Nicholas Chiaraito
- License
- M37279
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M37279 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jun 2026 to Sep 2026
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Peacock Construction (2)
- Engineers
- Jesus B Cabellon Jr, Stephen Shaffer
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 301 Howard St | 22nd and 23rd floor - deferred mep permit application #: 202608066150Details
22nd and 23rd floor - deferred mep permit application #: 202608066150 | $299,415 | |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | deferred mep for 20th floor office ti under permit 202602266553. ref: 202605272015/202602266553(me deferred)Details
deferred mep for 20th floor office ti under permit 202602266553. ref: 202605272015/202602266553(me deferred) | $150,000 |
| Jun 18, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | deferred mep for 19th floor office ti under permit 202602266548. 202605272012Details
deferred mep for 19th floor office ti under permit 202602266548. 202605272012 | $180,000 |