Block 0838, lot 001
205 Oak St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Units
- 4
- Rooms
- 2 bathrooms
- Building
- 4,425 sq ft
- Lot
- 2,622 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 205 Oak St | Sweitzer Inc. | 2 hoods, 1 normal, 1 solid fuel. grease duct, heat pump. deferred from pa#202503041510Details
2 hoods, 1 normal, 1 solid fuel. grease duct, heat pump. deferred from pa#202503041510 | |
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 205 Oak St | Certified Fire And Safety | install hood and duct fire suprression system . ref 202503041510Details
install hood and duct fire suprression system . ref 202503041510 | $6,000 |
| Mar 19, 2025 | Completed final sign-off Feb 2026 | 203 Oak St | Commercial Fire Protection Llc | install new fire alarm system to comply with 2022 sffc 1103.7.6.1 automatic and mannual fire system with pull station located throughout exits. all initiating and notification devices located in accordance with 2022 codes. sleeping units to have 520hz low frequency sounders.Details
install new fire alarm system to comply with 2022 sffc 1103.7.6.1 automatic and mannual fire system with pull station located throughout exits. all initiating and notification devices located in accordance with 2022 codes. sleeping units to have 520hz low frequency sounders. | $15,000 |
| Mar 11, 2025 | Completed final sign-off Jul 2025 | 203 Oak St | G M Building And Construction Inc | apt 2: remodel 1 kitchen & 1 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with aluminium wood clad.Details
apt 2: remodel 1 kitchen & 1 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with aluminium wood clad. | $45,000 |
| Mar 11, 2025 | Completed final sign-off Jul 2025 | 203 Oak St | G M Building And Construction Inc | apt 1: remodel 1 kitchen & 2 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with wood clad or alumimun clad windows.Details
apt 1: remodel 1 kitchen & 2 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with wood clad or alumimun clad windows. | $65,000 |
| Mar 4, 2025 | Completed final sign-off Feb 2026 | 205 Oak St | Sweitzer Inc. | change of operator- interior remodel of (e) restaurant work to include: accessibility improvements @ entry/path of travel, remodel (e) bathroom replacement of (e) kitchen equipment finishes & lighting in the dining room; deferred mechanical & electricalDetails
change of operator- interior remodel of (e) restaurant work to include: accessibility improvements @ entry/path of travel, remodel (e) bathroom replacement of (e) kitchen equipment finishes & lighting in the dining room; deferred mechanical & electrical | $137,000 |
| Sep 27, 2024 | In progress filed Sep 2024, not yet issued | 203 Oak St | Block 12 Construction | installation of exterior trash enclosure at the public right of way on oak st frontage to comply w/ nov 202425310Details
installation of exterior trash enclosure at the public right of way on oak st frontage to comply w/ nov 202425310 | $800 |
| Jul 26, 2016 | Completed final sign-off Aug 2016 | 199 Gough St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of ansul r102 fire suppression system in the kitchen hood & ductDetails
installation of ansul r102 fire suppression system in the kitchen hood & duct | $3,000 |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 199 Gough St | street soaceDetails
street soace | ||
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 199 Gough St | Fastnet Engineering & Const Inc | resubmittal for health dept. ref pa 2016-0525-8369Details
resubmittal for health dept. ref pa 2016-0525-8369 | |
| May 25, 2016 | Completed final sign-off Sep 2016 | 199 Gough St | Fastnet Engineering & Const Inc | relocate some electrical outlets and some plumbing fixtures. install new extraction hood over cooking area. ul 300 separte permitDetails
relocate some electrical outlets and some plumbing fixtures. install new extraction hood over cooking area. ul 300 separte permit | $30,000 |
| Aug 6, 2014 | Completed final sign-off Mar 2015 | 203 Oak St | C N A Construction | install 3 new fire places per plan. install gas line in existing fire place in living room. new base cabinet per plan.Details
install 3 new fire places per plan. install gas line in existing fire place in living room. new base cabinet per plan. | $16,000 |
| May 8, 2012 | Completed final sign-off Jul 2012 | 199 Gough St | Speedy Construction ****See Note | barrier removal. altering one extg toilet facility to meet accessibility requirements. new janitor sink, repair & replace portions of wood floor.Details
barrier removal. altering one extg toilet facility to meet accessibility requirements. new janitor sink, repair & replace portions of wood floor. | $9,500 |
| Apr 17, 2009 | Completed final sign-off Apr 2009 | 205 Oak St | Golden Seal General Construction | revision to application 2008-12-19-8851. 36"x48" level landing at exterior entrance is not provide cost of accesibility upgrade provided already exceed 20% of construction cost.Details
revision to application 2008-12-19-8851. 36"x48" level landing at exterior entrance is not provide cost of accesibility upgrade provided already exceed 20% of construction cost. | |
| Mar 25, 2009 | Completed final sign-off Apr 2009 | 205 Oak St | Universal Fire Equipment Co | install fire suppression system to protect hood duct, plenum and cooking equipment under the hood.Details
install fire suppression system to protect hood duct, plenum and cooking equipment under the hood. | $2,500 |
| Dec 19, 2008 | Completed final sign-off Jan 2009 | 205 Oak St | interior demolition only per ab-017.Details
interior demolition only per ab-017. | $2,500 | |
| Dec 19, 2008 | Completed final sign-off Apr 2009 | 205 Oak St | Golden Seal General Construction | relocating existing equipment, new refrigeration /freezer, repalce main entrance door, new interior partition & millwork.Details
relocating existing equipment, new refrigeration /freezer, repalce main entrance door, new interior partition & millwork. | $45,000 |
| Jul 21, 2006 | Completed final sign-off Aug 2006 | 201 Oak St | Dissmeyer Corp, Dba Acme Roofing Co | reroofingDetails
reroofing | $25,130 |
| Apr 7, 2003 | Never finaled issued Apr 2003, no final | 199 Gough St | renew appl#200206078532 for final inspection onlyDetails
renew appl#200206078532 for final inspection only | ||
| Dec 20, 2002 | Never finaled issued Dec 2002, no final | 199 Gough St | to close out an outstanding permit to call for a final inspection - 8403396Details
to close out an outstanding permit to call for a final inspection - 8403396 | $2,001 | |
| Jun 7, 2002 | Completed final sign-off May 2003 | 199 Gough St | replace (e) entrance door with new door & handrailDetails
replace (e) entrance door with new door & handrail | $8,000 | |
| Jun 7, 2002 | Completed final sign-off Sep 2002 | 199 Gough St | replace bartopDetails
replace bartop | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fastnet Engineering & Const Inc (2), G M Building And Construction Inc (2), Golden Seal General Construction (2), Sweitzer Inc. (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Block 12 Construction, C N A Construction, Certified Fire And Safety, Commercial Fire Protection Llc, Dissmeyer Corp, Dba Acme Roofing Co, Speedy Construction ****See Note, Universal Fire Equipment Co
- Architects
- Charles Hemminger Archt, Peter Braun
- Engineers
- Meng Hsiu Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.