Zahra Gerami
- Listed as
- engineer
- Firm
- J5 Infrastructure
- Based in
- Roswell
- On San Francisco permits
- Mar 2022 to Dec 2025
8 permits since 2000 (engineer on 8 permits): 6 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2025 | In progress issued Mar 2026 | 2350 Turk Bl | Metropolitan Electrical Construction | at&t: modification of an (e) wireless facility. r/r 7 antennas, removing 6 rrus, r/r 3 rrus, relocating sector c rudomes, and with new power trunks, fiber, conduit, h-frame. r/f 2 cabinets with 11 new rectifiers, 10 new converters, 6 new 30a breakers. r/r 4 batteries. relocating 20 (e) batteries toDetails
at&t: modification of an (e) wireless facility. r/r 7 antennas, removing 6 rrus, r/r 3 rrus, relocating sector c rudomes, and with new power trunks, fiber, conduit, h-frame. r/f 2 cabinets with 11 new rectifiers, 10 new converters, 6 new 30a breakers. r/r 4 batteries. relocating 20 (e) batteries to | $80,000 |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 3682 18th St | Metropolitan Electrical Construction | modification of an existing wireless facility consisting of; install 2 frp sled mounts for cameras; 8 concrete block ballast on mounts; one rfis rf monitoring system; 2 rfis-sk dc power relay; 2 rfis poe 30w injector; 1 led dual color signal light; 2 frpmast pipes; 1 aviglon h6a bullet camera;Details
modification of an existing wireless facility consisting of; install 2 frp sled mounts for cameras; 8 concrete block ballast on mounts; one rfis rf monitoring system; 2 rfis-sk dc power relay; 2 rfis poe 30w injector; 1 led dual color signal light; 2 frpmast pipes; 1 aviglon h6a bullet camera; | $25,000 |
| Nov 10, 2022 | Expired or cancelled cancelled Jan 2026 | 726 Polk St | att&t modification of an unmanned telecom facility consisting of: remove and replace 3 antennas; 6 rru's; install 6 back to back mounts; new rf safety signs and modify stripping on roof; install new eme barriers & gates; one new rectifier and one sub-panel.Details
att&t modification of an unmanned telecom facility consisting of: remove and replace 3 antennas; 6 rru's; install 6 back to back mounts; new rf safety signs and modify stripping on roof; install new eme barriers & gates; one new rectifier and one sub-panel. | $35,000 | |
| Sep 26, 2022 | Completed final sign-off Feb 2024 | 766 Vallejo St | Metropolitan Electrical Construction | at&t modification remove 9 antennas, install 6 antennas pipe mounts, r/r 6 rrus; install3 dc 9 boxes & 6 power trunks 3 fiber, remove 2 cabinets & add 1 new w/4 new 155ah load batteries; remove 9 tma's & 7/8 " cabling; install 2 rectifiers in (e) dcpp, 2 new dc12 on (e) frame, 1 new 6648 to 6630 bbuDetails
at&t modification remove 9 antennas, install 6 antennas pipe mounts, r/r 6 rrus; install3 dc 9 boxes & 6 power trunks 3 fiber, remove 2 cabinets & add 1 new w/4 new 155ah load batteries; remove 9 tma's & 7/8 " cabling; install 2 rectifiers in (e) dcpp, 2 new dc12 on (e) frame, 1 new 6648 to 6630 bbu | $75,000 |
| Aug 25, 2022 | Completed final sign-off Apr 2023 | 901 Cole St | Diablo Telecom & Construction Inc | remove & replace 6 antennas; remove 3 rru's;install new rf safety signs/striping on rooftop;r/r 20 batteries in(e) ruck & dcpp; install 1 new rectifier in (e) dcpp; install 6648 baseband unit in (e) rack.Details
remove & replace 6 antennas; remove 3 rru's;install new rf safety signs/striping on rooftop;r/r 20 batteries in(e) ruck & dcpp; install 1 new rectifier in (e) dcpp; install 6648 baseband unit in (e) rack. | $55,000 |
| Jul 14, 2022 | Completed final sign-off Jan 2023 | 2300 26th St | Ericsson Inc Dba E U S Inc | r/r 6 antennas; relocate 3 antennas; r/r 3 rru's; remove (8) 7/8in coax.install (1 new dc9 squid, (1) new dc power truck & rf safety signs at base of monopole. install (4) new rectifiers in (e) dcpp. install (1) new 6648 baseband unit in (e) rack.Details
r/r 6 antennas; relocate 3 antennas; r/r 3 rru's; remove (8) 7/8in coax.install (1 new dc9 squid, (1) new dc power truck & rf safety signs at base of monopole. install (4) new rectifiers in (e) dcpp. install (1) new 6648 baseband unit in (e) rack. | $35,000 |
| May 23, 2022 | Completed final sign-off Dec 2022 | 2390 Market St | Metropolitan Electrical Construction | at&t modification of an unmanned telecom facility consisting of: remove and replace (9) antennas ; remove and replace (3) rru's; install (3) new diplexers; new rf safety signs + stripping @ rooftop. install (6) new rectifiers in (e) dcp; (1) new 6648 baseband om (e) rack; install (8) new 190ah leadDetails
at&t modification of an unmanned telecom facility consisting of: remove and replace (9) antennas ; remove and replace (3) rru's; install (3) new diplexers; new rf safety signs + stripping @ rooftop. install (6) new rectifiers in (e) dcp; (1) new 6648 baseband om (e) rack; install (8) new 190ah lead | $45,000 |
| Mar 24, 2022 | Completed final sign-off Jan 2023 | 87 06th St | Ericsson Inc Dba E U S Inc | cell site mod:r/r 4 antennas behind (e) frp screening.install rf cautionsigns.install 1 rectifier w/ (e) cab,(1) new 6648 baseband unit in (e) purcell cab,1 (n) stackable battery cabinet with 4 new 185ah batteries.Details
cell site mod:r/r 4 antennas behind (e) frp screening.install rf cautionsigns.install 1 rectifier w/ (e) cab,(1) new 6648 baseband unit in (e) purcell cab,1 (n) stackable battery cabinet with 4 new 185ah batteries. | $35,000 |