Permit GraphShortlistSan Francisco building permits since 2000

Edward Rivera

License
2835
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, designer, engineer
Firm
Rivera Consulting Group Inc
Based in
San Francisco
On San Francisco permits
Dec 2004 to Nov 2026

87 permits since 2000 (engineer on 80 permits, architect on 6 permits, designer on 1 permit): 48 completed, 19 in progress, 8 never finaled, 12 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Skyline Construction (10), Gci, Inc (7), Bcci Construction Company (6), Field Construction Inc. (5), Hathaway Dinwiddie Co. (5), Source Planning And Construction Inc (5), Matrix Hg Inc (4), M C S Construction Services (3), Marchetti Group (3), C C I Commercial Construction & Improv (2), Dome Construction Corp (2), Richlen Construction (2), Wickman Development And Construction (2), Bear Flag Ironworks Llc, Dave Mason Building, Donald S. Maclean, Inc, Dpr Construction, Emcor Services/Mesa Energy Systems Inc, Gene Peterson General Contractor, Highland Property Construction, Level 10 Construction Lp, Lewis M Merlo Inc, Mik Construction Inc, Narrowback Construction Co., Novo Construction Inc, Otte North America Inc, Plant Construction Company Lp, Principal Builders Inc., Rudolph Commercial Interiors Inc, Rci, San Francisco Commercial Builders Inc, Turner Construction Co
Architects
Albert Costa (3), Scott E Clement (3), Andrew Mangan (2), Breck Polley (2), Candace Chan (2), Eric Ibsen (2), Joseph A. Remling (2), Lawrence Smith (2), Mark R. Walsh (2), Stanley H Lew (2), Stephanie Kwan (2), Alma Rossy Jauregui, Amir Kakavand, Bert Deviterbo, Brian Milford, Douglas Tom, Douglas Zucker, George Soskin, Jeffrey Ellerbrock, Karen Mar, Lisa Bieringer, Marco Fung, Stephen Maccracken, Teresa Emery, Terry Lofrano, William Diefenbach, Yi-Tso Jeff Chen
Engineers
Glenn Friedman (2), Levi G. Abarte (2), Meng Hsiu Chen (2), Amit Wadhwa, Anthony Winston Iii, Antonio Jacksalem, Barry C Abramson, Guil Orihuela, Jillian P. Moritz, Joshua Mcmmahan, Madison Ryutaro Roberts, Mike Howe, Neil Joson, Peter Bekey, Susanna M. See, Thomas Morse, Todd M. See, Wayne Gaw
Authorized agents
Albert Costa, Joyce Mizuhara, Turhin Ammons
Subcontractors
Donald S. Maclean

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 9, 2026In progress
filed Nov 2026, not yet issued
300 Clay StMatrix Hg Incalteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to
Details
Permit
202609027552

alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to

Open the permit page

$875,345
Sep 22, 2026In progress
issued Oct 2026
30 Battery StGci, Incaddition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.
Details
Permit
202609228466
Permit issued
Oct 29, 2026

addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.

Open the permit page

$625,000
Aug 26, 2026In progress
issued Oct 2026
405 Howard StBear Flag Ironworks Llcinstallation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access.
Details
Permit
202608267188
Permit issued
Oct 1, 2026

installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access.

Open the permit page

$375,000
Aug 25, 2026In progress
issued Sep 2026
201 Mission StRichlen Constructionref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.
Details
Permit
202608257109
Permit issued
Sep 1, 2026

ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.

Open the permit page

$322,135
Aug 20, 2026In progress
issued Nov 2026
1 Front StGci, Increpave (e) plaza @ market st entry w/stone. (n) planter & seating; repave 9e) entry @ front st w/stone; repave portion of sidewalk w/stone; (n) waterproofing extending into public right of way. (n) awning; (n) storefront doors & recessed entry; refurbish (e) stair door
Details
Permit
202608206931
Permit issued
Nov 20, 2026

repave (e) plaza @ market st entry w/stone. (n) planter & seating; repave 9e) entry @ front st w/stone; repave portion of sidewalk w/stone; (n) waterproofing extending into public right of way. (n) awning; (n) storefront doors & recessed entry; refurbish (e) stair door

Open the permit page

$277,065
Aug 4, 2026Completed
final sign-off Nov 2026
300 Mission StM C S Construction Services6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included
Details
Permit
202608046011
Permit issued
Aug 11, 2026
Final sign-off
Nov 18, 2026

6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included

Open the permit page

Jul 15, 2026In progress
filed Jul 2026, not yet issued
1 Market St1st fl: interior oly tenant improvement to construct new fitness center. mep deferred.
Details
Permit
202607155063

1st fl: interior oly tenant improvement to construct new fitness center. mep deferred.

Open the permit page

$1,363,200
Jul 10, 2026In progress
filed Jul 2026, not yet issued
1 Market St1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event space
Details
Permit
202607104845

1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event space

Open the permit page

$1,491,000
May 14, 2026In progress
issued Oct 2026
300 Mission StGci, Incev charging stations w/structural support
Details
Permit
202605141282
Permit issued
Oct 29, 2026

ev charging stations w/structural support

Open the permit page

$150,000
May 1, 2026In progress
filed May 2026, not yet issued
1 Market StField Construction Inc.ev charging station - basement level garage. restriping and add 4 ev charging stations. electrical and structural.
Details
Permit
202605010486

ev charging station - basement level garage. restriping and add 4 ev charging stations. electrical and structural.

Open the permit page

$300,000
Apr 27, 2026In progress
issued Apr 2026
101 02nd StSource Planning And Construction Inc(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.
Details
Permit
202604270132
Permit issued
Apr 27, 2026

(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.

Open the permit page

Apr 16, 2026In progress
filed Apr 2026, not yet issued
1 Market Stfloors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office tower
Details
Permit
202604169548

floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office tower

Open the permit page

$26,000
Apr 8, 2026In progress
issued Jun 2026
1 Market StOtte North America Incexterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.
Details
Permit
202604089100
Permit issued
Jun 2, 2026

exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.

Open the permit page

$449,000
Mar 9, 2026In progress
issued Aug 2026
1 Market StField Construction Inc.29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only
Details
Permit
202603097152
Permit issued
Aug 21, 2026

29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only

Open the permit page

Jan 21, 2026Expired or cancelled
withdrawn Feb 2026
2311 Taraval Strevision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate.
Details
Permit
202601214203

revision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate.

Open the permit page

Dec 17, 2025Completed
final sign-off Jul 2026
300 Mission StM C S Construction Services11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress.
Details
Permit
202512171972
Permit issued
Jan 20, 2026
Final sign-off
Jul 22, 2026

11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress.

Open the permit page

$75,000
Dec 15, 2025In progress
issued Feb 2026
1 Market StField Construction Inc.29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space.
Details
Permit
202512151798
Permit issued
Feb 27, 2026

29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space.

Open the permit page

$150,000
Oct 28, 2025In progress
issued Nov 2025
300 Clay StSkyline Constructioninterconnecting accessory (non-egress) stairs between levels 18 and 19.
Details
Permit
202510288277
Permit issued
Nov 25, 2025

interconnecting accessory (non-egress) stairs between levels 18 and 19.

Open the permit page

$113,150
Oct 28, 2025In progress
issued Nov 2025
1 Maritime PzSkyline Constructioninterconnecting accessory (non-egress) stairs between levels 17 & 18
Details
Permit
202510288266
Permit issued
Nov 25, 2025

interconnecting accessory (non-egress) stairs between levels 17 & 18

Open the permit page

$65,700
Sep 15, 2025Completed
final sign-off Nov 2026
4 Embarcadero CenterSkyline Construction14th fl - revision to approved structural element support operable partition ref pa 202508082665
Details
Permit
202509155301
Permit issued
Nov 14, 2025
Final sign-off
Nov 9, 2026

14th fl - revision to approved structural element support operable partition ref pa 202508082665

Open the permit page

Aug 15, 2025In progress
filed Aug 2025, not yet issued
875 Howard Stinstallation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuiting
Details
Permit
202505075990

installation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuiting

Open the permit page

$143,621
Jul 23, 2025Expired or cancelled
withdrawn Feb 2026
2311 Taraval Strevision to 202311301659: fan coil installation structural only, no change on mechanical design
Details
Permit
202507231417

revision to 202311301659: fan coil installation structural only, no change on mechanical design

Open the permit page

Jul 9, 2025Expired or cancelled
withdrawn Feb 2026
2311 Taraval Strevision to pa# 2023-1130-1659 change structural design with additional detail
Details
Permit
202507090441

revision to pa# 2023-1130-1659 change structural design with additional detail

Open the permit page

$50,000
Jul 1, 2025Completed
final sign-off Apr 2026
301 Howard StBcci Construction Companysuite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes.
Details
Permit
202507019862
Permit issued
Jul 16, 2025
Final sign-off
Apr 20, 2026

suite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes.

Open the permit page

$65,000
Dec 18, 2024In progress
issued Dec 2024
50 California StBcci Construction Company24th fl- ref pa # 2024-0904-9993 structural for movable partitions
Details
Permit
202412187084
Permit issued
Dec 20, 2024

24th fl- ref pa # 2024-0904-9993 structural for movable partitions

Open the permit page

Sep 24, 2024Completed
final sign-off Jul 2025
300 Clay StMatrix Hg Incground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurant
Details
Permit
202409241446
Permit issued
Oct 21, 2024
Final sign-off
Jul 18, 2025

ground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurant

Open the permit page

$352,749
May 17, 2024In progress
issued Mar 2025
375 Woodside Avmodernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity.
Details
Permit
202405061457
Permit issued
Mar 13, 2025

modernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity.

Open the permit page

$1,552,259
Dec 11, 2023Completed
final sign-off Sep 2024
1 Maritime PzHathaway Dinwiddie Co.ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above).
Details
Permit
202312112251
Permit issued
Jan 19, 2024
Final sign-off
Sep 27, 2024

ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above).

Open the permit page

$518,000
Jun 15, 2023Completed
final sign-off Oct 2023
450 Sansome StGci, Inc16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242
Details
Permit
202306150156
Permit issued
Jun 21, 2023
Final sign-off
Oct 5, 2023

16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242

Open the permit page

$2,000
Apr 13, 2023Completed
final sign-off Oct 2023
1 Market StSkyline Construction39/f: revision to bpa#202211307363 for structural work associated w/proposed nana wall in lieu of modem fold wall
Details
Permit
202304135630
Permit issued
May 17, 2023
Final sign-off
Oct 13, 2023

39/f: revision to bpa#202211307363 for structural work associated w/proposed nana wall in lieu of modem fold wall

Open the permit page

Mar 2, 2023Never finaled
issued Mar 2023, no final
101 California StSource Planning And Construction Inc30th flr - ste 3050 -rev to pa# 2022-1116-6644, addition of (1) p5500 lateral unistrut approx 10lf, extended (4) p5500 unistrut suppports and weld to lateral support.
Details
Permit
202303022894
Permit issued
Mar 17, 2023

30th flr - ste 3050 -rev to pa# 2022-1116-6644, addition of (1) p5500 lateral unistrut approx 10lf, extended (4) p5500 unistrut suppports and weld to lateral support.

Open the permit page

Jan 10, 2023Completed
final sign-off Sep 2023
201 Mission StRichlen Constructionrevision to pa# 202208291499, to include structural scope. structural scope previously deferred.
Details
Permit
202301109948
Permit issued
Jan 18, 2023
Final sign-off
Sep 12, 2023

revision to pa# 202208291499, to include structural scope. structural scope previously deferred.

Open the permit page

$52,000
Nov 17, 2022Never finaled
issued Jan 2023, no final
25 Van Ness AvMik Construction Incremove and replace damaged sections of sidewalk, sidewalk is over an occupied basement.
Details
Permit
202211176699
Permit issued
Jan 17, 2023

remove and replace damaged sections of sidewalk, sidewalk is over an occupied basement.

Open the permit page

$26,000
Oct 18, 2022Completed
final sign-off Feb 2023
4 Embarcadero CenterSource Planning And Construction Inc30/f structural only - installation of core holes in steel floor beams at the 30th floor. ref 202207057733.
Details
Permit
202210184539
Permit issued
Oct 18, 2022
Final sign-off
Feb 22, 2023

30/f structural only - installation of core holes in steel floor beams at the 30th floor. ref 202207057733.

Open the permit page

$10,000
Jul 11, 2022Completed
final sign-off Jul 2024
1 Market StSkyline Constructioncorporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements.
Details
Permit
202207118174
Permit issued
Oct 3, 2022
Final sign-off
Jul 10, 2024

corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements.

Open the permit page

$4,000,000
Jul 8, 2022Completed
final sign-off Mar 2023
1 Beach StLevel 10 Construction Lprevision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm.
Details
Permit
202207088078
Permit issued
Jul 12, 2022
Final sign-off
Mar 29, 2023

revision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm.

Open the permit page

May 17, 2022Completed
final sign-off Jun 2023
4 Embarcadero CenterSkyline Construction35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits.
Details
Permit
202205174425
Permit issued
May 20, 2022
Final sign-off
Jun 2, 2023

35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits.

Open the permit page

$50,000
May 11, 2022Completed
final sign-off Jul 2024
1 Market StSkyline Construction23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope.
Details
Permit
202205113973
Permit issued
Jun 22, 2022
Final sign-off
Jul 10, 2024

23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope.

Open the permit page

$500,000
Apr 29, 2022Completed
final sign-off Sep 2024
50 Beale StField Construction Inc.interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical.
Details
Permit
202204293259
Permit issued
Sep 13, 2023
Final sign-off
Sep 3, 2024

interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical.

Open the permit page

$391,000
Mar 28, 2022Completed
final sign-off Oct 2022
580 California StSan Francisco Commercial Builders Inc23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.
Details
Permit
202203280981
Permit issued
Jun 16, 2022
Final sign-off
Oct 21, 2022

23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.

Open the permit page

$190,000
Mar 1, 2022Completed
final sign-off Apr 2023
1 Maritime PzMatrix Hg Inc2 (e) steam boilers to be removed and replaced. add 4 (n) heating hot water boilers, 3 (n) air separators, 2 (n) heat exchangers, 6 (n) pumps, 2 (n) heating system expansion tanks to be provided to replace 4 (e) expansion tanks. no new fsd's are being added.
Details
Permit
202203018952
Permit issued
Mar 8, 2022
Final sign-off
Apr 5, 2023

2 (e) steam boilers to be removed and replaced. add 4 (n) heating hot water boilers, 3 (n) air separators, 2 (n) heat exchangers, 6 (n) pumps, 2 (n) heating system expansion tanks to be provided to replace 4 (e) expansion tanks. no new fsd's are being added.

Open the permit page

$2,128,734
Dec 16, 2021Completed
final sign-off Feb 2024
101 Spear StMarchetti Grouprevisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved.
Details
Permit
202112164578
Permit issued
Sep 7, 2022
Final sign-off
Feb 29, 2024

revisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved.

Open the permit page

$125,000
Oct 25, 2021Completed
final sign-off Dec 2023
1480 Folsom StBcci Construction Companyconversion of ext single story + or - 40000 sq ft automotive repair bldg to trade shop with accessory parking and storage. all associated ti fit out.
Details
Permit
202110251080
Permit issued
May 23, 2022
Final sign-off
Dec 14, 2023

conversion of ext single story + or - 40000 sq ft automotive repair bldg to trade shop with accessory parking and storage. all associated ti fit out.

Open the permit page

$2,000,000
Aug 13, 2021Completed
final sign-off Mar 2022
505 Montgomery StPrincipal Builders Inc.suite 1400: revision to pa# 202107013657. revisions include closets, shelving and installation of metal screen.
Details
Permit
202108136421
Permit issued
Aug 25, 2021
Final sign-off
Mar 7, 2022

suite 1400: revision to pa# 202107013657. revisions include closets, shelving and installation of metal screen.

Open the permit page

May 19, 2021Completed
final sign-off Feb 2022
405 Howard StGci, Incvoluntary seismic strengthening of historic unreinforced bearing wall building, previously reinforced with steel braces, & out of plane wall anchors. current retrofit installs additional out of plane wall anchors.
Details
Permit
202105190609
Permit issued
May 27, 2021
Final sign-off
Feb 17, 2022

voluntary seismic strengthening of historic unreinforced bearing wall building, previously reinforced with steel braces, & out of plane wall anchors. current retrofit installs additional out of plane wall anchors.

Open the permit page

$94,000
May 3, 2021Never finaled
issued Jun 2021, no final
121 Spear StMarchetti Groupremoval & replacement of sections of 1st floor slab. interior location.
Details
Permit
202105039698
Permit issued
Jun 10, 2021

removal & replacement of sections of 1st floor slab. interior location.

Open the permit page

$15,000
Apr 28, 2021Expired or cancelled
withdrawn Jun 2021
575 Market Streplacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing.
Details
Permit
202104289497

replacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing.

Open the permit page

$1,100,000
Dec 2, 2020Completed
final sign-off Nov 2021
20 Heron StC C I Commercial Construction & Improvminor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout.
Details
Permit
202012020112
Permit issued
Feb 19, 2021
Final sign-off
Nov 16, 2021

minor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout.

Open the permit page

Nov 25, 2020Completed
final sign-off Mar 2022
201 Mission StField Construction Inc.parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting.
Details
Permit
202011259763
Permit issued
May 21, 2021
Final sign-off
Mar 9, 2022

parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting.

Open the permit page

$260,000
Oct 22, 2020Completed
final sign-off Oct 2021
888 Brannan StLewis M Merlo Increplacment of concrete parapet, severly deteriorated with a new concrete parapet. 20lf along wall is falling hazard. we request expedited approval on an emergency basis.
Details
Permit
202010227186
Permit issued
Oct 22, 2020
Final sign-off
Oct 13, 2021

replacment of concrete parapet, severly deteriorated with a new concrete parapet. 20lf along wall is falling hazard. we request expedited approval on an emergency basis.

Open the permit page

$5,000
Oct 9, 2020Completed
final sign-off Dec 2021
1 Embarcadero CenterSkyline Construction9/f: demo of (e) suite & construction of t.i for single tenant future sublease space. new ceiling, lighting & partitions etc. meps, life safety, sprinklers & structural if needed under separate permit. (bldg fully sprinklered)
Details
Permit
202010096255
Permit issued
Jan 22, 2021
Final sign-off
Dec 29, 2021

9/f: demo of (e) suite & construction of t.i for single tenant future sublease space. new ceiling, lighting & partitions etc. meps, life safety, sprinklers & structural if needed under separate permit. (bldg fully sprinklered)

Open the permit page

$4,300,000
Oct 8, 2020Completed
final sign-off Nov 2021
20 Heron StC C I Commercial Construction & Improv(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.
Details
Permit
202010086198
Permit issued
Mar 30, 2021
Final sign-off
Nov 16, 2021

(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.

Open the permit page

$48,000
Sep 19, 2020Completed
final sign-off Aug 2021
444 Battery StGci, Increplacement of cast gypsum roof with concrete filled met deck & other diaphragm strengthening. alterations to the mechanical/mezzanine and repairs to interior concrete block walls.
Details
Permit
202009194516
Permit issued
Mar 16, 2021
Final sign-off
Aug 4, 2021

replacement of cast gypsum roof with concrete filled met deck & other diaphragm strengthening. alterations to the mechanical/mezzanine and repairs to interior concrete block walls.

Open the permit page

$1,500,000
Mar 5, 2020Completed
final sign-off Dec 2020
4 Embarcadero CenterSource Planning And Construction Inc20th fl - structural work for ti for a mobile partition. ref pa 2019-0815-8941
Details
Permit
202003056234
Permit issued
Dec 10, 2020
Final sign-off
Dec 31, 2020

20th fl - structural work for ti for a mobile partition. ref pa 2019-0815-8941

Open the permit page

$5,000
Jan 21, 2020Completed
final sign-off Apr 2021
300 Mission StBcci Construction Companyfloors 20-23; structural deferred submittal for approved arch plans ref pa# 201911217836, 201911217840, 201911217838, 2019111147260 n/a maher
Details
Permit
202001212327
Permit issued
Jan 23, 2020
Final sign-off
Apr 28, 2021

floors 20-23; structural deferred submittal for approved arch plans ref pa# 201911217836, 201911217840, 201911217838, 2019111147260 n/a maher

Open the permit page

$15,000
Dec 26, 2019Completed
final sign-off Dec 2020
450 Sansome StEmcor Services/Mesa Energy Systems Incstructural revision to pa# 2019-1011-4211. change to beam size.
Details
Permit
201912260664
Permit issued
Dec 26, 2019
Final sign-off
Dec 18, 2020

structural revision to pa# 2019-1011-4211. change to beam size.

Open the permit page

Nov 4, 2019Never finaled
issued Nov 2019, no final
101 Spear StMarchetti Groupproject scope includes the construction of raised platforms withtin the atrium of rincon center located at 121 spear street. referece pa 2019-0806-7976
Details
Permit
201911046383
Permit issued
Nov 8, 2019

project scope includes the construction of raised platforms withtin the atrium of rincon center located at 121 spear street. referece pa 2019-0806-7976

Open the permit page

Jun 13, 2019Never finaled
issued Jul 2019, no final
50 Beale StSkyline Constructionref pa# 201903145206; ahu replacement on 3rd fl.
Details
Permit
201906133291
Permit issued
Jul 15, 2019

ref pa# 201903145206; ahu replacement on 3rd fl.

Open the permit page

$510,000
May 20, 2019Expired or cancelled
expired Dec 2019
4 Embarcadero CenterTurner Construction Co25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit.
Details
Permit
201905201181
Permit issued
Jun 6, 2019

25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit.

Open the permit page

$3,000,000
Apr 8, 2019Completed
final sign-off Oct 2019
50 Beale StSkyline Constructionrev to pa# 201903145206; beam penetrations at 4th fl. framing plan for 3rd fl. tenant improvements
Details
Permit
201904087402
Permit issued
Apr 23, 2019
Final sign-off
Oct 17, 2019

rev to pa# 201903145206; beam penetrations at 4th fl. framing plan for 3rd fl. tenant improvements

Open the permit page

$20,000
Jan 9, 2019Completed
final sign-off Mar 2020
300 Clay StGci, Incphase 2 seismic strengthening partial/continues for tenant floors 10, 12, 13, 15, 16 under pa #2017-0802-3712 and original pa #2000-0526-1165 as open core & shell per ab017.
Details
Permit
201901099952
Permit issued
Jan 2, 2020
Final sign-off
Mar 5, 2020

phase 2 seismic strengthening partial/continues for tenant floors 10, 12, 13, 15, 16 under pa #2017-0802-3712 and original pa #2000-0526-1165 as open core & shell per ab017.

Open the permit page

$250,000
May 31, 2018Completed
final sign-off Oct 2018
201 Potrero AvM C S Construction Servicesinterior remodel - 2nd flr only - removal of door and widening of (e) door opening in (e) brick wall
Details
Permit
201805310685
Permit issued
Jun 1, 2018
Final sign-off
Oct 26, 2018

interior remodel - 2nd flr only - removal of door and widening of (e) door opening in (e) brick wall

Open the permit page

$32,000
Apr 26, 2018Completed
final sign-off Jun 2018
33 New Montgomery StRudolph Commercial Interiors Inc, Rcirevision to 201603081420 -structural anchors to concrete pad per inspector maher na
Details
Permit
201804267517
Permit issued
May 1, 2018
Final sign-off
Jun 8, 2018

revision to 201603081420 -structural anchors to concrete pad per inspector maher na

Open the permit page

Mar 9, 2018Expired or cancelled
cancelled Nov 2024
901 Market Stfabrication & installation of catwalk system on roof for washing skylight windows; & installation of roof anchors for unscheduled maintenance of exterior facade. none of the improvments will be visible from street since the catwalk is lower than the skylight & the roof anchors are 12" high
Details
Permit
201803093329

fabrication & installation of catwalk system on roof for washing skylight windows; & installation of roof anchors for unscheduled maintenance of exterior facade. none of the improvments will be visible from street since the catwalk is lower than the skylight & the roof anchors are 12" high

Open the permit page

$45,000
Sep 7, 2017Expired or cancelled
withdrawn Feb 2019
925 Pierce Stsoft story wood framed retrofit of 1st level. retro consists of addition of plywood shtg design per asce/sec 41-13.
Details
Permit
201709077263

soft story wood framed retrofit of 1st level. retro consists of addition of plywood shtg design per asce/sec 41-13.

Open the permit page

$45,000
Sep 1, 2017Completed
final sign-off Sep 2018
2124 Hyde StDave Mason Buildingsoft story wood frame seidmic retrofit 1st level fema p807 design criteria
Details
Permit
201709016776
Permit issued
Mar 23, 2018
Final sign-off
Sep 20, 2018

soft story wood frame seidmic retrofit 1st level fema p807 design criteria

Open the permit page

$35,000
Jul 13, 2017Completed
final sign-off Oct 2018
116 New Montgomery StDonald S. Maclean, Incsidewalk rehab over subbasement. inclucing ada ramp at the corner of mission st & new montgomery st, s/e corner. reference street improvement permit 171e-0425. n/a maher
Details
Permit
201707131812
Permit issued
Jul 18, 2017
Final sign-off
Oct 22, 2018

sidewalk rehab over subbasement. inclucing ada ramp at the corner of mission st & new montgomery st, s/e corner. reference street improvement permit 171e-0425. n/a maher

Open the permit page

$10,000
Oct 11, 2016Completed
final sign-off Feb 2017
2099 Market StWickman Development And Constructionalteration to non residential section of the 2nd floor, including removal of a portion of the existing mezzanine and installing new framing (beams and colums) to support floor structure to remain.
Details
Permit
201610119927
Permit issued
Nov 1, 2016
Final sign-off
Feb 24, 2017

alteration to non residential section of the 2nd floor, including removal of a portion of the existing mezzanine and installing new framing (beams and colums) to support floor structure to remain.

Open the permit page

$80,000
Aug 10, 2016Completed
final sign-off Aug 2018
116 New Montgomery StDome Construction Corpinstallation of guardrails at penthouse roof and 2nd fl roof, including access ladder between roof and penthouse roof
Details
Permit
201608104714
Permit issued
Sep 21, 2016
Final sign-off
Aug 30, 2018

installation of guardrails at penthouse roof and 2nd fl roof, including access ladder between roof and penthouse roof

Open the permit page

$25,000
Jul 22, 2016Completed
final sign-off Mar 2017
1 Maritime PzHathaway Dinwiddie Co.16th floor: structural permit for 2016 0518 7736. adding structural beam for new sliding glass door maher na
Details
Permit
201607223075
Permit issued
Jul 22, 2016
Final sign-off
Mar 27, 2017

16th floor: structural permit for 2016 0518 7736. adding structural beam for new sliding glass door maher na

Open the permit page

$5,000
May 3, 2016Completed
final sign-off Feb 2017
2099 Market StWickman Development And Constructionseismic retrofit upgrade for existing building.
Details
Permit
201605036449
Permit issued
May 17, 2016
Final sign-off
Feb 24, 2017

seismic retrofit upgrade for existing building.

Open the permit page

$200,000
Jan 11, 2016Never finaled
issued Jan 2016, no final
111 Sutter StSource Planning And Construction Inc16th floor: structural for 201511092076. n/a for maher
Details
Permit
201601116767
Permit issued
Jan 11, 2016

16th floor: structural for 201511092076. n/a for maher

Open the permit page

$20,000
Aug 12, 2015Completed
final sign-off Apr 2016
101 Townsend StNarrowback Construction Co.1st floor t.i. revision to pa #201504214160: architectural & structural - original permit #201504214160 took out raise floor & room on raised floor. this permit puts it back w/structural added etc. n/a maher ordinance
Details
Permit
201508124042
Permit issued
Jan 25, 2016
Final sign-off
Apr 12, 2016

1st floor t.i. revision to pa #201504214160: architectural & structural - original permit #201504214160 took out raise floor & room on raised floor. this permit puts it back w/structural added etc. n/a maher ordinance

Open the permit page

Jun 17, 2015Completed
final sign-off May 2016
1 Market StBcci Construction Company24/f: structural work assocviates with approved pa#201506169073 & a revised architectural sheet a0224to add battery information. compliance with maher ordinance 155-13 not required.
Details
Permit
201506179227
Permit issued
Jun 23, 2015
Final sign-off
May 6, 2016

24/f: structural work assocviates with approved pa#201506169073 & a revised architectural sheet a0224to add battery information. compliance with maher ordinance 155-13 not required.

Open the permit page

$4,500
Jun 8, 2015Never finaled
issued Aug 2015, no final
116 New Montgomery StDome Construction Corpinstallation of roof anchors & steel supports for use by window washing equipment. all installations on roof & roof over penthouse. all behind parapet - not visible from exterior. (maher ordinance - extended ordinance no.155-13 not required)
Details
Permit
201506088377
Permit issued
Aug 21, 2015

installation of roof anchors & steel supports for use by window washing equipment. all installations on roof & roof over penthouse. all behind parapet - not visible from exterior. (maher ordinance - extended ordinance no.155-13 not required)

Open the permit page

$35,000
Feb 18, 2015Completed
final sign-off Mar 2016
300 Clay StMatrix Hg Inc26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor system
Details
Permit
201502188609
Permit issued
Feb 25, 2015
Final sign-off
Mar 2, 2016

26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor system

Open the permit page

$875,000
Jan 22, 2014Completed
final sign-off Nov 2014
1 Market StDpr Constructionsteuart tower 5/f, 6/f- selective demolition of existing floor slab and structural elements as indicated, new construction to include addition of inter-connecting stairs, guardrails and structure as required. compliance with ordinance 155-13 not required.
Details
Permit
201401226761
Permit issued
Mar 31, 2014
Final sign-off
Nov 6, 2014

steuart tower 5/f, 6/f- selective demolition of existing floor slab and structural elements as indicated, new construction to include addition of inter-connecting stairs, guardrails and structure as required. compliance with ordinance 155-13 not required.

Open the permit page

$93,740
Jan 13, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd.
Details
Permit
201401136097
Permit issued
Feb 12, 2014
Final sign-off
Feb 18, 2016

12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd.

Open the permit page

$47,000
Sep 11, 2012Never finaled
issued Sep 2012, no final
1 Market StNovo Construction Inc26th floor ste 2600 -structural work for tenant improvement. ref #201203196335.
Details
Permit
201209119401
Permit issued
Sep 12, 2012

26th floor ste 2600 -structural work for tenant improvement. ref #201203196335.

Open the permit page

$2,000
Mar 21, 2011Completed
final sign-off Feb 2012
467 Turk StHighland Property Constructionrevision to 2010-0125-5240. this application is to amend existing 201001255240 for the construction of an underground transformer vault for pg&e to be constructed in the public sidewalk. the sfdpw bsm sidewalk vault encroachment permit for this work is #iiv-0011.
Details
Permit
201103212423
Permit issued
Jun 2, 2011
Final sign-off
Feb 15, 2012

revision to 2010-0125-5240. this application is to amend existing 201001255240 for the construction of an underground transformer vault for pg&e to be constructed in the public sidewalk. the sfdpw bsm sidewalk vault encroachment permit for this work is #iiv-0011.

Open the permit page

$35,000
Jul 18, 2007Expired or cancelled
expired Feb 2010
2391 Filbert StGene Peterson General Contractorwork on #2391. received permit for kitchen remodel on 06/08/07. pa#200706083441. during demolition found (e) floor joists were cut 4" to accomodate plumging for 3rd fl bathroom. we are proposing to strenthen (e) floor joists remove (e) plumbing and re arrange & replace 3rd fl bathroom fixtures to
Details
Permit
200707187076
Permit issued
Jul 18, 2007

work on #2391. received permit for kitchen remodel on 06/08/07. pa#200706083441. during demolition found (e) floor joists were cut 4" to accomodate plumging for 3rd fl bathroom. we are proposing to strenthen (e) floor joists remove (e) plumbing and re arrange & replace 3rd fl bathroom fixtures to

Open the permit page

$25,000
Dec 19, 2006Expired or cancelled
expired Oct 2007
300 Clay StPlant Construction Company Lprevision to pa 200610165157 relocation of hi density file on 21st floor
Details
Permit
200612190171
Permit issued
Dec 19, 2006

revision to pa 200610165157 relocation of hi density file on 21st floor

Open the permit page

Dec 11, 2006Completed
final sign-off Mar 2007
405 Howard Stnew 4x 12 slab opening for new mechanical shaft . permit of slab demolition only
Details
Permit
200612119616
Permit issued
Feb 14, 2007
Final sign-off
Mar 9, 2007

new 4x 12 slab opening for new mechanical shaft . permit of slab demolition only

Open the permit page

$16,000
Aug 9, 2005Expired or cancelled
expired Mar 2008
1 Market StHathaway Dinwiddie Co.architectural work & accessibility with regards to an increased area of high density files in litigations center for sedgwick on the 5th floor.
Details
Permit
200508099780
Permit issued
Dec 19, 2006

architectural work & accessibility with regards to an increased area of high density files in litigations center for sedgwick on the 5th floor.

Open the permit page

$40,000
Jun 23, 2005Expired or cancelled
expired Mar 2008
1 Market StHathaway Dinwiddie Co.extend structural reinforcing of slab on 5th floor for high density mobil files. girder strengthening & slab reinforcing @ 5th floor only.
Details
Permit
200506235880
Permit issued
Jul 10, 2006

extend structural reinforcing of slab on 5th floor for high density mobil files. girder strengthening & slab reinforcing @ 5th floor only.

Open the permit page

$20,000
Mar 7, 2005Expired or cancelled
expired May 2006
731 Market Stremove existing rooftop air handling unit supports &replc w/ new steel platforms.repair exist chille
Details
Permit
200503076926
Permit issued
May 18, 2005

remove existing rooftop air handling unit supports &replc w/ new steel platforms.repair exist chille

Open the permit page

$15,000
Dec 20, 2004Completed
final sign-off Jul 2005
201 Mission StBcci Construction Companyinfill stair that goes between floor 5 & 6,stair is tenant convinence stair and does not affect exit
Details
Permit
200412201813
Permit issued
Jan 24, 2005
Final sign-off
Jul 28, 2005

infill stair that goes between floor 5 & 6,stair is tenant convinence stair and does not affect exit

Open the permit page

$25,000