Mark Ruben Friedberg Eric Kennedy
- Listed as
- authorized agent-others, contractor, designer, engineer
- Firm
- Metropolitan Electrical Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jul 2026
801 permits since 2000 (contractor on 799 permits, authorized agent-others on 13 permits, designer on 1 permit, engineer on 1 permit): 539 completed, 13 in progress, 81 never finaled, 168 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 801.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Jul 2026 | 990 Columbus Av | Metropolitan Electrical Construction | to obtain final inspection for work approved under pa 201910245445. all work is complete.Details
to obtain final inspection for work approved under pa 201910245445. all work is complete. | |
| May 7, 2026 | Completed final sign-off Sep 2026 | 5 The Embarcadero | Metropolitan Electrical Construction | modification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage.Details
modification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage. | $46,722 |
| Apr 28, 2026 | In progress issued Apr 2026 | 55 Spear St | Metropolitan Electrical Construction | floor 13b, fire only work to add two 2-way comm stations on floor 13b (stewart tower) at the passsenger and freight elevator lobbies. no permit app#: since no remodel work being done.Details
floor 13b, fire only work to add two 2-way comm stations on floor 13b (stewart tower) at the passsenger and freight elevator lobbies. no permit app#: since no remodel work being done. | $12,008 |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 2739 Taylor St | Metropolitan Electrical Construction | to obtain final inspection for work approved under pa# 202406134416. all work is complete.Details
to obtain final inspection for work approved under pa# 202406134416. all work is complete. | |
| Mar 11, 2026 | In progress issued Apr 2026 | 650 Gilman Av | Metropolitan Electrical Construction | att modification fan (e) unmanned wireless facitiliy consisting , remove (2) and add (3) antennas, relocate 2 and add rru remove and replace power plant, 8 rectifers add 4 and 11 converers install dc 12 surge arrestor install rf safety signage stripping and barricado on roof topper rf reportDetails
att modification fan (e) unmanned wireless facitiliy consisting , remove (2) and add (3) antennas, relocate 2 and add rru remove and replace power plant, 8 rectifers add 4 and 11 converers install dc 12 surge arrestor install rf safety signage stripping and barricado on roof topper rf report | $50,200 |
| Dec 17, 2025 | In progress issued Mar 2026 | 2350 Turk Bl | Metropolitan Electrical Construction | at&t: modification of an (e) wireless facility. r/r 7 antennas, removing 6 rrus, r/r 3 rrus, relocating sector c rudomes, and with new power trunks, fiber, conduit, h-frame. r/f 2 cabinets with 11 new rectifiers, 10 new converters, 6 new 30a breakers. r/r 4 batteries. relocating 20 (e) batteries toDetails
at&t: modification of an (e) wireless facility. r/r 7 antennas, removing 6 rrus, r/r 3 rrus, relocating sector c rudomes, and with new power trunks, fiber, conduit, h-frame. r/f 2 cabinets with 11 new rectifiers, 10 new converters, 6 new 30a breakers. r/r 4 batteries. relocating 20 (e) batteries to | $80,000 |
| Dec 17, 2025 | In progress issued Sep 2026 | 930 Montgomery St | Metropolitan Electrical Construction | at&t modifcation of an (e) wireless facility consisting of: r/r rru's. install 3 antennas, platform reinforcements,4 190a batteries, 1 expansion shelf,1 retrofit kit, 1 conversion kit, 1 converters, 1 15 amp, 6 50 amp dc breakers, 1 bru, rf safety signs, stripping & barricades per rf eme reportDetails
at&t modifcation of an (e) wireless facility consisting of: r/r rru's. install 3 antennas, platform reinforcements,4 190a batteries, 1 expansion shelf,1 retrofit kit, 1 conversion kit, 1 converters, 1 15 amp, 6 50 amp dc breakers, 1 bru, rf safety signs, stripping & barricades per rf eme report | $80,322 |
| Dec 3, 2025 | In progress issued Mar 2026 | 400 Post St | Metropolitan Electrical Construction | at&t modification wireless facility consisting of: remove 9 antennas within existing frp structure; install 7 antennas; r/r rru's; remove 6 tma; remove 3 cabinets; install 2 omnion cabinets with rectifiers + converters; & (1) 15amp, 6 (50) amp + (3) 25 amp dc breakers.Details
at&t modification wireless facility consisting of: remove 9 antennas within existing frp structure; install 7 antennas; r/r rru's; remove 6 tma; remove 3 cabinets; install 2 omnion cabinets with rectifiers + converters; & (1) 15amp, 6 (50) amp + (3) 25 amp dc breakers. | $80,300 |
| Dec 3, 2025 | Completed final sign-off Jun 2026 | 1555 Irving St | Metropolitan Electrical Construction | at&t modification of an unmanned wireless facility consisting of: r/r (3) antennas within existing frp structure; r/r 1 power plant; r/r 1 battery rack; relocate 20 batteries; remove 4 rectifiers; install 10 rectifiers, 9 converters +(3) 50 amp dc breakers in new power plant.Details
at&t modification of an unmanned wireless facility consisting of: r/r (3) antennas within existing frp structure; r/r 1 power plant; r/r 1 battery rack; relocate 20 batteries; remove 4 rectifiers; install 10 rectifiers, 9 converters +(3) 50 amp dc breakers in new power plant. | $36,000 |
| Nov 25, 2025 | Completed final sign-off Aug 2026 | 260 Golden Gate Av | Metropolitan Electrical Construction | modification of an existing unmanned at&t wireless facility consisting of: r/r 3 antennas & 3 rrus. remove one infinity power plant, 5 convertors, 8 rectifiers & 1 rbs cabinets. install one netsure pp with 11 new rectifiers, 10 converters, 6 dc amp breakers. install rf safety signage, stripping &Details
modification of an existing unmanned at&t wireless facility consisting of: r/r 3 antennas & 3 rrus. remove one infinity power plant, 5 convertors, 8 rectifiers & 1 rbs cabinets. install one netsure pp with 11 new rectifiers, 10 converters, 6 dc amp breakers. install rf safety signage, stripping & | $52,000 |
| Nov 19, 2025 | Completed final sign-off Feb 2026 | 135 04th St | Metropolitan Electrical Construction | verizon: removing - 2 (e) antennas, 2 (e) radio 4449 units, 2 (e) radio 8863 units, 2 (e) filters, all (e) rrus-32 units, all (e) rrus-11 units. retaining - 4 (e) antennas, 1 (e) radio 8863, 1 (e) filter, all (e) jma wireless combiners, 6 (e) rack mounted raycab 2260Details
verizon: removing - 2 (e) antennas, 2 (e) radio 4449 units, 2 (e) radio 8863 units, 2 (e) filters, all (e) rrus-32 units, all (e) rrus-11 units. retaining - 4 (e) antennas, 1 (e) radio 8863, 1 (e) filter, all (e) jma wireless combiners, 6 (e) rack mounted raycab 2260 | $84,500 |
| Nov 19, 2025 | Completed final sign-off May 2026 | 2390 Market St | Metropolitan Electrical Construction | at&t mod of an unmanned wireless facity consisting of: r/r 3 antennas, remove 6 rrus, install 3 rrus, relocate 6 rrus, install netsure conversion kit w/ 8 converters and (3) 50 amp dc breakers, install (6) 2p breakers in (e) ac panel using available slots. install rf signs, stripping/barricadesDetails
at&t mod of an unmanned wireless facity consisting of: r/r 3 antennas, remove 6 rrus, install 3 rrus, relocate 6 rrus, install netsure conversion kit w/ 8 converters and (3) 50 amp dc breakers, install (6) 2p breakers in (e) ac panel using available slots. install rf signs, stripping/barricades | $47,750 |
| Sep 30, 2025 | Completed final sign-off May 2026 | 2110 Ingalls St | Metropolitan Electrical Construction | at&t modification of an existing wireless facility consisting remove and replace 3 antennas; install rf safety signs, stripping & barricades; remove two 3106 cabinets; one infinity power plant; 10 rectifiers; install one netsure power plant; 9 rectifiers; 9 converters; relocate (12) 180 ahDetails
at&t modification of an existing wireless facility consisting remove and replace 3 antennas; install rf safety signs, stripping & barricades; remove two 3106 cabinets; one infinity power plant; 10 rectifiers; install one netsure power plant; 9 rectifiers; 9 converters; relocate (12) 180 ah | $34,000 |
| Sep 17, 2025 | Completed final sign-off Jul 2026 | 375 Laguna Honda Bl | Metropolitan Electrical Construction | at&t modificiation of an (e) wireless facility consisting of: lower 3 & add 3 antennas; r/r 3 rrus; remove 1 power plant; 13 rectifiers; install (1) netsure power plant; (9) 58v converters, (12) 48v rectifiers; (1)g4 bbu, (a) 15a, (3) 30a dc breakers; rf safety signage stripping & barricadesDetails
at&t modificiation of an (e) wireless facility consisting of: lower 3 & add 3 antennas; r/r 3 rrus; remove 1 power plant; 13 rectifiers; install (1) netsure power plant; (9) 58v converters, (12) 48v rectifiers; (1)g4 bbu, (a) 15a, (3) 30a dc breakers; rf safety signage stripping & barricades | $83,700 |
| Sep 17, 2025 | Completed final sign-off Jun 2026 | 901 Cole St | Metropolitan Electrical Construction | at&t modification of (e) wireless facility consisting of r/r 3 antennas; remove 6 rrus; install 3 (n) rrus; remove 1 infinity power plant; 9 rectifiers; 4 converters & 4 batteries from (e) power plant; install 1(n) netsure power plant; 12 rectifiers; 11 converters; 91) 15 amp; (6) 30 amp breakersDetails
at&t modification of (e) wireless facility consisting of r/r 3 antennas; remove 6 rrus; install 3 (n) rrus; remove 1 infinity power plant; 9 rectifiers; 4 converters & 4 batteries from (e) power plant; install 1(n) netsure power plant; 12 rectifiers; 11 converters; 91) 15 amp; (6) 30 amp breakers | $50,200 |
| Sep 11, 2025 | Completed final sign-off Mar 2026 | 2 Henry Adams St | Metropolitan Electrical Construction | at&t modification of (e) wireless facility consisting of r/r 3 antennas, 3 rrus; remove infinity pp & rbs2206 cabinets; 9 rectifiers & 4 converters; install 1 netsure 7100 w/58v convertion pp; 11 rectifiers; 10 converters; 1 vdc bullet converter; (1) 15amp + (6) 50amp dc breakersDetails
at&t modification of (e) wireless facility consisting of r/r 3 antennas, 3 rrus; remove infinity pp & rbs2206 cabinets; 9 rectifiers & 4 converters; install 1 netsure 7100 w/58v convertion pp; 11 rectifiers; 10 converters; 1 vdc bullet converter; (1) 15amp + (6) 50amp dc breakers | $80,300 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 800 Powell St | Metropolitan Electrical Construction | at&t modification of an existing wireless facility consisting: relocate 2 antennas and add 2 air antennas within existing faux chimneys; remove 4 and install rrs (2); r/r 1 power plant; remove 7 rectificers, 6 50 am dc breakers; 4 25-30 amp, 3 15/20 amp dc breakers, 1 battery pack, 1 rack, install 1Details
at&t modification of an existing wireless facility consisting: relocate 2 antennas and add 2 air antennas within existing faux chimneys; remove 4 and install rrs (2); r/r 1 power plant; remove 7 rectificers, 6 50 am dc breakers; 4 25-30 amp, 3 15/20 amp dc breakers, 1 battery pack, 1 rack, install 1 | $72,000 |
| Aug 28, 2025 | In progress issued Jan 2026 | 1408 California St | Metropolitan Electrical Construction | modification of an unmanned existing wireless facility consisting of r/r 3 antennas, remove 1 infinity power plant, 6-48 v rectifies, 4 +24 v rectifiers,relocate 12 190 arl batteries, install 1 512 power plan, 12 48 v 8 58 v converters, 3 50 amp dc breakers, 1 15 amp breaker.Details
modification of an unmanned existing wireless facility consisting of r/r 3 antennas, remove 1 infinity power plant, 6-48 v rectifies, 4 +24 v rectifiers,relocate 12 190 arl batteries, install 1 512 power plan, 12 48 v 8 58 v converters, 3 50 amp dc breakers, 1 15 amp breaker. | $51,000 |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 3682 18th St | Metropolitan Electrical Construction | modification of an existing wireless facility consisting of; install 2 frp sled mounts for cameras; 8 concrete block ballast on mounts; one rfis rf monitoring system; 2 rfis-sk dc power relay; 2 rfis poe 30w injector; 1 led dual color signal light; 2 frpmast pipes; 1 aviglon h6a bullet camera;Details
modification of an existing wireless facility consisting of; install 2 frp sled mounts for cameras; 8 concrete block ballast on mounts; one rfis rf monitoring system; 2 rfis-sk dc power relay; 2 rfis poe 30w injector; 1 led dual color signal light; 2 frpmast pipes; 1 aviglon h6a bullet camera; | $25,000 |
| Jul 25, 2025 | In progress issued Feb 2026 | 5235 Diamond Heights Bl | Metropolitan Electrical Construction | t-mobile: install 6 new antennas, 6 radios, add 2 cabinets, remove 1 existing cabinet, remove 1 antenna.Details
t-mobile: install 6 new antennas, 6 radios, add 2 cabinets, remove 1 existing cabinet, remove 1 antenna. | $25,000 |
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 5 Embarcadero Center | Metropolitan Electrical Construction | installation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment.Details
installation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment. | $25,000 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 2324 Market St | Metropolitan Electrical Construction | t-mobile: revision to 202401174101. revise section b platroom base. no change to electrical, anthennas, r f report associate with this revision.Details
t-mobile: revision to 202401174101. revise section b platroom base. no change to electrical, anthennas, r f report associate with this revision. | |
| May 8, 2025 | Completed final sign-off Sep 2025 | 951 Howard St | Metropolitan Electrical Construction | at&t - modification of an (e) unmanned wireless facility consisting: removing 6 rrus, relocate 3 rrus, install 3 new rrus, add 3 new air antennas, 3 back to back brackets, ground (1) 48v rectifier, (3) 50a air 6419 antenna dc breaker, (3) 50a 4890 rru dc breakers.Details
at&t - modification of an (e) unmanned wireless facility consisting: removing 6 rrus, relocate 3 rrus, install 3 new rrus, add 3 new air antennas, 3 back to back brackets, ground (1) 48v rectifier, (3) 50a air 6419 antenna dc breaker, (3) 50a 4890 rru dc breakers. | $35,000 |
| May 5, 2025 | In progress issued May 2025 | 181 Fremont St | Metropolitan Electrical Construction | add card readers @ loby door ad noted. floors 19,20,21Details
add card readers @ loby door ad noted. floors 19,20,21 | $30,000 |
| Apr 25, 2025 | Completed final sign-off Sep 2025 | 665 03rd St | Metropolitan Electrical Construction | at&t modification: remove e) 9 antennas on slads, relocate n) steell framesto parapet wall, r/r/ 9 rru's, r/r e) panel w/ n) 200a ppc, rmove 4 e) cabinets, install n) vertiv 7100 scpp w/ 9 rectifiers & 8 converters, remove 3 strings, dela 145 ah batts. install 4 strings 190 ah, dc12 & 6648Details
at&t modification: remove e) 9 antennas on slads, relocate n) steell framesto parapet wall, r/r/ 9 rru's, r/r e) panel w/ n) 200a ppc, rmove 4 e) cabinets, install n) vertiv 7100 scpp w/ 9 rectifiers & 8 converters, remove 3 strings, dela 145 ah batts. install 4 strings 190 ah, dc12 & 6648 | $50,000 |
| Apr 10, 2025 | Completed final sign-off Sep 2026 | 185 Berry St | Metropolitan Electrical Construction | verizon: remove 9 (e) antennas & 3 (e) rrus; install 7 (n) antennas & 7 (n) rrus: relocate antenna sectors; no (n) batteries proposedDetails
verizon: remove 9 (e) antennas & 3 (e) rrus; install 7 (n) antennas & 7 (n) rrus: relocate antenna sectors; no (n) batteries proposed | $115,000 |
| Jan 31, 2025 | Completed final sign-off May 2026 | 15 Fell St | Metropolitan Electrical Construction | at&t install 12(n) antennas on roof within (n) screen walls; install equipment area in basement; install 16 (n) batteries; install (n) elec submeter & ppcDetails
at&t install 12(n) antennas on roof within (n) screen walls; install equipment area in basement; install 16 (n) batteries; install (n) elec submeter & ppc | $175,000 |
| Jan 21, 2025 | In progress issued Jan 2025 | 350 Mission St | Metropolitan Electrical Construction | 10 and 12/fl-ref 202409231365-install relocated security system head end control panels on floors 10 and 12 (1 each). install fire alarm relays at control panel. metro job #242168Details
10 and 12/fl-ref 202409231365-install relocated security system head end control panels on floors 10 and 12 (1 each). install fire alarm relays at control panel. metro job #242168 | $21,000 |
| Nov 7, 2024 | Completed final sign-off Apr 2025 | 2460 Alameda St | Metropolitan Electrical Construction | revision to permit: 202403228404. relocate single stall and charger. adding power for power max charger.Details
revision to permit: 202403228404. relocate single stall and charger. adding power for power max charger. | $38,298 |
| Oct 31, 2024 | Completed final sign-off Jul 2025 | 1101 Fillmore St | Metropolitan Electrical Construction | modifications to existing att facility: r/r 5 antennas, add one new air antenna; remove 9 rrus, install 8 plus 2 mounts; remove 3 diplexer; install one 6648 bbu; 1 new fif rack; install 58v retrofit kit (neq 53008) in existing dcpp; install new rf safety signs, barricades + stripping at rooftop.Details
modifications to existing att facility: r/r 5 antennas, add one new air antenna; remove 9 rrus, install 8 plus 2 mounts; remove 3 diplexer; install one 6648 bbu; 1 new fif rack; install 58v retrofit kit (neq 53008) in existing dcpp; install new rf safety signs, barricades + stripping at rooftop. | $65,000 |
| Oct 28, 2024 | In progress issued Dec 2024 | 2460 Alameda St | Metropolitan Electrical Construction | at the rear of the building, addition of 2 exterior high-speed roll-up doors, installed over 2 (e) overhead sectional roll-up doors. no change to size of door openings. no change to use or occupancy.Details
at the rear of the building, addition of 2 exterior high-speed roll-up doors, installed over 2 (e) overhead sectional roll-up doors. no change to size of door openings. no change to use or occupancy. | $79,690 |
| Oct 9, 2024 | Completed final sign-off Jun 2025 | 107 Sagamore St | Metropolitan Electrical Construction, Electric Tech Construction Inc | remove 3 antennas, 3 rruis, install 3 antennas, install 2 dc 9 swge suppressor box, install 1 baseband, 1 rectifier, 1 battery strig, 2 dc trunk & cable tray coverDetails
remove 3 antennas, 3 rruis, install 3 antennas, install 2 dc 9 swge suppressor box, install 1 baseband, 1 rectifier, 1 battery strig, 2 dc trunk & cable tray cover | $25,000 |
| Aug 28, 2024 | Completed final sign-off Oct 2025 | 2645 Ocean Av | Metropolitan Electrical Construction | t-mobile: relocate 2 (e) antennas, install 2 (n) anetennas 3(n) rrus located on roof. no proposed batteriesDetails
t-mobile: relocate 2 (e) antennas, install 2 (n) anetennas 3(n) rrus located on roof. no proposed batteries | $45,000 |
| Aug 13, 2024 | Completed final sign-off Jan 2026 | 401 03rd St | Metropolitan Electrical Construction | at&t wireless modification of an (e) roofing wireless facility consisting - remove 4 antennas, install 5 antennas, extend (e) frp screening; new 1 rectifier in (e) dcpp & 1 new xmu in (e) purcell cab; frp screening to match texture/color of (e) frp screeningDetails
at&t wireless modification of an (e) roofing wireless facility consisting - remove 4 antennas, install 5 antennas, extend (e) frp screening; new 1 rectifier in (e) dcpp & 1 new xmu in (e) purcell cab; frp screening to match texture/color of (e) frp screening | $85,000 |
| Jul 15, 2024 | Completed final sign-off Feb 2025 | 5 Embarcadero Center | Metropolitan Electrical Construction | remove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etcDetails
remove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etc | $25,000 |
| Jun 13, 2024 | Expired or cancelled expired Apr 2026 | 2739 Taylor St | Metropolitan Electrical Construction | remove, relocate, replace 9 antennas, install 4 new remove e radome/flagpole w steel flagpole, antennas within 2 frp screens, relocate rrus from ewuip rm to antenna area,install 3 new rectifiers in e dcpp 1 new battery rack with 8 190 ah lead acid batteries, 1 new 6673 baseband unit in e rack,1 newDetails
remove, relocate, replace 9 antennas, install 4 new remove e radome/flagpole w steel flagpole, antennas within 2 frp screens, relocate rrus from ewuip rm to antenna area,install 3 new rectifiers in e dcpp 1 new battery rack with 8 190 ah lead acid batteries, 1 new 6673 baseband unit in e rack,1 new | $80,000 |
| May 21, 2024 | Completed final sign-off Jul 2024 | 1072 Market St | Metropolitan Electrical Construction | att modification of unmanned telecom facility consisting of remove and 3 antennas, relocate 1 antenna install y cable and single 40 a breaker on e rru 4449 per sector,total 3. remove 3 e strings of 155 ah batteries install 2 strings,210 210 ah and 1 string 170 ah batteries in existing cabinets, instDetails
att modification of unmanned telecom facility consisting of remove and 3 antennas, relocate 1 antenna install y cable and single 40 a breaker on e rru 4449 per sector,total 3. remove 3 e strings of 155 ah batteries install 2 strings,210 210 ah and 1 string 170 ah batteries in existing cabinets, inst | $35,000 |
| May 16, 2024 | In progress issued Jan 2025 | 750 Kearny St | Metropolitan Electrical Construction | t-mobile remove all (e) cabinets; install 2(n) cabinets; remove & replace 6 antennas; install (n) frp screen; install 12(n) batteries; install (n) conduits for cabinetsDetails
t-mobile remove all (e) cabinets; install 2(n) cabinets; remove & replace 6 antennas; install (n) frp screen; install 12(n) batteries; install (n) conduits for cabinets | $75,000 |
| Apr 5, 2024 | Completed final sign-off May 2025 | 2460 Alameda St | Metropolitan Electrical Construction | revision to pa#202403228404 to revise bollard detail addition of two ev changers and four car lifts with power and structural on the 1st floor. addition of power and data outlets in 4 locations on the 3rd floor.Details
revision to pa#202403228404 to revise bollard detail addition of two ev changers and four car lifts with power and structural on the 1st floor. addition of power and data outlets in 4 locations on the 3rd floor. | $71,000 |
| Mar 22, 2024 | Completed final sign-off May 2025 | 2460 Alameda St | Metropolitan Electrical Construction | 2 electrical car chargers & convenience chargersDetails
2 electrical car chargers & convenience chargers | $29,865 |
| Jan 17, 2024 | Completed final sign-off Oct 2025 | 2324 Market St | Metropolitan Electrical Construction | t-mobile: remove & replace (3)(e) antenas w/(3)(n) antenas; install (3)(n) rrus; install (n)batteriesl replace (1)(e) cabinet & install (2)(n) cabinets; remove & replace electrical disconnect.Details
t-mobile: remove & replace (3)(e) antenas w/(3)(n) antenas; install (3)(n) rrus; install (n)batteriesl replace (1)(e) cabinet & install (2)(n) cabinets; remove & replace electrical disconnect. | $60,000 |
| Jan 4, 2024 | Completed final sign-off Nov 2024 | 450 Harrison St | Metropolitan Electrical Construction | at&t modification of unmanned telecom facility consisting of the following: r&r (6) antenna; relocate (1) antenna; remove (3) relocate & install (8) rrus; 3 pipe masts; 3 df0; frp 8'screen for sector b&c antennas; (n) rf safety signs; remove (1) cabinet; r&r (1) power plant;install (12) rectifiers;Details
at&t modification of unmanned telecom facility consisting of the following: r&r (6) antenna; relocate (1) antenna; remove (3) relocate & install (8) rrus; 3 pipe masts; 3 df0; frp 8'screen for sector b&c antennas; (n) rf safety signs; remove (1) cabinet; r&r (1) power plant;install (12) rectifiers; | $75,000 |
| Dec 19, 2023 | Completed final sign-off Nov 2024 | 720 Moscow St | Metropolitan Electrical Construction | t-mobile: install 2 new antennas, remove 4 tmas and install i new rrus, extend cabinet, remove 1 existing cabinet, replace w/ 2 new cabinets.Details
t-mobile: install 2 new antennas, remove 4 tmas and install i new rrus, extend cabinet, remove 1 existing cabinet, replace w/ 2 new cabinets. | $150,000 |
| Dec 7, 2023 | Completed final sign-off Jun 2024 | 2501 03rd St | Metropolitan Electrical Construction | revision to pa #202208160595. install (4) (n) kickers to (e) frp wall @ sector c.Details
revision to pa #202208160595. install (4) (n) kickers to (e) frp wall @ sector c. | $10,000 |
| Nov 21, 2023 | Expired or cancelled suspend Aug 2026 | 2055 Lombard St | Metropolitan Electrical Construction | att: remove e frp enclosure and 9 e antennas install 12 new antennas within 1 new frp screen, install 1 new cabinets, no change to e batteriesDetails
att: remove e frp enclosure and 9 e antennas install 12 new antennas within 1 new frp screen, install 1 new cabinets, no change to e batteries | $75,000 |
| Oct 24, 2023 | Completed final sign-off Jun 2025 | 37 Vicente St | Metropolitan Electrical Construction | revision to pa# 202201216398, revise equipment platform structural details, no change to batteries, no change to antennas, no revised electrical work.all structural work interior not visible from st.Details
revision to pa# 202201216398, revise equipment platform structural details, no change to batteries, no change to antennas, no revised electrical work.all structural work interior not visible from st. | |
| Oct 19, 2023 | In progress issued Jan 2025 | 86 03rd St | Metropolitan Electrical Construction | remove & replacce (3) antennas; remove & replace 3 rru radios; install 1 new battery cabinet to replace (e) cabinet; install routers baseban unit; install 3 dsu; install 12 batteries in (e) battery cabinetDetails
remove & replacce (3) antennas; remove & replace 3 rru radios; install 1 new battery cabinet to replace (e) cabinet; install routers baseban unit; install 3 dsu; install 12 batteries in (e) battery cabinet | $30,000 |
| Aug 23, 2023 | Completed final sign-off Sep 2023 | 2601 Mission St | Metropolitan Electrical Construction | revision to bpa# 202206095936: -at&t- install (2) new frp antenna cable skirts per section (6). see revised sheet s1&s2Details
revision to bpa# 202206095936: -at&t- install (2) new frp antenna cable skirts per section (6). see revised sheet s1&s2 | |
| Aug 11, 2023 | Completed final sign-off Jan 2026 | 2400 03rd St | Metropolitan Electrical Construction | remove (e) wireless equipment to include all e antennas, platform & cabinets to remainDetails
remove (e) wireless equipment to include all e antennas, platform & cabinets to remain | $10,000 |
| Jun 29, 2023 | Completed final sign-off Feb 2024 | 325 La Grande Av | Metropolitan Electrical Construction | section 6409 ef-at&t modification r&r (2) (e) antennas relocate (1) antenna installl (2) new air antennas, r&r (4) rru's; r&r power trunks, r&r antenna mounts, remove (e) units from (e) rack new dafi in "e" rack antenna painted to match building and 3m concealment film added to air antennasDetails
section 6409 ef-at&t modification r&r (2) (e) antennas relocate (1) antenna installl (2) new air antennas, r&r (4) rru's; r&r power trunks, r&r antenna mounts, remove (e) units from (e) rack new dafi in "e" rack antenna painted to match building and 3m concealment film added to air antennas | $45,000 |
| May 4, 2023 | Completed final sign-off Aug 2023 | 539 Bryant St | Metropolitan Electrical Construction | revision to 202203079346 (at&t: modification to an unmanned telecom facitity). revised mounting details.Details
revision to 202203079346 (at&t: modification to an unmanned telecom facitity). revised mounting details. | $15,000 |
| Jan 26, 2023 | Completed final sign-off Nov 2023 | 4175 Mission St | Metropolitan Electrical Construction | revison to bpa#202203250944, replace (e) antenna mountsDetails
revison to bpa#202203250944, replace (e) antenna mounts | $10,000 |
| Jan 26, 2023 | Completed final sign-off Dec 2023 | 800 Powell St | Metropolitan Electrical Construction | at&t modifications of an unmanned telecom facility consisting of remove & replace (4)(e) antennas; remove & replace (6)(e) frp vents/chimneys; remove (2)(e) rru's; remove (2) existing duw from existing racks; install (1) rectifier + (1) 6648 baseband in existinf dcpp + racks, new rf stripping + signDetails
at&t modifications of an unmanned telecom facility consisting of remove & replace (4)(e) antennas; remove & replace (6)(e) frp vents/chimneys; remove (2)(e) rru's; remove (2) existing duw from existing racks; install (1) rectifier + (1) 6648 baseband in existinf dcpp + racks, new rf stripping + sign | $65,000 |
| Jan 17, 2023 | Completed final sign-off Feb 2024 | 3250 19th Av | Metropolitan Electrical Construction | att remove section of cable tray and conduit, reroute cable trays, remove and replace all e fiber and power cables from equip to antennas. no change to batteries.Details
att remove section of cable tray and conduit, reroute cable trays, remove and replace all e fiber and power cables from equip to antennas. no change to batteries. | $10,000 |
| Dec 13, 2022 | Completed final sign-off Sep 2024 | 3535 Balboa St | Metropolitan Electrical Construction | at&t: remove (2)(e) micro antennas; install (1)(n) micro antenna; remove (2)(e) cabinets; install (1)(n) cabinet; install (4)(n) batteries.Details
at&t: remove (2)(e) micro antennas; install (1)(n) micro antenna; remove (2)(e) cabinets; install (1)(n) cabinet; install (4)(n) batteries. | $42,000 |
| Dec 7, 2022 | Completed final sign-off Sep 2023 | 3682 18th St | Metropolitan Electrical Construction | at&t modifcation of an unmanned telecom facility, consisiting of remove & replace 6-antenas, 6-radomes, remove 8-rru's and add 2-rru's, rf safety signs, stripping on roof, new 2x6 wood beam sistered to e 2x6 at antena location, install 1-6648 in existing rackDetails
at&t modifcation of an unmanned telecom facility, consisiting of remove & replace 6-antenas, 6-radomes, remove 8-rru's and add 2-rru's, rf safety signs, stripping on roof, new 2x6 wood beam sistered to e 2x6 at antena location, install 1-6648 in existing rack | $45,000 |
| Nov 30, 2022 | Completed final sign-off Jun 2025 | 1100 Pine St | Metropolitan Electrical Construction | att: remove (2) (e) ombi antennas; install (2) (n) antennas within (2) (n) faax vents ; install (4) (n) rru's, remove all unused euipment; remove all (e) batteries to install (8) (n) batteries.Details
att: remove (2) (e) ombi antennas; install (2) (n) antennas within (2) (n) faax vents ; install (4) (n) rru's, remove all unused euipment; remove all (e) batteries to install (8) (n) batteries. | $72,000 |
| Sep 29, 2022 | Completed final sign-off Mar 2023 | 2440 16th St | Metropolitan Electrical Construction | at&t modif of unmanned telecom, remove/replace (6) antennas, remove (6) tma's, install new rf safety signage, r/r (12) batteries (leudacid) w/in(e) cabinet, r/r cabling w/in sector a cable tray, install (1) rectifier w/in(e) dccp, install (1) new 6648 baseband in (1) new f/x 21 cabinetDetails
at&t modif of unmanned telecom, remove/replace (6) antennas, remove (6) tma's, install new rf safety signage, r/r (12) batteries (leudacid) w/in(e) cabinet, r/r cabling w/in sector a cable tray, install (1) rectifier w/in(e) dccp, install (1) new 6648 baseband in (1) new f/x 21 cabinet | $55,000 |
| Sep 26, 2022 | Completed final sign-off Jun 2023 | 1408 California St | Metropolitan Electrical Construction | att modification of unmanned telecom facility consisting of remove/replace 9 antennas, remove 6 rrus, installl 3 new rrus, 3 new diplexers, relocate 1 radome with new sleeper platform. new rf safety sign barricades, stripping on roof. remove/replace 20 acid lead batteries within e cabinets.Details
att modification of unmanned telecom facility consisting of remove/replace 9 antennas, remove 6 rrus, installl 3 new rrus, 3 new diplexers, relocate 1 radome with new sleeper platform. new rf safety sign barricades, stripping on roof. remove/replace 20 acid lead batteries within e cabinets. | $55,000 |
| Sep 26, 2022 | Completed final sign-off Feb 2024 | 766 Vallejo St | Metropolitan Electrical Construction | at&t modification remove 9 antennas, install 6 antennas pipe mounts, r/r 6 rrus; install3 dc 9 boxes & 6 power trunks 3 fiber, remove 2 cabinets & add 1 new w/4 new 155ah load batteries; remove 9 tma's & 7/8 " cabling; install 2 rectifiers in (e) dcpp, 2 new dc12 on (e) frame, 1 new 6648 to 6630 bbuDetails
at&t modification remove 9 antennas, install 6 antennas pipe mounts, r/r 6 rrus; install3 dc 9 boxes & 6 power trunks 3 fiber, remove 2 cabinets & add 1 new w/4 new 155ah load batteries; remove 9 tma's & 7/8 " cabling; install 2 rectifiers in (e) dcpp, 2 new dc12 on (e) frame, 1 new 6648 to 6630 bbu | $75,000 |
| Sep 22, 2022 | Completed final sign-off Apr 2023 | 501 Laguna St | Metropolitan Electrical Construction | att: revision to 2020 0826 2674. remove (e) 4 batteriers (e) cabinetDetails
att: revision to 2020 0826 2674. remove (e) 4 batteriers (e) cabinet | |
| Sep 12, 2022 | Completed final sign-off Dec 2025 | 647 Mission St | Metropolitan Electrical Construction | att:remove 4 (e) antenas; install 4 (n) antenas, no change to (e) batteriesDetails
att:remove 4 (e) antenas; install 4 (n) antenas, no change to (e) batteries | $35,000 |
| Aug 29, 2022 | Completed final sign-off Mar 2023 | 199 Leland Av | Metropolitan Electrical Construction | remove 6 antennas, install 6 antannas, remove 3 rrus, remove (e) radomes, install new radomes, install 1 baseboard in cabinet, (e) ladder hookes to be removed and replaced, install striping and barriers per emeDetails
remove 6 antennas, install 6 antannas, remove 3 rrus, remove (e) radomes, install new radomes, install 1 baseboard in cabinet, (e) ladder hookes to be removed and replaced, install striping and barriers per eme | $25,000 |
| Aug 18, 2022 | Completed final sign-off Jun 2025 | 185 Berry St | Metropolitan Electrical Construction | att modification of unmanned telelcom facility consising of remove 7 relcate 2 ex antennas, 7 new antenna behing e frp screen, paint to match, replace 4 rrus, install 2 twin diplexers, 2 surge suppressor,pwer trunks, rf safety signs/barricade/strip,1 purcell cab, 4 rectifier,4 new 190 ah batteriesDetails
att modification of unmanned telelcom facility consising of remove 7 relcate 2 ex antennas, 7 new antenna behing e frp screen, paint to match, replace 4 rrus, install 2 twin diplexers, 2 surge suppressor,pwer trunks, rf safety signs/barricade/strip,1 purcell cab, 4 rectifier,4 new 190 ah batteries | $85,000 |
| Aug 16, 2022 | Completed final sign-off Jun 2024 | 2501 03rd St | Metropolitan Electrical Construction | att modifcation of unmanned telecom facility, remove (9)panel antennas, (6)new, remove (3)rrus, install (3)6 awg power trunk cables. new rf safety signs, barricade/striping rooftop, install (1)new rectifier in e dc power plant, (1)new 6648 baseband unit in existing purcell cabinetDetails
att modifcation of unmanned telecom facility, remove (9)panel antennas, (6)new, remove (3)rrus, install (3)6 awg power trunk cables. new rf safety signs, barricade/striping rooftop, install (1)new rectifier in e dc power plant, (1)new 6648 baseband unit in existing purcell cabinet | $55,000 |
| Jul 28, 2022 | Completed final sign-off May 2023 | 333 Baker St | Metropolitan Electrical Construction | att modification unmanned telecom facility rr 6 panel antennas behind e frp screen, remove 4 rrus, new 2 rrus,2 dc 9 box, 2 awg power trunks, 1 1/4"fiber trunk, rf safety sign, barricades, striping roof, r/r 20 batteries in e racks,1 dc 12 rm, 1 6648 and 1 6630 in e racksDetails
att modification unmanned telecom facility rr 6 panel antennas behind e frp screen, remove 4 rrus, new 2 rrus,2 dc 9 box, 2 awg power trunks, 1 1/4"fiber trunk, rf safety sign, barricades, striping roof, r/r 20 batteries in e racks,1 dc 12 rm, 1 6648 and 1 6630 in e racks | $65,000 |
| Jul 13, 2022 | Completed final sign-off Oct 2023 | 540 Van Ness Av | Metropolitan Electrical Construction | att remove 2 (e) antennas, 3 (e) rrus, 1 (e) radome, install 5 (n) antennas, 2 (n) radomes, no change to (e) batteriesDetails
att remove 2 (e) antennas, 3 (e) rrus, 1 (e) radome, install 5 (n) antennas, 2 (n) radomes, no change to (e) batteries | $52,000 |
| Jul 13, 2022 | Completed final sign-off Dec 2023 | 1160 Battery St | Metropolitan Electrical Construction | att remove 9 (e) antennas, 9 (e) rrus, install 9 (n) antennas 3 rrus, remove 1 (e) cabinet; install 1 (n) cabinet w/batteriesDetails
att remove 9 (e) antennas, 9 (e) rrus, install 9 (n) antennas 3 rrus, remove 1 (e) cabinet; install 1 (n) cabinet w/batteries | $49,000 |
| Jun 23, 2022 | Completed final sign-off Apr 2023 | 100 Pine St | Invertice Inc, Metropolitan Electrical Construction | at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack.Details
at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack. | $65,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2023 | 2601 Mission St | Metropolitan Electrical Construction | at&t modification: roof - remove + replace 9 antennas, 9 rru's, 9 cable shrouds. add 3 new rru's, 6 dc9 boxes, 6 #6 awg dc power trunks. remove 6 dc6 boxes. install 4 rectifiers in (e) dcpp, 1 dc power dist panel in (e) rack. 1 dc12-rm and 1 6648 baseband unit in (e) racks.Details
at&t modification: roof - remove + replace 9 antennas, 9 rru's, 9 cable shrouds. add 3 new rru's, 6 dc9 boxes, 6 #6 awg dc power trunks. remove 6 dc6 boxes. install 4 rectifiers in (e) dcpp, 1 dc power dist panel in (e) rack. 1 dc12-rm and 1 6648 baseband unit in (e) racks. | $75,000 |
| May 31, 2022 | Completed final sign-off Sep 2023 | 1111 California St | Metropolitan Electrical Construction | att: remove (4) (e) antennas, install (4) (n) antennas; remove (2) (e) cabinets; install (1) (n) cabinet ; install (4) (n) batteries.Details
att: remove (4) (e) antennas, install (4) (n) antennas; remove (2) (e) cabinets; install (1) (n) cabinet ; install (4) (n) batteries. | $53,000 |
| May 23, 2022 | Completed final sign-off Mar 2024 | 536 Mission St | Metropolitan Electrical Construction | at&t modicficaition of an unmanned telecom facility, consisting of: remove and replace (18) antennas; remove (12) rru's install (6); install (6) dc9 box with (6) power trunks; r+r (8) antenna masts; remove (28) strings 155ah batteries + install (16) 190ah battery in new battery rack. (12) 190 ag inDetails
at&t modicficaition of an unmanned telecom facility, consisting of: remove and replace (18) antennas; remove (12) rru's install (6); install (6) dc9 box with (6) power trunks; r+r (8) antenna masts; remove (28) strings 155ah batteries + install (16) 190ah battery in new battery rack. (12) 190 ag in | $85,000 |
| May 23, 2022 | Completed final sign-off Dec 2022 | 2390 Market St | Metropolitan Electrical Construction | at&t modification of an unmanned telecom facility consisting of: remove and replace (9) antennas ; remove and replace (3) rru's; install (3) new diplexers; new rf safety signs + stripping @ rooftop. install (6) new rectifiers in (e) dcp; (1) new 6648 baseband om (e) rack; install (8) new 190ah leadDetails
at&t modification of an unmanned telecom facility consisting of: remove and replace (9) antennas ; remove and replace (3) rru's; install (3) new diplexers; new rf safety signs + stripping @ rooftop. install (6) new rectifiers in (e) dcp; (1) new 6648 baseband om (e) rack; install (8) new 190ah lead | $45,000 |
| May 16, 2022 | Completed final sign-off Apr 2023 | 990 Columbus Av | Metropolitan Electrical Construction | at&t: remove + replace frp screen. install 3 new antennas. install 4 new batteries.Details
at&t: remove + replace frp screen. install 3 new antennas. install 4 new batteries. | $57,000 |
| May 4, 2022 | Completed final sign-off Jul 2024 | 795 Folsom St | Metropolitan Electrical Construction | r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinetsDetails
r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinets | $55,000 |
| Apr 28, 2022 | Completed final sign-off Nov 2022 | 255 12th St | Metropolitan Electrical Construction | at&t mobility: r/r 4 panel antennas + radomes, 8 facade mounted. r/r 3 rrus. install 2 8" stand-offs at b+c, 3 (n) twinduplexers. 3 (n) dc9 boxes, & 3 #6awg power trunks. rf safety signs/ stripping at rooftop. 1 (n) dc 12 box on (e) frame + 1 (n) 6648 baseband in (e) purcell cabinet. paint.Details
at&t mobility: r/r 4 panel antennas + radomes, 8 facade mounted. r/r 3 rrus. install 2 8" stand-offs at b+c, 3 (n) twinduplexers. 3 (n) dc9 boxes, & 3 #6awg power trunks. rf safety signs/ stripping at rooftop. 1 (n) dc 12 box on (e) frame + 1 (n) 6648 baseband in (e) purcell cabinet. paint. | $75,000 |
| Apr 26, 2022 | Completed final sign-off Nov 2022 | 225 30th St | Metropolitan Electrical Construction | att cell site mod: r/r 9 panel antennas.remove 6 rru's and replace with 3 new rrus. install 3 new diplexers near antennas sector.r/r 20 batteirs.install new rf safety signs and striping at rooftop.Details
att cell site mod: r/r 9 panel antennas.remove 6 rru's and replace with 3 new rrus. install 3 new diplexers near antennas sector.r/r 20 batteirs.install new rf safety signs and striping at rooftop. | $45,000 |
| Apr 14, 2022 | Completed final sign-off Sep 2022 | 2 New Montgomery St | Metropolitan Electrical Construction | at&t wireless: modification of an unmanned at&t telecom facility consisting of: remove & replace 4 panel antennas. remove 2 rrus 11 b12 and 2 rruw b5. install new rrus 4478 b12a. install 1 new 6648 baseband unit in (e) rack.Details
at&t wireless: modification of an unmanned at&t telecom facility consisting of: remove & replace 4 panel antennas. remove 2 rrus 11 b12 and 2 rruw b5. install new rrus 4478 b12a. install 1 new 6648 baseband unit in (e) rack. | $30,000 |
| Apr 12, 2022 | Completed final sign-off Oct 2023 | 55 Francisco St | Metropolitan Electrical Construction | att - remove & replace 4 (e) antennas w/4 (n) antennas; install 6 (n) counters, 2 (n) rectifier, 1 (n) battery rack & 12 (n) batteriesDetails
att - remove & replace 4 (e) antennas w/4 (n) antennas; install 6 (n) counters, 2 (n) rectifier, 1 (n) battery rack & 12 (n) batteries | $42,000 |
| Apr 4, 2022 | Completed final sign-off Dec 2022 | 650 07th St | Metropolitan Electrical Construction | at&t- remove 3 (e) antennas; 9 (e) rrus; install 3 (n) anatennas, 3 (n) rrus' remove & replace 16 (e) batteries w/(n) batteriesDetails
at&t- remove 3 (e) antennas; 9 (e) rrus; install 3 (n) anatennas, 3 (n) rrus' remove & replace 16 (e) batteries w/(n) batteries | $39,000 |
| Mar 31, 2022 | Completed final sign-off Oct 2022 | 234 09th St | Metropolitan Electrical Construction | at&t: remove and replace 6 antennas. remove 6 rrus and install 3 rrus. remove and replace 20 batteries. remove (1) 5216 within (e) fif rack. install 1 rectifier.Details
at&t: remove and replace 6 antennas. remove 6 rrus and install 3 rrus. remove and replace 20 batteries. remove (1) 5216 within (e) fif rack. install 1 rectifier. | $45,000 |
| Mar 24, 2022 | Never finaled issued Aug 2022, no final | 353 Sacramento St | Metropolitan Electrical Construction | cell site mod: r/r 6 panel antennas,install 1 new rectifier w/in (e) dc power plant.install (1) 6648 baseband within (e) fif rack.Details
cell site mod: r/r 6 panel antennas,install 1 new rectifier w/in (e) dc power plant.install (1) 6648 baseband within (e) fif rack. | $35,000 |
| Mar 14, 2022 | Completed final sign-off Jan 2023 | 274 Brannan St | Metropolitan Electrical Construction | at&t: modification of an unmanned telecom facility. remove + replace 6 panel antennas. install new rf safety signs battiers, stripping on roof. remove + replace 16 batteries & install 2 new rectifiers in (e) dcpp rack,Details
at&t: modification of an unmanned telecom facility. remove + replace 6 panel antennas. install new rf safety signs battiers, stripping on roof. remove + replace 16 batteries & install 2 new rectifiers in (e) dcpp rack, | $35,000 |
| Mar 14, 2022 | Completed final sign-off Nov 2024 | 647 Mission St | Metropolitan Electrical Construction | at&t: remove (6)(e) antennas, (4)(e) rrus, raise (6) (e) antenna mounting poles; install (6)(n) antennas; install (8)(n) rrus install (3)(n) surge suppresors, remove unused euipment ; remove all (e) batteries, install (2) (n) cabinets; install (n) batteries.Details
at&t: remove (6)(e) antennas, (4)(e) rrus, raise (6) (e) antenna mounting poles; install (6)(n) antennas; install (8)(n) rrus install (3)(n) surge suppresors, remove unused euipment ; remove all (e) batteries, install (2) (n) cabinets; install (n) batteries. | $55,000 |
| Mar 14, 2022 | Completed final sign-off Nov 2022 | 2288 Broadway | Metropolitan Electrical Construction | at&t modification of an unmanned telecom facility consisting of: install (2) new panel antennas, rf safety signs, barriers/stripping. remove diplexers, (2) rrus. install 6648 baseband in (e) rack, (1) rectifier in (e) dcpp, (4) ah batteries in (e) rack. remove (1) ecisting duw in existing rack.Details
at&t modification of an unmanned telecom facility consisting of: install (2) new panel antennas, rf safety signs, barriers/stripping. remove diplexers, (2) rrus. install 6648 baseband in (e) rack, (1) rectifier in (e) dcpp, (4) ah batteries in (e) rack. remove (1) ecisting duw in existing rack. | $35,000 |
| Mar 7, 2022 | Completed final sign-off Nov 2023 | 539 Bryant St | Metropolitan Electrical Construction | at&t: modification to an unmanned telecom facitity. r/r 9 antennas, 4 rudomes, 3 rrus and relocate 1 rru at sector c on new mt. install 3 new #6 awg dc power trunks, 3 new 1/4" fiber trunks, new rf safety signs and barriers on rooftop, 3 new dc9 power trunks. r/r 20 batteries. install 12 newDetails
at&t: modification to an unmanned telecom facitity. r/r 9 antennas, 4 rudomes, 3 rrus and relocate 1 rru at sector c on new mt. install 3 new #6 awg dc power trunks, 3 new 1/4" fiber trunks, new rf safety signs and barriers on rooftop, 3 new dc9 power trunks. r/r 20 batteries. install 12 new | $55,000 |
| Mar 4, 2022 | Completed final sign-off Sep 2024 | 99 Grove St | Metropolitan Electrical Construction | att antenna: remove & install 21 rrus. install 3 antennas and & (6) diplexers, dc9 surge suppressord (3), dc power trunk (3) fiber trunksDetails
att antenna: remove & install 21 rrus. install 3 antennas and & (6) diplexers, dc9 surge suppressord (3), dc power trunk (3) fiber trunks | $45,000 |
| Feb 24, 2022 | Completed final sign-off Nov 2024 | 562 Market St | Invertice Inc, Metropolitan Electrical Construction | at&t: remove 11 panel antennas. install 9 (n) panel antennas. install missing antenna skirts @ sector a & install (n) safety rf signs, barriers & stripping. install 1 (n) flex 21v2 purcell cab w/6648 baseband unit within. remove (12) 155 155ah batteries & install 12 (n) 190ah in (e) dcpp & (4) rectiDetails
at&t: remove 11 panel antennas. install 9 (n) panel antennas. install missing antenna skirts @ sector a & install (n) safety rf signs, barriers & stripping. install 1 (n) flex 21v2 purcell cab w/6648 baseband unit within. remove (12) 155 155ah batteries & install 12 (n) 190ah in (e) dcpp & (4) recti | $45,000 |
| Feb 16, 2022 | Completed final sign-off Dec 2022 | 985 Geneva Av | Metropolitan Electrical Construction | remove 9 antennas:install 9 antennas, remove 9 rrus, install 6 rrus, remove 6 frp radomes. install 6 frp radomes, install 3 y cable splitters, install barriers/striping, install 1 baseband, install 2 battery strings, install 1 rectifier.Details
remove 9 antennas:install 9 antennas, remove 9 rrus, install 6 rrus, remove 6 frp radomes. install 6 frp radomes, install 3 y cable splitters, install barriers/striping, install 1 baseband, install 2 battery strings, install 1 rectifier. | $25,000 |
| Feb 15, 2022 | Completed final sign-off Nov 2024 | 1520 Stockton St | Metropolitan Electrical Construction | att: install 3 new antennas; install 9 new rrus; remove 2 extg cabinets; install new equipment rack with batteries; no electrical work.Details
att: install 3 new antennas; install 9 new rrus; remove 2 extg cabinets; install new equipment rack with batteries; no electrical work. | $53,000 |
| Jan 21, 2022 | Completed final sign-off Jun 2025 | 37 Vicente St | Metropolitan Electrical Construction | at&t remove (e) omni antennas; install 9(n) roof mounted anteannas (2 inside vent pipes, 6 inside (n) frp box); remove (e) equipment on ground; install (n) equipment plat form w/(n) equipment on roof top; install (n)200a meterDetails
at&t remove (e) omni antennas; install 9(n) roof mounted anteannas (2 inside vent pipes, 6 inside (n) frp box); remove (e) equipment on ground; install (n) equipment plat form w/(n) equipment on roof top; install (n)200a meter | $115,000 |
| Jan 18, 2022 | Completed final sign-off Jan 2023 | 4610 Mission St | Metropolitan Electrical Construction | at&t: remove 9 antennas, install 9 antennas, remove 6 rrus, install 3 rrus. paint rf striping per eme. install 1 baseband, install 1 battery string. install 1 rectifier in cabinet.Details
at&t: remove 9 antennas, install 9 antennas, remove 6 rrus, install 3 rrus. paint rf striping per eme. install 1 baseband, install 1 battery string. install 1 rectifier in cabinet. | $25,000 |
| Jan 11, 2022 | Completed final sign-off Nov 2022 | 901 Market St | Metropolitan Electrical Construction | roof - cell site: mod to unmanned telecomm: r/r 3 panel antennas; remove 24-155ah batts & replace with 20(n) 190ah batts; 1(n) rectifer in (e) dc power plant. install 1 (n) 6448 baseband unit in (e) purcell cabinet.Details
roof - cell site: mod to unmanned telecomm: r/r 3 panel antennas; remove 24-155ah batts & replace with 20(n) 190ah batts; 1(n) rectifer in (e) dc power plant. install 1 (n) 6448 baseband unit in (e) purcell cabinet. | $85,000 |
| Dec 22, 2021 | Completed final sign-off Feb 2022 | 1501 Franklin St | Metropolitan Electrical Construction | cell site - fire review only for work approved under pa202005197601. - "no change to scope"Details
cell site - fire review only for work approved under pa202005197601. - "no change to scope" | |
| Dec 21, 2021 | Completed final sign-off Nov 2022 | 121 Steuart St | Metropolitan Electrical Construction | at&t: replace 10 antennas, remove 3 rru's, relocate 4 rru's, install 3 diplexers, remove 2 cabinets, remove 1 dus41, remove 12 batteries, install 2 rectifiers, install 1 battery rack with 8 strings of batteries, install 12 batteries.Details
at&t: replace 10 antennas, remove 3 rru's, relocate 4 rru's, install 3 diplexers, remove 2 cabinets, remove 1 dus41, remove 12 batteries, install 2 rectifiers, install 1 battery rack with 8 strings of batteries, install 12 batteries. | $25,000 |
| Dec 21, 2021 | Completed final sign-off Sep 2022 | 250 Clay St | Metropolitan Electrical Construction | at&t: replace 2 antennas, add 2 antennas, relocate 2 natennas, relocate 2 rru's, install 2 rru's, install 2 antennas mounts, install new rf safety signs and striping, install 1 rectifier, install 1 bbu.Details
at&t: replace 2 antennas, add 2 antennas, relocate 2 natennas, relocate 2 rru's, install 2 rru's, install 2 antennas mounts, install new rf safety signs and striping, install 1 rectifier, install 1 bbu. | $25,000 |
| Dec 20, 2021 | Completed final sign-off Nov 2022 | 1 Richardson Av | Metropolitan Electrical Construction | remove & replace existing antennas (8) total. remove & replace rrus (9) total. install dc-9 + dc power trunks. install new fiber.Details
remove & replace existing antennas (8) total. remove & replace rrus (9) total. install dc-9 + dc power trunks. install new fiber. | $37,000 |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 22 04th St | Metropolitan Electrical Construction | retrofit from flourescent to led. provide lighting t.i. to 7800sq ft of open office and enclosed office in new scope area. ref# pa#201805088466.Details
retrofit from flourescent to led. provide lighting t.i. to 7800sq ft of open office and enclosed office in new scope area. ref# pa#201805088466. | $65,000 |
| Dec 10, 2021 | Completed final sign-off Aug 2022 | 255 Steiner St | Metropolitan Electrical Construction | at&t modification.remove & replace(9) panel antennas in (e) radomes-sector c to remove & replace radomes.remove(6)rru's & replace w/3 new rru's & (3)new twin diplexers.remove(2)existing duw from (e)purcell cabs.install(8)new 185 ah batteries in(e)battery cabinet.(3)new rectifiersin(e) dc power plantDetails
at&t modification.remove & replace(9) panel antennas in (e) radomes-sector c to remove & replace radomes.remove(6)rru's & replace w/3 new rru's & (3)new twin diplexers.remove(2)existing duw from (e)purcell cabs.install(8)new 185 ah batteries in(e)battery cabinet.(3)new rectifiersin(e) dc power plant | $85,000 |
| Dec 7, 2021 | Completed final sign-off Mar 2023 | 30 Rickard St | Metropolitan Electrical Construction | modification to existing cellsite. replace (9) antennas, replace 3 remote radio units, remove 28 loax. install (3) diplexers, install (1) surge suppressor. install (1) power , 1 fiber trunk, install 3 rectifiers at the equipment area.Details
modification to existing cellsite. replace (9) antennas, replace 3 remote radio units, remove 28 loax. install (3) diplexers, install (1) surge suppressor. install (1) power , 1 fiber trunk, install 3 rectifiers at the equipment area. | $15,000 |