158 permits since 2000 (engineer on 144 permits, architect on 7 permits, authorized agent-others on 6 permits, attorney on 1 permit): 108 completed, 17 in progress, 18 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 158.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 534 04th St | M C S Construction Services | tenant improvement to 1st and 2nd fl. new restrooms, workrooms, open office area, presentation room. building entry stair under sep permit 202608056135. mechanical, electrical, kplumbing, fire/life safety as required by above scope. nfpa 13 fire sprinkler to be provided.Details
tenant improvement to 1st and 2nd fl. new restrooms, workrooms, open office area, presentation room. building entry stair under sep permit 202608056135. mechanical, electrical, kplumbing, fire/life safety as required by above scope. nfpa 13 fire sprinkler to be provided. | $1,800,000 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 600 California St | 5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $2,750,000 | |
| Jul 27, 2026 | In progress issued Jul 2026 | 200 Pine St | Rainbow Waterproofing & Restor | concrete repair in basement: repair at concrete walls, beams and soffit, include beam replacement at seven sections of beam. perform epoxy crack injection and concrete spall repairs. all repairs in kind to match original construction.Details
concrete repair in basement: repair at concrete walls, beams and soffit, include beam replacement at seven sections of beam. perform epoxy crack injection and concrete spall repairs. all repairs in kind to match original construction. | $214,300 |
| Jul 22, 2026 | In progress issued Aug 2026 | 55 Spear St | Skyline Construction | l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landingDetails
l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landing | $715,000 |
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 637 Carolina St | Mic Construction | revision to 202605261883. repair (in-kind) 23 concrete steps in 637 caorlina st., stairs, repalce stairs less 50%. inspector asked for plans. all work interior.Details
revision to 202605261883. repair (in-kind) 23 concrete steps in 637 caorlina st., stairs, repalce stairs less 50%. inspector asked for plans. all work interior. | |
| May 22, 2026 | In progress issued Jun 2026 | 101 California St | Hathaway Dinwiddie Co. | 12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1Details
12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1 | $15,000 |
| May 14, 2026 | In progress issued Aug 2026 | 2043 19th Av | Giampolini & Co Dba Giampolini/Courtney, Mulhall Construction Inc. | to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof.Details
to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof. | $50,000 |
| May 14, 2026 | In progress issued Jul 2026 | 750 Battery St | Field Construction Inc. | foundation wall, crack damage repair. structural only. no exterior work.Details
foundation wall, crack damage repair. structural only. no exterior work. | $150,000 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | Hathaway Dinwiddie Co. | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke controlDetails
11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control | $399,334 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | Hathaway Dinwiddie Co. | 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishesDetails
13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes | $399,334 |
| Apr 7, 2026 | Completed final sign-off Apr 2026 | 1556 Lombard St | S L M Development Inc. | submit the as built structural drawing. ref 202306210515Details
submit the as built structural drawing. ref 202306210515 | |
| Mar 18, 2026 | In progress filed Mar 2026, not yet issued | 840 Ellis St | Rainbow Waterproofing & Restor | repair of existing damaged floor framing members. cracked concrete floor joists are to be repaired by epoxy injection and carbon fiber wrap. a portion of the floor slab and one beam near the north/west corner will be rebuilt.Details
repair of existing damaged floor framing members. cracked concrete floor joists are to be repaired by epoxy injection and carbon fiber wrap. a portion of the floor slab and one beam near the north/west corner will be rebuilt. | $188,000 |
| Dec 8, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations.Details
new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations. | $1,000,000 |
| Nov 4, 2025 | In progress issued Apr 2026 | 505 Howard St | Novo Construction Inc | 5th fl - millwork and equipment for back of house pantry. interior non-structural partitions, new finishes millwork.Details
5th fl - millwork and equipment for back of house pantry. interior non-structural partitions, new finishes millwork. | $700,000 |
| Aug 11, 2025 | In progress filed Aug 2025, not yet issued | 333 Market St | City Building Inc. | 335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers andDetails
335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers and | $175,000 |
| Jul 16, 2025 | Completed final sign-off Jan 2026 | 1550 Union St | Moroso Construction Inc | structural revision to pa# 2025-0521-6974. no other work on this permit.retain 1x sheathing, add plywood, staples sheet metal blocking provided at interior pwd panel boundaries, add blockings for future work.Details
structural revision to pa# 2025-0521-6974. no other work on this permit.retain 1x sheathing, add plywood, staples sheet metal blocking provided at interior pwd panel boundaries, add blockings for future work. | |
| Jun 5, 2025 | Completed final sign-off Oct 2025 | 2001 Mcallister St | Bigo Construction Inc. | deck repair per plans (balcony repairs in kind) remove & replace damaged beam per plans. remove & redo waterproofing per plans. remove & redo stucco where needed & cedar shingles. install temporary scaffold & shoringDetails
deck repair per plans (balcony repairs in kind) remove & replace damaged beam per plans. remove & redo waterproofing per plans. remove & redo stucco where needed & cedar shingles. install temporary scaffold & shoring | $44,000 |
| May 14, 2025 | Completed final sign-off Aug 2026 | 2695 19th Av | Rainbow Waterproofing & Restor | this is a maintenance project: repair 1.2k sqft of exterior west wall tiles temp winterization of west wall. repair north and south wall sealing. steel beam rust remediation/cleaning. roof coping replacement.Details
this is a maintenance project: repair 1.2k sqft of exterior west wall tiles temp winterization of west wall. repair north and south wall sealing. steel beam rust remediation/cleaning. roof coping replacement. | $380,000 |
| May 9, 2025 | In progress filed May 2025, not yet issued | 85 02nd St | 7/f suite 710 - installation of (3) single-occupant phone privacy booths. to partially remedy sffd nov 2405-0056.Details
7/f suite 710 - installation of (3) single-occupant phone privacy booths. to partially remedy sffd nov 2405-0056. | $3,000 | |
| Apr 9, 2025 | Completed final sign-off Sep 2026 | 100 California St | Turner Construction Co | alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way.Details
alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way. | $1,300,000 |
| Nov 22, 2024 | Completed final sign-off Apr 2026 | 1564 Lombard St | S L M Development Inc. | rev 202306210515- rear unit 1564c- change in entry layout. new concrete slab on gradeDetails
rev 202306210515- rear unit 1564c- change in entry layout. new concrete slab on grade | |
| Nov 22, 2024 | Completed final sign-off Apr 2026 | 1556 Lombard St | S L M Development Inc. | rev 202103086117- rear unit 1556b- change in entry layout. new concrete slabDetails
rev 202103086117- rear unit 1556b- change in entry layout. new concrete slab | $7,500 |
| Nov 21, 2024 | Completed final sign-off Jul 2026 | 1020 Union St | Hoover Brindmore Inc. | unit 8: while operating under 202406134412. inspector d. martin requested drawings be provided with a stamp from an engineer of record. structural framing upgrades to correct found deficencies.Details
unit 8: while operating under 202406134412. inspector d. martin requested drawings be provided with a stamp from an engineer of record. structural framing upgrades to correct found deficencies. | $60,000 |
| Nov 14, 2024 | In progress issued Dec 2024 | 355 Buena Vista East Av | Winfield Building Group Dba C.W. Dillion | remove old staircase from outside access (not primary access); fabricate new staircase and install as noted in the structural drawings. in-kindDetails
remove old staircase from outside access (not primary access); fabricate new staircase and install as noted in the structural drawings. in-kind | $25,000 |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 505 Howard St | Novo Construction Inc | 5th floor: interior tenant improvement. to include non-load bearing partitions, ceilings and finishes. mep under seperate permit. structural under separate permit. no cfc until mep and structural deferred submittals are permitted and completed.Details
5th floor: interior tenant improvement. to include non-load bearing partitions, ceilings and finishes. mep under seperate permit. structural under separate permit. no cfc until mep and structural deferred submittals are permitted and completed. | $3,822,000 |
| Aug 30, 2024 | Completed final sign-off Apr 2025 | 1812 Green St | 2k Builders Llc | rev 202102194988-structural reframe based on limited investigation based on construction verification in the fieldDetails
rev 202102194988-structural reframe based on limited investigation based on construction verification in the field | $2,500 |
| Jul 23, 2024 | Expired or cancelled cancelled Apr 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | revise pa# 202205164296: to amend scope to repair (e) precase concrete veneer on cooling tower vents. no change in use of occupancy.Details
revise pa# 202205164296: to amend scope to repair (e) precase concrete veneer on cooling tower vents. no change in use of occupancy. | $150,000 |
| Apr 29, 2024 | In progress filed Apr 2024, not yet issued | 5140 Diamond Heights Bl | Andrew Chekene Enterprises/ Dba Ac Enter | remove and replace one purlin beam like for likeDetails
remove and replace one purlin beam like for like | $10,000 |
| Apr 25, 2024 | In progress issued May 2024 | 450 09th St | Tom Lewis Restoration And Consulting | repair steel liner(s) @ the south wall and general repair to the exterior brick masonry walls to include helitte brick reinforcement and repointingDetails
repair steel liner(s) @ the south wall and general repair to the exterior brick masonry walls to include helitte brick reinforcement and repointing | $280,000 |
| Mar 20, 2024 | Completed final sign-off Jun 2025 | 2360 Pacific Av | Everest Waterproofing & Restoration Inc. | removal and replacement of degraded facade steel mullians in kindDetails
removal and replacement of degraded facade steel mullians in kind | $188,000 |
| Jul 21, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 254: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,installDetails
unit 254: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,install | $38,200 |
| Jul 21, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 329: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,installDetails
unit 329: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,install | $38,200 |
| Jul 20, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 255: close decks barricading the doors to the decks, remove railings and store, demo flashing, trim and siding at doors as needed and dispose of debris, demo deck including siding sufficient to install new flashing and waterproofing per plans, repair joists, shear wall and framing as requiredDetails
unit 255: close decks barricading the doors to the decks, remove railings and store, demo flashing, trim and siding at doors as needed and dispose of debris, demo deck including siding sufficient to install new flashing and waterproofing per plans, repair joists, shear wall and framing as required | $38,200 |
| Jun 27, 2023 | Expired or cancelled cancelled Jul 2023 | 161 Shipley St | Andrew Chekene Enterprises/ Dba Ac Enter | remove approx. 350'sf of t1-11 siding. remove (e) trim around windows and doors. install approx. 350'sf of 1/2 cdx shearwall or plywood. install new weather barrier. install new trim around (e) windows and doors. install new hardy plank siding. all work at rear side elevation. (e)guardrail remainDetails
remove approx. 350'sf of t1-11 siding. remove (e) trim around windows and doors. install approx. 350'sf of 1/2 cdx shearwall or plywood. install new weather barrier. install new trim around (e) windows and doors. install new hardy plank siding. all work at rear side elevation. (e)guardrail remain | $18,000 |
| Jun 27, 2023 | Expired or cancelled cancelled Jul 2023 | 163 Shipley St | Andrew Chekene Enterprises/ Dba Ac Enter | remove approx. 400'sf of t1-11 siding. remove (e) trim around windows and doors. install approx. 400'sf of 1/2 cdx shearwall or plywood. install new weather barrier. install new trim around (e) windows and doors. install new hardy plank siding. all work at rear side elevation. (e)guardrail remainDetails
remove approx. 400'sf of t1-11 siding. remove (e) trim around windows and doors. install approx. 400'sf of 1/2 cdx shearwall or plywood. install new weather barrier. install new trim around (e) windows and doors. install new hardy plank siding. all work at rear side elevation. (e)guardrail remain | $18,000 |
| Jun 27, 2023 | Expired or cancelled cancelled Jul 2023 | 159 Shipley St | Andrew Chekene Enterprises/ Dba Ac Enter | remove approx. 350'sf of t1-11 siding. remove (e) trim around windows and doors. install approx. 350'sf of 1/2 cdx shearwall or plywood. install new weather barrier. install new trim around (e) windows and doors. install new hardy plank siding. all work at rear side elevation. (e)guardrail remainDetails
remove approx. 350'sf of t1-11 siding. remove (e) trim around windows and doors. install approx. 350'sf of 1/2 cdx shearwall or plywood. install new weather barrier. install new trim around (e) windows and doors. install new hardy plank siding. all work at rear side elevation. (e)guardrail remain | $18,000 |
| Jun 21, 2023 | Completed final sign-off Jul 2024 | 333 Market St | G L C Construction Company Inc | 1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodelDetails
1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodel | $135,000 |
| May 11, 2023 | Completed final sign-off Feb 2024 | 100 Masonic Av | International Waterproofing | within preschool classroom- removing extg step in the slab to even out the floor for ada accessibility pour of 3" of concrete on the extg slab to level with adjacent corridor for ada pour new partial concrete slab where old step is removed. revision ot 202205315241Details
within preschool classroom- removing extg step in the slab to even out the floor for ada accessibility pour of 3" of concrete on the extg slab to level with adjacent corridor for ada pour new partial concrete slab where old step is removed. revision ot 202205315241 | $80,000 |
| Apr 14, 2023 | Never finaled issued Apr 2023, no final | 35 South Park | Novo Construction Inc | roof trellis and associated structural and penthouse deck. deferred submittal associated with prev approved permit 202008222419Details
roof trellis and associated structural and penthouse deck. deferred submittal associated with prev approved permit 202008222419 | |
| Mar 7, 2023 | Completed final sign-off May 2023 | 115 Red Rock Wy | Andrew Chekene Enterprises/ Dba Ac Enter | revision to pa #202211186801. additional new 4x4 o.t. post with 2 7/8 though bolts.Details
revision to pa #202211186801. additional new 4x4 o.t. post with 2 7/8 though bolts. | |
| Dec 22, 2022 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | core and shell improvements. no lot merger for this project. n lift, walls, stairs & associated structural and mep.Details
core and shell improvements. no lot merger for this project. n lift, walls, stairs & associated structural and mep. | $400,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | core and shell improvements. new platform lift , stairs. no lot merger for this project.Details
core and shell improvements. new platform lift , stairs. no lot merger for this project. | $400,000 |
| Dec 16, 2022 | Completed final sign-off Mar 2025 | 300 Page St | Herrero Builders Incorporated | sf zen center modernization and ada upgrades. work includes renovated ada upgrades @ page st, new elevator, new interior lift adj to laguna entrance. new restrooms @ each floor, upgraded mech ventilation at zendo basement level. to comply w/his nov 201470281 - ada upgrades/grab bars. mep deferredDetails
sf zen center modernization and ada upgrades. work includes renovated ada upgrades @ page st, new elevator, new interior lift adj to laguna entrance. new restrooms @ each floor, upgraded mech ventilation at zendo basement level. to comply w/his nov 201470281 - ada upgrades/grab bars. mep deferred | $3,400,000 |
| Jun 8, 2022 | Completed final sign-off Jun 2023 | 730 Sacramento St | Everest Waterproofing & Restoration Inc. | concrete repair of deck and facade in-kind. repair to steel balcony in-kind. waterproof coating on balcony.Details
concrete repair of deck and facade in-kind. repair to steel balcony in-kind. waterproof coating on balcony. | $55,000 |
| May 23, 2022 | Never finaled issued May 2022, no final | 400 Montgomery St | Novo Construction Inc | 11th fl: tenant improvement to include new non-structural partitions.Details
11th fl: tenant improvement to include new non-structural partitions. | $250,000 |
| Mar 16, 2022 | Completed final sign-off Jul 2023 | 124 Geary St | Dickinson Cameron Construction Company I | revision to 202108116268. interior layout modification. interior lighting layout modification, reuse of (e) stair w/ replacement of (e) lift with (n) lift. structural clarifications & updates to reflect (n) scope.Details
revision to 202108116268. interior layout modification. interior lighting layout modification, reuse of (e) stair w/ replacement of (e) lift with (n) lift. structural clarifications & updates to reflect (n) scope. | |
| Feb 10, 2022 | Completed final sign-off Feb 2023 | 555 California St | Bcci Construction Company | concourse level: interior ti, including selective demolition and construction of non-structural partitions, finishes, ceilings, lighting and millwork. no change in occupancy, use or area.Details
concourse level: interior ti, including selective demolition and construction of non-structural partitions, finishes, ceilings, lighting and millwork. no change in occupancy, use or area. | $700,000 |
| Feb 9, 2022 | Never finaled issued May 2022, no final | 899 Howard St | Plant Construction Co, Lp | exterior renovation of an (e) 3-story structure known as 899 howard demolition of (e) cement plaster cladding, glass block & concrete infill panels. installation of a new aluminum & glass curtain wall system with integrated metal cladding sunscrees & canopies per planning dept case no 2015-009141ofaDetails
exterior renovation of an (e) 3-story structure known as 899 howard demolition of (e) cement plaster cladding, glass block & concrete infill panels. installation of a new aluminum & glass curtain wall system with integrated metal cladding sunscrees & canopies per planning dept case no 2015-009141ofa | $9,000,000 |
| Dec 6, 2021 | Completed final sign-off Nov 2022 | 333 Market St | Richlen Construction | installation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel.Details
installation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel. | $16,000 |
| Dec 3, 2021 | Expired or cancelled cancelled Jan 2026 | 875 Folsom St | repair damaged out of plane anchorage located at 875 folsom the concrete walls along the north na south elevation of the single story will be repaired where damaged is visible and new out of plane anchorage will be installed at the timber trusses spanning between the walls at the roof. the anchorageDetails
repair damaged out of plane anchorage located at 875 folsom the concrete walls along the north na south elevation of the single story will be repaired where damaged is visible and new out of plane anchorage will be installed at the timber trusses spanning between the walls at the roof. the anchorage | $75,000 | |
| Apr 14, 2021 | Completed final sign-off Jul 2022 | 1235 17th Av | M. Gaehwiler Construction Inc | voluntary seismic retrofit. install 3 moment frames & related work per drawings.Details
voluntary seismic retrofit. install 3 moment frames & related work per drawings. | $150,000 |
| Feb 19, 2021 | Completed final sign-off Apr 2025 | 1812 Green St | 2k Builders Llc | to abate nov #200561775/enf7402 & nov #202038181/enf2020-005902 - 1/f: legalize expansion of rear deck, bath, and kitchen remodel. 2/f: restore dwelling unit & remove opening between 1/f & 2/f units. legalize change of facade entry from 2 doors to 1. basement: legalize rear expansion, laundry & bathDetails
to abate nov #200561775/enf7402 & nov #202038181/enf2020-005902 - 1/f: legalize expansion of rear deck, bath, and kitchen remodel. 2/f: restore dwelling unit & remove opening between 1/f & 2/f units. legalize change of facade entry from 2 doors to 1. basement: legalize rear expansion, laundry & bath | $20,000 |
| Feb 10, 2021 | Never finaled filed Feb 2021, never issued | 52 Zoe St | new air distribution being added to serve floor space; vrv fan coil units; vev air cooled condenser units; heating/ venting unit; no new smoke dampers added. current occupancy s-1, change of occ type/use to be filed separately for b occupancyDetails
new air distribution being added to serve floor space; vrv fan coil units; vev air cooled condenser units; heating/ venting unit; no new smoke dampers added. current occupancy s-1, change of occ type/use to be filed separately for b occupancy | $323,574 | |
| Sep 12, 2020 | Completed final sign-off Apr 2022 | 2360 Pacific Av | Millan & Associates | renovation of 2 existing bathrooms andding closes. removal of two partitions in dining room. ** maher: n/a **Details
renovation of 2 existing bathrooms andding closes. removal of two partitions in dining room. ** maher: n/a ** | $30,000 |
| Aug 19, 2020 | Completed final sign-off Feb 2022 | 200 Rhode Island St | Skyline Capital Builders Llc | deferred micropile submittal for seismic upgrade. ref pa201909181993.Details
deferred micropile submittal for seismic upgrade. ref pa201909181993. | $20,000 |
| Aug 19, 2020 | Completed final sign-off Feb 2022 | 200 Rhode Island St | Skyline Capital Builders Llc | deferred micropile submittal for seismic upgrade. ref pa201909181992.Details
deferred micropile submittal for seismic upgrade. ref pa201909181992. | $253,000 |
| Jul 9, 2020 | Completed final sign-off Dec 2020 | 458 Jackson St | Bevilacqua & Sons | structural work comprises of repair to existing timbers and columns.Details
structural work comprises of repair to existing timbers and columns. | $40,000 |
| Jun 8, 2020 | Completed final sign-off Jul 2021 | 180 Townsend St | Vance Brown Inc., Bayview Environmental Services Inc. | revision to pa#201912068914 & #201909030456. scope includes relocating the proposed (n)sump pit location so not to compromise foundation integrity. as a result, the plumbing room (b16) has been enlargedDetails
revision to pa#201912068914 & #201909030456. scope includes relocating the proposed (n)sump pit location so not to compromise foundation integrity. as a result, the plumbing room (b16) has been enlarged | $5,000 |
| Feb 14, 2020 | Completed final sign-off Feb 2020 | 2045 Cabrillo St | Steelcore Builders Inc | revision to 201708296189, soft story retrofit to conform with chapter 4d of the sfebc per ab107 utilizing fema p807 designDetails
revision to 201708296189, soft story retrofit to conform with chapter 4d of the sfebc per ab107 utilizing fema p807 design | |
| Dec 19, 2019 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | 30th fl - ti for office remodel. new partitions, millwork & finishes. mep deferred. maher na. vif card readers in elevator lobbies require two way communication per cfc 1010.1.9.12Details
30th fl - ti for office remodel. new partitions, millwork & finishes. mep deferred. maher na. vif card readers in elevator lobbies require two way communication per cfc 1010.1.9.12 | $980,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2021 | 180 Townsend St | Vance Brown Inc. | interior renovation for 2nd & 3rd floor. no demo required unde rapproved pa# 2019-0415-7945. new non-load bearing walls includes mepDetails
interior renovation for 2nd & 3rd floor. no demo required unde rapproved pa# 2019-0415-7945. new non-load bearing walls includes mep | $1,900,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2021 | 180 Townsend St | Vance Brown Inc. | interior renovation for 1st & basement floors. no demo required (under approved pa#2019-0719-6425). new non-load bearing walls, includes mepDetails
interior renovation for 1st & basement floors. no demo required (under approved pa#2019-0719-6425). new non-load bearing walls, includes mep | $1,900,000 |
| Dec 2, 2019 | Completed final sign-off Jun 2021 | 253 Post St | Michilli Inc | ground floor - (n) cafe, (n) 2 x fitting room, (n) ada fitting room, (n) staircase connecting ground floor to basement, (n) elevator shaft; basement - adding partitions for back of house offices and staff lounge, adding 945 sf sales area, and (n) ada fitting roomDetails
ground floor - (n) cafe, (n) 2 x fitting room, (n) ada fitting room, (n) staircase connecting ground floor to basement, (n) elevator shaft; basement - adding partitions for back of house offices and staff lounge, adding 945 sf sales area, and (n) ada fitting room | $300,000 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 1020 Union St | Lokman Construction | unit 2: stiffen the (e) curb & reduce wind deflection of the glass railing on existing roof deck. no visual impact.Details
unit 2: stiffen the (e) curb & reduce wind deflection of the glass railing on existing roof deck. no visual impact. | $2,000 |
| Aug 1, 2019 | Completed final sign-off Jan 2021 | 100 Pine St | Hathaway Dinwiddie Co. | revision to 2018-1010-2762, to provide structural foundation details.Details
revision to 2018-1010-2762, to provide structural foundation details. | $56,000 |
| Jun 17, 2019 | Completed final sign-off Jul 2021 | 2716 Scott St | revision to pa 201602190048. replace (e) unreinforced concrete walls at ground level w/ plaster and wood framed walls. provide plywood at exterior walls. replace windows to match. a window fenestration has been deleted allowing a plywood shear wall in its place. moment frame has been deleted.Details
revision to pa 201602190048. replace (e) unreinforced concrete walls at ground level w/ plaster and wood framed walls. provide plywood at exterior walls. replace windows to match. a window fenestration has been deleted allowing a plywood shear wall in its place. moment frame has been deleted. | ||
| Jun 10, 2019 | Completed final sign-off Nov 2019 | 3053 Sacramento St | Michael E Miranda General Contractor | revision to app#201809129810: add new shearwall & new conc grade beam(detail 5s3.0) and(s2.0). to replace 2 shearwalls (l=5'-6" & l= 4'-5 1/5") n/a for maherDetails
revision to app#201809129810: add new shearwall & new conc grade beam(detail 5s3.0) and(s2.0). to replace 2 shearwalls (l=5'-6" & l= 4'-5 1/5") n/a for maher | $7,000 |
| Apr 22, 2019 | Never finaled issued Apr 2019, no final | 2750 Jackson St | Occidental Express | increasing of existing netting system at upper playfield from approx 10'0 to 14'0Details
increasing of existing netting system at upper playfield from approx 10'0 to 14'0 | $12,000 |
| Mar 26, 2019 | Expired or cancelled cancelled Apr 2019 | 1020 Union St | K & R Builders Inc | unit # 23: revision to 201803123436 and 201807245361 new guardrail at east side of (e) roof deck on top of (e) curb per plans.Details
unit # 23: revision to 201803123436 and 201807245361 new guardrail at east side of (e) roof deck on top of (e) curb per plans. | $4,800 |
| Feb 15, 2019 | Completed final sign-off Dec 2020 | 1011 Market St | Michilli Inc | interior tenant improvement (supreme) with structural re-framing, new interior partitions, new restrooms, new flooring wall and ceiling finishes re-configured mezzanine, new mechanical, lighting and electrical. storefront under separate permitDetails
interior tenant improvement (supreme) with structural re-framing, new interior partitions, new restrooms, new flooring wall and ceiling finishes re-configured mezzanine, new mechanical, lighting and electrical. storefront under separate permit | $800,000 |
| Feb 13, 2019 | Completed final sign-off Jun 2020 | 981 Elizabeth St | Gartan Construction | to comply with nov 201848681 construction of retaining wall at east side of rear yard.Details
to comply with nov 201848681 construction of retaining wall at east side of rear yard. | $24,000 |
| Feb 11, 2019 | Completed final sign-off Aug 2021 | 180 Townsend St | Rossi Builders Inc. | elevator modernization of qualifying historic building. elevator 1: cosmetic, hvac, electrical and equipment upgrades only. no arch or structural work. elevator 2: rebuilding shaft walls, replacing one elevator can, associated structural, mechanical, electrical work.Details
elevator modernization of qualifying historic building. elevator 1: cosmetic, hvac, electrical and equipment upgrades only. no arch or structural work. elevator 2: rebuilding shaft walls, replacing one elevator can, associated structural, mechanical, electrical work. | $552,325 |
| Nov 28, 2018 | Never finaled issued Dec 2018, no final | 301 Battery St | Field Construction Inc. | revision to 201809211070 structural drawings tube steel frames for interior. n/a for maher.Details
revision to 201809211070 structural drawings tube steel frames for interior. n/a for maher. | $3,000 |
| Oct 12, 2018 | Completed final sign-off Mar 2019 | 600 California St | Build Group Inc. | structural calculations of partition wall on 20th fl. ref ti #201804116086 & 201809261393Details
structural calculations of partition wall on 20th fl. ref ti #201804116086 & 201809261393 | $4,000 |
| Oct 12, 2018 | Completed final sign-off Nov 2018 | 2360 Pacific Av | Everest Waterproofing & Restoration Inc. | revision: completion of work commenced under bpa #201807305930Details
revision: completion of work commenced under bpa #201807305930 | $28,000 |
| Sep 12, 2018 | Completed final sign-off Nov 2019 | 3053 Sacramento St | Michael E Miranda General Contractor | soft story retrofit per ab107, fema p-807. add (1) new wood s.w. in middle of bldg, transverse directory. ** maher: n/a **Details
soft story retrofit per ab107, fema p-807. add (1) new wood s.w. in middle of bldg, transverse directory. ** maher: n/a ** | $10,000 |
| Sep 12, 2018 | Expired or cancelled expired Jan 2024 | 460 South Van Ness Av | soft story retrofit in accordance w/ ab107 fema p-807, ground floor: (7) new wood s.w. (1) new smf or new ftg.Details
soft story retrofit in accordance w/ ab107 fema p-807, ground floor: (7) new wood s.w. (1) new smf or new ftg. | $45,000 | |
| Sep 5, 2018 | Completed final sign-off Sep 2021 | 670 Brunswick St | A W T Construction Group Inc | interior remodel of existing club house to a preschool, including remodel bathroom and teacher's loungeDetails
interior remodel of existing club house to a preschool, including remodel bathroom and teacher's lounge | $300,000 |
| Aug 29, 2018 | Expired or cancelled expired Aug 2022 | 1387 Hayes St | soft-story retrofit to conform w/ ab-107 4d of 2016 sfebc. installation of new plywood s.w on ground level, structural connections added to wood posts, top & bottom, design per fema p807Details
soft-story retrofit to conform w/ ab-107 4d of 2016 sfebc. installation of new plywood s.w on ground level, structural connections added to wood posts, top & bottom, design per fema p807 | $45,000 | |
| Aug 29, 2018 | Expired or cancelled expired Feb 2023 | 2050 Powell St | Michael E Miranda General Contractor | commercial: soft story retrofit to conform with ab-107 (4d of 2016 sfebc)installation of 2 new moment frames, 3 new shearwalls, all work is on 1st floor, design per fema p-807. ** maher: n/a **Details
commercial: soft story retrofit to conform with ab-107 (4d of 2016 sfebc)installation of 2 new moment frames, 3 new shearwalls, all work is on 1st floor, design per fema p-807. ** maher: n/a ** | $30,000 |
| Aug 24, 2018 | Completed final sign-off Mar 2019 | 2108 Broadway | Rainbow Waterproofing & Restor, Grand Industries Inc | replace column base with new concrete 4 locations.Details
replace column base with new concrete 4 locations. | $35,000 |
| Jul 24, 2018 | Completed final sign-off Apr 2019 | 1020 Union St | K & R Builders Inc | revision to permit #201803123436. install (n) blocking and hardware per plans.Details
revision to permit #201803123436. install (n) blocking and hardware per plans. | $350 |
| Jul 18, 2018 | Completed final sign-off Oct 2020 | 650 Townsend St | Hathaway Dinwiddie Co. | revision to structural design of slab infill on 3rd fl due to infield conditions. ref 201804035411Details
revision to structural design of slab infill on 3rd fl due to infield conditions. ref 201804035411 | |
| Jun 28, 2018 | Completed final sign-off Nov 2018 | 460 09th St | Everest Waterproofing & Restoration Inc. | parapet & beam repairs at roofDetails
parapet & beam repairs at roof | $15,840 |
| Jun 20, 2018 | Expired or cancelled expired Feb 2023 | 2050 Powell St | Michael E Miranda General Contractor | residential: soft story retrofit to conform with ab-107 (4d of 2016 sfebc) installation of 2 new moment frames, 3 new shearwalls, all work is on 1st floor, design per fema p-807. ** maher: n/a **Details
residential: soft story retrofit to conform with ab-107 (4d of 2016 sfebc) installation of 2 new moment frames, 3 new shearwalls, all work is on 1st floor, design per fema p-807. ** maher: n/a ** | $30,000 |
| May 30, 2018 | Completed final sign-off Dec 2018 | 458 Jackson St | Trim Fit Constr. - O'reilly Engineering | new partitions, new accessible restroom. new mechanical system, electrical, structural re-framing. ref planning 2018-001100coa. pa#201801088001.Details
new partitions, new accessible restroom. new mechanical system, electrical, structural re-framing. ref planning 2018-001100coa. pa#201801088001. | $475,000 |
| May 11, 2018 | Completed final sign-off Jul 2020 | 2411 Chestnut St | Mw General Contracting | residential - soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. commercial soft story under pa 2018-0511-8918. ** maher: n/a **Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. commercial soft story under pa 2018-0511-8918. ** maher: n/a ** | $195,000 |
| May 11, 2018 | Completed final sign-off Jul 2020 | 2413 Chestnut St | Mw General Contracting | commercial - soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. new automatic door openers & partial new storefront replacement as required. residential soft story under pa 2018-0511-8916. ** maher: n/a **Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. new automatic door openers & partial new storefront replacement as required. residential soft story under pa 2018-0511-8916. ** maher: n/a ** | $65,000 |
| Mar 22, 2018 | Expired or cancelled cancelled Jan 2026 | 2101 Mission St | A M Rocca Inc. | revision to pa #201312033192 for improved structural connection between braced frames as depicted on s4.0 detail 10 & 11. no other work under this revision. maher naDetails
revision to pa #201312033192 for improved structural connection between braced frames as depicted on s4.0 detail 10 & 11. no other work under this revision. maher na | $1,000 |
| Mar 20, 2018 | Never finaled issued Apr 2018, no final | 760 Market St | Novo Construction Inc | structural work for 2nd and 3rd for revised platform. ref pa pa 2018-0123-9213Details
structural work for 2nd and 3rd for revised platform. ref pa pa 2018-0123-9213 | |
| Mar 8, 2018 | Completed final sign-off Jan 2019 | 550 California St | G L C Construction Company Inc | 5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areasDetails
5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areas | $1,550,000 |
| Jan 17, 2018 | Completed final sign-off Jul 2018 | 4625 Cabrillo St | Everest Waterproofing & Restoration Inc. | interior concrete wall repair. structural. n/a for maher.Details
interior concrete wall repair. structural. n/a for maher. | $15,000 |
| Oct 30, 2017 | Completed final sign-off Mar 2020 | 815 Hyde St | repair ceiling in unit 815-lc due to water damage. will need to pour concrete and fix stuccoDetails
repair ceiling in unit 815-lc due to water damage. will need to pour concrete and fix stucco | $12,000 | |
| Oct 6, 2017 | Never finaled issued Oct 2017, no final | 825 La Playa | Everest Waterproofing & Restoration Inc. | repair of rusted steel columns. common areasDetails
repair of rusted steel columns. common areas | $14,000 |
| Sep 15, 2017 | Completed final sign-off May 2018 | 315 Montgomery St | G Swanson Constr. Inc. | 1/f- t.i. modifications to include relocated access ramp and stairs, new financial and client advisor rooms & client meeting rooms, new ceilings. (e) restrooms and breakrooms to remain. new furniture and finishes. n/a ordinance #155-13Details
1/f- t.i. modifications to include relocated access ramp and stairs, new financial and client advisor rooms & client meeting rooms, new ceilings. (e) restrooms and breakrooms to remain. new furniture and finishes. n/a ordinance #155-13 | $700,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2020 | 2195 Green St | Seismic Retrofitters Inc. | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. ** maher: n/a ** | $246,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2019 | 1234 Washington St | Sykes General Contractors Inc, Sgdm Llc | mandatory soft story retrofit of multi story residential to the ground floor. chapter 4d asce 41-13. **maher n/a**Details
mandatory soft story retrofit of multi story residential to the ground floor. chapter 4d asce 41-13. **maher n/a** | $48,000 |
| Aug 29, 2017 | Completed final sign-off Feb 2020 | 2045 Cabrillo St | soft story retrofit to confomr with chater 4d of the sfebc per ab-107 utilizing fema p-807 design.Details
soft story retrofit to confomr with chater 4d of the sfebc per ab-107 utilizing fema p-807 design. | $45,000 | |
| Jun 28, 2017 | Expired or cancelled expired Aug 2022 | 1366 Haight St | soft story retrofit per fema p-807Details
soft story retrofit per fema p-807 | $100,000 | |
| Jun 16, 2017 | Completed final sign-off Jun 2018 | 1043 Fell St | Essa's Remodeling | soft story retrofit per sfebc chapter 4d engineering creteriafema p-807. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d engineering creteriafema p-807. ** maher: n/a ** | $75,000 |