Barry Bourbon
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Gensler
- Based in
- San Francisco
- On San Francisco permits
- Oct 2002 to Dec 2024
122 permits since 2000 (architect on 115 permits, engineer on 6 permits, authorized agent-others on 2 permits): 69 completed, 41 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 122.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 6, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing onlyDetails
deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only | $497,168 |
| Oct 24, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal.Details
tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal. | $145,500 |
| Sep 9, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | revision to pa 202406114197 revise office door 203 configuration. revise electrical room 211 fire ratingDetails
revision to pa 202406114197 revise office door 203 configuration. revise electrical room 211 fire rating | ||
| Jun 11, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | 1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.Details
1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers. | $2,236,032 |
| Feb 2, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | 1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017.Details
1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017. | $120,000 |
| Aug 24, 2023 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | updating passenger elevator#4 to be in code compliance as an accessible means of egress elevator and minor modifications to ikea space.Details
updating passenger elevator#4 to be in code compliance as an accessible means of egress elevator and minor modifications to ikea space. | $250,000 |
| Jul 20, 2023 | Completed final sign-off Oct 2024 | 120 Stockton St | Skyline Construction | 4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service.Details
4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service. | $5,000 |
| May 4, 2023 | Completed final sign-off Jul 2023 | 945 Market St | Skyline Construction | construction of a temporary ramp in the loading dock of the building. ref#: 202206106079Details
construction of a temporary ramp in the loading dock of the building. ref#: 202206106079 | $35,000 |
| Dec 16, 2022 | Never finaled issued Jan 2023, no final | 120 Stockton St | Novo Construction Inc | lobby/6/7/8-f: t.i., demo of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office amenity, new ceiling finishes, furring walls, breakroom. structural trellis on exterior deckDetails
lobby/6/7/8-f: t.i., demo of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office amenity, new ceiling finishes, furring walls, breakroom. structural trellis on exterior deck | $450,000 |
| Nov 23, 2022 | Completed final sign-off Feb 2025 | 120 Stockton St | Skyline Construction | 4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code."Details
4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code." | $2,000,000 |
| Nov 9, 2022 | Completed final sign-off Feb 2025 | 120 Stockton St | Skyline Construction | tenant improvement in a vacant core & shell bldg. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceiling finishes fixtures & casework.Details
tenant improvement in a vacant core & shell bldg. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceiling finishes fixtures & casework. | $150,000 |
| Oct 11, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | administrative review of amended smoke control report. no work under this permit.Details
administrative review of amended smoke control report. no work under this permit. | |
| Aug 12, 2022 | Completed final sign-off May 2023 | 18 Geary St | G Swanson Constr. Inc. | to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors.Details
to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors. | $50,000 |
| Jun 10, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.Details
exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates. | $10,600,000 |
| Mar 9, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | complete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied.Details
complete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied. | $485,000 |
| Dec 28, 2021 | Never finaled issued Mar 2022, no final | 120 Stockton St | Novo Construction Inc | construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215Details
construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215 | $1,460,000 |
| Dec 27, 2021 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | storm water control plans for pa# 201805048215 & pa# 202008101490. for pid review only.Details
storm water control plans for pa# 201805048215 & pa# 202008101490. for pid review only. | |
| Sep 17, 2021 | Never finaled issued Sep 2021, no final | 120 Stockton St | Plant Construction Co, Lp | revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tankDetails
revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tank | |
| May 28, 2021 | Never finaled issued Sep 2021, no final | 120 Stockton St | Plant Construction Co, Lp | partial replacement of (e) pg&e vault lid due to upgraded lift out panel & sizing as well as associated demolition & structural upgrades. refer to the site permit 201805048215Details
partial replacement of (e) pg&e vault lid due to upgraded lift out panel & sizing as well as associated demolition & structural upgrades. refer to the site permit 201805048215 | $60,000 |
| Feb 18, 2021 | Never finaled issued Mar 2021, no final | 1156 Valencia St | Swinerton Builders | upgrade of the existing light based on the new layout, addition of two exhaust fans for new shower rooms & one dryer vent and modifications to the existing plumbing to accomodate the new build out. these are the mep plans for architectural plans approved under permit number #202009295384.Details
upgrade of the existing light based on the new layout, addition of two exhaust fans for new shower rooms & one dryer vent and modifications to the existing plumbing to accomodate the new build out. these are the mep plans for architectural plans approved under permit number #202009295384. | $105,000 |
| Nov 20, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Plant Construction Co, Lp | suite 150: gym: t.i. : non-strucural partitions, new floor and wall finisehs, environmental wall graphics, celings, lighting, electrical,mech & plumb; 2 (n) single occupancy all-genger restrooms, one with ada shower. no changes to (e) base building structureo. no work to exterior shell. maher n/aDetails
suite 150: gym: t.i. : non-strucural partitions, new floor and wall finisehs, environmental wall graphics, celings, lighting, electrical,mech & plumb; 2 (n) single occupancy all-genger restrooms, one with ada shower. no changes to (e) base building structureo. no work to exterior shell. maher n/a | $1,200,000 |
| Sep 29, 2020 | Completed final sign-off May 2021 | 1156 Valencia St | Swinerton Builders | sfdph project: interior remodel to demolish 2 existing non-accessible restrooms and 2 multipurpoise rooms to be renovated to 2 accessible showers/changing rooms. laundry area scope includes demolition & construction of walls, ceilings, and floor finishes.Details
sfdph project: interior remodel to demolish 2 existing non-accessible restrooms and 2 multipurpoise rooms to be renovated to 2 accessible showers/changing rooms. laundry area scope includes demolition & construction of walls, ceilings, and floor finishes. | $300,000 |
| Aug 10, 2020 | Never finaled issued Dec 2021, no final | 120 Stockton St | Plant Construction Co, Lp | revision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade.Details
revision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade. | $1,100,000 |
| Sep 19, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | Marini Construction Inc | interior improvement at ramp area includes new topping slab, finishes, dropped ceiling systems. no change to e base building structureDetails
interior improvement at ramp area includes new topping slab, finishes, dropped ceiling systems. no change to e base building structure | $500,000 |
| May 2, 2019 | Never finaled issued Jun 2019, no final | 300 16th St | Marini Construction Inc | ste 12 -chase center gatehouse. interior ti of (e) shell (1st time ti). improvements include new floor finishes, ceiling, lighting,mech, millwork, non structural partitions and signage (signs under sep permit). no point of sale. all transactions performed electronically/digitallyDetails
ste 12 -chase center gatehouse. interior ti of (e) shell (1st time ti). improvements include new floor finishes, ceiling, lighting,mech, millwork, non structural partitions and signage (signs under sep permit). no point of sale. all transactions performed electronically/digitally | $340,000 |
| Feb 26, 2019 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | new foundation & new opening in (e) floor slabs for installation of construction tower crane. ** comply maher ord 155-13**Details
new foundation & new opening in (e) floor slabs for installation of construction tower crane. ** comply maher ord 155-13** | $300,000 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 298 Alabama St | Terra Nova Industries | permit revision #3 to pa #201802020205, including documentation of changes to lighting, electrical, mechanical & plumbing.Details
permit revision #3 to pa #201802020205, including documentation of changes to lighting, electrical, mechanical & plumbing. | |
| Aug 20, 2018 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | proposed soft demo consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215Details
proposed soft demo consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215 | $100,000 |
| May 4, 2018 | Completed final sign-off Aug 2024 | 120 Stockton St | Pribuss Engineering Inc, Plant Construction Co, Lp | major alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher**Details
major alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher** | $80,000,000 |
| Mar 1, 2018 | Completed final sign-off Jun 2018 | 345 Stockton St | Peacock Construction | mezzanine: tenant improvement: interior conversion of public dining room to pantry. finishes, equipment & lighting. maher naDetails
mezzanine: tenant improvement: interior conversion of public dining room to pantry. finishes, equipment & lighting. maher na | $65,000 |
| Aug 18, 2017 | Completed final sign-off Dec 2018 | 345 Stockton St | Peacock Construction | ground floor ti: millwork upgrades at reception, lighting & electrical improvements.Details
ground floor ti: millwork upgrades at reception, lighting & electrical improvements. | $275,000 |
| Jul 26, 2017 | Never finaled issued Aug 2017, no final | 3251 20th Av | Alain Hirsch Construction Corp | space 151 & 235: new furouts with gyp bd on interior walls, vet flooring application, wall ceiling paint. hvac system to installed, convenience outlets, tenant security cameras, it systems, lighting to be installedDetails
space 151 & 235: new furouts with gyp bd on interior walls, vet flooring application, wall ceiling paint. hvac system to installed, convenience outlets, tenant security cameras, it systems, lighting to be installed | $200,000 |
| May 2, 2017 | Completed final sign-off Oct 2018 | 590 Hayes St | Trainor Commercial Construction Inc. | revision to 201612205468. reconfiguration of entry at hayes st retail space on ground floor. no other workDetails
revision to 201612205468. reconfiguration of entry at hayes st retail space on ground floor. no other work | $12,000 |
| Mar 9, 2017 | Never finaled issued Nov 2017, no final | 222 Sansome St | Hathaway Dinwiddie Co. | interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a **Details
interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a ** | $624,825 |
| Feb 8, 2017 | Never finaled issued Mar 2017, no final | 18 Geary St | Build Group Inc., Michilli Inc | revision to pa 2016-0419-5148. changes to millwork, partitions, finishes & mep. maher naDetails
revision to pa 2016-0419-5148. changes to millwork, partitions, finishes & mep. maher na | $20,000 |
| Jan 3, 2017 | Completed final sign-off Mar 2017 | 945 Market St | Plant Construction Co, Lp | ref pa#201011084497 s8: as-built for rooftop generator & fuel oil. to provide additional information /specifications. maher n/a.Details
ref pa#201011084497 s8: as-built for rooftop generator & fuel oil. to provide additional information /specifications. maher n/a. | |
| Dec 21, 2016 | Completed final sign-off Apr 2018 | 757 Market St | Plant Construction Co, Lp | interior renovation of guest rooms 1205,1405,1505,1603,1703 and selected accessibility upgrades to guest rooms 710,810,910,1007,1110,1210,1410, 1510,1610 and 1724. no modifications to fire sprinklers are proposed. modifications to fire alarm, plumbing and electrical will be delegated designDetails
interior renovation of guest rooms 1205,1405,1505,1603,1703 and selected accessibility upgrades to guest rooms 710,810,910,1007,1110,1210,1410, 1510,1610 and 1724. no modifications to fire sprinklers are proposed. modifications to fire alarm, plumbing and electrical will be delegated design | $75,000 |
| Dec 21, 2016 | Never finaled issued Jan 2017, no final | 735 Market St | Plant Construction Co, Lp | ti on 5th floor consisting of a business center to board room conversion). modifications to fire alarm, fire sprinklers, electrical and mechanical will be delegated design and permitted separately by others as deferred submittalsDetails
ti on 5th floor consisting of a business center to board room conversion). modifications to fire alarm, fire sprinklers, electrical and mechanical will be delegated design and permitted separately by others as deferred submittals | $25,000 |
| Nov 23, 2016 | Completed final sign-off Jun 2021 | 298 Alabama St | Ecotechnikos | t.i including electrical, hvac, install ductwork per plan for hvac, construction of interior processing room. ref pa 2015-0521-6951 (arch/struc only). mep's added. n/a for maher ordinance.Details
t.i including electrical, hvac, install ductwork per plan for hvac, construction of interior processing room. ref pa 2015-0521-6951 (arch/struc only). mep's added. n/a for maher ordinance. | $1,200,000 |
| Jun 13, 2016 | Never finaled issued Jul 2016, no final | 2 Stockton St | Shawmut Woodworking & Supply Inc | revision to pa 2015-0407-3020 to add 2 lights to store front facade and remove 1 light added in pa 2016-0307-1382. maher naDetails
revision to pa 2015-0407-3020 to add 2 lights to store front facade and remove 1 light added in pa 2016-0307-1382. maher na | $500 |
| May 20, 2016 | Completed final sign-off Jan 2017 | 945 Market St | Plant Construction Co, Lp | revision to ref pa 2010 1108 4497 s3: stevenson st facade eliminate the areas of refuge per cbc 1007.3 & 1007.4. change wall railing between passenger elevator & service elevator & other various cordination related modifications. maher naDetails
revision to ref pa 2010 1108 4497 s3: stevenson st facade eliminate the areas of refuge per cbc 1007.3 & 1007.4. change wall railing between passenger elevator & service elevator & other various cordination related modifications. maher na | |
| May 16, 2016 | Completed final sign-off Jan 2017 | 945 Market St | Swinerton Builders, Plant Construction Co, Lp | ground fl: revision to pa#2010-1108-4497 to make fire pump room door 60-minute fire rated. n/a ordinance #155-13Details
ground fl: revision to pa#2010-1108-4497 to make fire pump room door 60-minute fire rated. n/a ordinance #155-13 | |
| Apr 19, 2016 | Never finaled issued Apr 2017, no final | 18 Geary St | Build Group Inc., Michilli Inc | exterior storefront improvement for new retail store. existing brick facade to remain. interior t.i. under separate permit pa#2016 0419 5148 ** maher: n/a **Details
exterior storefront improvement for new retail store. existing brick facade to remain. interior t.i. under separate permit pa#2016 0419 5148 ** maher: n/a ** | $80,000 |
| Apr 11, 2016 | Completed final sign-off Jun 2017 | 2095 Union St | Ap- Build Inc | minor ti changes in restroom & locker area, including new plumbing and electrical, display platform & retail area.Details
minor ti changes in restroom & locker area, including new plumbing and electrical, display platform & retail area. | $77,900 |
| Mar 7, 2016 | Never finaled issued Mar 2016, no final | 2 Stockton St | Shawmut Woodworking & Supply Inc | facade minor modification set to app 1 facade downlight. ref 201601046306, 201504073020Details
facade minor modification set to app 1 facade downlight. ref 201601046306, 201504073020 | $500 |
| Feb 18, 2016 | Never finaled issued Dec 2016, no final | 222 Sansome St | Hathaway Dinwiddie Co. | interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13Details
interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13 | $850,000 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 77 Ofarrell St | Shawmut Woodworking & Supply Inc | revision to pa#201504174004 for updated ab-010 documentation for communicating opening @ 77 o'farrell & 2 stockton.Details
revision to pa#201504174004 for updated ab-010 documentation for communicating opening @ 77 o'farrell & 2 stockton. | |
| Jun 19, 2015 | Completed final sign-off Apr 2017 | 222 Mason St | Goike Construction Management | 5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly.Details
5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly. | $110,000 |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 77 Ofarrell St | Shawmut Woodworking & Supply Inc | ti portion of 3rd fl only. will include partital non structural demo and minor renovation to retail and stock areas where indicatedDetails
ti portion of 3rd fl only. will include partital non structural demo and minor renovation to retail and stock areas where indicated | $250,000 |
| May 27, 2015 | Expired or cancelled cancelled Aug 2016 | 222 Mason St | Goike Construction Management | retroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion.Details
retroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion. | $5,000 |
| Apr 17, 2015 | Never finaled issued Jul 2015, no final | 2 Stockton St | Shawmut Woodworking & Supply Inc | t.i of portion of g/f; full basement to serve as retail; stock rms & offices. work also includes communicating openings btw (e) lower level retail space @ 48 stockton & (n) retail area @ 2 stockton. structural and mep work included.Details
t.i of portion of g/f; full basement to serve as retail; stock rms & offices. work also includes communicating openings btw (e) lower level retail space @ 48 stockton & (n) retail area @ 2 stockton. structural and mep work included. | $3,500,000 |
| Feb 27, 2015 | Completed final sign-off May 2015 | 2 Folsom St | Swinerton Builders | gallery t.i to ground floor gallery/studio space including new partitions, electrical, plumbing, painting and lighting. no change of occupancy type. minor accessible upgrades. maher n/a. life safety deferred submittal.Details
gallery t.i to ground floor gallery/studio space including new partitions, electrical, plumbing, painting and lighting. no change of occupancy type. minor accessible upgrades. maher n/a. life safety deferred submittal. | $454,901 |
| Jan 29, 2015 | Completed final sign-off Feb 2016 | 371 Hayes St | Ssw Construction Corp | exterior facade renovation and interior soft demo in advance of t.i.Details
exterior facade renovation and interior soft demo in advance of t.i. | $125,000 |
| Dec 17, 2014 | Expired or cancelled cancelled Aug 2016 | 222 Mason St | Goike Construction Management | level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal.Details
level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal. | $200,000 |
| Nov 18, 2014 | Never finaled issued Jan 2015, no final | 945 Market St | Swinerton Builders | revision to pa 201011084497-s3 to include approved smoke control report only; maher n/aDetails
revision to pa 201011084497-s3 to include approved smoke control report only; maher n/a | |
| Oct 24, 2014 | Completed final sign-off Jun 2015 | 400 Castro St | Ap- Build Inc | change of use from m to a-3, new cycling gym, in conjunction with pending c.u.case #2014-0985.Details
change of use from m to a-3, new cycling gym, in conjunction with pending c.u.case #2014-0985. | $310,000 |
| Oct 3, 2014 | Never finaled issued Oct 2014, no final | 222 Mason St | Goike Construction Management | revision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. n/a maher ordinanceDetails
revision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. n/a maher ordinance | |
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 901 Market St | Fisher Development Inc | non structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13Details
non structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13 | $10,000 |
| Jun 20, 2014 | Completed final sign-off Jan 2015 | 555 California St | Bcci Construction Company | 50th floor t.i. removal of 1 interior door. installation of 2 new interior doors. patching and repairing of area around removal office door. no change to occupancy. electrical, fire sprinkler and fire alarm modifications under separate permit. maher n/a.Details
50th floor t.i. removal of 1 interior door. installation of 2 new interior doors. patching and repairing of area around removal office door. no change to occupancy. electrical, fire sprinkler and fire alarm modifications under separate permit. maher n/a. | $93,944 |
| May 23, 2014 | Completed final sign-off Mar 2017 | 901 Market St | Fisher Development Inc | basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinanceDetails
basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinance | $900,000 |
| Apr 22, 2014 | Completed final sign-off Aug 2014 | 680 Folsom St | Turner Construction Co | new cafe bakery resstaurant at gr fl. new interior non bearing partitions, celing finishes. new kitchen and food prep parea. new mech units duct work and register. new electrical/plumbing. fully sprinkler. fire protection/alarm sep permit. change of use m to a2.Details
new cafe bakery resstaurant at gr fl. new interior non bearing partitions, celing finishes. new kitchen and food prep parea. new mech units duct work and register. new electrical/plumbing. fully sprinkler. fire protection/alarm sep permit. change of use m to a2. | $400,000 |
| Apr 18, 2014 | Completed final sign-off Jul 2014 | 2 Folsom St | Swinerton Builders | 11th floor - minor commercial office tenant interior improvement & upgrades to accessible parking. parking upgrades on parking level. mep, fire alarm deferred submittals. compliance with ordinance #155-13 not requiredDetails
11th floor - minor commercial office tenant interior improvement & upgrades to accessible parking. parking upgrades on parking level. mep, fire alarm deferred submittals. compliance with ordinance #155-13 not required | $107,000 |
| Mar 7, 2014 | Completed final sign-off Apr 2014 | 2 Harrison St | Bcci Construction Company | barrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not requiredDetails
barrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not required | $6,500 |
| Mar 6, 2014 | Completed final sign-off Oct 2014 | 767 Market St | Plant Construction Company Lp | existing vacant retail space - installation of new elevator & escalator, selective demolition. tenant improvements under separate permit. sprinkler & fire alarm under separate permit. to remain vacant until tenant improvement permit.Details
existing vacant retail space - installation of new elevator & escalator, selective demolition. tenant improvements under separate permit. sprinkler & fire alarm under separate permit. to remain vacant until tenant improvement permit. | $650,000 |
| Feb 12, 2014 | Completed final sign-off Jan 2015 | 50 03rd St | Plant Construction Company Lp | convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab.Details
convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab. | $210,000 |
| Feb 11, 2014 | Completed final sign-off May 2014 | 101 New Montgomery St | Turner Construction Co | change of use from b to a-2 in existing restaunt space due to increase in seating. remodel of the kitchen & dining area, no exterior work to be done, compliance with ordinance 155-13 not required. occupant verification required.Details
change of use from b to a-2 in existing restaunt space due to increase in seating. remodel of the kitchen & dining area, no exterior work to be done, compliance with ordinance 155-13 not required. occupant verification required. | $75,000 |
| Dec 2, 2013 | Completed final sign-off May 2014 | 1075 California St | Hathaway Dinwiddie Co. | remodel of existing guestrooms to provide accessible requirements and minor remodel to remaining guestrooms. mep as shown on drawings. life safety permits separate.Details
remodel of existing guestrooms to provide accessible requirements and minor remodel to remaining guestrooms. mep as shown on drawings. life safety permits separate. | $4,700,000 |
| Nov 7, 2013 | Expired or cancelled expired Aug 2021 | 222 Mason St | Goike Construction Management | renovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals.Details
renovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals. | $580,000 |
| Nov 5, 2013 | Expired or cancelled cancelled Mar 2020 | 901 Market St | exterior stone cladding system installation & anchorage. refer to pa# 2009-0709-2282Details
exterior stone cladding system installation & anchorage. refer to pa# 2009-0709-2282 | ||
| Oct 30, 2013 | Expired or cancelled withdrawn Nov 2013 | 1075 California St | t.i. to guestrooms, including plumbing & elecrical upgrades. guestroom count reduced from 147 rooms to 134 rooms.Details
t.i. to guestrooms, including plumbing & elecrical upgrades. guestroom count reduced from 147 rooms to 134 rooms. | $4,700,000 | |
| Sep 19, 2013 | Expired or cancelled cancelled Jan 2026 | 1075 California St | main entry canopy painting, lighting upgrades, and signage upgrades. replacement in kind of 2 aditional canopies with new canvas & signageDetails
main entry canopy painting, lighting upgrades, and signage upgrades. replacement in kind of 2 aditional canopies with new canvas & signage | $7,500 | |
| Aug 14, 2013 | Completed final sign-off Oct 2013 | 2222 Fillmore St | Kdc Construction | interior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment.Details
interior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment. | $226,000 |
| May 21, 2013 | Completed final sign-off May 2014 | 1075 California St | Hathaway Dinwiddie Co. | penthouse: 13th floor-elevator modernization related work consisting of new partitions, new electrical & new hvac for elevator machine roomDetails
penthouse: 13th floor-elevator modernization related work consisting of new partitions, new electrical & new hvac for elevator machine room | $107,138 |
| Apr 15, 2013 | Completed final sign-off May 2014 | 50 03rd St | Plant Construction Company Lp | lobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit.Details
lobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit. | $600,000 |
| Apr 5, 2013 | Completed final sign-off Nov 2013 | 50 03rd St | ref to approved pa# 201212035334. modified layout for the accessible parking spaces in the basement parking gargae.Details
ref to approved pa# 201212035334. modified layout for the accessible parking spaces in the basement parking gargae. | $15,000 | |
| Apr 2, 2013 | Completed final sign-off Jul 2013 | 359 Grant Av | Wells Construction Inc | minor improvement to existing cafe, relocation of exisitng equipments, new finishes, light fixtures & plumbing fixtures, new hi-lo automatic door opener at front door. signage, fire alarn, sprinklers unde separate permit.Details
minor improvement to existing cafe, relocation of exisitng equipments, new finishes, light fixtures & plumbing fixtures, new hi-lo automatic door opener at front door. signage, fire alarn, sprinklers unde separate permit. | $150,000 |
| Mar 26, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Fisher Development Inc | struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr.Details
struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr. | $1,500,000 |
| Mar 21, 2013 | Completed final sign-off Dec 2013 | 1 Market St | Gci, Inc | 6th floor-interior t.i to include new non load bearing partitions, ceiling & finshes. fire sprinkler & life safety under seperate permit. mep under seperate permit.Details
6th floor-interior t.i to include new non load bearing partitions, ceiling & finshes. fire sprinkler & life safety under seperate permit. mep under seperate permit. | $2,604,228 |
| Mar 15, 2013 | Completed final sign-off Mar 2014 | 343 Sansome St | T C B Builders Inc | interior t.i. to extg starbucks coffee shop. no mechanical work.Details
interior t.i. to extg starbucks coffee shop. no mechanical work. | $234,575 |
| Mar 12, 2013 | Completed final sign-off Jul 2013 | 5455 Geary Bl | Kdc Construction | minor cosmetic improvement - consisting of re-facing of cabinets, millwork and flooring. minor electrical improvement consisting of replacing specific light fixtures and new power outlets.Details
minor cosmetic improvement - consisting of re-facing of cabinets, millwork and flooring. minor electrical improvement consisting of replacing specific light fixtures and new power outlets. | $80,000 |
| Feb 15, 2013 | Never finaled issued Feb 2013, no final | 365 Main St | Truebeck Construction | - -` 1st/3rd flrs reference 201206072090 and 201206082234; demo only of non load bearing partitions ceiling etc, mech, elec and plmbg eqpt in lobby and 3rd flr, mgt offices, areas are vacant space as per ab-017 interior work onlyDetails
- -` 1st/3rd flrs reference 201206072090 and 201206082234; demo only of non load bearing partitions ceiling etc, mech, elec and plmbg eqpt in lobby and 3rd flr, mgt offices, areas are vacant space as per ab-017 interior work only | $1,000 |
| Dec 5, 2012 | Completed final sign-off Sep 2016 | 943 Market St | Swinerton Builders | to demolish 1 story, office building.Details
to demolish 1 story, office building. | $5,000 |
| Dec 5, 2012 | Completed final sign-off Sep 2016 | 949 Market St | Swinerton Builders | to demolish 3 stories, retail building.Details
to demolish 3 stories, retail building. | $5,000 |
| Dec 5, 2012 | Completed final sign-off Sep 2016 | 939 Market St | Swinerton Builders | to demolish 6 stories, office building.Details
to demolish 6 stories, office building. | $5,000 |
| Dec 3, 2012 | Completed final sign-off Mar 2013 | 901 Market St | Commercial Interior Builders Inc | 4th floor suite 470 - interior non-structural tenant improvement to existing office space, demolitoin of partitions, carpet & reconfigure offices within tanant space.Details
4th floor suite 470 - interior non-structural tenant improvement to existing office space, demolitoin of partitions, carpet & reconfigure offices within tanant space. | $250,000 |
| Dec 3, 2012 | Completed final sign-off Mar 2013 | 901 Market St | Commercial Interior Builders Inc | 4th floor suite 460 - interior non-structural tenant improvement to existing office space, demolitoin of some interior partitions, carpet & reconfigure offices within space.Details
4th floor suite 460 - interior non-structural tenant improvement to existing office space, demolitoin of some interior partitions, carpet & reconfigure offices within space. | $100,000 |
| Nov 26, 2012 | Expired or cancelled expired Dec 2014 | 201 03rd St | T C B Builders Inc | installation of temporary trailer for retail coffee service. connectin of electrical , freshwater, waste water to facililites in existing starbucksDetails
installation of temporary trailer for retail coffee service. connectin of electrical , freshwater, waste water to facililites in existing starbucks | $5,000 |
| Nov 5, 2012 | Completed final sign-off Dec 2012 | 901 Market St | Commercial Interior Builders Inc | interior non structural tenant improvement on the existing office space on the 3rd floor. mep and fire safety under separate permitDetails
interior non structural tenant improvement on the existing office space on the 3rd floor. mep and fire safety under separate permit | $425,000 |
| Sep 12, 2012 | Completed final sign-off Oct 2012 | 3350 Sacramento St | Stroub Construction | demo of non-structural walls, new finish throughout, 1 new floor monument, relocate 2 outletsDetails
demo of non-structural walls, new finish throughout, 1 new floor monument, relocate 2 outlets | $30,000 |
| Aug 30, 2012 | Never finaled issued Oct 2012, no final | 345 Stockton St | revision to 201108222979. revise landscape along stockton street frontageDetails
revision to 201108222979. revise landscape along stockton street frontage | ||
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 375 Sutter St | Hathaway Dinwiddie Co. | construct restroom in lower level usning (e) plumbng lnes & hvac exhaust / supply. revision to pa# 201108192814Details
construct restroom in lower level usning (e) plumbng lnes & hvac exhaust / supply. revision to pa# 201108192814 | $20,000 |
| Aug 15, 2012 | Never finaled issued Aug 2012, no final | 111 Powell St | Shawmut Woodworking & Supply Inc | revision to pa# 2012-0417-8515-new work includes modifications to previously approved design on all floors to reduce construction costDetails
revision to pa# 2012-0417-8515-new work includes modifications to previously approved design on all floors to reduce construction cost | |
| Jul 16, 2012 | Completed final sign-off Oct 2012 | 2201 Fillmore St | Kdc Construction | interior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation.Details
interior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation. | $14,500 |
| Jul 3, 2012 | Completed final sign-off Feb 2013 | 4094 18th St | Wells Construction Inc | ti to existing cafe of existing starbucks. update walls, floors, furniture, casework, bar equipment, new lighting, mechanical diffusers. new storefront location and finishesDetails
ti to existing cafe of existing starbucks. update walls, floors, furniture, casework, bar equipment, new lighting, mechanical diffusers. new storefront location and finishes | $600,000 |
| Jun 29, 2012 | Never finaled issued Jun 2012, no final | 391 Sutter St | T C B Builders Inc | investigative demolition of existing stucco facade treatment in selective areas " starbucks".Details
investigative demolition of existing stucco facade treatment in selective areas " starbucks". | $15,580 |
| Jun 13, 2012 | Never finaled issued Jun 2012, no final | 111 Powell St | Shawmut Woodworking & Supply Inc | remove & store 9e) storefront for future reinstallation after core & shell work under pa#201205301485 & pa#2012060519021-s completed.Details
remove & store 9e) storefront for future reinstallation after core & shell work under pa#201205301485 & pa#2012060519021-s completed. | $2,500 |
| Jun 8, 2012 | Completed final sign-off Jul 2013 | 365 Main St | Truebeck Construction | tenant improvements: non load bearing partitions, ceilings, furnishings and modifications to (e) doors, modifications to (e) mechanical, electrical & plumbing distribution systems with design build.Details
tenant improvements: non load bearing partitions, ceilings, furnishings and modifications to (e) doors, modifications to (e) mechanical, electrical & plumbing distribution systems with design build. | $850,000 |
| Jun 7, 2012 | Never finaled issued Jul 2012, no final | 166 Grant Av | Plant Construction Company Lp | replace entry doors & transom window, with new door. no other work.Details
replace entry doors & transom window, with new door. no other work. | $10,000 |
| Jun 7, 2012 | Completed final sign-off Jul 2013 | 365 Main St | Truebeck Construction | tenant improvement: non-load bearing partitions, ceilings, furnishings & modifications to (e) doos, modifications to (e) mechanical, electrical & plumbing distribution systems.Details
tenant improvement: non-load bearing partitions, ceilings, furnishings & modifications to (e) doos, modifications to (e) mechanical, electrical & plumbing distribution systems. | $1,300,000 |
| May 25, 2012 | Completed final sign-off Aug 2012 | 2801 Jones St | Wells Construction Inc | revision to pa# 2012-0106-1833-revisions to exterior canopy supportDetails
revision to pa# 2012-0106-1833-revisions to exterior canopy support | $4,000 |