a for the maher | |
| Jul 8, 2015 | Never finaled issued Dec 2015, no final | 1000 Larkin St | change of use from retail to a new resturant. building of existing shell space into resturant include kitchen, hood, dining rooms, restrooms, lula lift. maher n/a.Details
change of use from retail to a new resturant. building of existing shell space into resturant include kitchen, hood, dining rooms, restrooms, lula lift. maher n/a. | $200,000 |
| Jun 30, 2014 | Completed final sign-off Mar 2015 | 658 Market St | install all ductwork necessary, install kitchen hood and all kitchen ventilation. re#201401176573.Details
install all ductwork necessary, install kitchen hood and all kitchen ventilation. re#201401176573. | $255,525 |
| May 1, 2014 | Completed final sign-off Feb 2017 | 82 14th St | renovation, fire remediation of fire damage. change of occ from b to a2. full sprinklers sep permit. new open kitchen, entry bar, dining, dish rm, private dining, storage, lockers, waitstations, 2 accessible restrooms, service stair to mech roof equip, new exit corridor. ref pa# 201405024813.Details
renovation, fire remediation of fire damage. change of occ from b to a2. full sprinklers sep permit. new open kitchen, entry bar, dining, dish rm, private dining, storage, lockers, waitstations, 2 accessible restrooms, service stair to mech roof equip, new exit corridor. ref pa# 201405024813. | $350,000 |
| Jan 17, 2014 | Completed final sign-off Aug 2015 | 658 Market St | g/f-change use; 6,833 sf; from retail to restaurant. stru. work only at b/f; remodel include (n) storefront, kitchen, restrooms, interior finishes & fixtures & (n) mechanical/mezzanine level of 467 sq ft. n/a for maher ordinance #155-13Details
g/f-change use; 6,833 sf; from retail to restaurant. stru. work only at b/f; remodel include (n) storefront, kitchen, restrooms, interior finishes & fixtures & (n) mechanical/mezzanine level of 467 sq ft. n/a for maher ordinance #155-13 | $1,000,000 |
| Nov 25, 2013 | Completed final sign-off Jul 2014 | 3251 20th Av | tenant improvement for (n) a-2 restaurant. kitchen equipment, walls, finishes, restrooms. life safety under separate permit.Details
tenant improvement for (n) a-2 restaurant. kitchen equipment, walls, finishes, restrooms. life safety under separate permit. | $315,000 |
| Aug 1, 2013 | Never finaled issued Oct 2013, no final | 660 Market St | mech/plumbing deferred submittal. new type 1 hood, exhaust fan, makeup air, ductwork. new gas fired furnace unit, toilet exhaust fan, plumbing for kitchen and restroom with gas, water, sewer grease, waste,vent. ref 201307292937.Details
mech/plumbing deferred submittal. new type 1 hood, exhaust fan, makeup air, ductwork. new gas fired furnace unit, toilet exhaust fan, plumbing for kitchen and restroom with gas, water, sewer grease, waste,vent. ref 201307292937. | |
| Jul 29, 2013 | Completed final sign-off Jan 2014 | 660 Market St | suite #650-interior t.i-new sandwich shop at grd fl on (e) bldg including new commercial kitchen, seating & retail areas, interior lighting, plumbing & electrical work. a new accessible restrooms. no changes to (e) tenant footprint, area or height are proposed as part of the scopeDetails
suite #650-interior t.i-new sandwich shop at grd fl on (e) bldg including new commercial kitchen, seating & retail areas, interior lighting, plumbing & electrical work. a new accessible restrooms. no changes to (e) tenant footprint, area or height are proposed as part of the scope | $244,500 |
| Jun 19, 2013 | Completed final sign-off Jun 2014 | 140 New Montgomery St | interior tenant improvement for (n) restaurant bar. interior partitons, cabinetry, fixtures, finishes. 2 accessible bathrooms, commercial kitchen, no changes to building structure. mech/elec/plumbing and life safety separate permit. ref 201112221187Details
interior tenant improvement for (n) restaurant bar. interior partitons, cabinetry, fixtures, finishes. 2 accessible bathrooms, commercial kitchen, no changes to building structure. mech/elec/plumbing and life safety separate permit. ref 201112221187 | $403,000 |
| May 21, 2013 | Completed final sign-off Sep 2013 | 242 Columbus Av | interior renovation of non structural partitions extg kitchen with installation and or replacement of kitchen equipment. no change to restrooms. mep and kitchen hoods under seperate permit.Details
interior renovation of non structural partitions extg kitchen with installation and or replacement of kitchen equipment. no change to restrooms. mep and kitchen hoods under seperate permit. | $20,000 |
| Nov 19, 2012 | Completed final sign-off Apr 2014 | 1266 09th Av | new restauratn tenant improvement. incl bathrooms, kitchen, sheetrock lighting, exterior trellis.ref 200912183521Details
new restauratn tenant improvement. incl bathrooms, kitchen, sheetrock lighting, exterior trellis.ref 200912183521 | $275,000 |
| Mar 26, 2012 | Completed final sign-off Aug 2012 | 314 Sutter St | cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit.Details
cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit. | $130,000 |
| Jan 19, 2012 | Never finaled issued Mar 2012, no final | 133 Steuart St | construction/remodel for new restaurant/bar in basement. to include new kitchen, bars, restrooms, dining areas, new plumbing, new electrical, new lighting. approved occ. load 379 occupants sprinklers, fire alarm, hood & duct suppression system separateDetails
construction/remodel for new restaurant/bar in basement. to include new kitchen, bars, restrooms, dining areas, new plumbing, new electrical, new lighting. approved occ. load 379 occupants sprinklers, fire alarm, hood & duct suppression system separate | $1,400,000 |
| Aug 9, 2011 | Expired or cancelled expired Jun 2014 | 133 Steuart St | interior demolition of nonbearing partitions & millwork, all plbg, elec cap, seatng, durred walls kitchen equip, restroom fixtures, lighting panel, hvac duct per ab-017.Details
interior demolition of nonbearing partitions & millwork, all plbg, elec cap, seatng, durred walls kitchen equip, restroom fixtures, lighting panel, hvac duct per ab-017. | $12,000 |
| Jul 12, 2011 | Completed final sign-off Nov 2011 | 345 Spear St | unit #125: interior tenant improvements for restaurant includes partitions, finishes & kitchen equipment; sprinkler/fa under separate permitsDetails
unit #125: interior tenant improvements for restaurant includes partitions, finishes & kitchen equipment; sprinkler/fa under separate permits | $200,000 |
| Nov 12, 2009 | Completed final sign-off Nov 2010 | 1000 Van Ness Av | holly's restaurant. reinstall commercial kitchen equipments, new dumb waiter, ticket booth, new entry, bar, stage, single rest room.Details
holly's restaurant. reinstall commercial kitchen equipments, new dumb waiter, ticket booth, new entry, bar, stage, single rest room. | $350,000 |
| Aug 11, 2009 | Completed final sign-off Oct 2009 | 470 Pacific Av | rev. to pa# 2009.04.17.6554 (ti) and 2008.0729.3717 (struc), 2009.05.18.8624 (mech) to document changes made during constr. the drawings under this permit constitute the as built condition to show doors, kitchen ducting, lightinbg, mep changes. no exterior workDetails
rev. to pa# 2009.04.17.6554 (ti) and 2008.0729.3717 (struc), 2009.05.18.8624 (mech) to document changes made during constr. the drawings under this permit constitute the as built condition to show doors, kitchen ducting, lightinbg, mep changes. no exterior work | $10,000 |
| Jun 15, 2009 | Completed final sign-off Sep 2009 | 680 02nd St | 1st floor install commercial kitchen, new finishes, stair to (e) mezzanine. plumbing, mech & elec under separate permits. no work to exterior.Details
1st floor install commercial kitchen, new finishes, stair to (e) mezzanine. plumbing, mech & elec under separate permits. no work to exterior. | $150,000 |
| Jun 6, 2008 | Expired or cancelled cancelled Sep 2017 | 900 North Point St | #100- ti for new restaurant in ghiradelli square. new partitions, bathroom, office in basement(level 3) new partitions fixtures, finishes, kitchen equipment on g/f (level 4) horizontal extensions on patio.fire sprinklers throughout. mech.elec.plum seperate permit. obtain occupancy load verificationDetails
#100- ti for new restaurant in ghiradelli square. new partitions, bathroom, office in basement(level 3) new partitions fixtures, finishes, kitchen equipment on g/f (level 4) horizontal extensions on patio.fire sprinklers throughout. mech.elec.plum seperate permit. obtain occupancy load verification | $1,200,000 |
| Aug 14, 2006 | Completed final sign-off Feb 2007 | 216 Townsend St | to establish an a-3 occupant load (2) new ada restroom. change of use, patrial height partitions.new kitchen, new exit hallway, new center island bar. hardship power operated entry ada upgrade.Details
to establish an a-3 occupant load (2) new ada restroom. change of use, patrial height partitions.new kitchen, new exit hallway, new center island bar. hardship power operated entry ada upgrade. | $280,000 |
| Jan 24, 2005 | Completed final sign-off Aug 2007 | 125 03rd St | install kitchen equipment in hotel,hotel under construction.ref. to appl#200008309233Details
install kitchen equipment in hotel,hotel under construction.ref. to appl#200008309233 | $850,000 |