Pablo Orozco

License
M27485
Look the license up with the state
Listed as
designer, engineer
Firm
Diseno
Based in
San Ramon
On San Francisco permits
Apr 2016 to Sep 2026

101 permits since 2000 (engineer on 100 permits, designer on 1 permit): 76 completed, 10 in progress, 13 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 101.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 18, 2026In progress
issued Sep 2026
655 Montgomery StMatrix Hg Inc10th floor: install vfd on (e) supply fan. no other modifications to the building (e) mech system are included.
Details
Permit
202609188317
Status
issued
Filed
Sep 18, 2026
Permit issued
Sep 18, 2026
Declared cost
$71,000
Address
655 Montgomery St

10th floor: install vfd on (e) supply fan. no other modifications to the building (e) mech system are included.

Open the permit page

$71,000
Sep 14, 2026In progress
issued Sep 2026
2 Embarcadero CenterPeacock Construction28/f: deferred submittal for pa # 202608116388
Details
Permit
202609148076
Status
issued
Filed
Sep 14, 2026
Permit issued
Sep 17, 2026
Declared cost
$69,641
Address
2 Embarcadero Center

28/f: deferred submittal for pa # 202608116388

Open the permit page

$69,641
Sep 14, 2026In progress
issued Sep 2026
2 Embarcadero CenterPeacock Construction26/f: deferred submittal for pa # 202608116389
Details
Permit
202609148075
Status
issued
Filed
Sep 14, 2026
Permit issued
Sep 17, 2026
Declared cost
$60,400
Address
2 Embarcadero Center

26/f: deferred submittal for pa # 202608116389

Open the permit page

$60,400
Jul 24, 2026In progress
issued Aug 2026
150 Spear StPeacock Construction12th floor: hvac modifications under reference # 202606032405
Details
Permit
202607245535
Status
issued
Filed
Jul 24, 2026
Permit issued
Aug 7, 2026
Declared cost
$300,000
Address
150 Spear St

12th floor: hvac modifications under reference # 202606032405

Open the permit page

$300,000
Jul 16, 2026In progress
issued Jul 2026
2222 BroadwayCity Mechanical Incsteam boiler replacement with new of same capacity. no architectural or building structural work. no change in gas. new concrete pad. ref serial #57439
Details
Permit
202607165135
Status
issued
Filed
Jul 16, 2026
Permit issued
Jul 16, 2026
Declared cost
$189,000
Address
2222 Broadway

steam boiler replacement with new of same capacity. no architectural or building structural work. no change in gas. new concrete pad. ref serial #57439

Open the permit page

$189,000
Jun 24, 2026In progress
issued Jun 2026
3200 California StControl Air Enterprises Llcreplace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads.
Details
Permit
202606243814
Status
issued
Filed
Jun 24, 2026
Permit issued
Jun 24, 2026
Declared cost
$50,000
Address
3200 California St

replace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads.

Open the permit page

$50,000
Jun 16, 2026Completed
final sign-off Aug 2026
1 Embarcadero CenterPeacock Construction20th/f ste# 2050: ref to t.i. 202604239930: hvac modification to support interior t.i. central equipment is e) to remain
Details
Permit
202606163301
Status
complete
Filed
Jun 16, 2026
Permit issued
Jun 24, 2026
Final sign-off
Aug 25, 2026
Declared cost
$209,000
Address
1 Embarcadero Center

20th/f ste# 2050: ref to t.i. 202604239930: hvac modification to support interior t.i. central equipment is e) to remain

Open the permit page

$209,000
Jun 16, 2026In progress
issued Jun 2026
1000 Van Ness AvCity Mechanical Increplacement of existing garage exhaust and supply air fans with new of same flow. add variable frequency drives to fan motors and replace existing monitoring system.
Details
Permit
202606163270
Status
issued
Filed
Jun 16, 2026
Permit issued
Jun 16, 2026
Declared cost
$140,000
Address
1000 Van Ness Av

replacement of existing garage exhaust and supply air fans with new of same flow. add variable frequency drives to fan motors and replace existing monitoring system.

Open the permit page

$140,000
Mar 24, 2026Completed
final sign-off Jul 2026
601 California StPeacock Constructionref pa# 202601214264: hvac modifications to support interior tenant. all terminal units are existing. (e) central equipment, (e) controls.
Details
Permit
202603248168
Status
complete
Filed
Mar 24, 2026
Permit issued
Mar 25, 2026
Final sign-off
Jul 2, 2026
Declared cost
$15,000
Address
601 California St

ref pa# 202601214264: hvac modifications to support interior tenant. all terminal units are existing. (e) central equipment, (e) controls.

Open the permit page

$15,000
Mar 3, 2026Completed
final sign-off Aug 2026
655 Beach StMatrix Hg Incsuite 210: hvac modifications to support interior tenant improvements. all terminal units are existing to remain. (e) central equipment is existing to remain. (e) controls to remain. ref building permit 202512151752.
Details
Permit
202603036807
Status
complete
Filed
Mar 3, 2026
Permit issued
Mar 5, 2026
Final sign-off
Aug 25, 2026
Declared cost
$136,068
Address
655 Beach St

suite 210: hvac modifications to support interior tenant improvements. all terminal units are existing to remain. (e) central equipment is existing to remain. (e) controls to remain. ref building permit 202512151752.

Open the permit page

$136,068
Feb 19, 2026Completed
final sign-off Apr 2026
180 Montgomery StMatrix Hg Incste, 1900 hvac modifications to support interior ti (e) central equipment to remain. (e) controls to remain. ref pa 202512030868
Details
Permit
202602196137
Status
complete
Filed
Feb 19, 2026
Permit issued
Feb 19, 2026
Final sign-off
Apr 13, 2026
Declared cost
$15,000
Address
180 Montgomery St

ste, 1900 hvac modifications to support interior ti (e) central equipment to remain. (e) controls to remain. ref pa 202512030868

Open the permit page

$15,000
Feb 5, 2026In progress
issued Mar 2026
50 03rd StCity Mechanical Inccooling tower replacement.
Details
Permit
202602055328
Status
issued
Filed
Feb 5, 2026
Permit issued
Mar 18, 2026
Declared cost
$196,000
Address
50 03rd St

cooling tower replacement.

Open the permit page

$196,000
Dec 16, 2025Completed
final sign-off Jan 2026
3 Embarcadero CenterVulcan Construction Incdeffered permit for ref ti 202510157369- for mep to include relocate of air duct and registers.
Details
Permit
202512161905
Status
complete
Filed
Dec 16, 2025
Permit issued
Dec 19, 2025
Final sign-off
Jan 13, 2026
Declared cost
$10,000
Address
3 Embarcadero Center

deffered permit for ref ti 202510157369- for mep to include relocate of air duct and registers.

Open the permit page

$10,000
Dec 12, 2025Completed
final sign-off May 2026
288 West Portal AvMatrix Hg Inclike for like replacement of 3 rooftop packaged a/c gas pack units
Details
Permit
202512121631
Status
complete
Filed
Dec 12, 2025
Permit issued
Dec 12, 2025
Final sign-off
May 29, 2026
Declared cost
$30,000
Address
288 West Portal Av

like for like replacement of 3 rooftop packaged a/c gas pack units

Open the permit page

$30,000
Nov 20, 2025In progress
issued Nov 2025
255 California StNovo Construction Incmechanical and electrical work for tenant improvement at suite 1125. arch ref#: 202510298346.
Details
Permit
202511200069
Status
issued
Filed
Nov 20, 2025
Permit issued
Nov 25, 2025
Declared cost
$125,000
Address
255 California St

mechanical and electrical work for tenant improvement at suite 1125. arch ref#: 202510298346.

Open the permit page

$125,000
Nov 5, 2025Completed
final sign-off Feb 2026
655 Montgomery StMatrix Hg Inc11/fl- install (n) variable frequency drive on (e) supply fan. no other work to be done on the (e) mechanical system are included
Details
Permit
202511058950
Status
complete
Filed
Nov 5, 2025
Permit issued
Nov 5, 2025
Final sign-off
Feb 26, 2026
Declared cost
$71,389
Address
655 Montgomery St

11/fl- install (n) variable frequency drive on (e) supply fan. no other work to be done on the (e) mechanical system are included

Open the permit page

$71,389
Oct 16, 2025Completed
final sign-off Nov 2025
601 California StPeacock Constructionhvac to modify ti 202505227041. ste 1475
Details
Permit
202510167518
Status
complete
Filed
Oct 16, 2025
Permit issued
Oct 17, 2025
Final sign-off
Nov 24, 2025
Declared cost
$45,000
Address
601 California St

hvac to modify ti 202505227041. ste 1475

Open the permit page

$45,000
Jul 1, 2025Completed
final sign-off Dec 2025
101 02nd StMatrix Hg Increplace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building
Details
Permit
202507019866
Status
complete
Filed
Jul 1, 2025
Permit issued
Sep 3, 2025
Final sign-off
Dec 17, 2025
Declared cost
$35,524
Address
101 02nd St

replace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building

Open the permit page

$35,524
May 14, 2025Completed
final sign-off Oct 2025
10 Jackson StSkyline Construction1st fl suite 185 ref pa# 2024-1127-5843 mechanical and electrical work for ti
Details
Permit
202505146485
Status
complete
Filed
May 14, 2025
Permit issued
Jun 9, 2025
Final sign-off
Oct 17, 2025
Declared cost
$180,000
Address
10 Jackson St

1st fl suite 185 ref pa# 2024-1127-5843 mechanical and electrical work for ti

Open the permit page

$180,000
Mar 21, 2025Completed
final sign-off Jun 2025
33 New Montgomery StMatrix Hg Inchvac modifications to support interior ti. all other terminal units are existing to remain. (e) central equipment existing to remain. (e) pneumatic controls to remain. ref pa 202503061735
Details
Permit
202503212740
Status
complete
Filed
Mar 21, 2025
Permit issued
Mar 24, 2025
Final sign-off
Jun 25, 2025
Declared cost
$10,000
Address
33 New Montgomery St

hvac modifications to support interior ti. all other terminal units are existing to remain. (e) central equipment existing to remain. (e) pneumatic controls to remain. ref pa 202503061735

Open the permit page

$10,000
Jan 31, 2025Completed
final sign-off Apr 2025
150 Spear StPeacock Construction17/f suite 1700 - hvac modifications to support interior ti. ref permit 202412136794
Details
Permit
202501319454
Status
complete
Filed
Jan 31, 2025
Permit issued
Feb 5, 2025
Final sign-off
Apr 18, 2025
Declared cost
$10,000
Address
150 Spear St

17/f suite 1700 - hvac modifications to support interior ti. ref permit 202412136794

Open the permit page

$10,000
Jan 28, 2025Completed
final sign-off Jan 2026
255 California StMatrix Hg Incbasement: replace 1) 250 ton chiller, install ref, nonitor device, install new sf & ef fansf for ref, ventilation new ufds for e) pumps, rework electrical for chiller & pumps new electrical for fans & ref. monitor, chiller in basement
Details
Permit
202501289178
Status
complete
Filed
Jan 28, 2025
Permit issued
Jan 28, 2025
Final sign-off
Jan 23, 2026
Declared cost
$250,000
Address
255 California St

basement: replace 1) 250 ton chiller, install ref, nonitor device, install new sf & ef fansf for ref, ventilation new ufds for e) pumps, rework electrical for chiller & pumps new electrical for fans & ref. monitor, chiller in basement

Open the permit page

$250,000
Oct 22, 2024Completed
final sign-off Jan 2025
2575 Marin StCity Mechanical Incinstall new rooftop exhaust fans and pvc ductwork to accomodate customer supplied fume hoods. fume hoods installed to accommodate mechanical requirements from future change of use. note that the space appears to be vacant, formerly used as a vehicle repair facility.
Details
Permit
202410223406
Status
complete
Filed
Oct 22, 2024
Permit issued
Dec 10, 2024
Final sign-off
Jan 13, 2025
Declared cost
$55,000
Address
2575 Marin St

install new rooftop exhaust fans and pvc ductwork to accomodate customer supplied fume hoods. fume hoods installed to accommodate mechanical requirements from future change of use. note that the space appears to be vacant, formerly used as a vehicle repair facility.

Open the permit page

$55,000
Oct 3, 2024Completed
final sign-off Dec 2024
301 Howard StBcci Construction Company9th flr. - mep submittal to support approved architectural permit. (1) new vav terminal unit and micellaneous ductwork. ref#: 202408299692
Details
Permit
202410032279
Status
complete
Filed
Oct 3, 2024
Permit issued
Oct 4, 2024
Final sign-off
Dec 4, 2024
Declared cost
$20,000
Address
301 Howard St

9th flr. - mep submittal to support approved architectural permit. (1) new vav terminal unit and micellaneous ductwork. ref#: 202408299692

Open the permit page

$20,000
Aug 23, 2024Completed
final sign-off Oct 2024
301 Howard StMatrix Hg Inc14/f suite 1400: hvac modification to support interior tenant improvements no new fsd's ref pa# 2024-0530-3259
Details
Permit
202408239326
Status
complete
Filed
Aug 23, 2024
Permit issued
Aug 23, 2024
Final sign-off
Oct 18, 2024
Declared cost
$17,500
Address
301 Howard St

14/f suite 1400: hvac modification to support interior tenant improvements no new fsd's ref pa# 2024-0530-3259

Open the permit page

$17,500
Aug 16, 2024Completed
final sign-off Sep 2024
601 California StMatrix Hg Inc3/f-ste 300:hvac modifications to support interior tenant improvement ref pa# 202406214979.
Details
Permit
202408168816
Status
complete
Filed
Aug 16, 2024
Permit issued
Aug 16, 2024
Final sign-off
Sep 11, 2024
Declared cost
$22,000
Address
601 California St

3/f-ste 300:hvac modifications to support interior tenant improvement ref pa# 202406214979.

Open the permit page

$22,000
Jul 15, 2024Completed
final sign-off Sep 2024
1 Post StPeacock Construction16/f: hvac modifications to support new power and signal devices. reference pa# 202405232837
Details
Permit
202407156461
Status
complete
Filed
Jul 15, 2024
Permit issued
Aug 8, 2024
Final sign-off
Sep 23, 2024
Declared cost
$60,000
Address
1 Post St

16/f: hvac modifications to support new power and signal devices. reference pa# 202405232837

Open the permit page

$60,000
Apr 25, 2024Completed
final sign-off Sep 2024
321 07th StCity Mechanical Incair flow & zone system improvements. relocate one existing rooftop unit to provide mfgr required clearance.
Details
Permit
202404250697
Status
complete
Filed
Apr 25, 2024
Permit issued
Apr 25, 2024
Final sign-off
Sep 10, 2024
Declared cost
$70,000
Address
321 07th St

air flow & zone system improvements. relocate one existing rooftop unit to provide mfgr required clearance.

Open the permit page

$70,000
Apr 19, 2024In progress
issued Apr 2024
2 Embarcadero CenterPeacock Constructionhvac modification to support t.i. add 2 return grilles, new power & lighting. ref 202403157877
Details
Permit
202404190350
Status
issued
Filed
Apr 19, 2024
Permit issued
Apr 24, 2024
Declared cost
$25,000
Address
2 Embarcadero Center

hvac modification to support t.i. add 2 return grilles, new power & lighting. ref 202403157877

Open the permit page

$25,000
Apr 3, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Servicesdeferred mechanical and electrical (ref pa# 202403046974). mechanical - hvac modifications to support interior ti. electrical - lighting fixtures and associated circuiting/controls. power and signal devices and associated wiring.
Details
Permit
202404039203
Status
complete
Filed
Apr 3, 2024
Permit issued
Apr 3, 2024
Final sign-off
Oct 11, 2024
Declared cost
$80,000
Address
4 Embarcadero Center

deferred mechanical and electrical (ref pa# 202403046974). mechanical - hvac modifications to support interior ti. electrical - lighting fixtures and associated circuiting/controls. power and signal devices and associated wiring.

Open the permit page

$80,000
Jan 29, 2024Completed
final sign-off Mar 2024
655 Montgomery StMatrix Hg Incinstall variable frequency drives on existing supply fans. no other modifications to the buildings existing mechanical system are included
Details
Permit
202401294790
Status
complete
Filed
Jan 29, 2024
Permit issued
Jan 29, 2024
Final sign-off
Mar 28, 2024
Declared cost
$31,698
Address
655 Montgomery St

install variable frequency drives on existing supply fans. no other modifications to the buildings existing mechanical system are included

Open the permit page

$31,698
Oct 12, 2023Completed
final sign-off Apr 2024
301 Howard StBcci Construction Company14th fl hvac modification to support approved arch drawings. ref 202309196897
Details
Permit
202310128564
Status
complete
Filed
Oct 12, 2023
Permit issued
Nov 3, 2023
Final sign-off
Apr 26, 2024
Declared cost
$100,000
Address
301 Howard St

14th fl hvac modification to support approved arch drawings. ref 202309196897

Open the permit page

$100,000
Oct 6, 2023Completed
final sign-off Oct 2024
360 03rd StSouthland Industriesreplace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.
Details
Permit
202310068165
Status
complete
Filed
Oct 6, 2023
Permit issued
Oct 20, 2023
Final sign-off
Oct 8, 2024
Declared cost
$300,000
Address
360 03rd St

replace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.

Open the permit page

$300,000
Aug 25, 2023Completed
final sign-off Oct 2023
300 Clay StMatrix Hg Incdocument the previous installtion of variable frequency drives on e supply fans as request by fire life safety contractor. installation of variable frequency drives was by others. no modifications to buildings e mech system included.
Details
Permit
202308255237
Status
complete
Filed
Aug 25, 2023
Permit issued
Aug 25, 2023
Final sign-off
Oct 24, 2023
Declared cost
$1,000
Address
300 Clay St

document the previous installtion of variable frequency drives on e supply fans as request by fire life safety contractor. installation of variable frequency drives was by others. no modifications to buildings e mech system included.

Open the permit page

$1,000
Jul 11, 2023Completed
final sign-off Jan 2024
699 08th StMatrix Hg Increplace (e) fuel oil pipe with new.
Details
Permit
202307111824
Status
complete
Filed
Jul 11, 2023
Permit issued
Jul 11, 2023
Final sign-off
Jan 9, 2024
Declared cost
$179,620
Address
699 08th St

replace (e) fuel oil pipe with new.

Open the permit page

$179,620
Apr 6, 2023Completed
final sign-off Oct 2023
170 Valencia StSkyline Capital Builders Llcmodify plumbing as required for ti project. modify 1st fl restroom exhaust. all central hvac cooling/heating and outside air equipment in existing to remain. replaces misc grills at 1st fl with new of same dimensions. ref pa 2022-1026-5195
Details
Permit
202304065191
Status
complete
Filed
Apr 6, 2023
Permit issued
Apr 20, 2023
Final sign-off
Oct 27, 2023
Declared cost
$18,000
Address
170 Valencia St

modify plumbing as required for ti project. modify 1st fl restroom exhaust. all central hvac cooling/heating and outside air equipment in existing to remain. replaces misc grills at 1st fl with new of same dimensions. ref pa 2022-1026-5195

Open the permit page

$18,000
Mar 9, 2023Completed
final sign-off Sep 2023
55 Stockton StParadigm General Contractors7/f: internal removations, architectural and meps (1708 sqft) no change of use. fully sprinklered bldg. (suite 700/balconies not occupied, under separate permit for future tenant)
Details
Permit
202303093308
Status
complete
Filed
Mar 9, 2023
Permit issued
Mar 22, 2023
Final sign-off
Sep 26, 2023
Declared cost
$429,250
Address
55 Stockton St

7/f: internal removations, architectural and meps (1708 sqft) no change of use. fully sprinklered bldg. (suite 700/balconies not occupied, under separate permit for future tenant)

Open the permit page

$429,250
Feb 14, 2023Completed
final sign-off Mar 2023
655 Montgomery StM C S Construction Servicesdeferred mechanical & electrical ref pa 2022-1025-5080
Details
Permit
202302141951
Status
complete
Filed
Feb 14, 2023
Permit issued
Feb 14, 2023
Final sign-off
Mar 27, 2023
Declared cost
$120,000
Address
655 Montgomery St

deferred mechanical & electrical ref pa 2022-1025-5080

Open the permit page

$120,000
Feb 8, 2023Completed
final sign-off Aug 2023
388 Market StParadigm General Contractors13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade)
Details
Permit
202302081584
Status
complete
Filed
Feb 8, 2023
Permit issued
Feb 16, 2023
Final sign-off
Aug 4, 2023
Declared cost
$200,000
Address
388 Market St

13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade)

Open the permit page

$200,000
Dec 19, 2022Never finaled
issued Dec 2022, no final
255 California StMatrix Hg Inc#850: hvac modification to support interior t.i. no new vav terminal units.
Details
Permit
202212198623
Status
issued
Filed
Dec 19, 2022
Permit issued
Dec 19, 2022
Declared cost
$8,521
Address
255 California St

#850: hvac modification to support interior t.i. no new vav terminal units.

Open the permit page

$8,521
Dec 7, 2022Completed
final sign-off May 2023
9 Bernice StCity Mechanical Increlocation of existing rooftop ac unit to proper & safe location.
Details
Permit
202212077803
Status
complete
Filed
Dec 7, 2022
Permit issued
Dec 9, 2022
Final sign-off
May 16, 2023
Declared cost
$60,000
Address
9 Bernice St

relocation of existing rooftop ac unit to proper & safe location.

Open the permit page

$60,000
Oct 6, 2022Completed
final sign-off Apr 2023
55 Stockton StParadigm General Contractors8th fl interior renovation. approx construction area 6,755 sqft. scope includes architectural and meps.
Details
Permit
202210063919
Status
complete
Filed
Oct 6, 2022
Permit issued
Nov 3, 2022
Final sign-off
Apr 7, 2023
Declared cost
$1,925,021
Address
55 Stockton St

8th fl interior renovation. approx construction area 6,755 sqft. scope includes architectural and meps.

Open the permit page

$1,925,021
Sep 21, 2022Completed
final sign-off Jul 2023
55 02nd StPeacock Construction23rd fl - hvac modifications to support interior ti ref pa 2022-0615-6443
Details
Permit
202209212828
Status
complete
Filed
Sep 21, 2022
Permit issued
Sep 26, 2022
Final sign-off
Jul 17, 2023
Declared cost
$37,000
Address
55 02nd St

23rd fl - hvac modifications to support interior ti ref pa 2022-0615-6443

Open the permit page

$37,000
Sep 8, 2022Completed
final sign-off Jun 2023
1 Market StField Construction Inc.10th fl: hvac modification and interior tenant mino lighting updates. t.i. arch work under separate permit. ref pa# 202208110346
Details
Permit
202209082104
Status
complete
Filed
Sep 8, 2022
Permit issued
Sep 8, 2022
Final sign-off
Jun 27, 2023
Declared cost
$199,000
Address
1 Market St

10th fl: hvac modification and interior tenant mino lighting updates. t.i. arch work under separate permit. ref pa# 202208110346

Open the permit page

$199,000
Aug 2, 2022Never finaled
issued Aug 2022, no final
160 Spear StPeacock Construction12/f: hvac modifications to support interior t.i., electrical power, lighting & signal. t.i. pa202204051553.
Details
Permit
202208029702
Status
issued
Filed
Aug 2, 2022
Permit issued
Aug 10, 2022
Declared cost
$250,000
Address
160 Spear St

12/f: hvac modifications to support interior t.i., electrical power, lighting & signal. t.i. pa202204051553.

Open the permit page

$250,000
Jul 1, 2022Never finaled
issued Jul 2022, no final
255 California StMatrix Hg Inc8th fl ste 800: hvac modifications to support interior tenant improvements. new grills, registers, diffusers and ductwork. ref arch 202206277197.
Details
Permit
202207017655
Status
issued
Filed
Jul 1, 2022
Permit issued
Jul 5, 2022
Declared cost
$149,397
Address
255 California St

8th fl ste 800: hvac modifications to support interior tenant improvements. new grills, registers, diffusers and ductwork. ref arch 202206277197.

Open the permit page

$149,397
Jun 28, 2022Completed
final sign-off Oct 2022
2300 Harrison StNovo Construction Incsuite 100 & 150: mechanical for t.i. mechanical and electrical. ref app#202204182383
Details
Permit
202206287239
Status
complete
Filed
Jun 28, 2022
Permit issued
Jul 20, 2022
Final sign-off
Oct 24, 2022
Declared cost
$25,000
Address
2300 Harrison St

suite 100 & 150: mechanical for t.i. mechanical and electrical. ref app#202204182383

Open the permit page

$25,000
Jun 16, 2022Completed
final sign-off Sep 2022
444 06th StCity Mechanical Incti hvac front rtu & exhaust air improvement ref 202112214851
Details
Permit
202206166467
Status
complete
Filed
Jun 16, 2022
Permit issued
Jul 13, 2022
Final sign-off
Sep 9, 2022
Declared cost
$180,000
Address
444 06th St

ti hvac front rtu & exhaust air improvement ref 202112214851

Open the permit page

$180,000
Jun 14, 2022Completed
final sign-off Oct 2022
101 Montgomery StMatrix Hg Incste f: replace 1 4-ton 4-pipe fan coil unit.
Details
Permit
202206146256
Status
complete
Filed
Jun 14, 2022
Permit issued
Jun 14, 2022
Final sign-off
Oct 6, 2022
Declared cost
$46,323
Address
101 Montgomery St

ste f: replace 1 4-ton 4-pipe fan coil unit.

Open the permit page

$46,323
Jun 7, 2022Completed
final sign-off Aug 2022
101 Montgomery StMatrix Hg Inc8th flr ste 888 - hvac modifications to support interior heating & cooling system by installing (1) vav box.
Details
Permit
202206075756
Status
complete
Filed
Jun 7, 2022
Permit issued
Jun 7, 2022
Final sign-off
Aug 12, 2022
Declared cost
$34,607
Address
101 Montgomery St

8th flr ste 888 - hvac modifications to support interior heating & cooling system by installing (1) vav box.

Open the permit page

$34,607
Jun 6, 2022Completed
final sign-off Jan 2023
1 Maritime PzMatrix Hg Incg/f & 26/f - roof: install variable frequency drives on (e) supply fans. no other modifications to the buildings 9e) mechanical system are included. maher n/a.
Details
Permit
202206065643
Status
complete
Filed
Jun 6, 2022
Permit issued
Jun 6, 2022
Final sign-off
Jan 24, 2023
Declared cost
$24,734
Address
1 Maritime Pz

g/f & 26/f - roof: install variable frequency drives on (e) supply fans. no other modifications to the buildings 9e) mechanical system are included. maher n/a.

Open the permit page

$24,734
May 23, 2022Completed
final sign-off Aug 2022
101 Montgomery StNovo Construction Inc22nd fl, ste 2250 - mechanical and electrical work for ti ref pa 2022-0405-1653
Details
Permit
202205234769
Status
complete
Filed
May 23, 2022
Permit issued
May 25, 2022
Final sign-off
Aug 22, 2022
Declared cost
$85,000
Address
101 Montgomery St

22nd fl, ste 2250 - mechanical and electrical work for ti ref pa 2022-0405-1653

Open the permit page

$85,000
May 19, 2022Completed
final sign-off Aug 2022
101 Montgomery StNovo Construction Incste 1250: mechanical & electrical work for tenant improvement. ref arch pa# 202204283243.
Details
Permit
202205194594
Status
complete
Filed
May 19, 2022
Permit issued
May 25, 2022
Final sign-off
Aug 22, 2022
Declared cost
$95,000
Address
101 Montgomery St

ste 1250: mechanical & electrical work for tenant improvement. ref arch pa# 202204283243.

Open the permit page

$95,000
May 18, 2022Completed
final sign-off Aug 2024
2222 BroadwayCity Mechanical Incgym installation of split system.
Details
Permit
202205184478
Status
complete
Filed
May 18, 2022
Permit issued
Jun 1, 2022
Final sign-off
Aug 23, 2024
Declared cost
$30,000
Address
2222 Broadway

gym installation of split system.

Open the permit page

$30,000
May 17, 2022Never finaled
issued May 2022, no final
101 Montgomery StNovo Construction Incste 2400: mep for tenant improvement to include hvac modifications. new power & signal devices throughout space. new lighting & controls. ref pa# 202204051652.
Details
Permit
202205174420
Status
issued
Filed
May 17, 2022
Permit issued
May 24, 2022
Declared cost
$10,000
Address
101 Montgomery St

ste 2400: mep for tenant improvement to include hvac modifications. new power & signal devices throughout space. new lighting & controls. ref pa# 202204051652.

Open the permit page

$10,000
Apr 22, 2022Completed
final sign-off Oct 2022
55 Francisco StSwinerton Buildersste 790: mechanical & electrical drawings. arch drawings under pa# 202104269325. includes new air distribution & lighting throughout the space based on new layout.
Details
Permit
202204222765
Status
complete
Filed
Apr 22, 2022
Permit issued
Apr 22, 2022
Final sign-off
Oct 7, 2022
Declared cost
$65,000
Address
55 Francisco St

ste 790: mechanical & electrical drawings. arch drawings under pa# 202104269325. includes new air distribution & lighting throughout the space based on new layout.

Open the permit page

$65,000
Apr 19, 2022Completed
final sign-off Jun 2022
1409 Minnesota StPlant Construction Co, Lpref to t.i. 202104239279. mep only. electrical distribution for ti work, add ducting to (e) hvac units
Details
Permit
202204192516
Status
complete
Filed
Apr 19, 2022
Permit issued
Apr 19, 2022
Final sign-off
Jun 1, 2022
Declared cost
$60,000
Address
1409 Minnesota St

ref to t.i. 202104239279. mep only. electrical distribution for ti work, add ducting to (e) hvac units

Open the permit page

$60,000
Apr 14, 2022Completed
final sign-off Jul 2022
20 Heron StCity Mechanical Inctenant improvement - install new vrf indoor units. ref pa# 202110281420.
Details
Permit
202204142201
Status
complete
Filed
Apr 14, 2022
Permit issued
Apr 14, 2022
Final sign-off
Jul 22, 2022
Declared cost
$55,000
Address
20 Heron St

tenant improvement - install new vrf indoor units. ref pa# 202110281420.

Open the permit page

$55,000
Apr 6, 2022Completed
final sign-off Jul 2022
2800 California StCity Mechanical Increplace (e) type 1 hood, exhaust fan, greese duct, & makeup air fan with new.
Details
Permit
202204061679
Status
complete
Filed
Apr 6, 2022
Permit issued
Jun 22, 2022
Final sign-off
Jul 15, 2022
Declared cost
$110,000
Address
2800 California St

replace (e) type 1 hood, exhaust fan, greese duct, & makeup air fan with new.

Open the permit page

$110,000
Dec 20, 2021Completed
final sign-off Feb 2023
55 Francisco StPeacock Construction#330: hvac modifications. power lighting and signal. ref app#202104239275
Details
Permit
202112204715
Status
complete
Filed
Dec 20, 2021
Permit issued
Dec 22, 2021
Final sign-off
Feb 16, 2023
Declared cost
$100,000
Address
55 Francisco St

#330: hvac modifications. power lighting and signal. ref app#202104239275

Open the permit page

$100,000
Sep 28, 2021Never finaled
issued Oct 2021, no final
1700 Montgomery StPeacock Constructionste #210: new lighting & controls. new power for break room equipment. new power & data. hvac modifications.
Details
Permit
202109289322
Status
issued
Filed
Sep 28, 2021
Permit issued
Oct 1, 2021
Address
1700 Montgomery St

ste #210: new lighting & controls. new power for break room equipment. new power & data. hvac modifications.

Open the permit page

Sep 22, 2021Never finaled
issued Nov 2021, no final
560 Mission StTurner Construction Coti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.
Details
Permit
202109228950
Status
issued
Filed
Sep 22, 2021
Permit issued
Nov 9, 2021
Declared cost
$1,500,000
Address
560 Mission St

ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.

Open the permit page

$1,500,000
Sep 10, 2021Completed
final sign-off Jan 2022
153 Kearny StC C I Commercial Construction & Improvreplace (e) split-system w/ new of same capaticy. no grade level exterior or architectural work is proposed
Details
Permit
202109108182
Status
complete
Filed
Sep 10, 2021
Permit issued
Sep 17, 2021
Final sign-off
Jan 4, 2022
Declared cost
$95,000
Address
153 Kearny St

replace (e) split-system w/ new of same capaticy. no grade level exterior or architectural work is proposed

Open the permit page

$95,000
Sep 2, 2021Never finaled
issued Sep 2021, no final
2180 Post StCity Mechanical Inccooling tower replacement on rooftop, same location and less weight.
Details
Permit
202109027658
Status
issued
Filed
Sep 2, 2021
Permit issued
Sep 9, 2021
Declared cost
$215,000
Address
2180 Post St

cooling tower replacement on rooftop, same location and less weight.

Open the permit page

$215,000
Aug 12, 2021Never finaled
issued Sep 2021, no final
2180 Post StCity Mechanical Increplace existing corridor make up air units. (cooling tower sep permit). ref pa 201111219332.
Details
Permit
202108126303
Status
issued
Filed
Aug 12, 2021
Permit issued
Sep 9, 2021
Declared cost
$140,000
Address
2180 Post St

replace existing corridor make up air units. (cooling tower sep permit). ref pa 201111219332.

Open the permit page

$140,000
Aug 2, 2021Completed
final sign-off Dec 2021
77 Geary StC C I Commercial Construction & Improvsuite 300: hvac mod to support interior t.i. relocate (e) water source heat pumps.install new ductwok and air devices. all water source heat pumps are existing to remain. maher n/a.
Details
Permit
202108025565
Status
complete
Filed
Aug 2, 2021
Permit issued
Aug 5, 2021
Final sign-off
Dec 8, 2021
Declared cost
$8,000
Address
77 Geary St

suite 300: hvac mod to support interior t.i. relocate (e) water source heat pumps.install new ductwok and air devices. all water source heat pumps are existing to remain. maher n/a.

Open the permit page

$8,000
Jul 30, 2021Completed
final sign-off Oct 2021
3065 Jackson StBevilacqua & Sonsmechanical & electrical improvements to 2 classrooms space. t.i.project - no structural. ref t.i. pa202106102150 & 202108116261
Details
Permit
202107305453
Status
complete
Filed
Jul 30, 2021
Permit issued
Aug 16, 2021
Final sign-off
Oct 1, 2021
Declared cost
$75,000
Address
3065 Jackson St

mechanical & electrical improvements to 2 classrooms space. t.i.project - no structural. ref t.i. pa202106102150 & 202108116261

Open the permit page

$75,000
Jul 14, 2021Completed
final sign-off Sep 2021
2325 Noriega StMatrix Hg Increplace 4 existing rooftop package units with new of same make and capacity. replacement unit weights are within 5% of the existing unit weight.
Details
Permit
202107144330
Status
complete
Filed
Jul 14, 2021
Permit issued
Jul 21, 2021
Final sign-off
Sep 24, 2021
Declared cost
$28,913
Address
2325 Noriega St

replace 4 existing rooftop package units with new of same make and capacity. replacement unit weights are within 5% of the existing unit weight.

Open the permit page

$28,913
Jun 22, 2021Completed
final sign-off Jan 2022
201 California StBcci Construction Company3rd flr - hvac modifications to support interior tenant improvements. ref: 2021-0204-4009.
Details
Permit
202106222985
Status
complete
Filed
Jun 22, 2021
Permit issued
Jul 9, 2021
Final sign-off
Jan 21, 2022
Declared cost
$45,000
Address
201 California St

3rd flr - hvac modifications to support interior tenant improvements. ref: 2021-0204-4009.

Open the permit page

$45,000
Jun 8, 2021Completed
final sign-off Jun 2022
1 Market StGci, Inc15th fl & 41st fl: mechanical modificaiton to support interior ti elevator lobbies. electrical - power, lighting & signal. reference 202103015549 (15th fl), 202102265505 (41st fl).
Details
Permit
202106081907
Status
complete
Filed
Jun 8, 2021
Permit issued
Jun 21, 2021
Final sign-off
Jun 2, 2022
Declared cost
$50,000
Address
1 Market St

15th fl & 41st fl: mechanical modificaiton to support interior ti elevator lobbies. electrical - power, lighting & signal. reference 202103015549 (15th fl), 202102265505 (41st fl).

Open the permit page

$50,000
Jun 1, 2021Never finaled
issued Jun 2021, no final
1171 Mission StMatrix Hg Incinstall new design build hvac system to serve 3/f, install (1) make-up air fan & 24 tons of variable refrigerant flow. provide/install (6) fan coils
Details
Permit
202106011362
Status
issued
Filed
Jun 1, 2021
Permit issued
Jun 15, 2021
Declared cost
$187,060
Address
1171 Mission St

install new design build hvac system to serve 3/f, install (1) make-up air fan & 24 tons of variable refrigerant flow. provide/install (6) fan coils

Open the permit page

$187,060
May 21, 2021Completed
final sign-off Sep 2021
220 Bush StCity Mechanical Inc1st fl breadk room & scr room mechanical improvement. ref pa# 202103025694.
Details
Permit
202105210826
Status
complete
Filed
May 21, 2021
Permit issued
Jun 21, 2021
Final sign-off
Sep 23, 2021
Declared cost
$40,000
Address
220 Bush St

1st fl breadk room & scr room mechanical improvement. ref pa# 202103025694.

Open the permit page

$40,000
Dec 21, 2020Completed
final sign-off Jan 2021
410 Townsend StCity Mechanical Incventilation improvements for pa202006098271. maher n/a.
Details
Permit
202012211462
Status
complete
Filed
Dec 21, 2020
Permit issued
Jan 7, 2021
Final sign-off
Jan 20, 2021
Declared cost
$10,000
Address
410 Townsend St

ventilation improvements for pa202006098271. maher n/a.

Open the permit page

$10,000
Dec 21, 2020Completed
final sign-off May 2021
650 Townsend StCity Mechanical Incsuite 150c: mechanical improvements. (reference) maher n/a.
Details
Permit
202012211467
Status
complete
Filed
Dec 21, 2020
Permit issued
Mar 10, 2021
Final sign-off
May 4, 2021
Declared cost
$190,000
Address
650 Townsend St

suite 150c: mechanical improvements. (reference) maher n/a.

Open the permit page

$190,000
Dec 14, 2020Completed
final sign-off May 2021
146 Geary StCity Mechanical Inc1st, 3rd & 4th fl mechanical improvements. ref pa# 202001071340, pa#202009013209
Details
Permit
202012140939
Status
complete
Filed
Dec 14, 2020
Permit issued
Jan 5, 2021
Final sign-off
May 19, 2021
Declared cost
$125,000
Address
146 Geary St

1st, 3rd & 4th fl mechanical improvements. ref pa# 202001071340, pa#202009013209

Open the permit page

$125,000
Dec 14, 2020Never finaled
issued Feb 2021, no final
235 Pine StMatrix Hg Inchvac modifications to support interior tenant improvements. ref pa# 202008061204.
Details
Permit
202012140931
Status
issued
Filed
Dec 14, 2020
Permit issued
Feb 18, 2021
Declared cost
$71,280
Address
235 Pine St

hvac modifications to support interior tenant improvements. ref pa# 202008061204.

Open the permit page

$71,280
Dec 14, 2020Completed
final sign-off Sep 2021
121 Spear StCity Mechanical Incste# 250: mechanical improvements. ref pa# 201912200101
Details
Permit
202012140935
Status
complete
Filed
Dec 14, 2020
Permit issued
Feb 19, 2021
Final sign-off
Sep 10, 2021
Declared cost
$90,000
Address
121 Spear St

ste# 250: mechanical improvements. ref pa# 201912200101

Open the permit page

$90,000
Dec 1, 2020Completed
final sign-off Jul 2021
275 Battery StMatrix Hg Inc31/f & r: replace 2 heating hot water boilers with 4 new higher efficiency biolers, misco piping and misc hyronic accessories. maher n/a
Details
Permit
202012019993
Status
complete
Filed
Dec 1, 2020
Permit issued
Feb 2, 2021
Final sign-off
Jul 15, 2021
Declared cost
$460,847
Address
275 Battery St

31/f & r: replace 2 heating hot water boilers with 4 new higher efficiency biolers, misco piping and misc hyronic accessories. maher n/a

Open the permit page

$460,847
Oct 23, 2020Completed
final sign-off Sep 2022
2201 Bay Shore BlM Moser Associates Llcrevision to the issued permit number 2015-0701-0504. tenant improvement of existing building. new non-bearing interior partitions, doors, interior glazing, millwork, and finishes throughout. relocation of an elevator that was planned in a previous core-shell rehabilitation project.
Details
Permit
202010237295
Status
complete
Filed
Oct 23, 2020
Permit issued
Feb 19, 2021
Final sign-off
Sep 16, 2022
Declared cost
$4,500,000
Address
2201 Bay Shore Bl

revision to the issued permit number 2015-0701-0504. tenant improvement of existing building. new non-bearing interior partitions, doors, interior glazing, millwork, and finishes throughout. relocation of an elevator that was planned in a previous core-shell rehabilitation project.

Open the permit page

$4,500,000
Jul 21, 2020Completed
final sign-off Apr 2021
555 Montgomery StMatrix Hg Inc12th fl: hvac modifications to support interior ti. ref atch ti pa# 202002134365.
Details
Permit
202007210616
Status
complete
Filed
Jul 21, 2020
Permit issued
Aug 6, 2020
Final sign-off
Apr 20, 2021
Declared cost
$139,100
Address
555 Montgomery St

12th fl: hvac modifications to support interior ti. ref atch ti pa# 202002134365.

Open the permit page

$139,100
Jul 6, 2020Completed
final sign-off Dec 2020
101 Montgomery StNovo Construction Incsuite #2600: interior ti - remove non-structural partitions. new partitions, door assemblies, electrical, light fixtures & finishes. fire life safety and sprinklers under separate permit. maher na
Details
Permit
202007069578
Status
complete
Filed
Jul 6, 2020
Permit issued
Jul 14, 2020
Final sign-off
Dec 18, 2020
Declared cost
$250,000
Address
101 Montgomery St

suite #2600: interior ti - remove non-structural partitions. new partitions, door assemblies, electrical, light fixtures & finishes. fire life safety and sprinklers under separate permit. maher na

Open the permit page

$250,000
Jun 2, 2020Completed
final sign-off Nov 2020
101 Henry Adams StMatrix Hg Increplace one heating hot water boiler, primary pumps, and misc. hydronic accessories.
Details
Permit
202006028064
Status
complete
Filed
Jun 2, 2020
Permit issued
Aug 26, 2020
Final sign-off
Nov 3, 2020
Declared cost
$129,870
Address
101 Henry Adams St

replace one heating hot water boiler, primary pumps, and misc. hydronic accessories.

Open the permit page

$129,870
Feb 19, 2020Expired or cancelled
cancelled Jan 2026
101 02nd StMatrix Hg Incsuite 800: install water source heat pump to serve existing idf closet.
Details
Permit
202002194824
Status
cancelled
Filed
Feb 19, 2020
Declared cost
$39,408
Address
101 02nd St

suite 800: install water source heat pump to serve existing idf closet.

Open the permit page

$39,408
Dec 26, 2019Completed
final sign-off Aug 2020
1 La AvanzadaMatrix Hg Increplace existing split-systm with identical unit by same manufacturer
Details
Permit
201912260693
Status
complete
Filed
Dec 26, 2019
Permit issued
Dec 26, 2019
Final sign-off
Aug 13, 2020
Declared cost
$84,804
Address
1 La Avanzada

replace existing split-systm with identical unit by same manufacturer

Open the permit page

$84,804
Dec 20, 2019Completed
final sign-off Mar 2021
50 Bowling Green DrAzul Works, Inc.revision to hvac & electrical work issued under pa 2018-0514-9026
Details
Permit
201912200136
Status
complete
Filed
Dec 20, 2019
Permit issued
Jan 29, 2020
Final sign-off
Mar 18, 2021
Address
50 Bowling Green Dr

revision to hvac & electrical work issued under pa 2018-0514-9026

Open the permit page

Nov 25, 2019Completed
final sign-off Aug 2020
201 Spear StMatrix Hg Incroof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct work
Details
Permit
201911258132
Status
complete
Filed
Nov 25, 2019
Permit issued
Nov 25, 2019
Final sign-off
Aug 10, 2020
Declared cost
$199,000
Address
201 Spear St

roof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct work

Open the permit page

$199,000
Oct 29, 2019Completed
final sign-off Jun 2020
201 California StMatrix Hg Increplace existing evaporative condenser with a new unit of equal capacity and similar footprint, per plans. modify existing piping to accomodate new condenser. in kind replacement.
Details
Permit
201910295828
Status
complete
Filed
Oct 29, 2019
Permit issued
Nov 13, 2019
Final sign-off
Jun 15, 2020
Declared cost
$285,000
Address
201 California St

replace existing evaporative condenser with a new unit of equal capacity and similar footprint, per plans. modify existing piping to accomodate new condenser. in kind replacement.

Open the permit page

$285,000
Sep 24, 2019Completed
final sign-off Mar 2020
601 California StPeacock Construction1st fl. t-24 mechanical for work under pa# 201906264412
Details
Permit
201909242577
Status
complete
Filed
Sep 24, 2019
Permit issued
Sep 24, 2019
Final sign-off
Mar 5, 2020
Address
601 California St

1st fl. t-24 mechanical for work under pa# 201906264412

Open the permit page

Sep 19, 2019Expired or cancelled
expired Jul 2026
99 Rhode Island StMatrix Hg Increplace 1 heating hot water boiler, distribution pumps and misc hydront accessories. n/a for maher
Details
Permit
201909192116
Status
expired
Filed
Sep 19, 2019
Permit issued
Sep 27, 2019
Declared cost
$42,000
Address
99 Rhode Island St

replace 1 heating hot water boiler, distribution pumps and misc hydront accessories. n/a for maher

Open the permit page

$42,000
Jun 12, 2019Completed
final sign-off Aug 2019
555 Montgomery StMatrix Hg Incdemo (e) system, install 19 new vav's and associated duct and registers, install odc controls on vav's and install 1 new fsd for return air. ref pa 201904188368.
Details
Permit
201906123233
Status
complete
Filed
Jun 12, 2019
Permit issued
Jul 8, 2019
Final sign-off
Aug 19, 2019
Declared cost
$196,400
Address
555 Montgomery St

demo (e) system, install 19 new vav's and associated duct and registers, install odc controls on vav's and install 1 new fsd for return air. ref pa 201904188368.

Open the permit page

$196,400
Dec 7, 2018Completed
final sign-off Jan 2019
250 Montgomery StCity Mechanical Increloate (e) ductwork, add new ductwork and air devices as redq to accomodate floor plan changes. ref 201810193686 maher na
Details
Permit
201812077711
Status
complete
Filed
Dec 7, 2018
Permit issued
Dec 7, 2018
Final sign-off
Jan 9, 2019
Declared cost
$35,000
Address
250 Montgomery St

reloate (e) ductwork, add new ductwork and air devices as redq to accomodate floor plan changes. ref 201810193686 maher na

Open the permit page

$35,000
Dec 4, 2018Completed
final sign-off Feb 2019
555 Montgomery StMatrix Hg Inc3rd fl: hvac mechanical plsn for spec'd suite ti project. mew vavs w/ddc controls associated ductwork, piping, and air distribution. ref pa #201809109530.
Details
Permit
201812047367
Status
complete
Filed
Dec 4, 2018
Permit issued
Dec 4, 2018
Final sign-off
Feb 19, 2019
Declared cost
$296,052
Address
555 Montgomery St

3rd fl: hvac mechanical plsn for spec'd suite ti project. mew vavs w/ddc controls associated ductwork, piping, and air distribution. ref pa #201809109530.

Open the permit page

$296,052
Nov 30, 2018Never finaled
issued Nov 2018, no final
1155 Market StMatrix Hg Inc5/f: ref pa# 201810011862; t.i. relocate (e) ductwork, add new duct work and air, no new fsd's
Details
Permit
201811307092
Status
issued
Filed
Nov 30, 2018
Permit issued
Nov 30, 2018
Declared cost
$58,000
Address
1155 Market St

5/f: ref pa# 201810011862; t.i. relocate (e) ductwork, add new duct work and air, no new fsd's

Open the permit page

$58,000
Oct 15, 2018Completed
final sign-off Nov 2018
110 Sutter StMatrix Hg Incstructural monitoring of vrf system and addition of split system to serve idf rooms. ref mech pa 2018 07275782 ref arch 201805240048
Details
Permit
201810153173
Status
complete
Filed
Oct 15, 2018
Permit issued
Oct 17, 2018
Final sign-off
Nov 21, 2018
Declared cost
$22,000
Address
110 Sutter St

structural monitoring of vrf system and addition of split system to serve idf rooms. ref mech pa 2018 07275782 ref arch 201805240048

Open the permit page

$22,000
Sep 24, 2018Completed
final sign-off Feb 2019
555 Montgomery StMatrix Hg Inc17/f: hvac mechanical plans for specified suite. t.i. project: new vav's with ddc controls associated ductwork, piping and air distribution grills/diffusers. ref t.i. pa201809109530. maher n/a.
Details
Permit
201809241122
Status
complete
Filed
Sep 24, 2018
Permit issued
Sep 24, 2018
Final sign-off
Feb 19, 2019
Declared cost
$244,933
Address
555 Montgomery St

17/f: hvac mechanical plans for specified suite. t.i. project: new vav's with ddc controls associated ductwork, piping and air distribution grills/diffusers. ref t.i. pa201809109530. maher n/a.

Open the permit page

$244,933
Jul 27, 2018Completed
final sign-off Nov 2018
110 Sutter StMatrix Hg Inc5/f - suite 500: t.i.: install vrf system for floor. new ducted fan coils,duct work. ref pa#201805240048.
Details
Permit
201807275782
Status
complete
Filed
Jul 27, 2018
Permit issued
Jul 27, 2018
Final sign-off
Nov 21, 2018
Declared cost
$190,000
Address
110 Sutter St

5/f - suite 500: t.i.: install vrf system for floor. new ducted fan coils,duct work. ref pa#201805240048.

Open the permit page

$190,000
Apr 3, 2018Never finaled
issued Apr 2018, no final
149 New Montgomery StMatrix Hg Inc3/f: relocate 4 units, replace 4 units, and duct for new layout. ref pa 2018-0111-8386
Details
Permit
201804035387
Status
issued
Filed
Apr 3, 2018
Permit issued
Apr 4, 2018
Declared cost
$158,000
Address
149 New Montgomery St

3/f: relocate 4 units, replace 4 units, and duct for new layout. ref pa 2018-0111-8386

Open the permit page

$158,000
Apr 3, 2018Never finaled
issued Apr 2018, no final
149 New Montgomery StMatrix Hg Inc5/f: relocate 3 existing heat pumps, replace 1 unit and duct out units for new layout. ref pa 2018-0105-7985
Details
Permit
201804035386
Status
issued
Filed
Apr 3, 2018
Permit issued
Apr 4, 2018
Declared cost
$150,000
Address
149 New Montgomery St

5/f: relocate 3 existing heat pumps, replace 1 unit and duct out units for new layout. ref pa 2018-0105-7985

Open the permit page

$150,000
Feb 14, 2018Completed
final sign-off Apr 2018
2 Bryant StMatrix Hg Incremove and replace cooling tower, like for like on roof.
Details
Permit
201802141293
Status
complete
Filed
Feb 14, 2018
Permit issued
Feb 14, 2018
Final sign-off
Apr 26, 2018
Declared cost
$30,000
Address
2 Bryant St

remove and replace cooling tower, like for like on roof.

Open the permit page

$30,000
Aug 9, 2016Completed
final sign-off Oct 2016
55 Hawthorne StMatrix Hg Incroof top/penthouse- replacement of boiler & (2) pumps.
Details
Permit
201608094592
Status
complete
Filed
Aug 9, 2016
Permit issued
Aug 9, 2016
Final sign-off
Oct 6, 2016
Declared cost
$127,900
Address
55 Hawthorne St

roof top/penthouse- replacement of boiler & (2) pumps.

Open the permit page

$127,900