Block 3725, lot 079
125 06th St
- City’s use
- Commercial Hotel
- Built
- 1911
- Stories
- 4
- Units
- 5
- Rooms
- 38 bathrooms
- Building
- 39,536 sq ft
- Lot
- 10,000 sq ft
- Zoning
- RSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2026 | In progress issued Nov 2026 | 125 06th St | Freestone Reconstruction Inc | flooring, paint, kitchen, drop ceiling upgrades @ community roomDetails
flooring, paint, kitchen, drop ceiling upgrades @ community room | $61,500 |
| Oct 9, 2025 | In progress issued Oct 2025 | 125 06th St | United Systems Fire And Security Llc | like for like replacement in accordance with 2008 csfm information bulletin "fire alarm control unit replacement in existing building". the (e) faci is no longer supported & id being replaced with new est control panel. all initiating devices & notification appliances are being replaced on one-for-Details
like for like replacement in accordance with 2008 csfm information bulletin "fire alarm control unit replacement in existing building". the (e) faci is no longer supported & id being replaced with new est control panel. all initiating devices & notification appliances are being replaced on one-for- | $78,276 |
| Jul 31, 2024 | In progress issued Aug 2024 | 125 06th St | Freestone Reconstruction Inc | create 3 communications units w/ fire strobes. convert (e) common bathrooms wtih tubs to (n) common bathrooms with roll in showers. modernize (e) elevators with (n) controls.Details
create 3 communications units w/ fire strobes. convert (e) common bathrooms wtih tubs to (n) common bathrooms with roll in showers. modernize (e) elevators with (n) controls. | $950,000 |
| Jun 5, 2024 | Completed final sign-off Jul 2025 | 125 06th St | Freestone Reconstruction Inc | install 2nd entry door at reception area and reconfigure reception area layout. no exterior work.Details
install 2nd entry door at reception area and reconfigure reception area layout. no exterior work. | $75,000 |
| Aug 24, 2021 | Completed final sign-off Mar 2022 | 125 06th St | Pacific Auxiliary Fire Alarm | renew permit #9706484 for commencement of work approved under 9706484Details
renew permit #9706484 for commencement of work approved under 9706484 | $10,000 |
| Nov 23, 2020 | Never finaled issued Nov 2020, no final | 125 06th St | All Seasons North Roofing And Waterproof | re-roofing | $12,000 |
| Jul 19, 2018 | Expired or cancelled cancelled Jun 2022 | 131 06th St | Aura Fire Safety Inc | renew expired permit for fire only per app#200106252272Details
renew expired permit for fire only per app#200106252272 | |
| Jun 22, 2018 | Completed final sign-off Jun 2018 | 117 06th St | Western Allied Mechanical Inc. | reconfigure duct work at extg exhuast louverDetails
reconfigure duct work at extg exhuast louver | $4,000 |
| Jun 20, 2018 | Expired or cancelled cancelled Apr 2022 | 125 06th St | Pacific Auxiliary Fire Alarm | to obtain a final inspection for work approved under pa#9706484. all work is complete.Details
to obtain a final inspection for work approved under pa#9706484. all work is complete. | |
| May 17, 2016 | Completed final sign-off Jun 2016 | 125 06th St | bathroom on 1-2-3 floors and hallway in front of the bathroom; drywall hallway under layment fooring. toilet on 3- floors insulation on 3-floors new flooing ceiling tiles. n/a maher ord. # 155-13Details
bathroom on 1-2-3 floors and hallway in front of the bathroom; drywall hallway under layment fooring. toilet on 3- floors insulation on 3-floors new flooing ceiling tiles. n/a maher ord. # 155-13 | $8,000 | |
| Nov 9, 2015 | Completed final sign-off Feb 2016 | 125 06th St | Interstate Restoration California Lp | apt# 212 patch drywall. apt#412 drywall floot cut's apt#312 drywall patch. 4th fl bathrm-flooring,drywall,reset toilet & sink. 3rd fl bathrm,flooring,drywall,reset toilet & sink. 2nd fl bathrm flooring,drywall, reset toilet & sink. elect & lighting in all bathrms. n/a for maher.Details
apt# 212 patch drywall. apt#412 drywall floot cut's apt#312 drywall patch. 4th fl bathrm-flooring,drywall,reset toilet & sink. 3rd fl bathrm,flooring,drywall,reset toilet & sink. 2nd fl bathrm flooring,drywall, reset toilet & sink. elect & lighting in all bathrms. n/a for maher. | $10,000 |
| Aug 18, 2010 | Never finaled issued Sep 2010, no final | 125 06th St | Clear Channel Outdoor | obtain a building permit for sign located at 125 6th street as required by sign i.d number "orig 1186" per n.o.r dated may 24, 2010. block and lot#3725/079Details
obtain a building permit for sign located at 125 6th street as required by sign i.d number "orig 1186" per n.o.r dated may 24, 2010. block and lot#3725/079 | $5,000 |
| Apr 13, 2009 | Never finaled issued Apr 2009, no final | 125 06th St | street space & mta | ||
| Mar 19, 2009 | Completed final sign-off Dec 2009 | 125 06th St | to complete work and obtain final inspection for work approved under pa#200808270184. see das complaint nov#200722652.Details
to complete work and obtain final inspection for work approved under pa#200808270184. see das complaint nov#200722652. | ||
| Aug 27, 2008 | Expired or cancelled expired Sep 2010 | 125 06th St | City Builders | to comply with nov #200722652 das complaint. remodel 2nd floor shower and bathroom to meet current accessibility standardsDetails
to comply with nov #200722652 das complaint. remodel 2nd floor shower and bathroom to meet current accessibility standards | $15,000 |
| Jun 25, 2001 | Expired or cancelled cancelled Jun 2022 | 131 06th St | Pacific Automatic Sprinkler | install 6 fire sprinklers to property protect the new tenant areaDetails
install 6 fire sprinklers to property protect the new tenant area | $2,400 |
| Jan 23, 2001 | Completed final sign-off Sep 2001 | 131 06th St | North Berkeley Construct | construct a pizzaria in an existing vacant. retail space at the rose hotel 125 6th st, sf (address oDetails
construct a pizzaria in an existing vacant. retail space at the rose hotel 125 6th st, sf (address o | $50,000 |
| Jun 1, 2000 | Completed final sign-off Aug 2000 | 117 06th St | install 2 doors to existing officeDetails
install 2 doors to existing office | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Freestone Reconstruction Inc (3), Pacific Auxiliary Fire Alarm (2), All Seasons North Roofing And Waterproof, Aura Fire Safety Inc, City Builders, Clear Channel Outdoor, Interstate Restoration California Lp, North Berkeley Construct, Pacific Automatic Sprinkler, United Systems Fire And Security Llc, Western Allied Mechanical Inc.
- Architects
- Peter Scofield, Suzan Swabacker
- Engineers
- Antonio Jacksalem, Meng Hsiu Chen
- Authorized agents
- John Toby
- Designers
- Arshia Zameni
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.