Daniel Huntsman
- Listed as
- architect, authorized agent-others, designer, engineer, lessee, pmt consultant/expediter
- Firm
- Huntsman Architectural Group
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
867 permits since 2000 (architect on 809 permits, authorized agent-others on 64 permits, engineer on 8 permits, designer on 2 permits, lessee on 2 permits, pmt consultant/expediter on 2 permits): 660 completed, 4 in progress, 73 never finaled, 130 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 867.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 185 Berry St | Hathaway Dinwiddie Co. | revision to open permit#202602125816, design changes, revised evcs stall location.Details
revision to open permit#202602125816, design changes, revised evcs stall location. | |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491Details
45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491 | $202,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491Details
39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491 | $202,000 |
| May 20, 2026 | Completed final sign-off Sep 2026 | 201 Mission St | Richlen Construction | 21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approvedDetails
21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved | $218,435 |
| Feb 26, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | 22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawingDetails
22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing | $1,097,019 |
| Oct 8, 2025 | In progress issued Nov 2025 | 4 Embarcadero Center | Gci, Inc | revision to previously approved permitdrawings for re-arrangement pantry idf copy storage room & (2) offices. previously approved permit#202505287341Details
revision to previously approved permitdrawings for re-arrangement pantry idf copy storage room & (2) offices. previously approved permit#202505287341 | |
| Sep 22, 2022 | Completed final sign-off Mar 2023 | 1 Embarcadero Center | Source Planning And Construction Inc | 7/f: revision to bpa#202102114449, reduce scope of work - delete mepDetails
7/f: revision to bpa#202102114449, reduce scope of work - delete mep | |
| Jul 20, 2022 | Never finaled issued Aug 2022, no final | 995 Market St | San Francisco Commercial Builders Inc | main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit.Details
main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit. | $275,000 |
| Jul 12, 2022 | Completed final sign-off Oct 2022 | 4 Embarcadero Center | M C S Construction Services | non structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permitDetails
non structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permit | $169,300 |
| Jun 28, 2022 | Completed final sign-off Feb 2023 | 580 California St | Peacock Construction | 17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721)Details
17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721) | $902,002 |
| Jun 14, 2022 | Completed final sign-off Feb 2023 | 633 Battery St | Field Construction Inc. | 1f & mezz: new air distribution being added to serve floor space. 1 owner furnished contractor installed air cooled self contained ac unit. 1 new exhaust air fan added. new break room sink. new lighting & relocated lighting.Details
1f & mezz: new air distribution being added to serve floor space. 1 owner furnished contractor installed air cooled self contained ac unit. 1 new exhaust air fan added. new break room sink. new lighting & relocated lighting. | $194,000 |
| Mar 29, 2022 | Completed final sign-off Jun 2023 | 260 Townsend St | Wci-Gc Inc | 4/f:inteiror demo of non-structural elements including but not necessary limited to partitions,doors,finishes,lhghting,mech&elect outlets&switches. space shall remain vacant until future tenant buid-out.(e)opening ceiling requires sprinkler mod except in suspended ceilings to remain.Details
4/f:inteiror demo of non-structural elements including but not necessary limited to partitions,doors,finishes,lhghting,mech&elect outlets&switches. space shall remain vacant until future tenant buid-out.(e)opening ceiling requires sprinkler mod except in suspended ceilings to remain. | $170,000 |
| Mar 29, 2022 | Completed final sign-off Feb 2023 | 260 Townsend St | Aquamatic Fire Protection | 4/f: relocate/replace (55) fire sprinklers for t.i. no underground work.Details
4/f: relocate/replace (55) fire sprinklers for t.i. no underground work. | $16,600 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 580 California St | San Francisco Commercial Builders Inc | 23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.Details
23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit. | $190,000 |
| Jan 6, 2022 | Never finaled issued Jan 2022, no final | 50 California St | resubmittal of previously approved and completed pa# 201412184046 for purpose of confirming occupant load at break area #2635 in order to submit a permit to operate as required by sffd inspector michelle li, ref nov# 21120001Details
resubmittal of previously approved and completed pa# 201412184046 for purpose of confirming occupant load at break area #2635 in order to submit a permit to operate as required by sffd inspector michelle li, ref nov# 21120001 | ||
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 350 Rhode Island St | Rossi Builders Inc. | added scope of work to floor 2 common restroom permit#2021/10271275.replace all fixtures,partitions, equipt lighting and finishes. no structural work to be performed.Details
added scope of work to floor 2 common restroom permit#2021/10271275.replace all fixtures,partitions, equipt lighting and finishes. no structural work to be performed. | $50,000 |
| Feb 10, 2021 | Completed final sign-off May 2021 | 909 Montgomery St | Charles Pankow Builders Ltd | suite #400: revision to app#202010196842. modifications to extg a0.0 cover sheet regarding sprinkler system and construction type. all revisions clouded as bulletin 01, delta 2.2Details
suite #400: revision to app#202010196842. modifications to extg a0.0 cover sheet regarding sprinkler system and construction type. all revisions clouded as bulletin 01, delta 2.2 | |
| Nov 12, 2020 | Completed final sign-off Mar 2021 | 275 Battery St | 19th fl demo of non structural partitions, construction of new non structural partitions, lighting, finishes. no change in occupancy and no change in floor areaDetails
19th fl demo of non structural partitions, construction of new non structural partitions, lighting, finishes. no change in occupancy and no change in floor area | $7,544 | |
| Sep 24, 2020 | Completed final sign-off Feb 2021 | 600 California St | restripe of (e) accessible parking and addition of new parking signage. add an accessible van stall. sprinkler pipe re-routing under separate permit.Details
restripe of (e) accessible parking and addition of new parking signage. add an accessible van stall. sprinkler pipe re-routing under separate permit. | $24,000 | |
| Sep 23, 2020 | Completed final sign-off Apr 2021 | 909 Montgomery St | Charles Pankow Builders Ltd | removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor.Details
removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor. | $225,000 |
| Sep 12, 2020 | Never finaled issued Jan 2021, no final | 301 Howard St | Skyline Construction | 18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions.Details
18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions. | $82,505 |
| Aug 27, 2020 | Completed final sign-off Jun 2021 | 275 Battery St | Hathaway Dinwiddie Co. | demo of non structural non rated partitions,electrical tele data, lighting, ceiling tile and grid finishes. buildback of non rated glass partitions and non rated entrance doors. new ceiling work, finishes throughout and new millwork. no change of occupancy , use or areaDetails
demo of non structural non rated partitions,electrical tele data, lighting, ceiling tile and grid finishes. buildback of non rated glass partitions and non rated entrance doors. new ceiling work, finishes throughout and new millwork. no change of occupancy , use or area | $363,260 |
| Jul 22, 2020 | Completed final sign-off Jan 2021 | 2 Embarcadero Center | Source Planning And Construction Inc | 22/f: nonstructural demo, upgrade toilet room to be fully accessible, new finishes in toilet rooms, elevator lobby & corr. no change in occupancy, use or area. mep, life safety, sprinklers under seperate permit.Details
22/f: nonstructural demo, upgrade toilet room to be fully accessible, new finishes in toilet rooms, elevator lobby & corr. no change in occupancy, use or area. mep, life safety, sprinklers under seperate permit. | $150,000 |
| Jul 22, 2020 | Completed final sign-off Jan 2021 | 225 Bush St | Source Planning And Construction Inc | 3 & 18/f: new nonstructural partitions, doors, lighting, millwork, & finishes. no change in occupancy, use or area. elec/plumb/life safety/sprinklers deferredDetails
3 & 18/f: new nonstructural partitions, doors, lighting, millwork, & finishes. no change in occupancy, use or area. elec/plumb/life safety/sprinklers deferred | $473,336 |
| Dec 20, 2019 | Completed final sign-off Sep 2021 | 121 Spear St | Bevilacqua & Sons | suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permitDetails
suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permit | $2,343,634 |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 1 Daniel Burnham Ct | San Francisco Commercial Builders Inc | 3rd fl/ste #300c - non structural demo, new non structural partitoins, doors, lighting, millwork, finishes. no change in area, occupancy or use. mep ls, sprinklers under sep permitDetails
3rd fl/ste #300c - non structural demo, new non structural partitoins, doors, lighting, millwork, finishes. no change in area, occupancy or use. mep ls, sprinklers under sep permit | $94,527 |
| Dec 5, 2019 | Completed final sign-off Jul 2020 | 555 California St | Peacock Construction | concourse level convert e storage room to mother's roomDetails
concourse level convert e storage room to mother's room | $9,677 |
| Dec 4, 2019 | Expired or cancelled cancelled Jan 2026 | 600 Montgomery St | Hathaway Dinwiddie Co. | revision to 201910154447 installation of 1 pair of s doors. no change in occupancy, use, or area. mep, ls, sprinklers under sep permitDetails
revision to 201910154447 installation of 1 pair of s doors. no change in occupancy, use, or area. mep, ls, sprinklers under sep permit | $40,000 |
| Oct 3, 2019 | Completed final sign-off Oct 2020 | 535 Mission St | Peacock Construction | alteration of clean up room sink to an all gender restroom. modification to e coffee bar to accomodate new equipment and seatingDetails
alteration of clean up room sink to an all gender restroom. modification to e coffee bar to accomodate new equipment and seating | $218,000 |
| Jul 18, 2019 | Completed final sign-off Sep 2019 | 1 Maritime Pz | 11 floor: non structural demolition only per ab-017, no change in occupancy use or area. revision to app#201807305831. n/a for maher. tenant improvement required under separte permit.Details
11 floor: non structural demolition only per ab-017, no change in occupancy use or area. revision to app#201807305831. n/a for maher. tenant improvement required under separte permit. | $105,360 | |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mbc north. 1st time ti level 1-2. work includes new partitions, finishes, mep. work also includes coffee and smoothie bar and new communicating stair maher not reqDetails
mbc north. 1st time ti level 1-2. work includes new partitions, finishes, mep. work also includes coffee and smoothie bar and new communicating stair maher not req | $2,000,971 |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 south. 1st time ti level 1 + 2. work includes new partitions, finishes, mep. maher not reqDetails
mb4 south. 1st time ti level 1 + 2. work includes new partitions, finishes, mep. maher not req | $959,168 |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 south. 1st time ti level 3. work includes new partitions, finishes, maher not reqDetails
mb4 south. 1st time ti level 3. work includes new partitions, finishes, maher not req | $1,407,574 |
| May 16, 2019 | Completed final sign-off Oct 2019 | 1 Maritime Pz | Gci, Inc | #600:selective demolition of non-structural partitions, doors, glazing millwork, elec, lights, & finishes. construction of new non- structural partitions, doors, glazing, millwork, elec, ceiling, lights & finishes. restrooms under permit #201801027651. no change in occupancy, use or arae. mep. defDetails
#600:selective demolition of non-structural partitions, doors, glazing millwork, elec, lights, & finishes. construction of new non- structural partitions, doors, glazing, millwork, elec, ceiling, lights & finishes. restrooms under permit #201801027651. no change in occupancy, use or arae. mep. def | $609,900 |
| May 16, 2019 | Completed final sign-off Sep 2019 | 525 Market St | Hathaway Dinwiddie Co. | 14th floor: revision to app#201811196218: structural revision: 1 transformer is being installed & seismically anchored, rather than being suspended as shown previously. additional transformer is being supported on a unistrut frame lines. mep revision:nw heat pump hp14-s is being added.Details
14th floor: revision to app#201811196218: structural revision: 1 transformer is being installed & seismically anchored, rather than being suspended as shown previously. additional transformer is being supported on a unistrut frame lines. mep revision:nw heat pump hp14-s is being added. | $50,000 |
| Jan 10, 2019 | Completed final sign-off Jun 2019 | 1 California St | R.M.R. Construction Company | 16th floor:demo of non-structural walls. construction new tenant suite including non structural walls, plumbing and ceiling systems. life safety and sprinkler to be design build under seperate permit. n/a for maherDetails
16th floor:demo of non-structural walls. construction new tenant suite including non structural walls, plumbing and ceiling systems. life safety and sprinkler to be design build under seperate permit. n/a for maher | $1,672,776 |
| Dec 5, 2018 | Completed final sign-off Aug 2019 | 560 Mission St | Dome Construction Corp | 18th floor: addition of a new corridor and demising walls to split a extg full floor tenant into half including work to the elevator lobby & upgrades to the restrooms as needed. this includes demolition & construction of non structural partitions, door, light fixtures, millwork & finishes, mep,Details
18th floor: addition of a new corridor and demising walls to split a extg full floor tenant into half including work to the elevator lobby & upgrades to the restrooms as needed. this includes demolition & construction of non structural partitions, door, light fixtures, millwork & finishes, mep, | $124,800 |
| Dec 3, 2018 | Completed final sign-off Feb 2019 | 275 Battery St | Hathaway Dinwiddie Co. | garage - mechanical & electrical scope ref pa 2018-0920-0920Details
garage - mechanical & electrical scope ref pa 2018-0920-0920 | $275,000 |
| Oct 1, 2018 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | south tower, 6th & 7th floor 2-story improvement & terrace upgrade to an (e) core/shell building w/ office, food preparation, dining, terrace, structural, mechanical, electrical, plumbing & hvacDetails
south tower, 6th & 7th floor 2-story improvement & terrace upgrade to an (e) core/shell building w/ office, food preparation, dining, terrace, structural, mechanical, electrical, plumbing & hvac | $10,091,039 |
| Aug 2, 2018 | Completed final sign-off Nov 2020 | 300 16th St | Dpr Construction | north tower - upgrade to core & shell including restrooms & openings between levels. space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications. ref #201606149952Details
north tower - upgrade to core & shell including restrooms & openings between levels. space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications. ref #201606149952 | $1,112,777 |
| Aug 2, 2018 | Completed final sign-off Nov 2020 | 300 16th St | Dpr Construction | south tower - upgrades to core & shell including restrooms & openings between levels, space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications ref #201606149954Details
south tower - upgrades to core & shell including restrooms & openings between levels, space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications ref #201606149954 | $1,085,908 |
| Dec 11, 2017 | Completed final sign-off Apr 2018 | 315 Montgomery St | Bcci Construction Company | demo of (e) non struc partitions, fh, millwork ceilings, lighting, power finishes. new construction of mens, womens multi accomodation rr. space will be prepared as an unoccupied space for market purposes.no change in occupancy mep deferred.sprinkler rev do to demo ceiling under sepaeate appl.Details
demo of (e) non struc partitions, fh, millwork ceilings, lighting, power finishes. new construction of mens, womens multi accomodation rr. space will be prepared as an unoccupied space for market purposes.no change in occupancy mep deferred.sprinkler rev do to demo ceiling under sepaeate appl. | $65,880 |
| Nov 9, 2017 | Completed final sign-off Feb 2018 | 2 Embarcadero Center | Skyline Construction | 16th floor: admin permit for mechanical. ref app#201709209050. n/a for maherDetails
16th floor: admin permit for mechanical. ref app#201709209050. n/a for maher | $90,000 |
| Dec 2, 2016 | Completed final sign-off Jul 2020 | 345 California St | Gci, Inc | demo of (e) non-structural partitions, door, millwork ceiling grid and tile, lighting, power & finishes. new non-structural partitions, doors, ceiling, lighting, power & finishes. mep, life safety & fire sprinkler are design build/under separate permit. no change in occupancy or useDetails
demo of (e) non-structural partitions, door, millwork ceiling grid and tile, lighting, power & finishes. new non-structural partitions, doors, ceiling, lighting, power & finishes. mep, life safety & fire sprinkler are design build/under separate permit. no change in occupancy or use | $254,592 |
| Nov 15, 2016 | Completed final sign-off May 2017 | 301 Howard St | Rylko Builders Inc. | suite 550 - ref. ti appl #2016-1018-0533. title 24 only -install power and lighting in spec suits, limited mod to (e) unoccupied tennant suite. install (10) f-2 light fixtures, (5) f-1 2x4 fixtures, (2) f-4 2x2 fixtures and (1) f-5 fixtures, motion sensors & exit signs. (8) receptacles and switches.Details
suite 550 - ref. ti appl #2016-1018-0533. title 24 only -install power and lighting in spec suits, limited mod to (e) unoccupied tennant suite. install (10) f-2 light fixtures, (5) f-1 2x4 fixtures, (2) f-4 2x2 fixtures and (1) f-5 fixtures, motion sensors & exit signs. (8) receptacles and switches. | $50,000 |
| Nov 15, 2016 | Completed final sign-off May 2017 | 301 Howard St | Rylko Builders Inc. | suite 950 - ref. t.i. appl #2016-1018-0536. title 24 elec lighting only. limited modification to (e) occupied tenant suite. (5) f-1, (7) f-2, (1) f-4, (1) f-5 light fixtures, and emergency and exit lighting, motion sensors. (8) receptacles and switches. maher ord 155-13 naDetails
suite 950 - ref. t.i. appl #2016-1018-0536. title 24 elec lighting only. limited modification to (e) occupied tenant suite. (5) f-1, (7) f-2, (1) f-4, (1) f-5 light fixtures, and emergency and exit lighting, motion sensors. (8) receptacles and switches. maher ord 155-13 na | $45,000 |
| Nov 15, 2016 | Completed final sign-off Feb 2018 | 1 Post St | Skyline Construction | revision to 2016-1013-0150. selective non structural demo, new non structural partitions, new floors, wall, ceiling finishes, restroom upgrades. alarm/sprinkler/mep deferred.Details
revision to 2016-1013-0150. selective non structural demo, new non structural partitions, new floors, wall, ceiling finishes, restroom upgrades. alarm/sprinkler/mep deferred. | |
| Aug 19, 2016 | Completed final sign-off Oct 2016 | 1045 Sansome St | Thomas Kessenich | 2nd floor: revision to app#201607263341: add 1 urinal to men's restroom, omit janitorial closet, revise drinking fountain specification.Details
2nd floor: revision to app#201607263341: add 1 urinal to men's restroom, omit janitorial closet, revise drinking fountain specification. | |
| Jul 12, 2016 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 4th flr: ti- to include demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit. maher naDetails
4th flr: ti- to include demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit. maher na | $2,171,400 |
| Jan 6, 2016 | Completed final sign-off Apr 2016 | 275 Battery St | Hathaway Dinwiddie Co. | 3/f: non-structural demo. (n) non-structural partitions, electrical & finishes. no change in area, occupancy, use mep, l/s, sprinkler under separate permit. compliance with maher ordinance no 155-13 not required.Details
3/f: non-structural demo. (n) non-structural partitions, electrical & finishes. no change in area, occupancy, use mep, l/s, sprinkler under separate permit. compliance with maher ordinance no 155-13 not required. | $59,444 |
| Dec 22, 2015 | Completed final sign-off Mar 2016 | 275 Battery St | Hathaway Dinwiddie Co. | demolition of existing non-structural partitions, doors/frames, millwork, lighting, power & finishes. construction consists of new non-structural9 partitions, doors/frames, lighting and finishes. life safety and fire sprinkler is design build and under sep permit, mep is design build and udnerDetails
demolition of existing non-structural partitions, doors/frames, millwork, lighting, power & finishes. construction consists of new non-structural9 partitions, doors/frames, lighting and finishes. life safety and fire sprinkler is design build and under sep permit, mep is design build and udner | $117,194 |
| Dec 17, 2015 | Expired or cancelled cancelled Jan 2026 | 340 Bryant St | 3rd flr: full floor including mezz ti including non structural demlition, non structural partitions, interior finishes, doors, casework, light fixtures, plumb fixt, life safety, fire sprnkler sep permitDetails
3rd flr: full floor including mezz ti including non structural demlition, non structural partitions, interior finishes, doors, casework, light fixtures, plumb fixt, life safety, fire sprnkler sep permit | $147,863 | |
| Nov 10, 2015 | Completed final sign-off Mar 2016 | 50 California St | Skyline Construction | new non structural partitions, lighting, electrical, finishes, millwork. no change in occupancy or use, or area. n/a for maher.Details
new non structural partitions, lighting, electrical, finishes, millwork. no change in occupancy or use, or area. n/a for maher. | $700,000 |
| Aug 31, 2015 | Completed final sign-off Aug 2016 | 50 California St | Richlen Construction | ground floor: alteration of extg curtainwall, replacement of extg light fixtures, and addition of new light fixtures. n/a for maher.Details
ground floor: alteration of extg curtainwall, replacement of extg light fixtures, and addition of new light fixtures. n/a for maher. | $100,000 |
| Jun 24, 2015 | Completed final sign-off Jun 2016 | 1 Market St | Dpr Construction | 4th floor: defered submittal for structural anchorage (for equipment) to pa# 201503231539 issued on 6/8/15Details
4th floor: defered submittal for structural anchorage (for equipment) to pa# 201503231539 issued on 6/8/15 | $200,000 |
| Apr 15, 2015 | Completed final sign-off May 2017 | 555 Market St | Field Construction Inc. | demolition of interconnecting stairs between 5th and 6th flrs and refill of slab as required to separate floors. not for egress. floors 5 and 6 currently unoccupied and will remain unoccupied. any tenant work will be submitted under separate permit. no change in occupancy . no change in floor areaDetails
demolition of interconnecting stairs between 5th and 6th flrs and refill of slab as required to separate floors. not for egress. floors 5 and 6 currently unoccupied and will remain unoccupied. any tenant work will be submitted under separate permit. no change in occupancy . no change in floor area | $150,000 |
| Nov 10, 2014 | Never finaled issued Dec 2014, no final | 350 California St | Swinerton Builders | 1st and 24th floor mechanical work only. replacement of fan and ventilation equipment in kind and electrical connections as it relates to the equipment replacement. maher n/a.Details
1st and 24th floor mechanical work only. replacement of fan and ventilation equipment in kind and electrical connections as it relates to the equipment replacement. maher n/a. | $210,000 |
| Oct 27, 2014 | Never finaled issued Nov 2014, no final | 100 Pine St | Martinelli Environmental Graph | provide evacuation signs on floors b3,b2,b1,1,2,and 3. twenty-three signs total. no structural work included in this scope. maher n/a.Details
provide evacuation signs on floors b3,b2,b1,1,2,and 3. twenty-three signs total. no structural work included in this scope. maher n/a. | $6,900 |
| Sep 4, 2014 | Completed final sign-off Nov 2014 | 1 Embarcadero Center | Gci, Inc | 10th floor:non-structural demo. new non-structural partitions, outlets, millwork, finishes, no new ceiling, or lighting work. no increase in area, no change in occupancy or use. n/ for the maher ordinance #155-13Details
10th floor:non-structural demo. new non-structural partitions, outlets, millwork, finishes, no new ceiling, or lighting work. no increase in area, no change in occupancy or use. n/ for the maher ordinance #155-13 | $100,000 |
| Jun 16, 2014 | Completed final sign-off Dec 2014 | 555 California St | Gci, Inc | 52nd floor: revision to app#201311151984. reduce scope at restroom to only walls and stub out for plumbing.n/a for the maher ordinance #155-13Details
52nd floor: revision to app#201311151984. reduce scope at restroom to only walls and stub out for plumbing.n/a for the maher ordinance #155-13 | |
| May 16, 2014 | Completed final sign-off Dec 2014 | 760 Market St | Gci, Inc | on 8th floor - new non-structural partitions ceiling & lighting... millwork finishes. non structural demolition. upgrade toilet rooms. no change in occupancy, use, or area. na for maher ordiance.Details
on 8th floor - new non-structural partitions ceiling & lighting... millwork finishes. non structural demolition. upgrade toilet rooms. no change in occupancy, use, or area. na for maher ordiance. | $1,000,000 |
| Apr 8, 2014 | Completed final sign-off Oct 2014 | 425 Market St | Gci, Inc | 13/f: t.i. improvement. non-structural demo, non-structural partitions, ceiling, lighting, electrical finishes. no change in occupancy, use or area. mahr ord. 155-13 not applicable.Details
13/f: t.i. improvement. non-structural demo, non-structural partitions, ceiling, lighting, electrical finishes. no change in occupancy, use or area. mahr ord. 155-13 not applicable. | $950,000 |
| Mar 18, 2014 | Completed final sign-off Aug 2014 | 100 01st St | Skyline Construction | interior non structural demo of paritions, ceiling electrial outlets and finishes throughout ab-017Details
interior non structural demo of paritions, ceiling electrial outlets and finishes throughout ab-017 | $21,000 |
| Jan 17, 2014 | Completed final sign-off May 2014 | 555 California St | Bcci Construction Company | demo project on 31st floor of extg non structural partitions, door/frames, millwork, ceiling grid and tile, hvac loop, lighting,power and finishes. no new construction other than build back of hvac loop and sprinkler loop & distribution & service elevator lobby and walls in passenger elev lobbyDetails
demo project on 31st floor of extg non structural partitions, door/frames, millwork, ceiling grid and tile, hvac loop, lighting,power and finishes. no new construction other than build back of hvac loop and sprinkler loop & distribution & service elevator lobby and walls in passenger elev lobby | $300,000 |
| Dec 26, 2013 | Completed final sign-off May 2014 | 180 Howard St | Team Commercial Construction Inc. | 12/f: interior office tenant suite of an unoccupied warm shell condition space on a multi-tenant floor. construction of new partitions, glazing, doors, millwork and finishes. aera of work: 1275 sq ft. no structural work, mep under same permit. life safety under sep permit. maher ordinance exempt/naDetails
12/f: interior office tenant suite of an unoccupied warm shell condition space on a multi-tenant floor. construction of new partitions, glazing, doors, millwork and finishes. aera of work: 1275 sq ft. no structural work, mep under same permit. life safety under sep permit. maher ordinance exempt/na | $138,975 |
| Dec 26, 2013 | Completed final sign-off Apr 2014 | 100 Pine St | Team Commercial Construction Inc. | demo of non-structural walls. construction of new non-structural partitions, lighting, outlets, millwork and finishes. no structural work included in scope. no change to occupancy, use or area. mep under same permit. life safety and sprinkler to be design build under sep permit.;compliance with ordDetails
demo of non-structural walls. construction of new non-structural partitions, lighting, outlets, millwork and finishes. no structural work included in scope. no change to occupancy, use or area. mep under same permit. life safety and sprinkler to be design build under sep permit.;compliance with ord | $129,600 |
| Dec 19, 2013 | Never finaled issued May 2014, no final | 460 Bryant St | t-i in basement, ground floor & mezzanine. non structural partitions, ceiling lights, millwork. sprinkler on seperate permit. -maher- compliance with ordinanace no.155-13.not required.Details
t-i in basement, ground floor & mezzanine. non structural partitions, ceiling lights, millwork. sprinkler on seperate permit. -maher- compliance with ordinanace no.155-13.not required. | $3,273,488 | |
| Nov 15, 2013 | Completed final sign-off Oct 2014 | 555 California St | Gci, Inc | common area upgrades including 1 hour corridor, new elevator lobby finishes, new lighting, accessible restrooms. mep, ls separate permit- floor tenant improvement separate permit.Details
common area upgrades including 1 hour corridor, new elevator lobby finishes, new lighting, accessible restrooms. mep, ls separate permit- floor tenant improvement separate permit. | $1,087,765 |
| Nov 12, 2013 | Completed final sign-off Nov 2016 | 1 California St | R.M.R. Construction Company | 11th & 26th floors-demolition of (e) buildout & abatement. build back of restrooms & elevator lobbiesDetails
11th & 26th floors-demolition of (e) buildout & abatement. build back of restrooms & elevator lobbies | $300,000 |
| Oct 22, 2013 | Completed final sign-off Jun 2014 | 100 Pine St | Team Commercial Construction Inc. | 24th floor-non structural demoltion, non structural partitions, millwork, lighting & finishes. no change in occupancy, use or area. m.e.p under seperate permitDetails
24th floor-non structural demoltion, non structural partitions, millwork, lighting & finishes. no change in occupancy, use or area. m.e.p under seperate permit | $175,000 |
| Oct 22, 2013 | Never finaled issued Oct 2013, no final | 225 Bush St | Eco Bay Services Inc. | 16th floor-demolition only-all non structural, per ab-017Details
16th floor-demolition only-all non structural, per ab-017 | $50,000 |
| Oct 4, 2013 | Completed final sign-off Dec 2013 | 50 California St | Richlen Construction | tenant improvement including paritial dmo of existing non structural partitoins, new non structural partitons, new doors, frames, sidelights, pwoer data, elec, millwork, finishes. mep, sprinklers and fire alarm on sep permit.Details
tenant improvement including paritial dmo of existing non structural partitoins, new non structural partitons, new doors, frames, sidelights, pwoer data, elec, millwork, finishes. mep, sprinklers and fire alarm on sep permit. | $197,133 |
| Sep 30, 2013 | Completed final sign-off Nov 2014 | 575 Market St | Field Construction Inc. | 26th fl-ste# 2600-demolition of finishes, non structural partitions, ceiling tile, grid, light fixtures. construct new non structural partitions, grids, side lights, doors/frames/hardware & finishes. demo & construct new finishes @elevator lobby. full ada upgrades @men's & women's restrms, m.e.p & sDetails
26th fl-ste# 2600-demolition of finishes, non structural partitions, ceiling tile, grid, light fixtures. construct new non structural partitions, grids, side lights, doors/frames/hardware & finishes. demo & construct new finishes @elevator lobby. full ada upgrades @men's & women's restrms, m.e.p & s | $345,000 |
| Sep 30, 2013 | Completed final sign-off Feb 2014 | 220 Bush St | San Francisco Commercial Builders Inc | 16th fl: barrier removal for voluntary restroom upgrade for the 16th floor women's restroom. no increase in area or change in occupancy. removal of existing restroom fixtures, accessories and finishes. install new restroom fixtures, accessories, finishes and signage.Details
16th fl: barrier removal for voluntary restroom upgrade for the 16th floor women's restroom. no increase in area or change in occupancy. removal of existing restroom fixtures, accessories and finishes. install new restroom fixtures, accessories, finishes and signage. | $69,000 |
| Sep 13, 2013 | Completed final sign-off Feb 2014 | 130 Sutter St | Tear-N-It-Up Demolition Ince | demolition only of existing non structural tenant improvements. t.i. under separate permit.Details
demolition only of existing non structural tenant improvements. t.i. under separate permit. | $15,000 |
| Aug 27, 2013 | Expired or cancelled cancelled Jul 2015 | 900 Battery St | change in use for the (e) vacant 3 story (plus 1 basement) building from s-1 warehouse to b office space.Details
change in use for the (e) vacant 3 story (plus 1 basement) building from s-1 warehouse to b office space. | ||
| Aug 26, 2013 | Completed final sign-off Oct 2013 | 444 Spear St | Cci Com'l Constr & Improv**See 985808*** | reno suite 213. demo non structrual partitions, millwork and carpet. construct partiton millwork. mep under separate permitDetails
reno suite 213. demo non structrual partitions, millwork and carpet. construct partiton millwork. mep under separate permit | $100,000 |
| Aug 16, 2013 | Never finaled issued Aug 2013, no final | 201 Spear St | 8th & 9th floors-evacuation signs onlyDetails
8th & 9th floors-evacuation signs only | $1,800 | |
| Aug 15, 2013 | Completed final sign-off Nov 2013 | 555 California St | Richlen Construction | suite 3305:remove demising wall between 2 suites to combine into one. selective demolition of walls, doors, frames, glazing, ceiling tiles, lighting, & millwork. construction of doors, frames, lighting,ceiling tiles, millwork & finishes mep, sprklr/life sfty sperte prmt. relocate card readerDetails
suite 3305:remove demising wall between 2 suites to combine into one. selective demolition of walls, doors, frames, glazing, ceiling tiles, lighting, & millwork. construction of doors, frames, lighting,ceiling tiles, millwork & finishes mep, sprklr/life sfty sperte prmt. relocate card reader | $200,000 |
| Aug 14, 2013 | Completed final sign-off Dec 2013 | 201 Spear St | Peacock Construction Inc | demolition/construction of non-structural, non rated ceiling height partitions. existing light fixture relocations, new power/tele/data, new finishes. minor disabled access upgrades at men's/women's restroom, m.e.p. life safety & sprinklers under seperate permit.Details
demolition/construction of non-structural, non rated ceiling height partitions. existing light fixture relocations, new power/tele/data, new finishes. minor disabled access upgrades at men's/women's restroom, m.e.p. life safety & sprinklers under seperate permit. | $138,600 |
| Aug 13, 2013 | Completed final sign-off Dec 2013 | 121 Spear St | Commercial Interior Builders Inc | 2nd fl:t.i. selective demolition of interior partitions. relocation of extg light fixtures. construction of new interior high partitions. nw finishes throughout. mep to be design build and submitted under seperate permit. sprinklers & life safety to be design build & submitted under separate permit.Details
2nd fl:t.i. selective demolition of interior partitions. relocation of extg light fixtures. construction of new interior high partitions. nw finishes throughout. mep to be design build and submitted under seperate permit. sprinklers & life safety to be design build & submitted under separate permit. | $291,000 |
| Aug 7, 2013 | Never finaled issued Nov 2013, no final | 350 California St | Swinerton Builders | 23rd floor - project consists primarily of mechaical equipment & piping replacement & electrical system upgrades. no accessibility upgrades are proposed. includes structural reinforcement of (e) cupola roof and enlargement of one equipment pad.Details
23rd floor - project consists primarily of mechaical equipment & piping replacement & electrical system upgrades. no accessibility upgrades are proposed. includes structural reinforcement of (e) cupola roof and enlargement of one equipment pad. | $1,500,000 |
| Aug 5, 2013 | Completed final sign-off Feb 2014 | 266 King St | Evolv Commercial Construction Inc | non-structural demo, (n) non-structural partitions lighting, electrical, finishes. all interior work only. no change in occupancy use area. mep. sprinklers, life safety under seperate permit.Details
non-structural demo, (n) non-structural partitions lighting, electrical, finishes. all interior work only. no change in occupancy use area. mep. sprinklers, life safety under seperate permit. | $50,000 |
| Aug 2, 2013 | Completed final sign-off Jan 2014 | 45 Fremont St | R.M.R. Construction Company | installation of new ceiling and lighting, new carpet. the floor is vacant.Details
installation of new ceiling and lighting, new carpet. the floor is vacant. | $237,000 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 1 Bush St | Gci, Inc | 10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit.Details
10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit. | $1,374,300 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 1 Bush St | Gci, Inc | 9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permitDetails
9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permit | $1,374,300 |
| Jul 26, 2013 | Expired or cancelled cancelled Sep 2023 | 180 Howard St | 2nd floor-evacuation signs (3 total), no structural workDetails
2nd floor-evacuation signs (3 total), no structural work | $900 | |
| Jul 17, 2013 | Completed final sign-off Aug 2015 | 4 Embarcadero Center | Gci, Inc | 37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishesDetails
37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishes | $60,000 |
| Jul 17, 2013 | Completed final sign-off Aug 2013 | 225 Bush St | Eco Bay Services Inc. | 13th floor-demo of non structural walls, doors, ceiling componenets & abandoned equipment & conduit. construction of non structural wall, relocation of door & frame & hardware- tennat improvement, mep, sprinklers and fire alarms separate permit.Details
13th floor-demo of non structural walls, doors, ceiling componenets & abandoned equipment & conduit. construction of non structural wall, relocation of door & frame & hardware- tennat improvement, mep, sprinklers and fire alarms separate permit. | $55,000 |
| Jul 10, 2013 | Completed final sign-off Mar 2014 | 575 Market St | Field Construction Inc. | #2150- mechanical & electrical upgrades including hvac upgrade and power to the fan-power boxes plus conical tap to existing risers addition of fsd's and fire alarm interface. ref. to pa#201205110277Details
#2150- mechanical & electrical upgrades including hvac upgrade and power to the fan-power boxes plus conical tap to existing risers addition of fsd's and fire alarm interface. ref. to pa#201205110277 | $40,000 |
| Jul 5, 2013 | Completed final sign-off Aug 2013 | 353 Sacramento St | Peacock Construction Inc | 10th floor:demo selected non-structural partitions, construct new non-structural partitions. install minimal electrical, data - tele, new finishes. mep, sprinkler, and life safety done under sep permitDetails
10th floor:demo selected non-structural partitions, construct new non-structural partitions. install minimal electrical, data - tele, new finishes. mep, sprinkler, and life safety done under sep permit | $70,000 |
| Jul 1, 2013 | Completed final sign-off Jan 2014 | 1 California St | R.M.R. Construction Company | non structural demo. new non structural partitions, doors, glazing, millwork and finishes. no change in occupancy or use. no increase in footprint. mep separate permitDetails
non structural demo. new non structural partitions, doors, glazing, millwork and finishes. no change in occupancy or use. no increase in footprint. mep separate permit | $124,000 |
| Jun 28, 2013 | Completed final sign-off Oct 2013 | 575 Market St | Field Construction Inc. | demo and construction of non structural partitions, ceiling, light fixtures, door and sidelights. no change in occupancy or use. revision to 201211053532 suite 2125.Details
demo and construction of non structural partitions, ceiling, light fixtures, door and sidelights. no change in occupancy or use. revision to 201211053532 suite 2125. | $100,000 |
| Jun 21, 2013 | Completed final sign-off Oct 2013 | 633 Battery St | Hathaway Dinwiddie Co. | this project is a t.i to an (e) partially occupied floor, demo work includes removal of cosmetic fisnishes, lighting and hvac. new work consists of new non-structural partitions, lighting and hvac. there is no change in floor area of bldg height. all mep, sprinklers and life safety is design buildDetails
this project is a t.i to an (e) partially occupied floor, demo work includes removal of cosmetic fisnishes, lighting and hvac. new work consists of new non-structural partitions, lighting and hvac. there is no change in floor area of bldg height. all mep, sprinklers and life safety is design build | $975,000 |
| Jun 21, 2013 | Completed final sign-off Oct 2013 | 4 Embarcadero Center | Peacock Construction Inc | non-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit.Details
non-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit. | $40,000 |
| Jun 19, 2013 | Completed final sign-off Jul 2013 | 353 Sacramento St | Dome Construction Corp | this project is a tenant improvement in an existing bldg consisting of -demo of existing walls, doors, relocation/demo of fixtures -framing, door in stalls, flooring/carpet, painting,window treatments -all mep/fp work will be design build under separate permitDetails
this project is a tenant improvement in an existing bldg consisting of -demo of existing walls, doors, relocation/demo of fixtures -framing, door in stalls, flooring/carpet, painting,window treatments -all mep/fp work will be design build under separate permit | $280,000 |
| Jun 11, 2013 | Completed final sign-off Oct 2013 | 555 Market St | Novo Construction Inc | non-structural alteration. (n) non-structural partitions, ceiling, lights, electrical, finishes, millwork. no change in area use, occupancy. mep, sprinkler & fire alarm under sep permit.Details
non-structural alteration. (n) non-structural partitions, ceiling, lights, electrical, finishes, millwork. no change in area use, occupancy. mep, sprinkler & fire alarm under sep permit. | $450,000 |
| Jun 10, 2013 | Expired or cancelled cancelled Sep 2023 | 100 Pine St | evacuation signs only: b1,b2,b3, 1st, 2nd, 3rd floors (24 signs)Details
evacuation signs only: b1,b2,b3, 1st, 2nd, 3rd floors (24 signs) | $7,200 | |
| Jun 6, 2013 | Expired or cancelled withdrawn Feb 2014 | 600 California St | alteration project on the 6th fl of 600 california. consists of demo of existing non structural partitions, doors/frames, furniture, millwork, plumbin, ceiling grid, tile, soffits, lighting, power, floor finishes. new construction under this permit app. no change in occupancy or floor areaDetails
alteration project on the 6th fl of 600 california. consists of demo of existing non structural partitions, doors/frames, furniture, millwork, plumbin, ceiling grid, tile, soffits, lighting, power, floor finishes. new construction under this permit app. no change in occupancy or floor area | $70,000 | |
| May 29, 2013 | Completed final sign-off Aug 2014 | 575 Market St | Gci, Inc | demolition of non structural partitions, millwork, and relocation of doors and light fixtures. no change in area, occupancy, or use. sprinlkers and life safety separte permit.Details
demolition of non structural partitions, millwork, and relocation of doors and light fixtures. no change in area, occupancy, or use. sprinlkers and life safety separte permit. | $95,000 |