Robbin Mcdonald
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Rmw
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jun 2021
202 permits since 2000 (architect on 193 permits, authorized agent-others on 9 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 167 completed, 12 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 202.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2021 | Completed final sign-off Mar 2025 | 2315 Sacramento St | O'pro Construction Inc. | 4th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. 3th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. infill 4 windoss and install 6 new windows.Details
4th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. 3th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. infill 4 windoss and install 6 new windows. | $150,000 |
| Jan 16, 2018 | Completed final sign-off Jul 2018 | 45 Fremont St | Richlen Construction | restroom barrier removal work. new floor signage, finishes, countertops, sinks, faucets, light fixtures, stall partitions, duplex outlets/recept. e gyp bd ceiling devices to remain, e outlets to remain. relocate water closets in hc stall maher not reqDetails
restroom barrier removal work. new floor signage, finishes, countertops, sinks, faucets, light fixtures, stall partitions, duplex outlets/recept. e gyp bd ceiling devices to remain, e outlets to remain. relocate water closets in hc stall maher not req | $100,000 |
| Jan 16, 2018 | Completed final sign-off Jun 2018 | 45 Fremont St | Richlen Construction | restroom barrier removal work, new door signage, stall partitions finishes, countertops, light fixtures existing accessible plumbing to remain. existing gyp bd ceiling and devices to remain. existing power outlets to remain. maher n/aDetails
restroom barrier removal work, new door signage, stall partitions finishes, countertops, light fixtures existing accessible plumbing to remain. existing gyp bd ceiling and devices to remain. existing power outlets to remain. maher n/a | $85,000 |
| Jan 16, 2018 | Completed final sign-off Jun 2018 | 45 Fremont St | Richlen Construction | restroom barrier removal work: new door signage stall partitions finishes, countertops and light fixtures. e accessible plumbing fixtures to remain. e gyp board ceiling and devices to remain. e power outlets to remain. new stall partitions. mep sep permit. maher n/aDetails
restroom barrier removal work: new door signage stall partitions finishes, countertops and light fixtures. e accessible plumbing fixtures to remain. e gyp board ceiling and devices to remain. e power outlets to remain. new stall partitions. mep sep permit. maher n/a | $85,000 |
| Jul 25, 2016 | Completed final sign-off Nov 2016 | 214 Bradford St | Timber-Rock Craftsmen | kitchen and bathroom remodel, finsihes,fixtures, fittings. new wood backyard deck. plumbging/elec under spearate permit. minor alterations to front facade.Details
kitchen and bathroom remodel, finsihes,fixtures, fittings. new wood backyard deck. plumbging/elec under spearate permit. minor alterations to front facade. | $45,000 |
| Nov 17, 2015 | Completed final sign-off Mar 2016 | 535 Mission St | Peacock Construction | interior ti to elevator lobby, multi-tenant corridor & tenant suite; including new offices, conference room, break room, lighting & power. life safety, sprinkler under separate permitDetails
interior ti to elevator lobby, multi-tenant corridor & tenant suite; including new offices, conference room, break room, lighting & power. life safety, sprinkler under separate permit | $325,000 |
| Mar 15, 2013 | Completed final sign-off Jan 2014 | 1455 Market St | City Building Inc. | demolition of wall and door in storage room to extend corrider to garage and make a smaller storage room. relocate card reader, add light fixtures to corridor.Details
demolition of wall and door in storage room to extend corrider to garage and make a smaller storage room. relocate card reader, add light fixtures to corridor. | $118,700 |
| Sep 5, 2012 | Completed final sign-off Oct 2013 | 1355 Market St | demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing.Details
demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing. | $375,000 | |
| Feb 22, 2012 | Completed final sign-off Jun 2013 | 201 03rd St | Truebeck Construction | barrier removal, new van stall in loading dock area per ab-007.Details
barrier removal, new van stall in loading dock area per ab-007. | $24,000 |
| May 18, 2011 | Completed final sign-off Nov 2011 | 731 Market St | Peacock Construction Inc | 4th floor- demo walls, ceiling & lighting in 2 suites, per ab-017Details
4th floor- demo walls, ceiling & lighting in 2 suites, per ab-017 | $9,850 |
| May 18, 2011 | Completed final sign-off Jun 2011 | 201 03rd St | Reliable Concepts Corporation | 7th floor-relocate 1 wall & provide new reception deskDetails
7th floor-relocate 1 wall & provide new reception desk | $30,000 |
| May 11, 2011 | Completed final sign-off Nov 2011 | 505 Montgomery St | Gci, Inc | floor 10th & 11th minor t.i. work to existing tenant space to add new non load bearing partition & finishes.Details
floor 10th & 11th minor t.i. work to existing tenant space to add new non load bearing partition & finishes. | $175,000 |
| May 3, 2011 | Completed final sign-off May 2012 | 1 Montgomery St | Gci, Inc | construct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout.Details
construct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout. | $1,300,000 |
| Apr 14, 2011 | Completed final sign-off May 2011 | 111 Sutter St | Skyline Construction | divide 1 large office into 2 offices, relocate existing electrical outlets, demolish 1 light fixtureDetails
divide 1 large office into 2 offices, relocate existing electrical outlets, demolish 1 light fixture | $5,000 |
| Apr 8, 2011 | Completed final sign-off Jun 2011 | 475 Sansome St | Ward Alan Emery Construction Inc. | 5th floor-construct new server closet in suite 510, 5th floor.Details
5th floor-construct new server closet in suite 510, 5th floor. | $46,112 |
| Mar 23, 2011 | Completed final sign-off Jun 2011 | 235 Montgomery St | R.M.R. Construction Company | suite 400:new interior office and conference rooms, new finish, lighting, power, new millwork, sink. mep and fire. life safety under separate permitDetails
suite 400:new interior office and conference rooms, new finish, lighting, power, new millwork, sink. mep and fire. life safety under separate permit | $100,000 |
| Mar 4, 2011 | Completed final sign-off Apr 2011 | 100 California St | Peacock Construction Inc | 7th floor - demo of interior partitions, door & sidelite, build back interior partition, new finishes.Details
7th floor - demo of interior partitions, door & sidelite, build back interior partition, new finishes. | $17,500 |
| Feb 3, 2011 | Completed final sign-off Oct 2011 | 235 Montgomery St | R.M.R. Construction Company | barrier removal of parking cashier booth & adjoining area - new doors & wall finishes in waiting area of garage, mail room & cashier lobby. mep & fire sprinkler under separate permit.new doors and wall finishes in waiting area of garage, mailroom, and cashier lobby.Details
barrier removal of parking cashier booth & adjoining area - new doors & wall finishes in waiting area of garage, mail room & cashier lobby. mep & fire sprinkler under separate permit.new doors and wall finishes in waiting area of garage, mailroom, and cashier lobby. | $96,447 |
| Feb 1, 2011 | Completed final sign-off Mar 2011 | 201 03rd St | Plant Construction Company Lp | revision to appl #201012146697- architectural only - layout of game room revised door & wall removed from scope, paint locations revised, ceiling plan added.Details
revision to appl #201012146697- architectural only - layout of game room revised door & wall removed from scope, paint locations revised, ceiling plan added. | |
| Dec 23, 2010 | Completed final sign-off Sep 2011 | 275 Battery St | Hathaway Dinwiddie Co. | demolition of non structural partitions. construction of conference rooms, private offices,open office area and accessory rooms. new finishes throughout. mep & life safety systems under seperate permit, design build.Details
demolition of non structural partitions. construction of conference rooms, private offices,open office area and accessory rooms. new finishes throughout. mep & life safety systems under seperate permit, design build. | $300,000 |
| Dec 17, 2010 | Never finaled issued Dec 2010, no final | 111 Sutter St | Bevilacqua & Sons | demolition of ground floor space . no occupants!, no structural, per ab-017.Details
demolition of ground floor space . no occupants!, no structural, per ab-017. | $22,000 |
| Dec 16, 2010 | Completed final sign-off Sep 2011 | 275 Battery St | Hathaway Dinwiddie Co. | construction of conference rooms,private offices,open office enviornment, copy/mial rooms break room, new finishes throughout on 13th floor. hvac electrical, plumbing, fire sprinkler design bld under seperate permit.Details
construction of conference rooms,private offices,open office enviornment, copy/mial rooms break room, new finishes throughout on 13th floor. hvac electrical, plumbing, fire sprinkler design bld under seperate permit. | $400,000 |
| Nov 30, 2010 | Completed final sign-off Feb 2011 | 685 Market St | Commercial Interior Builders Inc | barrier removal and remodel of mens and womens restrooms on 1st floor, electrical and mechanical under separate permit.Details
barrier removal and remodel of mens and womens restrooms on 1st floor, electrical and mechanical under separate permit. | $65,000 |
| Oct 21, 2010 | Completed final sign-off Mar 2012 | 1 Montgomery St | Gci, Inc | 26th & 27th floor: construction of conference rooms, private offices, open office environment, copy rooms, break rooms, new finishes throughout. mech & electrical included . sp & ls separate permitDetails
26th & 27th floor: construction of conference rooms, private offices, open office environment, copy rooms, break rooms, new finishes throughout. mech & electrical included . sp & ls separate permit | $2,800,000 |
| Oct 6, 2010 | Completed final sign-off May 2011 | 221 Main St | Pankow Special Projects Lp | 6th floor-t.i. of (e) office space-open floor plan with some exterior offices (full height walls), 1 kitchen/break room will be added. work will includes demo of (e) gyp walls, installation of new gyp walls, carpet, millwork (limited) & electricalDetails
6th floor-t.i. of (e) office space-open floor plan with some exterior offices (full height walls), 1 kitchen/break room will be added. work will includes demo of (e) gyp walls, installation of new gyp walls, carpet, millwork (limited) & electrical | $375,000 |
| Sep 29, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | 17th floor tenant improvements including minor demolition & build back. new carpet & paint. mep,ls and sp separate permitDetails
17th floor tenant improvements including minor demolition & build back. new carpet & paint. mep,ls and sp separate permit | $90,000 |
| Aug 18, 2010 | Completed final sign-off Jul 2011 | 1 Sansome St | Stockham Construction | demo of 1 wall, install new doors (2), new plumbing for small kitchen, replace existing light fixtures with newDetails
demo of 1 wall, install new doors (2), new plumbing for small kitchen, replace existing light fixtures with new | $68,000 |
| Aug 13, 2010 | Completed final sign-off Oct 2010 | 685 Market St | Richlen Construction | relocate front entry doors,rotate exg conference room at 5th floor.Details
relocate front entry doors,rotate exg conference room at 5th floor. | $25,000 |
| Aug 13, 2010 | Completed final sign-off Feb 2011 | 685 Market St | Commercial Interior Builders Inc | barrier removal and remodel of men's and womens restrooms on the 7th floor.Details
barrier removal and remodel of men's and womens restrooms on the 7th floor. | $65,000 |
| Aug 5, 2010 | Completed final sign-off Oct 2013 | 505 Montgomery St | Novo Construction Inc | ground floor-bldg lobby-construct new guards desk, flip door swing, install new turnstiles. mechanical & plumbing not required. electrical under seperate permitDetails
ground floor-bldg lobby-construct new guards desk, flip door swing, install new turnstiles. mechanical & plumbing not required. electrical under seperate permit | $75,000 |
| Jul 22, 2010 | Completed final sign-off Aug 2010 | 111 Sutter St | Bevilacqua & Sons | 15th floor - demolition of one wall in open office space. patch and finish.Details
15th floor - demolition of one wall in open office space. patch and finish. | $5,000 |
| Jul 22, 2010 | Completed final sign-off Aug 2010 | 111 Sutter St | Bevilacqua & Sons | 8th floor- construct one work room by building one wall w/entry door. no mechanical or plumbing work. electrical permit to be filed separately.Details
8th floor- construct one work room by building one wall w/entry door. no mechanical or plumbing work. electrical permit to be filed separately. | $10,000 |
| Jul 19, 2010 | Completed final sign-off Oct 2010 | 717 Market St | Novo Construction Inc | office ti on the 4th fl. demo of interior non load bearing partitions and door assemblies. construction of new partitions and door assemblies. mep, fire and ls under separate permitDetails
office ti on the 4th fl. demo of interior non load bearing partitions and door assemblies. construction of new partitions and door assemblies. mep, fire and ls under separate permit | $47,500 |
| Jul 2, 2010 | Completed final sign-off Nov 2010 | 100 California St | Pankow Special Projects Lp | office tenant on the 6th floor. new gyp bd partitions, glazing, doors, frames, hardware, electrical, mep design build under seoarate permitDetails
office tenant on the 6th floor. new gyp bd partitions, glazing, doors, frames, hardware, electrical, mep design build under seoarate permit | $200,000 |
| Jul 2, 2010 | Completed final sign-off Nov 2010 | 100 California St | Pankow Special Projects Lp | office tenant on floor 11. provide new gyp bd partitions, glazing doors, frames, hardware , electrical mep design build under separate permitDetails
office tenant on floor 11. provide new gyp bd partitions, glazing doors, frames, hardware , electrical mep design build under separate permit | $74,000 |
| Jun 21, 2010 | Expired or cancelled cancelled Jan 2026 | 505 Montgomery St | revision to p.a.#200910290133. minor revisions to floor layout. structural plans for infill of stair opening.Details
revision to p.a.#200910290133. minor revisions to floor layout. structural plans for infill of stair opening. | ||
| Jun 11, 2010 | Completed final sign-off Mar 2011 | 180 Sansome St | Skyline Construction | ti 4th fl - incl rated elevator lobby with fire rated won door, non bearing partitions & millwork. ada accessible restrooms.Details
ti 4th fl - incl rated elevator lobby with fire rated won door, non bearing partitions & millwork. ada accessible restrooms. | $250,000 |
| Apr 22, 2010 | Completed final sign-off Jul 2010 | 685 Market St | Commercial Interior Builders Inc | 4th floor ada upgrade to the men's & women's retrooms. voluntary barrier removal.Details
4th floor ada upgrade to the men's & women's retrooms. voluntary barrier removal. | $65,000 |
| Feb 2, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | floor 17th - base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.Details
floor 17th - base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain. | $160,000 |
| Feb 2, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | floor 18th base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.Details
floor 18th base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain. | $160,000 |
| Dec 7, 2009 | Completed final sign-off Feb 2010 | 1 California St | remodel existing tenant improvements to rebuild 4 offices and 1 storage room and conference roomDetails
remodel existing tenant improvements to rebuild 4 offices and 1 storage room and conference room | $62,000 | |
| Oct 30, 2009 | Completed final sign-off Jan 2010 | 2 Henry Adams St | 4th floor-tenant improvements-selective demolition, construct new corridor, new finishes for corridor. mechanical, electrical under seperate permitDetails
4th floor-tenant improvements-selective demolition, construct new corridor, new finishes for corridor. mechanical, electrical under seperate permit | $49,000 | |
| Oct 29, 2009 | Expired or cancelled cancelled Jan 2026 | 505 Montgomery St | 23rd floor-selective demolition (gyp board partitions, glazing, doors, frames & hardward). paint (e) partitions. demo to comply with ab-017Details
23rd floor-selective demolition (gyp board partitions, glazing, doors, frames & hardward). paint (e) partitions. demo to comply with ab-017 | $35,000 | |
| Oct 29, 2009 | Expired or cancelled cancelled Jan 2026 | 505 Montgomery St | 6th floor-spec suite, demo internal stairs, selective demolition with the suite & new finishes. mechanical & electrical under a seperate permitDetails
6th floor-spec suite, demo internal stairs, selective demolition with the suite & new finishes. mechanical & electrical under a seperate permit | $175,000 | |
| Oct 29, 2009 | Expired or cancelled cancelled Jan 2026 | 505 Montgomery St | 24th floor-demolition (light fixtures, millwork & finishes). paint (e) partitions & selective ceiling tile, install new light fixtures.Details
24th floor-demolition (light fixtures, millwork & finishes). paint (e) partitions & selective ceiling tile, install new light fixtures. | $15,000 | |
| Aug 26, 2009 | Completed final sign-off Mar 2010 | 300 Montgomery St | Hillhouse Construction Company Inc | 3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit.Details
3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit. | $87,687 |
| Jul 13, 2009 | Completed final sign-off Sep 2009 | 1 Bush St | Skyline Construction | 12th floor interior demolition of partition, mep, fire sprinkelr & life safety under separate permit.-Details
12th floor interior demolition of partition, mep, fire sprinkelr & life safety under separate permit.- | $3,000 |
| Jun 29, 2009 | Completed final sign-off Oct 2009 | 620 Folsom St | Skyline Construction | 2nd floor demolition of existing work surfaces in private offices. relocate break room millwork, ne wfinishes. upgrade existing restrooms, mechanical & electrical included.Details
2nd floor demolition of existing work surfaces in private offices. relocate break room millwork, ne wfinishes. upgrade existing restrooms, mechanical & electrical included. | $350,000 |
| May 27, 2009 | Completed final sign-off Sep 2009 | 685 Market St | Commercial Interior Builders Inc | ada upgrade to mens and womens restroom on the 6th floorDetails
ada upgrade to mens and womens restroom on the 6th floor | $120,000 |
| May 8, 2009 | Completed final sign-off Sep 2009 | 50 California St | Skyline Construction | 8th floor-construction new 1 hour rated multi-tenant corridor, management training area & le spec suites. permit application includes mechanical, electrical & plumbingDetails
8th floor-construction new 1 hour rated multi-tenant corridor, management training area & le spec suites. permit application includes mechanical, electrical & plumbing | $670,000 |
| Apr 9, 2009 | Never finaled issued Apr 2009, no final | 1 Sansome St | Bcci Construction Company | 29th floor -revision to appl #200809111324 to relcoate stall partition door & install new paper cup dispenser in response to request from the field inspector.Details
29th floor -revision to appl #200809111324 to relcoate stall partition door & install new paper cup dispenser in response to request from the field inspector. | $2,700 |
| Feb 26, 2009 | Completed final sign-off Jul 2015 | 1355 Market St | Truebeck Construction | voluntary seismic rehabilitation to meet the life safety performanc level as required by the procedures of asce seismic rehabilitation of extg bldg as refrenced in cbc 2007 edition. rehab program consists of new concrete shear core surrounding future elevators from basement through 11th floor.Details
voluntary seismic rehabilitation to meet the life safety performanc level as required by the procedures of asce seismic rehabilitation of extg bldg as refrenced in cbc 2007 edition. rehab program consists of new concrete shear core surrounding future elevators from basement through 11th floor. | $4,800,000 |
| Feb 26, 2009 | Completed final sign-off Jul 2009 | 100 California St | Richlen Construction | revision to 200901129970: deduct exhaust fan from hvac scope of workDetails
revision to 200901129970: deduct exhaust fan from hvac scope of work | |
| Feb 9, 2009 | Completed final sign-off Feb 2009 | 300 Montgomery St | 3-D Construction | disable access 20% rule, remove signage from multiple accomodation toilets & provide new signs at each toilet directing person to single occupancy accesible facilities <150' on floor unreasonable hardship request ab-006. 2nd fl. separate accessible toilet facilities.Details
disable access 20% rule, remove signage from multiple accomodation toilets & provide new signs at each toilet directing person to single occupancy accesible facilities <150' on floor unreasonable hardship request ab-006. 2nd fl. separate accessible toilet facilities. | $600 |
| Jan 29, 2009 | Completed final sign-off Dec 2009 | 425 Market St | R.M.R. Construction Company | 9th floor-new storage room cabinets & finishes. no mep., life safety or sprinklers on this permit.Details
9th floor-new storage room cabinets & finishes. no mep., life safety or sprinklers on this permit. | $18,000 |
| Jan 28, 2009 | Completed final sign-off Mar 2009 | 50 California St | Teamwrkx Construction | 16th floor-tenant improvement, suite #1600 including minor demolition & construction of grid high suite partitions, move lights as required.Details
16th floor-tenant improvement, suite #1600 including minor demolition & construction of grid high suite partitions, move lights as required. | $20,000 |
| Jan 23, 2009 | Completed final sign-off Mar 2009 | 875 Stevenson St | Plant Construction Company Lp | ti floor 3: minor demolition, new partitions and finishes for portion of 3rd fl. elec outlets and lighting rearrangement, relocate door frames and install security locks at existing doors. mep, fire protection/life safety separate permitDetails
ti floor 3: minor demolition, new partitions and finishes for portion of 3rd fl. elec outlets and lighting rearrangement, relocate door frames and install security locks at existing doors. mep, fire protection/life safety separate permit | $500,000 |
| Jan 12, 2009 | Completed final sign-off Jul 2009 | 100 California St | Richlen Construction | 11th fl, suite 1100 & 1125 - architectural pa# 2008-1202-7575-electrical & hvac scope of work: install new lighting & electrical for 2 suites. install new vav boxes with t-stats. install new supply & return grilles, transfer fans & exhaust fans. comp 200854764-pid.Details
11th fl, suite 1100 & 1125 - architectural pa# 2008-1202-7575-electrical & hvac scope of work: install new lighting & electrical for 2 suites. install new vav boxes with t-stats. install new supply & return grilles, transfer fans & exhaust fans. comp 200854764-pid. | $139,000 |
| Dec 2, 2008 | Completed final sign-off Jul 2009 | 100 California St | Richlen Construction | suite 1110: remodel of 6851 sf of space, demo partitions, replace within new partitions, ceiling, light fixtures, furnishes, doors, sidelights, hardware. suite 1125: remodel 1492 sf of space, demo partitions, replace with new partitions, ceiling,lt fix,doors,sidelights,hardware,mep sep permitDetails
suite 1110: remodel of 6851 sf of space, demo partitions, replace within new partitions, ceiling, light fixtures, furnishes, doors, sidelights, hardware. suite 1125: remodel 1492 sf of space, demo partitions, replace with new partitions, ceiling,lt fix,doors,sidelights,hardware,mep sep permit | $200,000 |
| Nov 10, 2008 | Completed final sign-off Mar 2009 | 601 Montgomery St | Dome Construction Corp | 19th floor-tenant improvements in 7711 usf on 19th floor of 601 montgomery consisting of minor demolition and construction of partitions for office space. scope includes minor electrical and mechanical work throughout the space to accomodate new spaces. m.e.p, sp and ls to be separate permits.Details
19th floor-tenant improvements in 7711 usf on 19th floor of 601 montgomery consisting of minor demolition and construction of partitions for office space. scope includes minor electrical and mechanical work throughout the space to accomodate new spaces. m.e.p, sp and ls to be separate permits. | $295,000 |
| Oct 24, 2008 | Completed final sign-off Nov 2008 | 1 Sansome St | Richlen Construction | arch pa# 2008-0812-8987-flr lighting & power, connecting power to new/relocated light fixtures, power outlets & tenant equipment. add 2 cooling vav & 2 vav heating boxes, relocate one heat pump & 1 condenser water circulating pump from 8th to 7th flrs, add ceiling supply diffusers & return air griDetails
arch pa# 2008-0812-8987-flr lighting & power, connecting power to new/relocated light fixtures, power outlets & tenant equipment. add 2 cooling vav & 2 vav heating boxes, relocate one heat pump & 1 condenser water circulating pump from 8th to 7th flrs, add ceiling supply diffusers & return air gri | $100,000 |
| Oct 21, 2008 | Completed final sign-off Mar 2009 | 201 03rd St | Field Construction Inc. | 3/f -removal of gyp bd partions - construction of gyp bd patitions, glazing partitions, doors frames hardware, new electrical, plumbing & mechanical & millwork. electrical, plumbing, mechanical & life safety under separate permit.Details
3/f -removal of gyp bd partions - construction of gyp bd patitions, glazing partitions, doors frames hardware, new electrical, plumbing & mechanical & millwork. electrical, plumbing, mechanical & life safety under separate permit. | $350,000 |
| Oct 10, 2008 | Completed final sign-off Dec 2008 | 160 Pine St | Richlen Construction | 6th fl tenant improvement: construction of 1 private office, demolition of 2 walls to create open work areaDetails
6th fl tenant improvement: construction of 1 private office, demolition of 2 walls to create open work area | $18,000 |
| Oct 8, 2008 | Completed final sign-off Nov 2008 | 1 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinklers heads per tenant imp. 40 relocated, and 11 removed.Details
relocate fire sprinklers heads per tenant imp. 40 relocated, and 11 removed. | $8,000 |
| Sep 29, 2008 | Completed final sign-off Oct 2013 | 1355 Market St | Plant Construction Company Lp | construction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit.Details
construction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit. | $670,000 |
| Sep 15, 2008 | Completed final sign-off Mar 2009 | 425 Market St | R.M.R. Construction Company | minor non-structural interior demo. 11th fl. all work performed in accordance per ab-17.Details
minor non-structural interior demo. 11th fl. all work performed in accordance per ab-17. | $11,000 |
| Aug 29, 2008 | Completed final sign-off Oct 2008 | 260 California St | J C Morgan Builders | revision to application 200804210161 to comply with w/vhr3, replace restroom accessibility sheet.Details
revision to application 200804210161 to comply with w/vhr3, replace restroom accessibility sheet. | |
| Aug 22, 2008 | Never finaled issued Aug 2008, no final | 300 Montgomery St | 3-D Construction | 3rd floor: interior demo of non load bearing interior partitons and finishes. (12,750 sf) per ab-017Details
3rd floor: interior demo of non load bearing interior partitons and finishes. (12,750 sf) per ab-017 | $69,040 |
| Aug 15, 2008 | Completed final sign-off Jan 2009 | 2 Embarcadero Center | Bcci Construction Company | 4th floor-revision to pa# 2008-0730-8001-to the mechanical plan to include the revise of (e) hvac boxes in lieu of all new vav boxesDetails
4th floor-revision to pa# 2008-0730-8001-to the mechanical plan to include the revise of (e) hvac boxes in lieu of all new vav boxes | $500 |
| Aug 12, 2008 | Completed final sign-off Feb 2009 | 1 Sansome St | Richlen Construction | 7th floor-tenant improvements: new millwork, plumbing, partitions, doors, fame, hadware, electrical outlets, new ceiling grid & light fixturesDetails
7th floor-tenant improvements: new millwork, plumbing, partitions, doors, fame, hadware, electrical outlets, new ceiling grid & light fixtures | $325,000 |
| Jul 24, 2008 | Completed final sign-off Apr 2009 | 1 Embarcadero Center | Field Construction Inc. | 28th & 29th floors - tenant improvements of 5743 sf on 28th fl and communicating stair to 29th floor with 2 hr rated door. create lawyer offices and breakroom. bathroom upgrade under separate permit.Details
28th & 29th floors - tenant improvements of 5743 sf on 28th fl and communicating stair to 29th floor with 2 hr rated door. create lawyer offices and breakroom. bathroom upgrade under separate permit. | $631,730 |
| Jul 17, 2008 | Never finaled issued Jul 2008, no final | 49 Stevenson St | Ward Alan Emery Construction Inc. | at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility.Details
at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility. | $2,960 |
| Jul 9, 2008 | Completed final sign-off Mar 2009 | 1 Bush St | Dome Construction Corp | 7th & 8th floors-stair demolition and infill slab between the 7th & 8th floors. occupancy and final certificate of occupancy allowed after umbrella permit approved.Details
7th & 8th floors-stair demolition and infill slab between the 7th & 8th floors. occupancy and final certificate of occupancy allowed after umbrella permit approved. | $143,000 |
| Jul 3, 2008 | Completed final sign-off May 2009 | 717 Market St | Novo Construction Inc | demo some interior non-load bearing partition walls and door assemblies. construct new partition walls and door assemblies, provide new finishes throughout. mep and fire safety will be under a separate permit.Details
demo some interior non-load bearing partition walls and door assemblies. construct new partition walls and door assemblies, provide new finishes throughout. mep and fire safety will be under a separate permit. | $90,000 |
| Jun 26, 2008 | Completed final sign-off Sep 2008 | 731 Market St | Rudolph Commercial Interiors Inc, Rci | 5th floor: barrier removal - create new unisex restroom, add door frame + hardware & plumbing fixtures.Details
5th floor: barrier removal - create new unisex restroom, add door frame + hardware & plumbing fixtures. | $25,000 |
| Jun 26, 2008 | Completed final sign-off Sep 2008 | 731 Market St | Rudolph Commercial Interiors Inc, Rci | 6th floor: barrier removal, relocate plumbing fixtures. repair automatic door opener.Details
6th floor: barrier removal, relocate plumbing fixtures. repair automatic door opener. | $30,000 |
| Jun 26, 2008 | Completed final sign-off Sep 2008 | 731 Market St | Rudolph Commercial Interiors Inc, Rci | 4th floor: barrier removal, restrooms- new gyp board partition door, frame, hardware, relocate plumbing fixtures.Details
4th floor: barrier removal, restrooms- new gyp board partition door, frame, hardware, relocate plumbing fixtures. | $30,000 |
| Jun 26, 2008 | Completed final sign-off Oct 2008 | 731 Market St | Rudolph Commercial Interiors Inc, Rci | 2nd floor: tenant improvement, barrier removal - restrooms new gyp borad partition, door, frame, hardware. relocate (e) toilet accessories.Details
2nd floor: tenant improvement, barrier removal - restrooms new gyp borad partition, door, frame, hardware. relocate (e) toilet accessories. | $10,000 |
| Jun 19, 2008 | Never finaled issued Jun 2008, no final | 685 Market St | Richlen Construction | 7th fl: minor tenant improvements to the 7th floor. removeal of wall, additon of a door and 3 form panel room divider. ada restroom upgrades. mep separate permitDetails
7th fl: minor tenant improvements to the 7th floor. removeal of wall, additon of a door and 3 form panel room divider. ada restroom upgrades. mep separate permit | $50,000 |
| Jun 19, 2008 | Completed final sign-off Aug 2008 | 49 Stevenson St | Richlen Construction | reuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504Details
reuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504 | $60,000 |
| Jun 19, 2008 | Never finaled issued Jun 2008, no final | 685 Market St | Richlen Construction | suite 600, 6th fl: minor tenant improvments. minor demolition and construction to interior open office space. ada restroom upgrades. mep separate permit.Details
suite 600, 6th fl: minor tenant improvments. minor demolition and construction to interior open office space. ada restroom upgrades. mep separate permit. | $90,000 |
| Jun 11, 2008 | Completed final sign-off Nov 2008 | 235 Montgomery St | R.M.R. Construction Company | rev. to pa# 2007.11.07.7583 to document hardware group and specs of glass door (already installed w/out permit)to be fail safe, magnetic lock w/ motion sensor and lock release switch. access-controlled egress devices to doors to be installed under seperate permit no. 200806093888. by j. darmaninDetails
rev. to pa# 2007.11.07.7583 to document hardware group and specs of glass door (already installed w/out permit)to be fail safe, magnetic lock w/ motion sensor and lock release switch. access-controlled egress devices to doors to be installed under seperate permit no. 200806093888. by j. darmanin | $100 |
| Jun 9, 2008 | Completed final sign-off May 2009 | 717 Market St | Novo Construction Inc | 6th floor-tenant improvement works: construct new ceiling height for new offices, equipment room, new sink and millwork. adjust hvac per new layout, m.e.p., life safety will be under seperate permitsDetails
6th floor-tenant improvement works: construct new ceiling height for new offices, equipment room, new sink and millwork. adjust hvac per new layout, m.e.p., life safety will be under seperate permits | $50,000 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Devcon Construction | 2nd floor-provide/install electrical infrastructure to support new engineering lab including 1 225 kva transformer, 1 800 amp 208v dist. board, 1 200 amp 480 v feeder, 2 200 amp 208 v panels, relocate (e) fixturesDetails
2nd floor-provide/install electrical infrastructure to support new engineering lab including 1 225 kva transformer, 1 800 amp 208v dist. board, 1 200 amp 480 v feeder, 2 200 amp 208 v panels, relocate (e) fixtures | $210,000 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Devcon Construction | add 1 new ac unit to 24/7 load. 2nd flr ti. 24/7 ac for server lab. ti permit 200806063807Details
add 1 new ac unit to 24/7 load. 2nd flr ti. 24/7 ac for server lab. ti permit 200806063807 | $165,000 |
| May 15, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Team Commercial Construction Inc. | 14th floor-ti including rated elevator lobby with rated won door, non-bearing partitions, millwork and ada accessible restrooms. sprinklers and fire alarm separate permit. sprinkler system is completed throughout building- umbrella permit to be signed off before occupancy can be granted.Details
14th floor-ti including rated elevator lobby with rated won door, non-bearing partitions, millwork and ada accessible restrooms. sprinklers and fire alarm separate permit. sprinkler system is completed throughout building- umbrella permit to be signed off before occupancy can be granted. | $500,000 |
| May 8, 2008 | Completed final sign-off Sep 2008 | 685 Market St | to renew app#2005/11/04/7410 (for ab-056 building disabled access compliance) for final inspection only.Details
to renew app#2005/11/04/7410 (for ab-056 building disabled access compliance) for final inspection only. | ||
| May 7, 2008 | Completed final sign-off Jul 2008 | 100 California St | Richlen Construction | basement-new drywall, walls & metal gates walls. hvac and electrical to be filed seperatelyDetails
basement-new drywall, walls & metal gates walls. hvac and electrical to be filed seperately | $100,000 |
| May 1, 2008 | Completed final sign-off Oct 2008 | 235 Montgomery St | R.M.R. Construction Company | revision to pa#2008/02/28/5889 to modify ex. stairwell (exit). wall to maintain 2hr rating.Details
revision to pa#2008/02/28/5889 to modify ex. stairwell (exit). wall to maintain 2hr rating. | $26,000 |
| Apr 28, 2008 | Expired or cancelled expired Sep 2009 | 1 Bush St | Dome Construction Corp | minor demolition of e walls. new ceiling height partition walls, relocate e double doors. mep includedDetails
minor demolition of e walls. new ceiling height partition walls, relocate e double doors. mep included | $195,000 |
| Apr 24, 2008 | Completed final sign-off Aug 2008 | 49 Stevenson St | Richlen Construction | 4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit.Details
4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit. | $100,000 |
| Apr 22, 2008 | Completed final sign-off Nov 2008 | 101 Spear St | Bcci Construction Company | ti to adjust/reocate of 4th floor toilet partition and toilet accessories to comply with code requirements.Details
ti to adjust/reocate of 4th floor toilet partition and toilet accessories to comply with code requirements. | $12,808 |
| Apr 10, 2008 | Expired or cancelled expired Mar 2010 | 781 Beach St | Ward Alan Emery Construction Inc. | 3rd floor-provide new unisex accessible restrooms with shower, new finishes and ceiling in restrooms. relocate suite entry door. mep under seperate permitDetails
3rd floor-provide new unisex accessible restrooms with shower, new finishes and ceiling in restrooms. relocate suite entry door. mep under seperate permit | $50,000 |
| Apr 10, 2008 | Completed final sign-off Nov 2008 | 400 Montgomery St | Robbins Construction Inc Dba Trevor D Ro | 6th floor: tenant improvement with minor demolition of partitions; provide new partitions, and install sink/coffee bar.this project requires the demo of 2 existing doors in the path of egress leading to the exist fire escape; add permanent signage to demising wall doors to "keep clear at all times"Details
6th floor: tenant improvement with minor demolition of partitions; provide new partitions, and install sink/coffee bar.this project requires the demo of 2 existing doors in the path of egress leading to the exist fire escape; add permanent signage to demising wall doors to "keep clear at all times" | $82,000 |
| Mar 31, 2008 | Never finaled issued Apr 2008, no final | 120 Howard St | Dpr Construction Inc | demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used.Details
demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used. | $12,000 |
| Mar 26, 2008 | Completed final sign-off Jun 2008 | 120 Howard St | Dpr Construction Inc | t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit.Details
t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit. | $250,000 |
| Mar 18, 2008 | Completed final sign-off Aug 2008 | 475 Sansome St | Principal Builders Inc. | 5th floor-hvac remodel of an (e) office space including installation of new ductwork and installation of new diffusers pa# 2007-0114-2444Details
5th floor-hvac remodel of an (e) office space including installation of new ductwork and installation of new diffusers pa# 2007-0114-2444 | $26,000 |
| Mar 7, 2008 | Expired or cancelled expired Nov 2009 | 766 Harrison St | revision: demise 1st floor into 5 areas : (4) b use, (1) a-2 use. additional address at rizal st and @ harrision st for a-2 use . 2 sinks in a2, partial ceiling @ a-2. convert 2 toilets to 3. revise entry lobby windows. 4 hr wall @ sw prop line.revise mech system and sprkl system. workroom @ bsmtDetails
revision: demise 1st floor into 5 areas : (4) b use, (1) a-2 use. additional address at rizal st and @ harrision st for a-2 use . 2 sinks in a2, partial ceiling @ a-2. convert 2 toilets to 3. revise entry lobby windows. 4 hr wall @ sw prop line.revise mech system and sprkl system. workroom @ bsmt | $20,000 | |
| Feb 21, 2008 | Completed final sign-off May 2008 | 50 California St | tenant improvement to include minor construction & demolition of non-bearing, grid high partitions, construction of millwork base cabinet, and minor electrical work. mep under seperate permit, #2310Details
tenant improvement to include minor construction & demolition of non-bearing, grid high partitions, construction of millwork base cabinet, and minor electrical work. mep under seperate permit, #2310 | $40,000 | |
| Feb 12, 2008 | Completed final sign-off Mar 2008 | 1 Sansome St | Richlen Construction | 7th floor: revision to appl #200709142665 - change in the overall scope of work, (reduce scope of work) change in the office layout in suite 710, added finish information.Details
7th floor: revision to appl #200709142665 - change in the overall scope of work, (reduce scope of work) change in the office layout in suite 710, added finish information. |