Permit GraphShortlistSan Francisco building permits since 2000

Craig Ristow

License
M30828
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M30828 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Acco Engineered Systems
Based in
San Leandro
On San Francisco permits
Dec 2006 to Feb 2023

140 permits since 2000 (engineer on 134 permits, architect on 6 permits): 105 completed, 30 never finaled, 5 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Acco Engineered Systems Inc. Dba Acco En (35), Novo Construction Inc (10), Skyline Construction (9), Source Planning And Construction Inc (6), Gci, Inc (5), Sc Builders, Inc (5), Principal Builders Inc. (4), Bcci Construction Company (3), Hathaway Dinwiddie Co. (3), Arco Murray Design Build (2), Field Construction Inc. (2), Lusardi Construction Co (2), Richlen Construction (2), Truebeck Construction (2), Balfour Beatty Construction Llc, Cahill Contractors Inc, Fisher Development Inc, R.M.R. Construction Company, Skender Construction Llc, Turner Construction Co
Architects
Teresa Emery (2), Adam Murphy, Brian Liles, Lawrence Smith, Leighton Lee
Engineers
Elisabeth M Allen (3), Brenda Rettio (2), Earl Finlay (2), Rey Solidum (2), Sean Cua (2), Stephen Shaffer (2), William Hadinger (2), Alex Filatov, Alexander Joseph Pacheco, Carl Milsum, David Fulton, Enhao Zhang, Erica Hayes, Jesus B Cabellon Jr, Marc Press, Nathan D Tremblay, Ramil Batiancila, Rebecca Boulter, Rudolfo P Bustos Iii, Ryan Paul January
Subcontractors
Peter Goldsmith

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

Showing the 100 most recent of 140.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 2, 2023Completed
final sign-off Sep 2023
135 Mississippi StLusardi Construction Co2nd fl deferred mep for 202109299432
Details
Permit
202302021291
Permit issued
Apr 20, 2023
Final sign-off
Sep 12, 2023

2nd fl deferred mep for 202109299432

Open the permit page

$5,000
Feb 2, 2023Completed
final sign-off Sep 2023
135 Mississippi StLusardi Construction Co1st fl & mezzanine defered mep for pa#202109299425.
Details
Permit
202302021289
Permit issued
Apr 20, 2023
Final sign-off
Sep 12, 2023

1st fl & mezzanine defered mep for pa#202109299425.

Open the permit page

$416,000
Nov 16, 2022Never finaled
issued Jan 2023, no final
510 Townsend StBcci Construction Company6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.
Details
Permit
202211166666
Permit issued
Jan 24, 2023

6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.

Open the permit page

$50,000
Oct 26, 2022Never finaled
issued Nov 2022, no final
510 Townsend StBcci Construction Company2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709
Details
Permit
202210265240
Permit issued
Nov 29, 2022

2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709

Open the permit page

$50,000
Sep 20, 2022Completed
final sign-off Mar 2024
600 Montgomery StHathaway Dinwiddie Co.42/f: deffered mep submittal for bpa#202205234807
Details
Permit
202209202793
Permit issued
Oct 5, 2022
Final sign-off
Mar 13, 2024

42/f: deffered mep submittal for bpa#202205234807

Open the permit page

$215,000
Aug 17, 2022Completed
final sign-off Dec 2023
633 Battery StAcco Engineered Systems Inc. Dba Acco Enbasement: new mechanical equipment to replace existing at basement exercise rooms and building engineer's office. new duct at ground floor breezeway.
Details
Permit
202208170679
Permit issued
Nov 7, 2022
Final sign-off
Dec 15, 2023

basement: new mechanical equipment to replace existing at basement exercise rooms and building engineer's office. new duct at ground floor breezeway.

Open the permit page

$42,000
Dec 9, 2021Completed
final sign-off Apr 2022
410 Townsend StAcco Engineered Systems Inc. Dba Acco Endirect replacement of (3) water source heat and ac units no alterations to electrical or piping
Details
Permit
202112094056
Permit issued
Dec 15, 2021
Final sign-off
Apr 6, 2022

direct replacement of (3) water source heat and ac units no alterations to electrical or piping

Open the permit page

$25,000
Aug 5, 2021Completed
final sign-off Dec 2021
3201 California StAcco Engineered Systems Inc. Dba Acco Enlike for like replacement for rooftop package air conditioning unit. like for like replacement of boiler skid complete with boiler, pump, expansion tank, pot feeder and necessary piping.
Details
Permit
202108055878
Permit issued
Aug 6, 2021
Final sign-off
Dec 21, 2021

like for like replacement for rooftop package air conditioning unit. like for like replacement of boiler skid complete with boiler, pump, expansion tank, pot feeder and necessary piping.

Open the permit page

$205,000
Jul 23, 2021Completed
final sign-off Mar 2022
505 Brannan StAcco Engineered Systems Inc. Dba Acco Enfurnish and install a new 4-ton vrv split system ac for the 1st fl mdf room
Details
Permit
202107234980
Permit issued
Aug 4, 2021
Final sign-off
Mar 8, 2022

furnish and install a new 4-ton vrv split system ac for the 1st fl mdf room

Open the permit page

$80,000
Mar 25, 2021Completed
final sign-off Mar 2022
1 Dr Carlton B Goodlett PlAcco Engineered Systems Inc. Dba Acco Endirect replacement of 27 water source heat pumps.
Details
Permit
202103257301
Permit issued
May 17, 2021
Final sign-off
Mar 7, 2022

direct replacement of 27 water source heat pumps.

Open the permit page

$400,000
Jan 26, 2021Never finaled
issued Feb 2021, no final
875 Howard StAcco Engineered Systems Inc. Dba Acco En3/f: like for like replacement of one (1) ac unit on the 3rd floor.
Details
Permit
202101263352
Permit issued
Feb 22, 2021

3/f: like for like replacement of one (1) ac unit on the 3rd floor.

Open the permit page

$30,000
Jan 11, 2021Never finaled
issued Feb 2022, no final
901 16th StTruebeck Constructioncombine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)
Details
Permit
202101112460
Permit issued
Feb 14, 2022

combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)

Open the permit page

$40,000,000
Sep 28, 2020Completed
final sign-off May 2021
600 Battery StAcco Engineered Systems Inc. Dba Acco Enremove & replace (e) boiler skid w/ new like for like skid. disconnect (e) electric rooms from exhaust system. install new transfer fans to serve (e) electrical rooms
Details
Permit
202009285322
Permit issued
Jan 7, 2021
Final sign-off
May 26, 2021

remove & replace (e) boiler skid w/ new like for like skid. disconnect (e) electric rooms from exhaust system. install new transfer fans to serve (e) electrical rooms

Open the permit page

$320,000
Feb 28, 2020Completed
final sign-off Aug 2020
400 Montgomery StNovo Construction Inc10th fl: install new heat pump split systems in idg room & conference room. ref arch pa #201912300884
Details
Permit
202002285669
Permit issued
Mar 11, 2020
Final sign-off
Aug 6, 2020

10th fl: install new heat pump split systems in idg room & conference room. ref arch pa #201912300884

Open the permit page

$100,000
Jan 28, 2020Completed
final sign-off Jul 2020
650 California StRichlen Construction29th fl - provide and install new vav, duct, grills and equipment per hvac plans and balance as needed. ref pa #202001131736
Details
Permit
202001282881
Permit issued
Jan 28, 2020
Final sign-off
Jul 21, 2020

29th fl - provide and install new vav, duct, grills and equipment per hvac plans and balance as needed. ref pa #202001131736

Open the permit page

$40,000
Dec 17, 2019Never finaled
issued Dec 2019, no final
2345 03rd StAcco Engineered Systems Inc. Dba Acco Enadd new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maher
Details
Permit
201912179741
Permit issued
Dec 20, 2019

add new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maher

Open the permit page

$530,000
Nov 14, 2019Never finaled
issued Nov 2019, no final
555 California StAcco Engineered Systems Inc. Dba Acco Endemo and replace (e) 6.5 ton water cooled crac unit with new 5 ton water- cooled crac unit
Details
Permit
201911147350
Permit issued
Nov 14, 2019

demo and replace (e) 6.5 ton water cooled crac unit with new 5 ton water- cooled crac unit

Open the permit page

$29,500
Oct 18, 2019Never finaled
issued Nov 2019, no final
2 Henry Adams StNovo Construction Inclevel 4 - deferred mep submittal for pa 2019-0911-1373
Details
Permit
201910185002
Permit issued
Nov 14, 2019

level 4 - deferred mep submittal for pa 2019-0911-1373

Open the permit page

$5,000
Oct 18, 2019Never finaled
issued Nov 2019, no final
2 Henry Adams StNovo Construction Inclevel 5 - deferred mep submittal for pa 2019-0911-1376
Details
Permit
201910185001
Permit issued
Nov 14, 2019

level 5 - deferred mep submittal for pa 2019-0911-1376

Open the permit page

$5,000
Sep 11, 2019Completed
final sign-off May 2021
153 Townsend StAcco Engineered Systems Inc. Dba Acco Enrevision to 201807063876 change out 1 additional rooftop packaged ac unit
Details
Permit
201909111367
Permit issued
Sep 11, 2019
Final sign-off
May 4, 2021

revision to 201807063876 change out 1 additional rooftop packaged ac unit

Open the permit page

$300,000
Jul 23, 2019Completed
final sign-off May 2020
120 Kearny StSc Builders, Inc8th fl, ste 800 meps for 2019-0611-3077 and 2019-0626-4411
Details
Permit
201907236582
Permit issued
Aug 9, 2019
Final sign-off
May 21, 2020

8th fl, ste 800 meps for 2019-0611-3077 and 2019-0626-4411

Open the permit page

$500,000
Jun 17, 2019Completed
final sign-off Mar 2020
1 Maritime PzGci, Inc16th floor: replace (e) fire dampers and modify (e) ductwork to accomodate new dampers.
Details
Permit
201906173520
Permit issued
Jul 11, 2019
Final sign-off
Mar 16, 2020

16th floor: replace (e) fire dampers and modify (e) ductwork to accomodate new dampers.

Open the permit page

May 29, 2019Never finaled
issued May 2019, no final
500 Folsom StBalfour Beatty Construction Llcsmoke control panel layout submitted as a revision to the addendum 4 (mep) issued permit. ref pa #201503110506 s4. n/a for maher.
Details
Permit
201905291862
Permit issued
May 30, 2019

smoke control panel layout submitted as a revision to the addendum 4 (mep) issued permit. ref pa #201503110506 s4. n/a for maher.

Open the permit page

May 20, 2019Completed
final sign-off Dec 2019
71 Stevenson StArco Murray Design Builddeferred meps for 201905029625. 20th fl.
Details
Permit
201905201088
Permit issued
May 28, 2019
Final sign-off
Dec 19, 2019

deferred meps for 201905029625. 20th fl.

Open the permit page

May 20, 2019Completed
final sign-off Dec 2019
71 Stevenson StArco Murray Design Builddeferred meps for 201905029621. 19th fl
Details
Permit
201905201085
Permit issued
May 28, 2019
Final sign-off
Dec 19, 2019

deferred meps for 201905029621. 19th fl

Open the permit page

May 15, 2019Completed
final sign-off Jul 2019
333 Bush StAcco Engineered Systems Inc. Dba Acco En20th fl: install new duct work and grilles install new vav boxes
Details
Permit
201905150658
Permit issued
May 15, 2019
Final sign-off
Jul 25, 2019

20th fl: install new duct work and grilles install new vav boxes

Open the permit page

$132,000
Mar 22, 2019Completed
final sign-off May 2019
140 South ParkAcco Engineered Systems Inc. Dba Acco Enrevision to 201902284088, fsd to be removed per code and condensing unit is to be relocated
Details
Permit
201903226056
Permit issued
Mar 26, 2019
Final sign-off
May 31, 2019

revision to 201902284088, fsd to be removed per code and condensing unit is to be relocated

Open the permit page

$115,000
Feb 28, 2019Never finaled
issued Feb 2019, no final
140 South ParkAcco Engineered Systems Inc. Dba Acco Enapplying for mechanical permit/ install new variable refrigerant sysem to serve new 1st floor build-out. new system to be installed to be under 2000cfm. ti project in reference to 201901180789
Details
Permit
201902284088
Permit issued
Feb 28, 2019

applying for mechanical permit/ install new variable refrigerant sysem to serve new 1st floor build-out. new system to be installed to be under 2000cfm. ti project in reference to 201901180789

Open the permit page

$115,000
Dec 19, 2018Completed
final sign-off Jul 2019
222 02nd StAcco Engineered Systems Inc. Dba Acco En1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head base
Details
Permit
201812198704
Permit issued
Dec 19, 2018
Final sign-off
Jul 12, 2019

1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head base

Open the permit page

$20,000
Dec 3, 2018Completed
final sign-off Nov 2019
939 Ellis StAcco Engineered Systems Inc. Dba Acco Enremove and replace extg boiler like for like and provide new piping connections. n/a for maher
Details
Permit
201812037284
Permit issued
Jan 28, 2019
Final sign-off
Nov 8, 2019

remove and replace extg boiler like for like and provide new piping connections. n/a for maher

Open the permit page

$247,000
Sep 13, 2018Completed
final sign-off Feb 2019
575 Market StField Construction Inc.29th floor/suite #2950: meps for 201807315971
Details
Permit
201809130084
Permit issued
Sep 19, 2018
Final sign-off
Feb 6, 2019

29th floor/suite #2950: meps for 201807315971

Open the permit page

$180,000
Aug 31, 2018Completed
final sign-off Jun 2019
303 02nd StGci, Inc5th fl - mechanical new wshp & vav boxes, new ef to serve (n) tenant rr & janitors closet demo (e) & install (n) ductwork, grilles & diffusers ref pa 2018-0627-3171
Details
Permit
201808318860
Permit issued
Sep 10, 2018
Final sign-off
Jun 27, 2019

5th fl - mechanical new wshp & vav boxes, new ef to serve (n) tenant rr & janitors closet demo (e) & install (n) ductwork, grilles & diffusers ref pa 2018-0627-3171

Open the permit page

Aug 22, 2018Completed
final sign-off Dec 2018
1 Market StGci, Incfloors 4 & 5: mechanical new vav. maher n/a.
Details
Permit
201808227999
Permit issued
Aug 24, 2018
Final sign-off
Dec 6, 2018

floors 4 & 5: mechanical new vav. maher n/a.

Open the permit page

$107,000
Aug 7, 2018Completed
final sign-off Jan 2019
989 Market StNovo Construction Incmechanical work on the 4th fl. new vrf fan coil units, new vav erminal units, ductwork and thermostats. new. ref pa #201808036355.
Details
Permit
201808076645
Permit issued
Aug 22, 2018
Final sign-off
Jan 29, 2019

mechanical work on the 4th fl. new vrf fan coil units, new vav erminal units, ductwork and thermostats. new. ref pa #201808036355.

Open the permit page

Aug 7, 2018Completed
final sign-off Feb 2019
989 Market StNovo Construction Incmechanical work on the 5th fl. new vrf condensing units, vrg coil units, exhaust fans & electrical work. ref pa #201808036362.
Details
Permit
201808076643
Permit issued
Aug 22, 2018
Final sign-off
Feb 12, 2019

mechanical work on the 5th fl. new vrf condensing units, vrg coil units, exhaust fans & electrical work. ref pa #201808036362.

Open the permit page

Jul 18, 2018Completed
final sign-off Nov 2018
218 Stockton StFisher Development Incinstall new vrf condensing unit including piping. shell & core work only. tenant improvement under separate permit
Details
Permit
201807184810
Permit issued
Sep 11, 2018
Final sign-off
Nov 9, 2018

install new vrf condensing unit including piping. shell & core work only. tenant improvement under separate permit

Open the permit page

$50,000
Jul 6, 2018Completed
final sign-off May 2021
153 Townsend StAcco Engineered Systems Inc. Dba Acco Enremove and replace one extg packaged unit.
Details
Permit
201807063876
Permit issued
Jul 12, 2018
Final sign-off
May 4, 2021

remove and replace one extg packaged unit.

Open the permit page

$400,000
Jun 25, 2018Completed
final sign-off Feb 2020
2325 03rd StAcco Engineered Systems Inc. Dba Acco Enmep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na
Details
Permit
201806252784
Permit issued
Jun 29, 2018
Final sign-off
Feb 27, 2020

mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na

Open the permit page

$450,000
Nov 13, 2017Completed
final sign-off Jan 2018
550 Kearny StSkender Construction Llcdemo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lighting
Details
Permit
201711133852
Permit issued
Nov 15, 2017
Final sign-off
Jan 12, 2018

demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lighting

Open the permit page

$220,000
Oct 12, 2017Completed
final sign-off Aug 2018
185 Berry StSkyline Construction5/f- mechanical and electrical for tenant improvement on the 5th fl ref pa#201708164958. maher not req
Details
Permit
201710121030
Permit issued
Oct 26, 2017
Final sign-off
Aug 14, 2018

5/f- mechanical and electrical for tenant improvement on the 5th fl ref pa#201708164958. maher not req

Open the permit page

$3,000
Sep 25, 2017Completed
final sign-off Dec 2017
250 Montgomery StField Construction Inc.8th fl, suite #800: mechanical and electircal for pa #201707283220. maher na
Details
Permit
201709259456
Permit issued
Sep 27, 2017
Final sign-off
Dec 4, 2017

8th fl, suite #800: mechanical and electircal for pa #201707283220. maher na

Open the permit page

$120,000
Sep 21, 2017Never finaled
issued Oct 2017, no final
760 Market StNovo Construction Inc6th fl: mechanical and electrical work for t.i. lighting, power & signal, wiring and controls, new dx split unit, new water source heat pump, new exhaust fan. ref pa #2017-0712-1707. maher na
Details
Permit
201709219158
Permit issued
Oct 18, 2017

6th fl: mechanical and electrical work for t.i. lighting, power & signal, wiring and controls, new dx split unit, new water source heat pump, new exhaust fan. ref pa #2017-0712-1707. maher na

Open the permit page

$25,000
Sep 15, 2017Expired or cancelled
expired Jul 2020
1 Maritime PzGci, Inc14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13
Details
Permit
201709158385
Permit issued
Sep 29, 2017

14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13

Open the permit page

$80,000
Aug 8, 2017Completed
final sign-off Apr 2018
201 Mission StAcco Engineered Systems Inc. Dba Acco Endemo and replace existing chill water risers and associated piping serving floor by floor ahus and fcs as shown, from basement to level 31 penthouse. maher na
Details
Permit
201708084149
Permit issued
Aug 9, 2017
Final sign-off
Apr 26, 2018

demo and replace existing chill water risers and associated piping serving floor by floor ahus and fcs as shown, from basement to level 31 penthouse. maher na

Open the permit page

$3,010,121
Aug 8, 2017Completed
final sign-off May 2018
274 Brannan StSource Planning And Construction Inc5th floor, ste 500 - mechanical and electrical for 2017-0616-9558 and revised arc permit #2017-08-17-5072
Details
Permit
201708084184
Permit issued
Oct 3, 2017
Final sign-off
May 21, 2018

5th floor, ste 500 - mechanical and electrical for 2017-0616-9558 and revised arc permit #2017-08-17-5072

Open the permit page

Nov 2, 2016Completed
final sign-off May 2017
353 Sacramento Stbasement- replace (2) existing boilers, (2) existing hot water pumps, add (2) new primary hot water pumps, install (1) new combustion air supply fan & modify piping & flue. n/a ordinance #155-13
Details
Permit
201611021694
Permit issued
Dec 7, 2016
Final sign-off
May 23, 2017

basement- replace (2) existing boilers, (2) existing hot water pumps, add (2) new primary hot water pumps, install (1) new combustion air supply fan & modify piping & flue. n/a ordinance #155-13

Open the permit page

$300,000
Jul 15, 2016Completed
final sign-off Aug 2017
1400 16th StSkyline Constructionnew non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **
Details
Permit
201607152520
Permit issued
Dec 27, 2016
Final sign-off
Aug 11, 2017

new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **

Open the permit page

$4,800,000
Jun 24, 2016Completed
final sign-off Jun 2018
210 King StRichlen Construction2nd flr: revision to ref pa 2016-0513-7354: hvac - ti project; rework (e) hvac system per new 2nd floor ti. fire alarm deferred for system shutdown.
Details
Permit
201606240817
Permit issued
Jun 24, 2016
Final sign-off
Jun 6, 2018

2nd flr: revision to ref pa 2016-0513-7354: hvac - ti project; rework (e) hvac system per new 2nd floor ti. fire alarm deferred for system shutdown.

Open the permit page

$300,000
Apr 27, 2016Never finaled
issued Apr 2016, no final
500 03rd StAcco Engineered Systems Inc. Dba Acco Enfurnish & install (1) new condensing split vrf system with (2) new wall mounted fan coil units for the t.i. room. n/a ordinance #155-13
Details
Permit
201604275796
Permit issued
Apr 27, 2016

furnish & install (1) new condensing split vrf system with (2) new wall mounted fan coil units for the t.i. room. n/a ordinance #155-13

Open the permit page

$45,000
Apr 11, 2016Never finaled
issued Apr 2016, no final
101 02nd StSkyline Constructionsuite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinance
Details
Permit
201604114431
Permit issued
Apr 14, 2016

suite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinance

Open the permit page

$55,000
Nov 17, 2015Completed
final sign-off May 2016
600 Harrison StNovo Construction Increvision to app#201510089178 to alter mechanical scope of work at dining area #359. n/a for maher
Details
Permit
201511172797
Permit issued
Nov 17, 2015
Final sign-off
May 6, 2016

revision to app#201510089178 to alter mechanical scope of work at dining area #359. n/a for maher

Open the permit page

Nov 17, 2015Completed
final sign-off Mar 2017
555 California StGci, Inc5th fl: mep only: new mechanical, electrical & plumbing, reference building permit 2015-0916-7087.
Details
Permit
201511172831
Permit issued
Dec 1, 2015
Final sign-off
Mar 16, 2017

5th fl: mep only: new mechanical, electrical & plumbing, reference building permit 2015-0916-7087.

Open the permit page

$247,000
Aug 17, 2015Never finaled
issued Aug 2015, no final
4122 18th Stac unit replacement on roof. not visable from street
Details
Permit
201508174499
Permit issued
Aug 18, 2015

ac unit replacement on roof. not visable from street

Open the permit page

$16,867
Aug 13, 2015Completed
final sign-off Oct 2015
201 California StTurner Construction Comeps for 201503181201. 10th fl & 11th fl t.i. sheet a601 added to mep's for card reader compliance info. revisoin in this set to clarify elevator card reader.
Details
Permit
201508134149
Permit issued
Sep 25, 2015
Final sign-off
Oct 27, 2015

meps for 201503181201. 10th fl & 11th fl t.i. sheet a601 added to mep's for card reader compliance info. revisoin in this set to clarify elevator card reader.

Open the permit page

$990,000
Aug 4, 2015Completed
final sign-off Dec 2015
535 Pacific AvPrincipal Builders Inc.4th floor - mechanical & electrical, title 24 to relocate & add new fixtures & equipment. pls refer to pa # 201506017646 t.i.
Details
Permit
201508043300
Permit issued
Aug 14, 2015
Final sign-off
Dec 8, 2015

4th floor - mechanical & electrical, title 24 to relocate & add new fixtures & equipment. pls refer to pa # 201506017646 t.i.

Open the permit page

$309,815
May 28, 2015Never finaled
issued May 2015, no final
335 Powell StAcco Engineered Systems Inc. Dba Acco En3/f -replacement of 1 chiller in (e) mechanical room, equipment anchorage, seismic calculations, electrical will be seperate/deferred submission from mechanical. n/a ordinance #155-13
Details
Permit
201505287353
Permit issued
May 29, 2015

3/f -replacement of 1 chiller in (e) mechanical room, equipment anchorage, seismic calculations, electrical will be seperate/deferred submission from mechanical. n/a ordinance #155-13

Open the permit page

$600,000
May 6, 2015Completed
final sign-off Jun 2015
50 Hawthorne StBcci Construction Companyroof penthouse. install a transformer in the penthouse to provide power to roof heaters.
Details
Permit
201505065507
Permit issued
May 6, 2015
Final sign-off
Jun 11, 2015

roof penthouse. install a transformer in the penthouse to provide power to roof heaters.

Open the permit page

$20,000
Mar 24, 2015Expired or cancelled
cancelled Jan 2026
499 Illinois StAcco Engineered Systems Inc. Dba Acco Enmech work- ref pa #2013.1219.4661 snd 201405286875. fire/smoke damper abandoned in place in lieu of a 3m wrap. 2nd floor n/a maher ordinance
Details
Permit
201503241669

mech work- ref pa #2013.1219.4661 snd 201405286875. fire/smoke damper abandoned in place in lieu of a 3m wrap. 2nd floor n/a maher ordinance

Open the permit page

$1,000
Dec 11, 2014Completed
final sign-off Oct 2015
100 Montgomery StSource Planning And Construction Incmechanical & electrical for pa# 201410027856. n/a ordinance# 155-13
Details
Permit
201412113529
Permit issued
Jan 8, 2015
Final sign-off
Oct 5, 2015

mechanical & electrical for pa# 201410027856. n/a ordinance# 155-13

Open the permit page

Dec 11, 2014Completed
final sign-off Oct 2015
100 Montgomery StSource Planning And Construction Incmechanical & electrical for pa# 201410148728. n/a ordinance# 155-13
Details
Permit
201412113526
Permit issued
Jan 8, 2015
Final sign-off
Oct 5, 2015

mechanical & electrical for pa# 201410148728. n/a ordinance# 155-13

Open the permit page

Dec 11, 2014Completed
final sign-off Oct 2015
100 Montgomery StSource Planning And Construction Incmechanical & electrical for pa# 201410209305. n/a ordinance# 155-13
Details
Permit
201412113528
Permit issued
Jan 8, 2015
Final sign-off
Oct 5, 2015

mechanical & electrical for pa# 201410209305. n/a ordinance# 155-13

Open the permit page

Sep 24, 2014Never finaled
issued Dec 2014, no final
1355 Market StNovo Construction Incinstall new condenser water piping. new ceiling mounted water source heat pump unit and new electrical power to the 8th fl maher not req
Details
Permit
201409247182
Permit issued
Dec 16, 2014

install new condenser water piping. new ceiling mounted water source heat pump unit and new electrical power to the 8th fl maher not req

Open the permit page

$25,000
Jul 2, 2014Completed
final sign-off Sep 2014
101 Howard StCahill Contractors Inchvac renovations to accomodate new layout at 1/f & 4/f. n/a ordinance #155-13.
Details
Permit
201407020296
Permit issued
Jul 15, 2014
Final sign-off
Sep 26, 2014

hvac renovations to accomodate new layout at 1/f & 4/f. n/a ordinance #155-13.

Open the permit page

$125,000
Jun 27, 2014Never finaled
issued Jul 2014, no final
901 Market StNovo Construction Inc5th and 6th floor: mechanical work for t.i. to include water source heat pumps vav boxes. new air diffusers. 5th floor: arch app#201406249220 and 6th floor: ref arch #201406249224. n/a for the maher ordinance #155-13
Details
Permit
201406279687
Permit issued
Jul 14, 2014

5th and 6th floor: mechanical work for t.i. to include water source heat pumps vav boxes. new air diffusers. 5th floor: arch app#201406249220 and 6th floor: ref arch #201406249224. n/a for the maher ordinance #155-13

Open the permit page

$531,000
Jun 26, 2014Completed
final sign-off Nov 2014
100 Spear StAcco Engineered Systems Inc. Dba Acco Eninstall one new reheat vav box, relocate air outlets based on new floor plan, relocate thermostats based on new floor plan. n/a for the maher ordinance #155-13. reference arch app#201406037358 (not issued yet). 11th floor.
Details
Permit
201406269568
Permit issued
Jun 27, 2014
Final sign-off
Nov 18, 2014

install one new reheat vav box, relocate air outlets based on new floor plan, relocate thermostats based on new floor plan. n/a for the maher ordinance #155-13. reference arch app#201406037358 (not issued yet). 11th floor.

Open the permit page

$30,000
Jun 25, 2014Completed
final sign-off Jul 2014
71 Stevenson StSource Planning And Construction Inc7th floor #725a & 725b- mechanical & electrical for project #2014.0303.9715.
Details
Permit
201406259401
Permit issued
Jun 30, 2014
Final sign-off
Jul 10, 2014

7th floor #725a & 725b- mechanical & electrical for project #2014.0303.9715.

Open the permit page

$5,000
Jun 25, 2014Completed
final sign-off Aug 2014
71 Stevenson StSource Planning And Construction Inc6th floor - mechanical for project #2014.0501.4720.
Details
Permit
201406259398
Permit issued
Jun 30, 2014
Final sign-off
Aug 22, 2014

6th floor - mechanical for project #2014.0501.4720.

Open the permit page

$5,000
Jun 24, 2014Never finaled
issued Jun 2014, no final
475 Sansome StNovo Construction Incmech and elec work on the 9th fl to include demo of ductwork, new heat pump for idf room, rebalance existing fan coils. na for maher.
Details
Permit
201406249284
Permit issued
Jun 25, 2014

mech and elec work on the 9th fl to include demo of ductwork, new heat pump for idf room, rebalance existing fan coils. na for maher.

Open the permit page

$400,000
Jun 23, 2014Completed
final sign-off Oct 2014
360 03rd StSkyline Construction4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not required
Details
Permit
201406239056
Permit issued
Jul 9, 2014
Final sign-off
Oct 21, 2014

4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not required

Open the permit page

$5,000
Jun 18, 2014Completed
final sign-off Jul 2014
600 California StSc Builders, Incmep 18th fl for 201404153220. n/a maher ordinance
Details
Permit
201406188701
Permit issued
Jul 3, 2014
Final sign-off
Jul 23, 2014

mep 18th fl for 201404153220. n/a maher ordinance

Open the permit page

$150,000
Jun 18, 2014Never finaled
issued Jun 2014, no final
444 De Haro StAcco Engineered Systems Inc. Dba Acco Enrelocate existing supply air fan, furnace and ductwork at 1st and 2nd floor; relocate osa duct serving 1st flr to existing shaft at roof; maher n/a
Details
Permit
201406188755
Permit issued
Jun 19, 2014

relocate existing supply air fan, furnace and ductwork at 1st and 2nd floor; relocate osa duct serving 1st flr to existing shaft at roof; maher n/a

Open the permit page

$8,000
May 28, 2014Never finaled
issued Jun 2014, no final
100 Spear StAcco Engineered Systems Inc. Dba Acco Enremove & replace 500 ton cooling tower and vfd. n/a ordinance #155-13
Details
Permit
201405286893
Permit issued
Jun 5, 2014

remove & replace 500 ton cooling tower and vfd. n/a ordinance #155-13

Open the permit page

$350,000
May 21, 2014Completed
final sign-off Jun 2014
101 Greenwich StSkyline Constructionmechanical & electrical work on hte 4th flr, new hot water heater , vav boxes modify (e) ductwork, revise van zones one new transfer fan, ref.# 201404163425 n/a maher
Details
Permit
201405216361
Permit issued
May 21, 2014
Final sign-off
Jun 23, 2014

mechanical & electrical work on hte 4th flr, new hot water heater , vav boxes modify (e) ductwork, revise van zones one new transfer fan, ref.# 201404163425 n/a maher

Open the permit page

$10,000
May 19, 2014Completed
final sign-off Aug 2014
55 Music Concourse DrAcco Engineered Systems Inc. Dba Acco En1st floor- install n2 purge exhaust line. n/a maher ordinance 155-13
Details
Permit
201405196113
Permit issued
Jul 31, 2014
Final sign-off
Aug 8, 2014

1st floor- install n2 purge exhaust line. n/a maher ordinance 155-13

Open the permit page

$7,000
May 14, 2014Completed
final sign-off Dec 2014
235 Montgomery StR.M.R. Construction Company#1230- tenant remodel of hvac. n/a ordinance #155-13. reference architecture pa # 2014-0414-3123.
Details
Permit
201405145710
Permit issued
May 23, 2014
Final sign-off
Dec 30, 2014

#1230- tenant remodel of hvac. n/a ordinance #155-13. reference architecture pa # 2014-0414-3123.

Open the permit page

$3,000
May 8, 2014Completed
final sign-off Mar 2017
1645 Van Ness AvAcco Engineered Systems Inc. Dba Acco Enremove & replace two (2) existing 15-ton hvac split system heat pump/cooling units. units have failed permaturely. compliance with ordinance #155-13 not required
Details
Permit
201405085192
Permit issued
May 28, 2014
Final sign-off
Mar 10, 2017

remove & replace two (2) existing 15-ton hvac split system heat pump/cooling units. units have failed permaturely. compliance with ordinance #155-13 not required

Open the permit page

$200,000
Apr 10, 2014Never finaled
issued Apr 2014, no final
153 Townsend StPrincipal Builders Inc.5th floor - mechanical / electrical - t.i. to demo ductwork & lighting & construct new ductwork, grilles, diffusers & lighting. refer to #2014.0310.0263 for t.i. work. compliance with ordinance #155-13 not required
Details
Permit
201404102937
Permit issued
Apr 18, 2014

5th floor - mechanical / electrical - t.i. to demo ductwork & lighting & construct new ductwork, grilles, diffusers & lighting. refer to #2014.0310.0263 for t.i. work. compliance with ordinance #155-13 not required

Open the permit page

$70,000
Mar 26, 2014Completed
final sign-off Jan 2015
455 Market StAcco Engineered Systems Inc. Dba Acco Endemo (2) existing 4,600 mbh hydronic boilers, install (3) new 3,000 mbh hydronic boilers, primary pumps and hot water piping. na ordinance #155-13
Details
Permit
201403261758
Permit issued
Mar 27, 2014
Final sign-off
Jan 21, 2015

demo (2) existing 4,600 mbh hydronic boilers, install (3) new 3,000 mbh hydronic boilers, primary pumps and hot water piping. na ordinance #155-13

Open the permit page

$350,000
Mar 17, 2014Never finaled
issued Mar 2014, no final
1161 Mission StAcco Engineered Systems Inc. Dba Acco En4th floor - install new 2 ton unit on roof for server room. compliance with ordinance #155-13 not required
Details
Permit
201403170885
Permit issued
Mar 17, 2014

4th floor - install new 2 ton unit on roof for server room. compliance with ordinance #155-13 not required

Open the permit page

$8,586
Mar 6, 2014Completed
final sign-off Jun 2014
909 Montgomery StPrincipal Builders Inc.title 24 mechanical and electrical to install new equipment and fixture in partial 5th floor. t.i. ref app#201402108188
Details
Permit
201403060044
Permit issued
Mar 13, 2014
Final sign-off
Jun 18, 2014

title 24 mechanical and electrical to install new equipment and fixture in partial 5th floor. t.i. ref app#201402108188

Open the permit page

$60,000
Jan 13, 2014Completed
final sign-off Feb 2015
2500 16th StAcco Engineered Systems Inc. Dba Acco Enfurnish/install exhaust fan, furnish/install new make up air unit to match existing performance. reference to pa#201311212519. compliance with ordinance no. 155-13 not required.
Details
Permit
201401136095
Permit issued
Jan 13, 2014
Final sign-off
Feb 23, 2015

furnish/install exhaust fan, furnish/install new make up air unit to match existing performance. reference to pa#201311212519. compliance with ordinance no. 155-13 not required.

Open the permit page

$20,000
Dec 27, 2013Completed
final sign-off Apr 2014
2 Folsom StAcco Engineered Systems Inc. Dba Acco Eninstall new supplemental fan coil unit. pipe new chilled water lines from futures tp fan coil. tie into exitsting condensate drain line. install new fire/smoke damper, supply and return grilles and ductwork (ref permit #201312184441)
Details
Permit
201312275158
Permit issued
Jan 15, 2014
Final sign-off
Apr 23, 2014

install new supplemental fan coil unit. pipe new chilled water lines from futures tp fan coil. tie into exitsting condensate drain line. install new fire/smoke damper, supply and return grilles and ductwork (ref permit #201312184441)

Open the permit page

$30,000
Dec 23, 2013Completed
final sign-off Feb 2014
153 Townsend StPrincipal Builders Inc.5th floor. title 24 electrical mechanical t.i. to demo & construct new lighting and fixtures. reference to pa#2013-1125-2705.
Details
Permit
201312234880
Permit issued
Feb 4, 2014
Final sign-off
Feb 10, 2014

5th floor. title 24 electrical mechanical t.i. to demo & construct new lighting and fixtures. reference to pa#2013-1125-2705.

Open the permit page

$56,000
Dec 9, 2013Never finaled
issued Dec 2013, no final
574 Pacific AvAcco Engineered Systems Inc. Dba Acco Enportion of 3rd & 4th floor only - remove (1) existing a/v unit + (1) existing condensing unit, furnish installing, (1) new a/c unit + (1) new condensing unit, connect new units ot existing duct, ref pa #2013.0529.8112
Details
Permit
201312093658
Permit issued
Dec 9, 2013

portion of 3rd & 4th floor only - remove (1) existing a/v unit + (1) existing condensing unit, furnish installing, (1) new a/c unit + (1) new condensing unit, connect new units ot existing duct, ref pa #2013.0529.8112

Open the permit page

$20,000
Nov 26, 2013Never finaled
issued Nov 2013, no final
1155 Market StAcco Engineered Systems Inc. Dba Acco En1st & 2nd floor - install new ductwork & grilles & air balance hvac system. construction under pa#2013.0213.0147
Details
Permit
201311262911
Permit issued
Nov 26, 2013

1st & 2nd floor - install new ductwork & grilles & air balance hvac system. construction under pa#2013.0213.0147

Open the permit page

$40,000
Nov 22, 2013Completed
final sign-off Dec 2013
201 Post StSc Builders, Inc11/f- mechanical and electrical for pa# 201310018179
Details
Permit
201311222605
Permit issued
Dec 2, 2013
Final sign-off
Dec 30, 2013

11/f- mechanical and electrical for pa# 201310018179

Open the permit page

$50,000
Nov 13, 2013Completed
final sign-off Dec 2013
225 Bush StSkyline Construction13th floor - mechanical & electrical work to consist of new vav boxes, transfer fans, condenser & heat pump, new lighting. ref pa #2013.10.03.8355.
Details
Permit
201311131764
Permit issued
Nov 14, 2013
Final sign-off
Dec 23, 2013

13th floor - mechanical & electrical work to consist of new vav boxes, transfer fans, condenser & heat pump, new lighting. ref pa #2013.10.03.8355.

Open the permit page

$25,000
Oct 31, 2013Completed
final sign-off Aug 2015
650 California StAcco Engineered Systems Inc. Dba Acco En#1100 - adding (2) new vav zones and (3) existing vav zone and (1) existing a/c unit, to distribute air in a newly constructed supply air duct system. plumbing and electrical by others. reference pa# 2013-0918-7107 for t.i.
Details
Permit
201310310804
Permit issued
Nov 6, 2013
Final sign-off
Aug 18, 2015

#1100 - adding (2) new vav zones and (3) existing vav zone and (1) existing a/c unit, to distribute air in a newly constructed supply air duct system. plumbing and electrical by others. reference pa# 2013-0918-7107 for t.i.

Open the permit page

$65,000
Oct 30, 2013Never finaled
issued Oct 2013, no final
1 Montgomery StHathaway Dinwiddie Co.roof area:remove fire sprinkler pipe and heads from elevator machine room and hoist way per elevator modernization.
Details
Permit
201310300628
Permit issued
Oct 30, 2013

roof area:remove fire sprinkler pipe and heads from elevator machine room and hoist way per elevator modernization.

Open the permit page

$125,000
Oct 22, 2013Completed
final sign-off Jan 2014
525 Market StHathaway Dinwiddie Co.rebalance (1) vav box, relocate (1) pendent light, add (1) switch and occupancy sensor, add (2) outlets. fire sprinkler drawings shall be under seperate permit. electrical and mechanical modification for pa# 201310018136
Details
Permit
201310229872
Permit issued
Oct 22, 2013
Final sign-off
Jan 21, 2014

rebalance (1) vav box, relocate (1) pendent light, add (1) switch and occupancy sensor, add (2) outlets. fire sprinkler drawings shall be under seperate permit. electrical and mechanical modification for pa# 201310018136

Open the permit page

$5,000
Sep 12, 2013Never finaled
issued Nov 2013, no final
240 Stockton St8th floor mechanical retrofit. addition of six (6) new duct fire-smoke dampers. fire permit separate. ref ti 2012.1130.5228
Details
Permit
201309126608
Permit issued
Nov 19, 2013

8th floor mechanical retrofit. addition of six (6) new duct fire-smoke dampers. fire permit separate. ref ti 2012.1130.5228

Open the permit page

$200,000
Aug 28, 2013Completed
final sign-off Oct 2014
360 03rd StSkyline Construction6/f - mechanical & electrical for t.i.
Details
Permit
201308285461
Permit issued
Aug 29, 2013
Final sign-off
Oct 17, 2014

6/f - mechanical & electrical for t.i.

Open the permit page

$3,000
Jun 12, 2013Completed
final sign-off Aug 2013
121 Spear StSc Builders, Inc2nd floor ste 250 - hvac & electrical work to bldg pa# 201304305810
Details
Permit
201306129295
Permit issued
Jun 21, 2013
Final sign-off
Aug 19, 2013

2nd floor ste 250 - hvac & electrical work to bldg pa# 201304305810

Open the permit page

$100,000
May 15, 2013Completed
final sign-off Jan 2014
760 Market StSc Builders, Inc11th floor t.i. :hvac modification to extg system to accomodate new office layout. electrical lighting and modification to accomodate new office layout. bldg app#201303152287
Details
Permit
201305156964
Permit issued
Jun 10, 2013
Final sign-off
Jan 24, 2014

11th floor t.i. :hvac modification to extg system to accomodate new office layout. electrical lighting and modification to accomodate new office layout. bldg app#201303152287

Open the permit page

$300,000
Apr 12, 2013Completed
final sign-off Jan 2014
225 Bush StSkyline Construction10th floor-t.i of mechanical & electrical work to include new transfer fan & supply, new supply fan with electric duct heater & new exhaust grilles & transfer grills. ref. arch# 201302271062
Details
Permit
201304124393
Permit issued
Apr 12, 2013
Final sign-off
Jan 3, 2014

10th floor-t.i of mechanical & electrical work to include new transfer fan & supply, new supply fan with electric duct heater & new exhaust grilles & transfer grills. ref. arch# 201302271062

Open the permit page

$75,000
Apr 11, 2013Completed
final sign-off Jul 2013
60 Spear StAcco Engineered Systems Inc. Dba Acco En1.install new dx split systems. 2. install new air distribution for 2nd floor build out.
Details
Permit
201304114306
Permit issued
Apr 12, 2013
Final sign-off
Jul 18, 2013

1.install new dx split systems. 2. install new air distribution for 2nd floor build out.

Open the permit page

$112,000
Apr 11, 2013Completed
final sign-off Jul 2013
60 Spear StAcco Engineered Systems Inc. Dba Acco Ennew air distribution 1. installation of medium and low pressure ducts for t.i build out of 6th fl. 2. installation of new transer fans.
Details
Permit
201304114283
Permit issued
Apr 12, 2013
Final sign-off
Jul 29, 2013

new air distribution 1. installation of medium and low pressure ducts for t.i build out of 6th fl. 2. installation of new transer fans.

Open the permit page

$112,000
Feb 19, 2013Never finaled
issued Feb 2013, no final
750 Kearny Stinstall 2 new condensing boilers into existing system. install new thermostatic mixing valve.
Details
Permit
201302190446
Permit issued
Feb 22, 2013

install 2 new condensing boilers into existing system. install new thermostatic mixing valve.

Open the permit page

$150,000
Jan 18, 2013Completed
final sign-off Feb 2013
225 Bush StSkyline Constructionmechanical & electrical work for ti on the 11th floor. architectural revision to change door swing @ elevator lobby. ref to pa#2012-12-21-6725
Details
Permit
201301188281
Permit issued
Jan 22, 2013
Final sign-off
Feb 25, 2013

mechanical & electrical work for ti on the 11th floor. architectural revision to change door swing @ elevator lobby. ref to pa#2012-12-21-6725

Open the permit page

$60,000
Dec 11, 2012Completed
final sign-off May 2014
1155 Market StTruebeck Constructionmechanical ductwork, electrical power & lighting and plumbing upgrade to floor basement & 1st floor. ref arch pa #201211305206 & accessibility pa# 201211204569. fire sprinkler under separate permit.
Details
Permit
201212115886
Permit issued
Dec 13, 2012
Final sign-off
May 2, 2014

mechanical ductwork, electrical power & lighting and plumbing upgrade to floor basement & 1st floor. ref arch pa #201211305206 & accessibility pa# 201211204569. fire sprinkler under separate permit.

Open the permit page

$100,000