Monica Sanga
- Listed as
- architect
- Based in
- Sf
- On San Francisco permits
- Jan 2019 to May 2026
8 permits since 2000 (architect on 8 permits): 6 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 11, 2026 | Completed final sign-off Jun 2026 | 2072 Chestnut St | Lemus Construction Inc | revision 202505146464- adding stairs instead of ramp at rear of property , exterior work only.Details
revision 202505146464- adding stairs instead of ramp at rear of property , exterior work only. | $5,000 |
| May 14, 2025 | Completed final sign-off Jun 2026 | 2072 Chestnut St | Lemus Construction Inc | change of use from personal service to limited restaurant. installing new tile throughout space. installing electrical outlets. replacing plumbing fixtures, demoeing back deck and sheds. installing ramp, adding 3-compartment sink and fridge.Details
change of use from personal service to limited restaurant. installing new tile throughout space. installing electrical outlets. replacing plumbing fixtures, demoeing back deck and sheds. installing ramp, adding 3-compartment sink and fridge. | $91,750 |
| Aug 10, 2023 | Never finaled filed Aug 2023, never issued | 2115 Fillmore St | t.i. change of use from reetail to cafe, the project consists of an interior renovation to existing retail space including lighting, cabinety, partitions, plumbing, electrical, mechanical, flooring. a new stair, storefront, and ada compliant bathroom and fixtures are also proposedDetails
t.i. change of use from reetail to cafe, the project consists of an interior renovation to existing retail space including lighting, cabinety, partitions, plumbing, electrical, mechanical, flooring. a new stair, storefront, and ada compliant bathroom and fixtures are also proposed | $194,899 | |
| Nov 23, 2022 | Never finaled issued Dec 2022, no final | 2115 Fillmore St | Lemus Construction Inc | t.i. new furniture, paint, replace (1) broken glass lite in-kind, upgrade electrical if needed. pre-prepare food only. no food or drink prep.Details
t.i. new furniture, paint, replace (1) broken glass lite in-kind, upgrade electrical if needed. pre-prepare food only. no food or drink prep. | $1,000 |
| Oct 19, 2022 | Completed final sign-off Jun 2023 | 2703 Bush St | Vega Construction Company | main floor - remove fire place in bedroom; convert a closet into 1/2 bathroom frame in closet and replace tile in (e) shower. installation of new shower tubDetails
main floor - remove fire place in bedroom; convert a closet into 1/2 bathroom frame in closet and replace tile in (e) shower. installation of new shower tub | $43,000 |
| Jun 18, 2021 | Completed final sign-off Feb 2022 | 2579 37th Av | Mountain Top Construction Llc | relocate bathroom. install 2 windows (not facing street). build another bedroom with 2 closets.Details
relocate bathroom. install 2 windows (not facing street). build another bedroom with 2 closets. | $45,000 |
| Sep 12, 2020 | Completed final sign-off Mar 2021 | 117 Wisconsin St | I E General Const Inc | (unit h): tenant improvement - demo existing kitchen. new flooring, new kitchen cab + appliances, paint.Details
(unit h): tenant improvement - demo existing kitchen. new flooring, new kitchen cab + appliances, paint. | $35,000 |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 56 Lower Tr | Toolbox | remodel kitchen and two bathrooms. new fixtures and finishes. new cabinetry and doors. replace in kind.Details
remodel kitchen and two bathrooms. new fixtures and finishes. new cabinetry and doors. replace in kind. | $48,000 |