Gyo Max Obata
- Listed as
- architect
- Firm
- Obata Noblin Office
- Based in
- Sf
- On San Francisco permits
- Mar 2021 to Aug 2026
14 permits since 2000 (architect on 14 permits): 10 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2026 | Completed final sign-off Sep 2026 | 33 Mountain Spring Av | Nima Construction | revision to bpa: 202505297535: add in unit washer and dryer. ref pa# 2025-1223-2564Details
revision to bpa: 202505297535: add in unit washer and dryer. ref pa# 2025-1223-2564 | |
| Apr 15, 2026 | Completed final sign-off Jun 2026 | 1068 Noe St | Plath & Company Inc | revision to bpa#202408027881, change top floor guardrail design from picket design to solid guard rail.Details
revision to bpa#202408027881, change top floor guardrail design from picket design to solid guard rail. | |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 33 Mountain Spring Av | Nima Construction | revision to 202505297535, revise addition at 2nd fl from 89 sf to 245 sfw, interior remodel to remainDetails
revision to 202505297535, revise addition at 2nd fl from 89 sf to 245 sfw, interior remodel to remain | $60,000 |
| Jul 2, 2025 | Completed final sign-off Apr 2026 | 1163 Alabama St | this project proposes the reconstruction of the (e) rear exist stairs serving a (6) unit building the new stair will match existing in both construction and configurationDetails
this project proposes the reconstruction of the (e) rear exist stairs serving a (6) unit building the new stair will match existing in both construction and configuration | $25,000 | |
| May 29, 2025 | Completed final sign-off Sep 2026 | 33 Mountain Spring Av | Nima Construction | single family residence interior remodel and minor 89 sq ft addition.Details
single family residence interior remodel and minor 89 sq ft addition. | $140,000 |
| Aug 2, 2024 | Completed final sign-off Jun 2026 | 1068 Noe St | Plath & Company Inc | interior remodel of a two unit building. all new exterior windows and doors will be energy-efficient models. some windows and doors locations will be modified. guards at bbalconies will be replaced.Details
interior remodel of a two unit building. all new exterior windows and doors will be energy-efficient models. some windows and doors locations will be modified. guards at bbalconies will be replaced. | $500,000 |
| Mar 27, 2024 | In progress issued Aug 2024 | 2111 Franklin St | unit 10: 208sf horizontal addition to an (e) 5/f single level condo. the enclosure of an (e) 25sf exterior balcony to conditioned space and a minor remodel of the (e) primary bathroom, powder room and laundry area.Details
unit 10: 208sf horizontal addition to an (e) 5/f single level condo. the enclosure of an (e) 25sf exterior balcony to conditioned space and a minor remodel of the (e) primary bathroom, powder room and laundry area. | $50,000 | |
| Jan 4, 2024 | Completed final sign-off Feb 2026 | 2111 Franklin St | unit 10: (e) condo renovation. (1) new half bath. all (e) exterior windows and doors will be replaced with energy-efficient models. some window and door locations will be modified. (1) existing fireplace will be replaced w/ a code-compliant model. no. of bedrooms will remain unchanged.Details
unit 10: (e) condo renovation. (1) new half bath. all (e) exterior windows and doors will be replaced with energy-efficient models. some window and door locations will be modified. (1) existing fireplace will be replaced w/ a code-compliant model. no. of bedrooms will remain unchanged. | $65,000 | |
| Oct 12, 2023 | In progress issued Oct 2023 | 451 Jackson St | Skyline Construction | revision to 202307061604, minor layout change at breakroom, accessible elevator upgrades for building, and updates to mechanical and electrical designDetails
revision to 202307061604, minor layout change at breakroom, accessible elevator upgrades for building, and updates to mechanical and electrical design | |
| Jul 6, 2023 | Completed final sign-off Mar 2024 | 451 Jackson St | Skyline Construction | interior t.i. at 2nd fl. includes open work space, muddle rooms, cell rooms, break room, toilet rooms, and lactation/ wellness room, no demo structural elements, no exterior changesDetails
interior t.i. at 2nd fl. includes open work space, muddle rooms, cell rooms, break room, toilet rooms, and lactation/ wellness room, no demo structural elements, no exterior changes | $100,000 |
| Mar 29, 2023 | Never finaled issued Apr 2023, no final | 451 Jackson St | Skyline Construction | investigative demo plans in preparation for interior office ti, 3,282 sq. ft. demo area. renovation at 2nd fl tenant space. no demo of structural elements; no exterior changes. ref ab-017Details
investigative demo plans in preparation for interior office ti, 3,282 sq. ft. demo area. renovation at 2nd fl tenant space. no demo of structural elements; no exterior changes. ref ab-017 | $22,800 |
| Nov 14, 2022 | In progress issued May 2024 | 615 Alvarado St | Alward Const. Co Inc A Ca Corp | minor reconfiguration & expansion of 1st flr. horizontal addition of artist studio, deck & spiral stair in the back yard. renovation of 2nd flr bathroom. enclosure of open-air entryway. replacement of various windows.Details
minor reconfiguration & expansion of 1st flr. horizontal addition of artist studio, deck & spiral stair in the back yard. renovation of 2nd flr bathroom. enclosure of open-air entryway. replacement of various windows. | $150,000 |
| Nov 17, 2021 | Completed final sign-off Nov 2022 | 37 Chenery St | E & E General Builder Inc | (e) bathroom will be fully demolish and new walls will be constructed to trace new bath, closet and powder room.interior garage door relocated. while no new sf will be added, approximately 500 sf of existing garage space will be converted into living space. new electrical fixtures and devices willDetails
(e) bathroom will be fully demolish and new walls will be constructed to trace new bath, closet and powder room.interior garage door relocated. while no new sf will be added, approximately 500 sf of existing garage space will be converted into living space. new electrical fixtures and devices will | $20,000 |
| Mar 25, 2021 | Completed final sign-off Dec 2021 | 37 Chenery St | E & E General Builder Inc | kitchen remodel. replace skylight with dual-pane models. remove several walls. erect new partial roof and walls at kitchen. new electrical outlets. temporary remove (e) pv array on roof and replaced in same location.Details
kitchen remodel. replace skylight with dual-pane models. remove several walls. erect new partial roof and walls at kitchen. new electrical outlets. temporary remove (e) pv array on roof and replaced in same location. | $100,000 |