Terra Nova Industries
- Based in
- Walnut Creek
- On San Francisco permits
- Feb 2000 to Apr 2026
- Last 24 months
- 11 permits filed
340 permits since 2000: 231 completed, 8 in progress, 78 never finaled, 23 expired or cancelled.
Of the 78 never-finaled permits, 4 are 3 to 5 years old, 21 are 5 to 10 years old, 53 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
14 stairs permits: 8 completed, 1 in progress, 5 never finaled. Typically 42 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2026 | Completed final sign-off Aug 2026 | 2359 Chestnut St | remove wood framed residential stairs in the passageway & new support for lower e) landing (exterior work only)Details
remove wood framed residential stairs in the passageway & new support for lower e) landing (exterior work only) | $10,000 |
| Oct 26, 2022 | In progress issued May 2026 | 1501 Folsom St | remodel of existing nightclub and restaurant to include: interior alterations at all floors; rebuild of stair 2 to meet egress and ada requirements. (n) outdoor bar at level 3 outdoor occupied roof deck. restooms to be redesigned as all gender multi-user. new hvac systems, & minor structural.Details
remodel of existing nightclub and restaurant to include: interior alterations at all floors; rebuild of stair 2 to meet egress and ada requirements. (n) outdoor bar at level 3 outdoor occupied roof deck. restooms to be redesigned as all gender multi-user. new hvac systems, & minor structural. | $975,000 |
| Mar 7, 2022 | Completed final sign-off Oct 2023 | 599 Skyline Bl | interior work for demo. (n) golfers bar & (e) dining area. (n) enclosed patio dining area to (e) exterior patio. (n) egress stairs, (n)mens/womens toilet rooms. interior finishes & paint. ref demo 202201035256.Details
interior work for demo. (n) golfers bar & (e) dining area. (n) enclosed patio dining area to (e) exterior patio. (n) egress stairs, (n)mens/womens toilet rooms. interior finishes & paint. ref demo 202201035256. | $250,000 |
| Dec 26, 2019 | Never finaled issued Aug 2020, no final | 599 Skyline Bl | basement level exterior window replacement with new door; provide new guardrail around existing exterior stair from first floor; exterior paved patio on grade at new basement level door;Details
basement level exterior window replacement with new door; provide new guardrail around existing exterior stair from first floor; exterior paved patio on grade at new basement level door; | $50,000 |
| Nov 16, 2015 | Completed final sign-off Apr 2018 | 2136 Union St | repair of handrail and stairs due to rot.Details
repair of handrail and stairs due to rot. | $4,000 |
| May 1, 2014 | Completed final sign-off Feb 2017 | 82 14th St | renovation, fire remediation of fire damage. change of occ from b to a2. full sprinklers sep permit. new open kitchen, entry bar, dining, dish rm, private dining, storage, lockers, waitstations, 2 accessible restrooms, service stair to mech roof equip, new exit corridor. ref pa# 201405024813.Details
renovation, fire remediation of fire damage. change of occ from b to a2. full sprinklers sep permit. new open kitchen, entry bar, dining, dish rm, private dining, storage, lockers, waitstations, 2 accessible restrooms, service stair to mech roof equip, new exit corridor. ref pa# 201405024813. | $350,000 |
| Apr 2, 2014 | Never finaled issued May 2014, no final | 1033 Kearny St | renovation to extg bldg. food prep area. upgrade restrooms to meet ada accessibility, add egress corridor, correct extg stairs for width and headroom. mep on seperate permit.Details
renovation to extg bldg. food prep area. upgrade restrooms to meet ada accessibility, add egress corridor, correct extg stairs for width and headroom. mep on seperate permit. | $120,000 |
| Sep 18, 2013 | Never finaled issued Sep 2013, no final | 1301 Van Ness Av | revision to appl #2013.07.13.1118 - relocate stairs, replace lift with fork lift, relocate drinking fountain, reduce (e) loading dock & add new main door.Details
revision to appl #2013.07.13.1118 - relocate stairs, replace lift with fork lift, relocate drinking fountain, reduce (e) loading dock & add new main door. | $20,000 |
| Sep 9, 2013 | Completed final sign-off Sep 2014 | 1301 Van Ness Av | tenant improvement. sale area expansion, (n) hvac & condensing units. (n) ramp & stairs, (n) lighting in expansion space.Details
tenant improvement. sale area expansion, (n) hvac & condensing units. (n) ramp & stairs, (n) lighting in expansion space. | $400,000 |
| Jul 3, 2013 | Never finaled issued Aug 2013, no final | 1301 Van Ness Av | tenant improvement @ back of the building, remove (e) loading ramp & install new platform, stairs & scissor lift, remove (e) single occupied restrooms, office & breakroom & install (n) multi occupied restrooms, office, storage & breakroom.Details
tenant improvement @ back of the building, remove (e) loading ramp & install new platform, stairs & scissor lift, remove (e) single occupied restrooms, office & breakroom & install (n) multi occupied restrooms, office, storage & breakroom. | $150,000 |
| Jan 31, 2013 | Completed final sign-off Mar 2014 | 801 Montgomery St | revision to approved ti #201210152074 to reduce construction cost. including stair detailing, ommission of ada lift, incorporation of ada ramp and reconfiguration of ground flr restroomsDetails
revision to approved ti #201210152074 to reduce construction cost. including stair detailing, ommission of ada lift, incorporation of ada ramp and reconfiguration of ground flr restrooms | |
| Nov 8, 2012 | Never finaled issued Jun 2013, no final | 1355 Market St | demo of ground fl to 2nd fl masonry boiler flue & demo of 2nd fl slab for (n)egress stair. (n)work incl (n)egress stair, (n)ground & 2nd fl toping slabs, (n)glass guardrails @ 2nd fl, (n)glass partition walls @ 2nd fl, (n)ground fl restrms (incl ada) (n) steel retail portals, motorized 2nd fl elevDetails
demo of ground fl to 2nd fl masonry boiler flue & demo of 2nd fl slab for (n)egress stair. (n)work incl (n)egress stair, (n)ground & 2nd fl toping slabs, (n)glass guardrails @ 2nd fl, (n)glass partition walls @ 2nd fl, (n)ground fl restrms (incl ada) (n) steel retail portals, motorized 2nd fl elev | $2,400,000 |
| Mar 26, 2012 | Completed final sign-off Aug 2012 | 314 Sutter St | cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit.Details
cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit. | $130,000 |
| Jun 15, 2009 | Completed final sign-off Sep 2009 | 680 02nd St | 1st floor install commercial kitchen, new finishes, stair to (e) mezzanine. plumbing, mech & elec under separate permits. no work to exterior.Details
1st floor install commercial kitchen, new finishes, stair to (e) mezzanine. plumbing, mech & elec under separate permits. no work to exterior. | $150,000 |