Stanley Wu
- Listed as
- engineer
- Firm
- Sunset & Annex Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Nov 2025
9 permits since 2000 (engineer on 9 permits): 2 completed, 4 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 25, 2025 | In progress filed Nov 2025, not yet issued | 3931 18th St | interior remodel of 2nd fl, reconfigure partitions, add full bath, remodel (e) kitchen & bath. add (n) tankless water heater, add (n) elec heat pump heating/cooling. replace (e) windows, add (n) skylights and front door. replace knob & tube w/ new electrical, (n) lighting.Details
interior remodel of 2nd fl, reconfigure partitions, add full bath, remodel (e) kitchen & bath. add (n) tankless water heater, add (n) elec heat pump heating/cooling. replace (e) windows, add (n) skylights and front door. replace knob & tube w/ new electrical, (n) lighting. | $305,000 | |
| Sep 3, 2025 | In progress issued Sep 2025 | 821 33rd Av | replace and repair damaged framing due to termite damage. revise existing window location. new shearwalls to repair damaged walls. revision to bpa#202507221284Details
replace and repair damaged framing due to termite damage. revise existing window location. new shearwalls to repair damaged walls. revision to bpa#202507221284 | $40,000 | |
| May 20, 2025 | In progress issued May 2025 | 371 16th Av | D S Management Inc Dba Metrocon Builders | interior remodel of all 3 floors of a sfd, including remodel of 2nd floor kit., bath and laundry, new 3rd flr. bath and master bath. replace furnace w/ electric heat pump mini splits, tankless gas water heater, replace 2 3/f casement windows at rear, new skylight.Details
interior remodel of all 3 floors of a sfd, including remodel of 2nd floor kit., bath and laundry, new 3rd flr. bath and master bath. replace furnace w/ electric heat pump mini splits, tankless gas water heater, replace 2 3/f casement windows at rear, new skylight. | $50,000 |
| Nov 18, 2024 | Completed final sign-off Apr 2025 | 53 Alvarado St | Jian Lou Construction Co. | non structural bathroom remodelDetails
non structural bathroom remodel | $24,000 |
| Dec 1, 2023 | In progress issued Aug 2024 | 4408 Ulloa St | erect a 2-story, type 5, detached rear single family(adu) structure. main single family house to remain.Details
erect a 2-story, type 5, detached rear single family(adu) structure. main single family house to remain. | $125,000 | |
| Aug 10, 2023 | Never finaled filed Aug 2023, never issued | 2115 Fillmore St | t.i. change of use from reetail to cafe, the project consists of an interior renovation to existing retail space including lighting, cabinety, partitions, plumbing, electrical, mechanical, flooring. a new stair, storefront, and ada compliant bathroom and fixtures are also proposedDetails
t.i. change of use from reetail to cafe, the project consists of an interior renovation to existing retail space including lighting, cabinety, partitions, plumbing, electrical, mechanical, flooring. a new stair, storefront, and ada compliant bathroom and fixtures are also proposed | $194,899 | |
| Dec 3, 2020 | Never finaled issued Jan 2021, no final | 1925 Ellis St | Pioneer Contracting Inc. | revision to pa# 202009194527 change from beam to post.Details
revision to pa# 202009194527 change from beam to post. | |
| Sep 24, 2020 | Never finaled filed Sep 2020, never issued | 2416 16th Av | addition of a spiral staircase in the rear yard.Details
addition of a spiral staircase in the rear yard. | $20,000 | |
| Sep 19, 2020 | Completed final sign-off Oct 2021 | 1925 Ellis St | Pioneer Contracting Inc. | kitchen remodel: replacement of (e) casework and appliances. work include the enlargement & the dining room by demolition of (e) closets and enlargment of the (e) door portal to create a pocket door.Details
kitchen remodel: replacement of (e) casework and appliances. work include the enlargement & the dining room by demolition of (e) closets and enlargment of the (e) door portal to create a pocket door. | $49,000 |