Block 7231, lot 003
3250 19th Ave
- City’s use
- Commercial Misc
- Built
- 1952
- Stories
- 4
- Rooms
- 4 bathrooms
- Building
- 81,756 sq ft
- Lot
- 234,696 sq ft
- Zoning
- RH1D
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
45 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 3250 19th Av | Thompson Builders Corp | to obtain final inspection for work approved under pa # 202206106049. all work is complete.Details
to obtain final inspection for work approved under pa # 202206106049. all work is complete. | |
| Jun 22, 2026 | In progress issued Aug 2026 | 3250 19th Av | Thompson Builders Corp | revision to pa#: 202209082129. mep. work includes: main relief duct layout on floors 1, 1 revised - restroom,storage,and janitor room exhaust layout on floor 1 through 3 revised - outside air and relief/exhaust duct shafts revised -fan coils fc 4-3 + fc 4-5 +vav boxes vav 4-3 & fc 4-5 relocated ductDetails
revision to pa#: 202209082129. mep. work includes: main relief duct layout on floors 1, 1 revised - restroom,storage,and janitor room exhaust layout on floor 1 through 3 revised - outside air and relief/exhaust duct shafts revised -fan coils fc 4-3 + fc 4-5 +vav boxes vav 4-3 & fc 4-5 relocated duct | |
| Mar 16, 2026 | Completed final sign-off May 2026 | 3250 19th Av | Mastec Network Solutions Inc | t-mobile decommission antennas, cables, beam. remove panel antennas and mounting pipes, all apxvfww24x-c-na20 (hex); all 1-5/8 coax; air32krd901146/1_b66_b2a (octo); all coax jumpers; all compsocpe twin style 3cx-tmat1921xb68-21a;all rfs twin syle 1a1900d-1a20 -comscope twin 700/pcs; all cab-steelDetails
t-mobile decommission antennas, cables, beam. remove panel antennas and mounting pipes, all apxvfww24x-c-na20 (hex); all 1-5/8 coax; air32krd901146/1_b66_b2a (octo); all coax jumpers; all compsocpe twin style 3cx-tmat1921xb68-21a;all rfs twin syle 1a1900d-1a20 -comscope twin 700/pcs; all cab-steel | $5,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 3250 19th Av | Crime Watch Security Sys Llc | tenant improvement: extend the existing main school fire alarm voice evac system to cover the adjacents arts building. ref fire pa# 202410314112Details
tenant improvement: extend the existing main school fire alarm voice evac system to cover the adjacents arts building. ref fire pa# 202410314112 | $70,000 |
| Jun 11, 2025 | Completed final sign-off Aug 2025 | 3250 19th Av | Central Coating Company | reroofing, no hot work. install sprayed polyurethane foam spf roof over 1 existing built up roof per ulex. r267056. top coat of coating will be bright white and cool roof. compliant crri product id 0620-061Details
reroofing, no hot work. install sprayed polyurethane foam spf roof over 1 existing built up roof per ulex. r267056. top coat of coating will be bright white and cool roof. compliant crri product id 0620-061 | $296,935 |
| Oct 31, 2024 | Completed final sign-off Sep 2025 | 3250 19th Av | Crime Watch Security Sys Llc | as built fire alarm pa 202401194271. added 2 way ecs and additional devices throughout the building.Details
as built fire alarm pa 202401194271. added 2 way ecs and additional devices throughout the building. | $20,000 |
| Oct 3, 2024 | Completed final sign-off Nov 2024 | 3250 19th Av | Crime Watch Security Sys Llc | due to in operable fire panel upgrade existing fire alarm system like for like. all existing fire alarm devices will be upgraded to be compatible with new fire alarm panel.Details
due to in operable fire panel upgrade existing fire alarm system like for like. all existing fire alarm devices will be upgraded to be compatible with new fire alarm panel. | $22,800 |
| May 29, 2024 | In progress issued Aug 2024 | 3250 19th Av | Thompson Builders Corp, Kevin M. Sullivan & Associates Inc | storm water prevention ref pa 2022-0908-2129Details
storm water prevention ref pa 2022-0908-2129 | |
| May 13, 2024 | In progress issued May 2024 | 3250 19th Av | Custom Fire Protection Inc | ref 202308043739- install of (n) underground fire line from the backflow to the point of conneciton in the basementDetails
ref 202308043739- install of (n) underground fire line from the backflow to the point of conneciton in the basement | $78,491 |
| Mar 6, 2024 | In progress issued Mar 2024 | 3250 19th Av | Thompson Builders Corp | excavating and installing new 6" fire line to feed new spirnkler system. will also be installing a backflow preventor for the fire line. ref pa 202308043739Details
excavating and installing new 6" fire line to feed new spirnkler system. will also be installing a backflow preventor for the fire line. ref pa 202308043739 | $25,000 |
| Jan 19, 2024 | Completed final sign-off Aug 2025 | 3250 19th Av | Crime Watch Security Sys Llc | installation of new automatic fire alarm voice evac system. ref 202308043739, 202309082129Details
installation of new automatic fire alarm voice evac system. ref 202308043739, 202309082129 | $132,000 |
| Aug 4, 2023 | Completed final sign-off Sep 2025 | 3250 19th Av | Custom Fire Protection Inc | installation of a new fire sprinkler system as part of a modernization project with a new underground service. ref pa202209082129.Details
installation of a new fire sprinkler system as part of a modernization project with a new underground service. ref pa202209082129. | $477,000 |
| Apr 26, 2023 | Expired or cancelled cancelled Jan 2026 | 3250 19th Av | tmobile: relocate e cable tray on rooftopDetails
tmobile: relocate e cable tray on rooftop | $2,000 | |
| Jan 31, 2023 | Completed final sign-off Jul 2024 | 3250 19th Av | Sterling Environmental Corp. | asbetos abatement & interior soft demolitiion related to abatement. ref ti pa #202209082129. jea #asb128617Details
asbetos abatement & interior soft demolitiion related to abatement. ref ti pa #202209082129. jea #asb128617 | $1,607,000 |
| Jan 17, 2023 | Completed final sign-off Feb 2024 | 3250 19th Av | Metropolitan Electrical Construction | att remove section of cable tray and conduit, reroute cable trays, remove and replace all e fiber and power cables from equip to antennas. no change to batteries.Details
att remove section of cable tray and conduit, reroute cable trays, remove and replace all e fiber and power cables from equip to antennas. no change to batteries. | $10,000 |
| Sep 8, 2022 | Never finaled issued Jun 2023, no final | 3250 19th Av | Thompson Builders Corp | priority process - interior & exterior remodel: structural seismic retrofit, accommodating per-school & elementary classrooms, & provide accessible toilet rooms fpr staff & students. sitework: remove & construct in (n) play areas(landscape/hardscape/play trucrures/basketball courts/fences/gates.Details
priority process - interior & exterior remodel: structural seismic retrofit, accommodating per-school & elementary classrooms, & provide accessible toilet rooms fpr staff & students. sitework: remove & construct in (n) play areas(landscape/hardscape/play trucrures/basketball courts/fences/gates. | $3,200,000 |
| Jun 10, 2022 | Never finaled issued Jun 2023, no final | 3250 19th Av | Thompson Builders Corp, Plant Construction Co, Lp | barrier removal project of (e) mercy high school building include: new accessible elevator. renovations for new accessible gender neutral student and staff restrooms. misc improvements to make path of travel to areas of work accessible (contrasting striping, handrails, guardril. sitework toDetails
barrier removal project of (e) mercy high school building include: new accessible elevator. renovations for new accessible gender neutral student and staff restrooms. misc improvements to make path of travel to areas of work accessible (contrasting striping, handrails, guardril. sitework to | $600,000 |
| Mar 7, 2022 | Expired or cancelled withdrawn Aug 2024 | 3250 19th Av | 9 antennas , install rru's, remove 12 rru's, install 1 squid, install 1 power eme, install 1 baseband, remove strings, install 5 strings. install 3 rectifiers.Details
9 antennas , install rru's, remove 12 rru's, install 1 squid, install 1 power eme, install 1 baseband, remove strings, install 5 strings. install 3 rectifiers. | $25,000 | |
| Feb 4, 2021 | Never finaled filed Feb 2021, never issued | 3250 19th Av | modification to unmanned telecommunications facility pursuant to section 6409. remove 2 antenna mounts & move to new mounts. install 3 new antennas. relocate tmd's. remove diplexers. relocate capc screens. install 2 platforms & hybrid cable. no change to battery.Details
modification to unmanned telecommunications facility pursuant to section 6409. remove 2 antenna mounts & move to new mounts. install 3 new antennas. relocate tmd's. remove diplexers. relocate capc screens. install 2 platforms & hybrid cable. no change to battery. | $25,000 | |
| Aug 24, 2018 | Never finaled issued Jun 2020, no final | 3250 19th Av | Pk Kirk Electrical & Telecom | t-mobile. install 3 new 4' antennas, swap dus41, install 6 dc conductorsDetails
t-mobile. install 3 new 4' antennas, swap dus41, install 6 dc conductors | $25,000 |
| Jun 21, 2018 | Completed final sign-off Jul 2019 | 3250 19th Av | Electric Tech Construction Inc | at&t modification r&r 9(e) antennas with 9(n) antennas, paint to match; install 9(n) rrus and other small equipment; install (n) batteries; remove all unused equipmentDetails
at&t modification r&r 9(e) antennas with 9(n) antennas, paint to match; install 9(n) rrus and other small equipment; install (n) batteries; remove all unused equipment | $62,000 |
| Mar 16, 2017 | Never finaled issued Jun 2017, no final | 3250 19th Av | Dehart Electric | 4/f: title 24 only. new lights for conference room and lounge and hall; exit and egress lighting.Details
4/f: title 24 only. new lights for conference room and lounge and hall; exit and egress lighting. | $19,000 |
| Feb 16, 2017 | Completed final sign-off Aug 2018 | 3250 19th Av | Walker Cellular Inc | revision to 201607293738. modification of (e) cell site structural onlyDetails
revision to 201607293738. modification of (e) cell site structural only | |
| Jul 29, 2016 | Never finaled issued Aug 2016, no final | 3250 19th Av | Walker Cellular Inc | roof: modification to (e) t-mobile wireless telecommunications facility consisting of: removal of (4) existing antennas and replacing with (3) new antennas; (3) total antennas, installation of (4) new rrus, and cape screening on proposed antennasDetails
roof: modification to (e) t-mobile wireless telecommunications facility consisting of: removal of (4) existing antennas and replacing with (3) new antennas; (3) total antennas, installation of (4) new rrus, and cape screening on proposed antennas | $20,000 |
| Feb 24, 2016 | Completed final sign-off May 2016 | 3250 19th Av | Triton Tower Inc | att modification of (e) facility: r & r (3) (e) antennas w/(3)(n) antennas, install (3)(n) rrus-32 @ antennas & (3)(n) rrus-11 @ equip; install (n) 3rd dus-41 w/in (n) 6601 chassis inside (e) 19" rack & install fiber trunks w/n (n) innerduct to follow (e) cable route & (6)(n) 7/8" coax in (n)conduitDetails
att modification of (e) facility: r & r (3) (e) antennas w/(3)(n) antennas, install (3)(n) rrus-32 @ antennas & (3)(n) rrus-11 @ equip; install (n) 3rd dus-41 w/in (n) 6601 chassis inside (e) 19" rack & install fiber trunks w/n (n) innerduct to follow (e) cable route & (6)(n) 7/8" coax in (n)conduit | $21,000 |
| Sep 24, 2015 | Completed final sign-off Mar 2016 | 3250 19th Av | Triton Tower Inc | att modification to e telecom facility: install 3 new rrus-11 with 3 n a2 modules, r and r 3 e antennas with e n antennas, paint to match e building, r+r e dul with 1 n dush inside e 19" rackDetails
att modification to e telecom facility: install 3 new rrus-11 with 3 n a2 modules, r and r 3 e antennas with e n antennas, paint to match e building, r+r e dul with 1 n dush inside e 19" rack | $15,000 |
| Jan 24, 2014 | Completed final sign-off Mar 2014 | 3250 19th Av | Cba Site Services Inc. | modification to an (e) unmanned telecom facility consisting of adding a (n) 3418 cabinet in an (e) equip. room. also remove and replace a (e) antenna w/ a (n) antenna and adding a (n) fiber conduit with (3) (n) rru'sDetails
modification to an (e) unmanned telecom facility consisting of adding a (n) 3418 cabinet in an (e) equip. room. also remove and replace a (e) antenna w/ a (n) antenna and adding a (n) fiber conduit with (3) (n) rru's | $28,000 |
| Dec 9, 2013 | Completed final sign-off Oct 2014 | 3250 19th Av | Electric Tech Construction Inc | a modification to an existing at&t unmanned telecommunication facility consisting of installing three new rrus-11' & three new dc-2 surge suppressor.Details
a modification to an existing at&t unmanned telecommunication facility consisting of installing three new rrus-11' & three new dc-2 surge suppressor. | $6,000 |
| Jul 30, 2013 | Completed final sign-off Aug 2013 | 3250 19th Av | Battalion One Fire Protection | elevator recall addition to fire alarm systemDetails
elevator recall addition to fire alarm system | $7,500 |
| Jun 3, 2011 | Completed final sign-off Sep 2011 | 3250 19th Av | Thd At-Home Services Inc/Home Depot | replace 3 windows, visible from the street, no structural changes, max u factor .40Details
replace 3 windows, visible from the street, no structural changes, max u factor .40 | $1,770 |
| Feb 23, 2011 | Expired or cancelled cancelled Jun 2016 | 3250 19th Av | Capital Tower & Communications | remove 1 (e) t-mobile equipment cabinet and replace with 1 (n) equipment cabinet in same location on roof.Details
remove 1 (e) t-mobile equipment cabinet and replace with 1 (n) equipment cabinet in same location on roof. | $3,500 |
| Oct 27, 2010 | Completed final sign-off Nov 2011 | 3250 19th Av | Broken Arrow Communications Inc | at&t. modification to an (e)unmanned telecom facility. add a (n) 6601 rbs cab in an (e0) n19" racj in (e) equipment rm. 6 (n0rrv's, 4(n) 2" inner ducts, (n) fc-12 splice box, 3(n) oc-2 surge suppressors,(n)gps antenna, swap 6 antennas w/ 6 new port antennasDetails
at&t. modification to an (e)unmanned telecom facility. add a (n) 6601 rbs cab in an (e0) n19" racj in (e) equipment rm. 6 (n0rrv's, 4(n) 2" inner ducts, (n) fc-12 splice box, 3(n) oc-2 surge suppressors,(n)gps antenna, swap 6 antennas w/ 6 new port antennas | $40,000 |
| May 11, 2010 | Expired or cancelled withdrawn Jan 2014 | 3250 19th Av | a modif.to an(e)unmanned telecommun. facility consist. of adding a(n)3418 cabinet in an(e)equip.room, removing and replacing an(e)antenna w/a(n)antenna,adding a(n)fiber conduit,(3)(n) rru's,&(2)(n)ret's (remote electronic tilt) to (e)antennae. ret powered by low voltage signaled through(e)coax cableDetails
a modif.to an(e)unmanned telecommun. facility consist. of adding a(n)3418 cabinet in an(e)equip.room, removing and replacing an(e)antenna w/a(n)antenna,adding a(n)fiber conduit,(3)(n) rru's,&(2)(n)ret's (remote electronic tilt) to (e)antennae. ret powered by low voltage signaled through(e)coax cable | $25,000 | |
| Jul 2, 2009 | Expired or cancelled expired Jul 2013 | 3250 19th Av | Thd At-Home Services Inc/Home Depot | replace 29 windows into existing openings visible from the street. no structural changes u factor .67 max. work to be done on 4th floor onlyDetails
replace 29 windows into existing openings visible from the street. no structural changes u factor .67 max. work to be done on 4th floor only | $12,862 |
| May 20, 2009 | Completed final sign-off Feb 2010 | 3250 19th Av | Transceive Communications Inc. | add 2 new lines to antenna position 2 for umts. install 2nd carrier kit. install-remove electronic t.i.t (ret). remove (e) 3206 cabinet and replace w/new 3206 cabinet.Details
add 2 new lines to antenna position 2 for umts. install 2nd carrier kit. install-remove electronic t.i.t (ret). remove (e) 3206 cabinet and replace w/new 3206 cabinet. | $4,700 |
| Dec 6, 2007 | Expired or cancelled expired Jul 2013 | 3250 19th Av | Pioneer Contractors Inc | reroofing.Details
reroofing. | $57,000 |
| Jun 19, 2006 | Expired or cancelled expired Dec 2008 | 3250 19th Av | Vulcan Fire Protection | replace obsolete kittchen hood/duct fire system @ g/fDetails
replace obsolete kittchen hood/duct fire system @ g/f | $2,800 |
| Apr 21, 2006 | Expired or cancelled expired Jul 2013 | 3250 19th Av | Pioneer Contractors Inc | reroofingDetails
reroofing | $33,000 |
| Mar 1, 2006 | Expired or cancelled cancelled Jul 2015 | 3250 19th Av | changing out 2 antennas & associated cabling on northeast side of building. antennas will be of like dimensions to current equipemnt. cell site - telecommunications facility.Details
changing out 2 antennas & associated cabling on northeast side of building. antennas will be of like dimensions to current equipemnt. cell site - telecommunications facility. | $11,000 | |
| Jun 3, 2003 | Expired or cancelled expired Oct 2005 | 3250 19th Av | Pioneer Contractors Inc | reroofingDetails
reroofing | $51,510 |
| May 7, 2002 | Expired or cancelled expired Oct 2005 | 3250 19th Av | remove casework.install cabinets, electrical outlets, computer network,relocate closet door,flooringDetails
remove casework.install cabinets, electrical outlets, computer network,relocate closet door,flooring | $45,000 | |
| Feb 12, 2001 | Expired or cancelled expired Sep 2001 | 3250 19th Av | Brayer Electric Company | fire alarm systemDetails
fire alarm system | $9,000 |
| Mar 16, 2000 | Expired or cancelled expired Nov 2000 | 3250 19th Av | Vintage Fire Protection | instal new fire sprinkler systemDetails
instal new fire sprinkler system | $20,000 |
| Feb 28, 2000 | Expired or cancelled expired Sep 2002 | 3250 19th Av | erect 1 story gym & 2 classroomsDetails
erect 1 story gym & 2 classrooms | $2,700,000 | |
| Feb 11, 2000 | Expired or cancelled expired Aug 2000 | 3250 19th Av | Pioneer Roofing Organization | reroofingDetails
reroofing |