Jesus B Cabellon Jr
- Listed as
- architect, designer, engineer, lessee
- Firm
- Jg Engineers
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Sep 2026
291 permits since 2000 (engineer on 286 permits, architect on 4 permits, designer on 1 permit, lessee on 1 permit): 191 completed, 15 in progress, 80 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 291.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 350 Bush St | B N Builders Inc | deferred mep for ref pa 202608136550Details
deferred mep for ref pa 202608136550 | $350,000 |
| Sep 29, 2026 | In progress issued Sep 2026 | 600 Townsend St | Kr Johnston Construction Inc | modify hvac ductwork for new layout. add electrical outlets. modify lighting. ref pa# 202605070870Details
modify hvac ductwork for new layout. add electrical outlets. modify lighting. ref pa# 202605070870 | $20,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 75 Broadway | Mcclure Electric Inc | 2/f: title 24 for lighting and electrical engineered drawings. ref arch pa# 202607134920.Details
2/f: title 24 for lighting and electrical engineered drawings. ref arch pa# 202607134920. | $850,000 |
| Sep 14, 2026 | In progress issued Sep 2026 | 44 Montgomery St | Field Construction Inc. | 15/f: mechanical and electrical work for office tenant improvement project under main arch 202608206963Details
15/f: mechanical and electrical work for office tenant improvement project under main arch 202608206963 | $142,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 1265 Battery St | Rod Heisler Construction | ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting.Details
ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting. | $450,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1 Post St | Peacock Construction | 10th fl deferred electrical under pa 202604280192/202607285653 new lighting, power & signal & branch circuitingDetails
10th fl deferred electrical under pa 202604280192/202607285653 new lighting, power & signal & branch circuiting | $70,000 |
| Jul 21, 2026 | Completed final sign-off Sep 2026 | 601 California St | Gci, Inc | suite 800. electrical power, lighting a signal. reference 202604240028.Details
suite 800. electrical power, lighting a signal. reference 202604240028. | $75,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | 21st fl suite 2100 and 2150: electrical only. ref drawings 202606032424Details
21st fl suite 2100 and 2150: electrical only. ref drawings 202606032424 | $168,564 |
| Jun 24, 2026 | In progress issued Jul 2026 | 1 Market St | Field Construction Inc. | 25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panelDetails
25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panel | $150,000 |
| Jun 24, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | 17/f, ste 1700: deferred electrical for pa# 202604028794- provide new lighting and branch circuiting. new power and signal branch. title 24.Details
17/f, ste 1700: deferred electrical for pa# 202604028794- provide new lighting and branch circuiting. new power and signal branch. title 24. | $15,000 |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | deferred mep for 20th floor office ti under permit 202602266553. ref: 202605272015/202602266553(me deferred)Details
deferred mep for 20th floor office ti under permit 202602266553. ref: 202605272015/202602266553(me deferred) | $150,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 750 Battery St | Field Construction Inc. | 6th fl - ref pa 202502266563/202605221763 electrical only power & signal/lightingDetails
6th fl - ref pa 202502266563/202605221763 electrical only power & signal/lighting | $15,000 |
| May 27, 2026 | In progress issued May 2026 | 235 Montgomery St | Acosta And Sons Inc | 24th floor- electrical only permit to support approved architectural drawings. ref: bpa# 202604229858. new lighting and power & signal in restrooms and elevator lobby refresh.Details
24th floor- electrical only permit to support approved architectural drawings. ref: bpa# 202604229858. new lighting and power & signal in restrooms and elevator lobby refresh. | $15,000 |
| Apr 23, 2026 | Completed final sign-off Jun 2026 | 750 Battery St | Field Construction Inc. | 7th floor provide new lighting and branch circuiting to existing panel. ref pa#: 202601234385Details
7th floor provide new lighting and branch circuiting to existing panel. ref pa#: 202601234385 | $10,000 |
| Apr 7, 2026 | Completed final sign-off Jul 2026 | 201 California St | Richlen Construction | 15th fl - provide new lighting @ ste 1500 ref pa 202510026577Details
15th fl - provide new lighting @ ste 1500 ref pa 202510026577 | $190,000 |
| Apr 3, 2026 | Completed final sign-off Sep 2026 | 44 Montgomery St | Mcclure Electric Inc | 42/fl- electrical engineered drawing. ref 202602196146Details
42/fl- electrical engineered drawing. ref 202602196146 | $150,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Hathaway Dinwiddie Co. | deferred mep for office ti permit 202603036821. spec suites 250 and 270.Details
deferred mep for office ti permit 202603036821. spec suites 250 and 270. | $200,000 |
| Feb 20, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Bradshaw Group Inc | ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work.Details
ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work. | $250,000 |
| Jan 27, 2026 | Completed final sign-off Apr 2026 | 1 Embarcadero Center | Skyline Construction | 16th/f ste#1600: the project generally consists of interior t.i. of ste# 1600 on 16th/f of an e) multi-story buildingDetails
16th/f ste#1600: the project generally consists of interior t.i. of ste# 1600 on 16th/f of an e) multi-story building | $85,000 |
| Dec 12, 2025 | In progress issued Dec 2025 | 650 Davis St | Mcclure Electric Inc | title 24 compliance for lighting only ref#: 202510298368Details
title 24 compliance for lighting only ref#: 202510298368 | $19,380 |
| Nov 25, 2025 | In progress issued Nov 2025 | 235 Montgomery St | Acosta And Sons Inc | suite 2210. 22nd floor. electrical to support approved architectual. new lighting and power for office t.i. ref#: 202510308550.Details
suite 2210. 22nd floor. electrical to support approved architectual. new lighting and power for office t.i. ref#: 202510308550. | $150,000 |
| Nov 21, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | Hathaway Dinwiddie Co. | 17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642Details
17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642 | |
| Nov 19, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | mechanical and electrical work for ti on 2nd fl ref pa 202507221305/202510298361Details
mechanical and electrical work for ti on 2nd fl ref pa 202507221305/202510298361 | $75,000 |
| Nov 19, 2025 | Completed final sign-off Feb 2026 | 760 Market St | Mcclure Electric Inc | 2/fl-ref - title 24 compliance for lighting only. ref pa# 202509115092Details
2/fl-ref - title 24 compliance for lighting only. ref pa# 202509115092 | $60,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 1 Maritime Pz | Gci, Inc | 23rd & 24th fl: deferred mech & elec. mechanical- new vav boxes, ductwork, air distributors, ppc controls & air balance. electrical- power, lighting, & signal. ref permits 202507080364 and 202507080366Details
23rd & 24th fl: deferred mech & elec. mechanical- new vav boxes, ductwork, air distributors, ppc controls & air balance. electrical- power, lighting, & signal. ref permits 202507080364 and 202507080366 | $291,000 |
| Sep 15, 2025 | Completed final sign-off Mar 2026 | 333 Bush St | Source Planning And Construction Inc | 21st fl ref pa # 2024-1205-6265: provide new lighting & branch circuiting to existing panel. provide california title 24 complaince forms.Details
21st fl ref pa # 2024-1205-6265: provide new lighting & branch circuiting to existing panel. provide california title 24 complaince forms. | $75,000 |
| Aug 29, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | C B F Inc | #100: new lighting, branch circuiting.provide new power and signal. ref pa#202503263112Details
#100: new lighting, branch circuiting.provide new power and signal. ref pa#202503263112 | $440,000 |
| Aug 20, 2025 | Completed final sign-off Nov 2025 | 235 Montgomery St | Young Electric Co | 2200 & 2230 electrical work including new lighting & power ref pa 202507291850Details
2200 & 2230 electrical work including new lighting & power ref pa 202507291850 | $60,000 |
| Aug 18, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | electrical t.i. for level 18 t.i. ref pa #202412025941. work includes new lighting and branch circuiting to existing panel. new panel boards, new power and signal branch circuiting to new panel. t-24 compliance forms.Details
electrical t.i. for level 18 t.i. ref pa #202412025941. work includes new lighting and branch circuiting to existing panel. new panel boards, new power and signal branch circuiting to new panel. t-24 compliance forms. | |
| Jul 31, 2025 | Completed final sign-off Oct 2025 | 2300 California St | Herrero Builders Incorporated | level 1: finish and millwork updates to treatment rooms, office, and storage areas. modifications to light fixtures in treatement rooms, door modification in office and new wing wall in waiting area. update to restroom accessories. restriping parking.Details
level 1: finish and millwork updates to treatment rooms, office, and storage areas. modifications to light fixtures in treatement rooms, door modification in office and new wing wall in waiting area. update to restroom accessories. restriping parking. | $180,654 |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 88 Kearny St | Source Planning And Construction Inc | deferred mep for office ti permit 202507221279. rework (1) e - hvac box to accommodate 4 new offices, rework (1) e -vac cooling box for partial enclosed pantry area , install new 4 air diffusers and grilles and add 1 duck work, install insulation per t24. install (12) new 2x2 fixtures; install 11Details
deferred mep for office ti permit 202507221279. rework (1) e - hvac box to accommodate 4 new offices, rework (1) e -vac cooling box for partial enclosed pantry area , install new 4 air diffusers and grilles and add 1 duck work, install insulation per t24. install (12) new 2x2 fixtures; install 11 | $30,000 |
| Jul 9, 2025 | Completed final sign-off Oct 2025 | 1 Maritime Pz | Novo Construction Inc | 21st fl - mechanical & electrical work for ti ref pa 202506128527Details
21st fl - mechanical & electrical work for ti ref pa 202506128527 | $75,000 |
| Jul 9, 2025 | Completed final sign-off Nov 2025 | 1 Maritime Pz | Novo Construction Inc | 20th fl - mechanical & electrical work for ti ref pa 202506118462Details
20th fl - mechanical & electrical work for ti ref pa 202506118462 | $16,000 |
| May 15, 2025 | Completed final sign-off Jun 2025 | 55 Francisco St | Mcclure Electric Inc | ste 330 - deferred electrical permit for 55 francisco ste 330 office ti. ref pa 202503242881Details
ste 330 - deferred electrical permit for 55 francisco ste 330 office ti. ref pa 202503242881 | $41,910 |
| May 15, 2025 | Completed final sign-off Jun 2025 | 350 Rhode Island St | Mcclure Electric Inc | #240: deferred electrical for 350 rhode island office t.i. ref pa #202505055817Details
#240: deferred electrical for 350 rhode island office t.i. ref pa #202505055817 | $33,388 |
| Apr 9, 2025 | Completed final sign-off May 2025 | 235 Montgomery St | Acosta And Sons Inc | deferred electrical for 22nd floor: suite #2240: interior ti; permit 202412267398Details
deferred electrical for 22nd floor: suite #2240: interior ti; permit 202412267398 | |
| Apr 9, 2025 | In progress issued Apr 2025 | 235 Montgomery St | Acosta And Sons Inc | deferred electrical for 22nd floor interior ti of elevator lobby, stair vestibules, restrooms, and exit passageway; permit 202411265757Details
deferred electrical for 22nd floor interior ti of elevator lobby, stair vestibules, restrooms, and exit passageway; permit 202411265757 | |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 120 Kearny St | Hp Build | 35/f, ste 3500. ref pa# 202501108096. electrical.Details
35/f, ste 3500. ref pa# 202501108096. electrical. | $149,000 |
| Feb 19, 2025 | Completed final sign-off Aug 2025 | 333 Bush St | Source Planning And Construction Inc | 7th/f, suite 775: mech & electrical & plumbing. ref t.i. pa 202409261645.Details
7th/f, suite 775: mech & electrical & plumbing. ref t.i. pa 202409261645. | $193,734 |
| Jan 13, 2025 | Completed final sign-off Jul 2025 | 1 Maritime Pz | Gci, Inc | 26/fl- electrical (n) lighting and branch circuiting (n) power and signal and branch circuiting to (e) panelDetails
26/fl- electrical (n) lighting and branch circuiting (n) power and signal and branch circuiting to (e) panel | $32,000 |
| Jan 6, 2025 | Completed final sign-off Mar 2025 | 101 California St | Mcclure Electric Inc | 19/f suite 1925 - title 24 compliance for lighting and power. ref pa 202411215485.Details
19/f suite 1925 - title 24 compliance for lighting and power. ref pa 202411215485. | $36,448 |
| Dec 18, 2024 | Completed final sign-off Mar 2025 | 101 02nd St | Source Planning And Construction Inc | 3/fl- rev 202410314097- provide (n) lighting and branch cirutiing to (e) panel . provided (n) power signal and branch circuitng to (e) panel. provide title 24 compliance formsDetails
3/fl- rev 202410314097- provide (n) lighting and branch cirutiing to (e) panel . provided (n) power signal and branch circuitng to (e) panel. provide title 24 compliance forms | $225,000 |
| Oct 30, 2024 | Completed final sign-off Dec 2024 | 1 Market St | M C S Construction Services | b2/fl-ref 202405232787-deferred submision for ti electrical permitDetails
b2/fl-ref 202405232787-deferred submision for ti electrical permit | $5,000 |
| Oct 11, 2024 | Completed final sign-off Dec 2024 | 1 Market St | M C S Construction Services | deferred electrical permit for interior improvement project under pa # 202405222665/202409120646 b1 level.Details
deferred electrical permit for interior improvement project under pa # 202405222665/202409120646 b1 level. | $165,000 |
| Sep 18, 2024 | Completed final sign-off Apr 2025 | 235 Montgomery St | R.M.R. Construction Company | 21st/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. provided california title 24 compliance forms. ref to t.i. 202405222639Details
21st/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. provided california title 24 compliance forms. ref to t.i. 202405222639 | |
| Aug 8, 2024 | Completed final sign-off Nov 2024 | 101 South Park | Novo Construction Inc | electrical work for ti on the ground floor ref pa 202406174594Details
electrical work for ti on the ground floor ref pa 202406174594 | $10,000 |
| Jun 20, 2024 | Completed final sign-off Nov 2025 | 235 Montgomery St | R.M.R. Construction Company | 27/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. work under bpa# 202312273146. provided california title 24 compliance forms.Details
27/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. work under bpa# 202312273146. provided california title 24 compliance forms. | |
| May 10, 2024 | Completed final sign-off Apr 2026 | 1580 Valencia St | Herrero Builders Incorporated | 3/f: interior t.i. construction of new medical office primary care clinic in existing 8-story monteagle medical office building. separate interior demo under permit 202310108295Details
3/f: interior t.i. construction of new medical office primary care clinic in existing 8-story monteagle medical office building. separate interior demo under permit 202310108295 | $1,400,000 |
| Apr 1, 2024 | In progress issued Apr 2024 | 1240 Valencia St | Swinerton Builders | to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtainedDetails
to complete work installing new ducts, new bathrooms, kitchen, interiror ref pa# 2023-0622-0639 sep mep permits will be obtained | $100,000 |
| Feb 7, 2024 | Completed final sign-off May 2024 | 120 Kearny St | Peacock Construction | 27/f: ref to t.i. 202311211257. provide lighting & branch circuiting to (e) panel, t-24Details
27/f: ref to t.i. 202311211257. provide lighting & branch circuiting to (e) panel, t-24 | $145,000 |
| Feb 7, 2024 | In progress issued Apr 2024 | 560 Mission St | Turner Construction Co | revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices.Details
revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices. | $200,000 |
| Jan 24, 2024 | Completed final sign-off Apr 2024 | 1 Maritime Pz | Novo Construction Inc | reference pa 202312132475 & 202312132478- electrical work for ti on 20th and 21st floorDetails
reference pa 202312132475 & 202312132478- electrical work for ti on 20th and 21st floor | $32,000 |
| Nov 30, 2023 | Completed final sign-off Apr 2024 | 535 Mission St | Gci, Inc | 11th fl - electrical power, lighting & signal ref pa 2023-0901-5772Details
11th fl - electrical power, lighting & signal ref pa 2023-0901-5772 | $320,000 |
| Sep 14, 2023 | Completed final sign-off Nov 2023 | 300 Mission St | M C S Construction Services | suite 1500: deferred electrical permit-under main archtectural permit 202306281088. no exterior work. new lighting to "white box" space (interior office).Details
suite 1500: deferred electrical permit-under main archtectural permit 202306281088. no exterior work. new lighting to "white box" space (interior office). | $83,735 |
| Aug 24, 2023 | Completed final sign-off Feb 2024 | 595 Market St | Source Planning And Construction Inc | basement: mep for arch pa# 202303073171.Details
basement: mep for arch pa# 202303073171. | $300,000 |
| Aug 14, 2023 | Completed final sign-off Dec 2023 | 595 Market St | Source Planning And Construction Inc | suite 650: mech and electrical for 202305117566.Details
suite 650: mech and electrical for 202305117566. | $125,000 |
| Jul 14, 2023 | Completed final sign-off Mar 2024 | 940 Laguna Honda Bl | Paganini Electric Corp(See Signatories) | power new ada lift and door. power new drinking fountains. lighting modifications. exterior modifications are within private school property and not visible from the street.Details
power new ada lift and door. power new drinking fountains. lighting modifications. exterior modifications are within private school property and not visible from the street. | $24,000 |
| Jun 26, 2023 | Completed final sign-off Aug 2023 | 601 California St | Peacock Construction | title 24 compliance for tenant improvement under pa 202209152486. maher n/aDetails
title 24 compliance for tenant improvement under pa 202209152486. maher n/a | $125,000 |
| Jun 26, 2023 | Completed final sign-off Aug 2023 | 601 California St | Peacock Construction | title 24 compliance to include new lighting and branch circuit to existing panel for tenant improvement under pa 202003056337. fire life safety under sep. permit. maher n/aDetails
title 24 compliance to include new lighting and branch circuit to existing panel for tenant improvement under pa 202003056337. fire life safety under sep. permit. maher n/a | $125,000 |
| Jun 8, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Richlen Construction | electrical and mechanical work for ti pa 2023-0322-4185 & 2022-1215-8405Details
electrical and mechanical work for ti pa 2023-0322-4185 & 2022-1215-8405 | $125,000 |
| May 3, 2023 | Never finaled issued May 2023, no final | 250 Montgomery St | Mcclure Electric Inc | 6/f-suite 600: title 24, lighting only. ref bpa#202207259234Details
6/f-suite 600: title 24, lighting only. ref bpa#202207259234 | |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 600 Montgomery St | Skyline Construction | ref pa# 202304135679. electrical work from tenant improvement at the 33th floor.Details
ref pa# 202304135679. electrical work from tenant improvement at the 33th floor. | $12,000 |
| Apr 18, 2023 | Completed final sign-off Nov 2023 | 235 Montgomery St | R.M.R. Construction Company | suite 1050: deferred application on 202211166636. providing new lighting and branch circuiting to existing panel. maintain some ex power and signal circuits and new power and branch circuts. raceway systems as req.Details
suite 1050: deferred application on 202211166636. providing new lighting and branch circuiting to existing panel. maintain some ex power and signal circuits and new power and branch circuts. raceway systems as req. | $21,250 |
| Apr 17, 2023 | Completed final sign-off Jul 2023 | 360 03rd St | Gci, Inc | 1/f: mechanical & electrical work for t.i. to include demo of existing grille and installation of new grille w/ associated electrical wor, ref pa# 202212077790.Details
1/f: mechanical & electrical work for t.i. to include demo of existing grille and installation of new grille w/ associated electrical wor, ref pa# 202212077790. | $2,000 |
| Apr 13, 2023 | Completed final sign-off Jul 2023 | 625 02nd St | Source Planning And Construction Inc | suite# 100. provided new lighting and branch circuiting to (e) panel maintained some of the (e) power and signal outlets and provided additonal power branch circuiting and raccway systems as required to new power and signal outlets, provided ca title 24 compliance forms. ref pa# 202303133545.Details
suite# 100. provided new lighting and branch circuiting to (e) panel maintained some of the (e) power and signal outlets and provided additonal power branch circuiting and raccway systems as required to new power and signal outlets, provided ca title 24 compliance forms. ref pa# 202303133545. | $135,730 |
| Jan 12, 2023 | Completed final sign-off Mar 2023 | 71 Stevenson St | Marchetti Group | replace all existing light fixtures w/ energy efficient led lighting. ref ti permit 202104279372Details
replace all existing light fixtures w/ energy efficient led lighting. ref ti permit 202104279372 | $25,000 |
| Jan 11, 2023 | Completed final sign-off Feb 2023 | 601 California St | Bcci Construction Company | 18/f: electrical only permit to support approved arch permit #202207158616. new lighting and power.Details
18/f: electrical only permit to support approved arch permit #202207158616. new lighting and power. | $75,000 |
| Nov 1, 2022 | Never finaled issued Nov 2022, no final | 685 Market St | C C I Commercial Construction & Improv | ref bpa#202204051561. electrical work only, provide new lighting & branch circuiting panel, provide new power/signal/branch circuiting to (e) panel, provide ca title 24 compliance forms.Details
ref bpa#202204051561. electrical work only, provide new lighting & branch circuiting panel, provide new power/signal/branch circuiting to (e) panel, provide ca title 24 compliance forms. | $100 |
| Oct 14, 2022 | Never finaled issued Oct 2022, no final | 1192 Market St | Young Electric Co | deferred electrical drawings for pa# 2022-0418-2448. bar #2.Details
deferred electrical drawings for pa# 2022-0418-2448. bar #2. | $217,500 |
| Oct 14, 2022 | Never finaled issued Oct 2022, no final | 1192 Market St | Young Electric Co | deferred electrical drawings for pa# 2022-0418-2447. bar #1.Details
deferred electrical drawings for pa# 2022-0418-2447. bar #1. | $158,500 |
| Jun 30, 2022 | Completed final sign-off May 2023 | 555 Mission St | Novo Construction Inc | 17th fl, ste 1750 - mechanical and electrical work for tenant improvement ref pa 2022-0517-4379Details
17th fl, ste 1750 - mechanical and electrical work for tenant improvement ref pa 2022-0517-4379 | $55,000 |
| Jun 8, 2022 | Completed final sign-off Sep 2022 | 60 Spear St | Richlen Construction | basement: provide new lighting & branch circuiting to existing panel. maintained some existing power and signal outlets & provided additional new power branch circuiting & raceway systems as required to new power and signal outlets. provided ca title-24 compliance forms. ref pa# 2021-1216-4532Details
basement: provide new lighting & branch circuiting to existing panel. maintained some existing power and signal outlets & provided additional new power branch circuiting & raceway systems as required to new power and signal outlets. provided ca title-24 compliance forms. ref pa# 2021-1216-4532 | $30,000 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 1 Bush St | Premier Structures Inc | ste 510/525: mod of hvac system to including 1 new colling only vav, 1 new exhaust fan & duct distribution to accommodate new layout. modifty power distribution & lighting to accomoodate new layout - title 24 compliance. ref to pa202204081879.Details
ste 510/525: mod of hvac system to including 1 new colling only vav, 1 new exhaust fan & duct distribution to accommodate new layout. modifty power distribution & lighting to accomoodate new layout - title 24 compliance. ref to pa202204081879. | $150,000 |
| May 11, 2022 | Completed final sign-off Jan 2025 | 101 Townsend St | Novo Construction Inc | 2nd fl: mechanical and electrical for tenant improvement. ref pa# 202202258755.Details
2nd fl: mechanical and electrical for tenant improvement. ref pa# 202202258755. | $30,000 |
| May 11, 2022 | Completed final sign-off Jan 2025 | 111 Townsend St | Novo Construction Inc | 2nd fl: mechanical and electrical for tenant improvement. ref pa# 202202258753.Details
2nd fl: mechanical and electrical for tenant improvement. ref pa# 202202258753. | $30,000 |
| Apr 25, 2022 | Completed final sign-off Jan 2023 | 235 Montgomery St | R.M.R. Construction Company | suite 450: providing new lighting and branch circuiting to existing panel. providing ca title 24 compliance forms. ref permit 202203039148.Details
suite 450: providing new lighting and branch circuiting to existing panel. providing ca title 24 compliance forms. ref permit 202203039148. | $56,000 |
| Feb 7, 2022 | Completed final sign-off Oct 2022 | 111 Townsend St | Novo Construction Inc | mep for ti nes fsd's for b32 passage way; furnish and install new low side dict and registers; provide new lighting ref pa 2021-0921-8853 and 2021-0921-8855Details
mep for ti nes fsd's for b32 passage way; furnish and install new low side dict and registers; provide new lighting ref pa 2021-0921-8853 and 2021-0921-8855 | $25,000 |
| Nov 29, 2021 | Completed final sign-off Apr 2022 | 4 Embarcadero Center | Rossi Builders Inc. | 32/f: ref #202109178613. mep deferredDetails
32/f: ref #202109178613. mep deferred | $295,000 |
| Nov 10, 2021 | Completed final sign-off May 2022 | 1 Market St | M C S Construction Services | 10/f provide new lighting & branch circuits to (e) panel. ref pa202110190764.Details
10/f provide new lighting & branch circuits to (e) panel. ref pa202110190764. | $199,000 |
| Sep 22, 2021 | Never finaled issued Nov 2021, no final | 560 Mission St | Turner Construction Co | ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.Details
ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep. | $1,500,000 |
| Sep 22, 2021 | Never finaled issued Sep 2021, no final | 333 Bush St | Premier Structures Inc | 25th fl, ste 2500 - new lighting & t24 controls throughout. additional circuits for new heat pump & appliances. provide & install new heat pump, vav & distribution as needed. ref pa 2021-0812-6332Details
25th fl, ste 2500 - new lighting & t24 controls throughout. additional circuits for new heat pump & appliances. provide & install new heat pump, vav & distribution as needed. ref pa 2021-0812-6332 | $150,000 |
| Jul 7, 2021 | Completed final sign-off Jul 2022 | 1649 Divisadero St | Stratus Construction Company | 1270 sq. ft. cannabis retail ti per 2020-07023cua, ground floor of mixed use bldg. no consumption or manufacturing onsiteDetails
1270 sq. ft. cannabis retail ti per 2020-07023cua, ground floor of mixed use bldg. no consumption or manufacturing onsite | $100,000 |
| Jun 7, 2021 | Completed final sign-off Dec 2021 | 655 Montgomery St | C B F Inc | 20th flr - electrical only, lights, controls, plugs. ref t.i. bpa#202012030187 & 202002114168.Details
20th flr - electrical only, lights, controls, plugs. ref t.i. bpa#202012030187 & 202002114168. | $83,000 |
| May 28, 2021 | Never finaled issued May 2021, no final | 1 Maritime Pz | Richlen Construction | 20th floor - new lighting, branch, circuiting, electrical new power and signal outlets. title 24 ref pa 2020-1211-0883.Details
20th floor - new lighting, branch, circuiting, electrical new power and signal outlets. title 24 ref pa 2020-1211-0883. | $15,000 |
| May 3, 2021 | Completed final sign-off Oct 2021 | 185 Berry St | Peacock Construction | ste 120: replace ductwork & grille. remove/relocate existing transfer fans. provide new lighting & branch circuiting to existing panel. provide additional new power branch circuiting.Details
ste 120: replace ductwork & grille. remove/relocate existing transfer fans. provide new lighting & branch circuiting to existing panel. provide additional new power branch circuiting. | $90,000 |
| Jan 21, 2021 | Never finaled issued Feb 2021, no final | 185 Berry St | Peacock Construction | ste 170: title 24. electrical & mechanical work under pa# 202010076109.Details
ste 170: title 24. electrical & mechanical work under pa# 202010076109. | $115,000 |
| Jan 21, 2021 | Never finaled issued Feb 2021, no final | 235 Montgomery St | R.M.R. Construction Company | suite 935: title 24 compliance to ref pa202002114083. maher n/aDetails
suite 935: title 24 compliance to ref pa202002114083. maher n/a | $18,000 |
| Jan 21, 2021 | Completed final sign-off Apr 2021 | 450 Sansome St | Skyline Construction | 10/f: new lighting and branch circuiting to (e) panel. install new vav box. re-distribute downsteam duct work for new layout. ref pa 202010217059Details
10/f: new lighting and branch circuiting to (e) panel. install new vav box. re-distribute downsteam duct work for new layout. ref pa 202010217059 | $495 |
| Jan 19, 2021 | Completed final sign-off Nov 2022 | 235 Montgomery St | R.M.R. Construction Company | suite 420: title 24 compliance to ref pa202002215091. maher n/aDetails
suite 420: title 24 compliance to ref pa202002215091. maher n/a | $18,000 |
| Jan 6, 2021 | Never finaled issued Feb 2021, no final | 901 Battery St | Novo Construction Inc | 4th floor - electrical work for ti. ref pa 2020-0608-8251Details
4th floor - electrical work for ti. ref pa 2020-0608-8251 | $20,000 |
| Sep 5, 2020 | Completed final sign-off Nov 2020 | 435 Jackson St | Skyline Construction | 1,600 sqft of interior ti. deffered electrical. expension of existing meeting room + finishes througout. no structural work.Details
1,600 sqft of interior ti. deffered electrical. expension of existing meeting room + finishes througout. no structural work. | $100,000 |
| Mar 12, 2020 | Completed final sign-off Dec 2020 | 33 New Montgomery St | Peacock Construction | suite 1550 on fl 15. t-24 electrical for work under pa #202001101625.Details
suite 1550 on fl 15. t-24 electrical for work under pa #202001101625. | |
| Mar 4, 2020 | Never finaled issued Mar 2020, no final | 650 California St | Richlen Construction | revision to #202001212386. provide new lighting & branch circuiting to existing panel. maintained some existing power & signal outlets and provided new power branch circuiting/raceway system as required to new power signal outlets. provide title 24. 29th flDetails
revision to #202001212386. provide new lighting & branch circuiting to existing panel. maintained some existing power & signal outlets and provided new power branch circuiting/raceway system as required to new power signal outlets. provide title 24. 29th fl | $40,000 |
| Mar 3, 2020 | Completed final sign-off Nov 2022 | 235 Montgomery St | R.M.R. Construction Company | electrical work of app#201807023503Details
electrical work of app#201807023503 | $12,000 |
| Feb 21, 2020 | Completed final sign-off Feb 2021 | 1 Market St | M C S Construction Services | ref# 2020-0124-2724: deferred electrical only. minor lighting and power upgrades, no hvac or plumbing.Details
ref# 2020-0124-2724: deferred electrical only. minor lighting and power upgrades, no hvac or plumbing. | $35,000 |
| Feb 6, 2020 | Completed final sign-off Mar 2021 | 111 Sutter St | Gci, Inc | 20th and 21st floors: title 24 electrical n/a maherDetails
20th and 21st floors: title 24 electrical n/a maher | $38,000 |
| Jan 30, 2020 | Never finaled issued Feb 2020, no final | 575 Market St | M C S Construction Services | 20th fl - new light & electrical work. no structural partrition (n). no change in occupancy or use. ref pa 2019-1122-7959Details
20th fl - new light & electrical work. no structural partrition (n). no change in occupancy or use. ref pa 2019-1122-7959 | $11,716,080 |
| Jan 30, 2020 | Completed final sign-off Mar 2021 | 575 Market St | M C S Construction Services | scope of work includes new electrical & lighting within hallways and restrooms of the 8th, 25th & 27th floors. ref pa 2019-1210-9158Details
scope of work includes new electrical & lighting within hallways and restrooms of the 8th, 25th & 27th floors. ref pa 2019-1210-9158 | $166,157 |
| Jan 21, 2020 | Completed final sign-off Jul 2020 | 650 California St | Richlen Construction | provide new ligting and branch circut to (e) panel, maintained some of the (e) power and signal outlets and provide additional new power and raceway systems as required to new power and signal outlets, provide ca t-24 compliance formsDetails
provide new ligting and branch circut to (e) panel, maintained some of the (e) power and signal outlets and provide additional new power and raceway systems as required to new power and signal outlets, provide ca t-24 compliance forms | $15,000 |
| Jan 17, 2020 | Completed final sign-off Mar 2021 | 111 Sutter St | Gci, Inc | ref 201910174867, title 24 electricalDetails
ref 201910174867, title 24 electrical | $50,000 |