Permit GraphShortlistSan Francisco building permits since 2000

Barry Bourbon

License
C25873
Look the license up with the state
Listed as
architect, authorized agent-others, engineer
Firm
Gensler
Based in
San Francisco
On San Francisco permits
Oct 2002 to Dec 2024

122 permits since 2000 (architect on 115 permits, engineer on 6 permits, authorized agent-others on 2 permits): 69 completed, 41 never finaled, 12 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 122.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 6, 2024Completed
final sign-off Apr 2025
331 Powell StTurner Construction Codeferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only
Details
Permit
202412066325
Status
complete
Filed
Dec 6, 2024
Permit issued
Feb 5, 2025
Final sign-off
Apr 1, 2025
Declared cost
$497,168
Address
331 Powell St

deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only

Open the permit page

$497,168
Oct 24, 2024Completed
final sign-off Apr 2025
331 Powell StTurner Construction Cotenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal.
Details
Permit
202410243677
Status
complete
Filed
Oct 24, 2024
Permit issued
Oct 28, 2024
Final sign-off
Apr 1, 2025
Declared cost
$145,500
Address
331 Powell St

tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal.

Open the permit page

$145,500
Sep 9, 2024Completed
final sign-off Apr 2025
331 Powell Strevision to pa 202406114197 revise office door 203 configuration. revise electrical room 211 fire rating
Details
Permit
202409090336
Status
complete
Filed
Sep 9, 2024
Permit issued
Sep 16, 2024
Final sign-off
Apr 4, 2025
Address
331 Powell St

revision to pa 202406114197 revise office door 203 configuration. revise electrical room 211 fire rating

Open the permit page

Jun 11, 2024Completed
final sign-off Apr 2025
331 Powell StTurner Construction Co1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.
Details
Permit
202406114197
Status
complete
Filed
Jun 11, 2024
Permit issued
Jul 9, 2024
Final sign-off
Apr 4, 2025
Declared cost
$2,236,032
Address
331 Powell St

1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.

Open the permit page

$2,236,032
Feb 2, 2024Completed
final sign-off Apr 2025
331 Powell StTurner Construction Co1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017.
Details
Permit
202402025176
Status
complete
Filed
Feb 2, 2024
Permit issued
Mar 8, 2024
Final sign-off
Apr 4, 2025
Declared cost
$120,000
Address
331 Powell St

1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017.

Open the permit page

$120,000
Aug 24, 2023Completed
final sign-off Feb 2025
945 Market StSkyline Constructionupdating passenger elevator#4 to be in code compliance as an accessible means of egress elevator and minor modifications to ikea space.
Details
Permit
202308245149
Status
complete
Filed
Aug 24, 2023
Permit issued
Nov 13, 2023
Final sign-off
Feb 5, 2025
Declared cost
$250,000
Address
945 Market St

updating passenger elevator#4 to be in code compliance as an accessible means of egress elevator and minor modifications to ikea space.

Open the permit page

$250,000
Jul 20, 2023Completed
final sign-off Oct 2024
120 Stockton StSkyline Construction4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service.
Details
Permit
202307202638
Status
complete
Filed
Jul 20, 2023
Permit issued
Aug 23, 2023
Final sign-off
Oct 28, 2024
Declared cost
$5,000
Address
120 Stockton St

4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service.

Open the permit page

$5,000
May 4, 2023Completed
final sign-off Jul 2023
945 Market StSkyline Constructionconstruction of a temporary ramp in the loading dock of the building. ref#: 202206106079
Details
Permit
202305047084
Status
complete
Filed
May 4, 2023
Permit issued
May 18, 2023
Final sign-off
Jul 6, 2023
Declared cost
$35,000
Address
945 Market St

construction of a temporary ramp in the loading dock of the building. ref#: 202206106079

Open the permit page

$35,000
Dec 16, 2022Never finaled
issued Jan 2023, no final
120 Stockton StNovo Construction Inclobby/6/7/8-f: t.i., demo of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office amenity, new ceiling finishes, furring walls, breakroom. structural trellis on exterior deck
Details
Permit
202212168520
Status
issued
Filed
Dec 16, 2022
Permit issued
Jan 3, 2023
Declared cost
$450,000
Address
120 Stockton St

lobby/6/7/8-f: t.i., demo of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office amenity, new ceiling finishes, furring walls, breakroom. structural trellis on exterior deck

Open the permit page

$450,000
Nov 23, 2022Completed
final sign-off Feb 2025
120 Stockton StSkyline Construction4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code."
Details
Permit
202211237089
Status
complete
Filed
Nov 23, 2022
Permit issued
May 9, 2023
Final sign-off
Feb 12, 2025
Declared cost
$2,000,000
Address
120 Stockton St

4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code."

Open the permit page

$2,000,000
Nov 9, 2022Completed
final sign-off Feb 2025
120 Stockton StSkyline Constructiontenant improvement in a vacant core & shell bldg. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceiling finishes fixtures & casework.
Details
Permit
202211096227
Status
complete
Filed
Nov 9, 2022
Permit issued
Feb 8, 2023
Final sign-off
Feb 12, 2025
Declared cost
$150,000
Address
120 Stockton St

tenant improvement in a vacant core & shell bldg. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceiling finishes fixtures & casework.

Open the permit page

$150,000
Oct 11, 2022Completed
final sign-off Feb 2025
945 Market StSkyline Constructionadministrative review of amended smoke control report. no work under this permit.
Details
Permit
202210114103
Status
complete
Filed
Oct 11, 2022
Permit issued
Nov 9, 2022
Final sign-off
Feb 5, 2025
Address
945 Market St

administrative review of amended smoke control report. no work under this permit.

Open the permit page

Aug 12, 2022Completed
final sign-off May 2023
18 Geary StG Swanson Constr. Inc.to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors.
Details
Permit
202208120445
Status
complete
Filed
Aug 12, 2022
Permit issued
Apr 11, 2023
Final sign-off
May 26, 2023
Declared cost
$50,000
Address
18 Geary St

to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors.

Open the permit page

$50,000
Jun 10, 2022Completed
final sign-off Feb 2025
945 Market StSkyline Constructionexterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.
Details
Permit
202206106082
Status
complete
Filed
Jun 10, 2022
Permit issued
Jul 10, 2023
Final sign-off
Feb 11, 2025
Declared cost
$10,600,000
Address
945 Market St

exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.

Open the permit page

$10,600,000
Mar 9, 2022Completed
final sign-off Feb 2025
945 Market StSkyline Constructioncomplete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied.
Details
Permit
202203099550
Status
complete
Filed
Mar 9, 2022
Permit issued
Apr 5, 2023
Final sign-off
Feb 5, 2025
Declared cost
$485,000
Address
945 Market St

complete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied.

Open the permit page

$485,000
Dec 28, 2021Never finaled
issued Mar 2022, no final
120 Stockton StNovo Construction Incconstruction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215
Details
Permit
202112285092
Status
issued
Filed
Dec 28, 2021
Permit issued
Mar 30, 2022
Declared cost
$1,460,000
Address
120 Stockton St

construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215

Open the permit page

$1,460,000
Dec 27, 2021Expired or cancelled
expired Aug 2024
120 Stockton StPlant Construction Co, Lpstorm water control plans for pa# 201805048215 & pa# 202008101490. for pid review only.
Details
Permit
202112275035
Status
expired
Filed
Dec 27, 2021
Permit issued
Jan 6, 2022
Address
120 Stockton St

storm water control plans for pa# 201805048215 & pa# 202008101490. for pid review only.

Open the permit page

Sep 17, 2021Never finaled
issued Sep 2021, no final
120 Stockton StPlant Construction Co, Lprevision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tank
Details
Permit
202109178644
Status
issued
Filed
Sep 17, 2021
Permit issued
Sep 17, 2021
Address
120 Stockton St

revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tank

Open the permit page

May 28, 2021Never finaled
issued Sep 2021, no final
120 Stockton StPlant Construction Co, Lppartial replacement of (e) pg&e vault lid due to upgraded lift out panel & sizing as well as associated demolition & structural upgrades. refer to the site permit 201805048215
Details
Permit
202105281299
Status
issued
Filed
May 28, 2021
Permit issued
Sep 20, 2021
Declared cost
$60,000
Address
120 Stockton St

partial replacement of (e) pg&e vault lid due to upgraded lift out panel & sizing as well as associated demolition & structural upgrades. refer to the site permit 201805048215

Open the permit page

$60,000
Feb 18, 2021Never finaled
issued Mar 2021, no final
1156 Valencia StSwinerton Buildersupgrade of the existing light based on the new layout, addition of two exhaust fans for new shower rooms & one dryer vent and modifications to the existing plumbing to accomodate the new build out. these are the mep plans for architectural plans approved under permit number #202009295384.
Details
Permit
202102184913
Status
issued
Filed
Feb 18, 2021
Permit issued
Mar 10, 2021
Declared cost
$105,000
Address
1156 Valencia St

upgrade of the existing light based on the new layout, addition of two exhaust fans for new shower rooms & one dryer vent and modifications to the existing plumbing to accomodate the new build out. these are the mep plans for architectural plans approved under permit number #202009295384.

Open the permit page

$105,000
Nov 20, 2020Completed
final sign-off Oct 2021
633 Folsom StPlant Construction Co, Lpsuite 150: gym: t.i. : non-strucural partitions, new floor and wall finisehs, environmental wall graphics, celings, lighting, electrical,mech & plumb; 2 (n) single occupancy all-genger restrooms, one with ada shower. no changes to (e) base building structureo. no work to exterior shell. maher n/a
Details
Permit
202011209374
Status
complete
Filed
Nov 20, 2020
Permit issued
Apr 6, 2021
Final sign-off
Oct 19, 2021
Declared cost
$1,200,000
Address
633 Folsom St

suite 150: gym: t.i. : non-strucural partitions, new floor and wall finisehs, environmental wall graphics, celings, lighting, electrical,mech & plumb; 2 (n) single occupancy all-genger restrooms, one with ada shower. no changes to (e) base building structureo. no work to exterior shell. maher n/a

Open the permit page

$1,200,000
Sep 29, 2020Completed
final sign-off May 2021
1156 Valencia StSwinerton Builderssfdph project: interior remodel to demolish 2 existing non-accessible restrooms and 2 multipurpoise rooms to be renovated to 2 accessible showers/changing rooms. laundry area scope includes demolition & construction of walls, ceilings, and floor finishes.
Details
Permit
202009295384
Status
complete
Filed
Sep 29, 2020
Permit issued
Feb 22, 2021
Final sign-off
May 14, 2021
Declared cost
$300,000
Address
1156 Valencia St

sfdph project: interior remodel to demolish 2 existing non-accessible restrooms and 2 multipurpoise rooms to be renovated to 2 accessible showers/changing rooms. laundry area scope includes demolition & construction of walls, ceilings, and floor finishes.

Open the permit page

$300,000
Aug 10, 2020Never finaled
issued Dec 2021, no final
120 Stockton StPlant Construction Co, Lprevision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade.
Details
Permit
202008101490
Status
issued
Filed
Aug 10, 2020
Permit issued
Dec 27, 2021
Declared cost
$1,100,000
Address
120 Stockton St

revision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade.

Open the permit page

$1,100,000
Sep 19, 2019Never finaled
issued Oct 2019, no final
300 16th StMarini Construction Incinterior improvement at ramp area includes new topping slab, finishes, dropped ceiling systems. no change to e base building structure
Details
Permit
201909192160
Status
issued
Filed
Sep 19, 2019
Permit issued
Oct 4, 2019
Declared cost
$500,000
Address
300 16th St

interior improvement at ramp area includes new topping slab, finishes, dropped ceiling systems. no change to e base building structure

Open the permit page

$500,000
May 2, 2019Never finaled
issued Jun 2019, no final
300 16th StMarini Construction Incste 12 -chase center gatehouse. interior ti of (e) shell (1st time ti). improvements include new floor finishes, ceiling, lighting,mech, millwork, non structural partitions and signage (signs under sep permit). no point of sale. all transactions performed electronically/digitally
Details
Permit
201905029570
Status
issued
Filed
May 2, 2019
Permit issued
Jun 25, 2019
Declared cost
$340,000
Address
300 16th St

ste 12 -chase center gatehouse. interior ti of (e) shell (1st time ti). improvements include new floor finishes, ceiling, lighting,mech, millwork, non structural partitions and signage (signs under sep permit). no point of sale. all transactions performed electronically/digitally

Open the permit page

$340,000
Feb 26, 2019Expired or cancelled
expired Aug 2024
120 Stockton StPlant Construction Co, Lpnew foundation & new opening in (e) floor slabs for installation of construction tower crane. ** comply maher ord 155-13**
Details
Permit
201902263805
Status
expired
Filed
Feb 26, 2019
Permit issued
Aug 23, 2019
Declared cost
$300,000
Address
120 Stockton St

new foundation & new opening in (e) floor slabs for installation of construction tower crane. ** comply maher ord 155-13**

Open the permit page

$300,000
Sep 13, 2018Never finaled
issued Sep 2018, no final
298 Alabama StTerra Nova Industriespermit revision #3 to pa #201802020205, including documentation of changes to lighting, electrical, mechanical & plumbing.
Details
Permit
201809130095
Status
issued
Filed
Sep 13, 2018
Permit issued
Sep 17, 2018
Address
298 Alabama St

permit revision #3 to pa #201802020205, including documentation of changes to lighting, electrical, mechanical & plumbing.

Open the permit page

Aug 20, 2018Expired or cancelled
expired Aug 2024
120 Stockton StPlant Construction Co, Lpproposed soft demo consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215
Details
Permit
201808207773
Status
expired
Filed
Aug 20, 2018
Permit issued
Oct 26, 2018
Declared cost
$100,000
Address
120 Stockton St

proposed soft demo consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215

Open the permit page

$100,000
May 4, 2018Completed
final sign-off Aug 2024
120 Stockton StPribuss Engineering Inc, Plant Construction Co, Lpmajor alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher**
Details
Permit
201805048215
Status
complete
Filed
May 4, 2018
Permit issued
Nov 15, 2018
Final sign-off
Aug 21, 2024
Declared cost
$80,000,000
Address
120 Stockton St

major alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher**

Open the permit page

$80,000,000
Mar 1, 2018Completed
final sign-off Jun 2018
345 Stockton StPeacock Constructionmezzanine: tenant improvement: interior conversion of public dining room to pantry. finishes, equipment & lighting. maher na
Details
Permit
201803012584
Status
complete
Filed
Mar 1, 2018
Permit issued
Mar 23, 2018
Final sign-off
Jun 19, 2018
Declared cost
$65,000
Address
345 Stockton St

mezzanine: tenant improvement: interior conversion of public dining room to pantry. finishes, equipment & lighting. maher na

Open the permit page

$65,000
Aug 18, 2017Completed
final sign-off Dec 2018
345 Stockton StPeacock Constructionground floor ti: millwork upgrades at reception, lighting & electrical improvements.
Details
Permit
201708185305
Status
complete
Filed
Aug 18, 2017
Permit issued
Aug 23, 2018
Final sign-off
Dec 7, 2018
Declared cost
$275,000
Address
345 Stockton St

ground floor ti: millwork upgrades at reception, lighting & electrical improvements.

Open the permit page

$275,000
Jul 26, 2017Never finaled
issued Aug 2017, no final
3251 20th AvAlain Hirsch Construction Corpspace 151 & 235: new furouts with gyp bd on interior walls, vet flooring application, wall ceiling paint. hvac system to installed, convenience outlets, tenant security cameras, it systems, lighting to be installed
Details
Permit
201707262983
Status
issued
Filed
Jul 26, 2017
Permit issued
Aug 31, 2017
Declared cost
$200,000
Address
3251 20th Av

space 151 & 235: new furouts with gyp bd on interior walls, vet flooring application, wall ceiling paint. hvac system to installed, convenience outlets, tenant security cameras, it systems, lighting to be installed

Open the permit page

$200,000
May 2, 2017Completed
final sign-off Oct 2018
590 Hayes StTrainor Commercial Construction Inc.revision to 201612205468. reconfiguration of entry at hayes st retail space on ground floor. no other work
Details
Permit
201705025416
Status
complete
Filed
May 2, 2017
Permit issued
May 2, 2017
Final sign-off
Oct 1, 2018
Declared cost
$12,000
Address
590 Hayes St

revision to 201612205468. reconfiguration of entry at hayes st retail space on ground floor. no other work

Open the permit page

$12,000
Mar 9, 2017Never finaled
issued Nov 2017, no final
222 Sansome StHathaway Dinwiddie Co.interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a **
Details
Permit
201703091093
Status
issued
Filed
Mar 9, 2017
Permit issued
Nov 7, 2017
Declared cost
$624,825
Address
222 Sansome St

interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a **

Open the permit page

$624,825
Feb 8, 2017Never finaled
issued Mar 2017, no final
18 Geary StBuild Group Inc., Michilli Increvision to pa 2016-0419-5148. changes to millwork, partitions, finishes & mep. maher na
Details
Permit
201702088991
Status
issued
Filed
Feb 8, 2017
Permit issued
Mar 20, 2017
Declared cost
$20,000
Address
18 Geary St

revision to pa 2016-0419-5148. changes to millwork, partitions, finishes & mep. maher na

Open the permit page

$20,000
Jan 3, 2017Completed
final sign-off Mar 2017
945 Market StPlant Construction Co, Lpref pa#201011084497 s8: as-built for rooftop generator & fuel oil. to provide additional information /specifications. maher n/a.
Details
Permit
201701036438
Status
complete
Filed
Jan 3, 2017
Permit issued
Jan 4, 2017
Final sign-off
Mar 27, 2017
Address
945 Market St

ref pa#201011084497 s8: as-built for rooftop generator & fuel oil. to provide additional information /specifications. maher n/a.

Open the permit page

Dec 21, 2016Never finaled
issued Jan 2017, no final
735 Market StPlant Construction Co, Lpti on 5th floor consisting of a business center to board room conversion). modifications to fire alarm, fire sprinklers, electrical and mechanical will be delegated design and permitted separately by others as deferred submittals
Details
Permit
201612215575
Status
issued
Filed
Dec 21, 2016
Permit issued
Jan 9, 2017
Declared cost
$25,000
Address
735 Market St

ti on 5th floor consisting of a business center to board room conversion). modifications to fire alarm, fire sprinklers, electrical and mechanical will be delegated design and permitted separately by others as deferred submittals

Open the permit page

$25,000
Dec 21, 2016Completed
final sign-off Apr 2018
757 Market StPlant Construction Co, Lpinterior renovation of guest rooms 1205,1405,1505,1603,1703 and selected accessibility upgrades to guest rooms 710,810,910,1007,1110,1210,1410, 1510,1610 and 1724. no modifications to fire sprinklers are proposed. modifications to fire alarm, plumbing and electrical will be delegated design
Details
Permit
201612215577
Status
complete
Filed
Dec 21, 2016
Permit issued
Jan 9, 2017
Final sign-off
Apr 11, 2018
Declared cost
$75,000
Address
757 Market St

interior renovation of guest rooms 1205,1405,1505,1603,1703 and selected accessibility upgrades to guest rooms 710,810,910,1007,1110,1210,1410, 1510,1610 and 1724. no modifications to fire sprinklers are proposed. modifications to fire alarm, plumbing and electrical will be delegated design

Open the permit page

$75,000
Nov 23, 2016Completed
final sign-off Jun 2021
298 Alabama StEcotechnikost.i including electrical, hvac, install ductwork per plan for hvac, construction of interior processing room. ref pa 2015-0521-6951 (arch/struc only). mep's added. n/a for maher ordinance.
Details
Permit
201611233501
Status
complete
Filed
Nov 23, 2016
Permit issued
May 9, 2017
Final sign-off
Jun 24, 2021
Declared cost
$1,200,000
Address
298 Alabama St

t.i including electrical, hvac, install ductwork per plan for hvac, construction of interior processing room. ref pa 2015-0521-6951 (arch/struc only). mep's added. n/a for maher ordinance.

Open the permit page

$1,200,000
Jun 13, 2016Never finaled
issued Jul 2016, no final
2 Stockton StShawmut Woodworking & Supply Increvision to pa 2015-0407-3020 to add 2 lights to store front facade and remove 1 light added in pa 2016-0307-1382. maher na
Details
Permit
201606139806
Status
issued
Filed
Jun 13, 2016
Permit issued
Jul 14, 2016
Declared cost
$500
Address
2 Stockton St

revision to pa 2015-0407-3020 to add 2 lights to store front facade and remove 1 light added in pa 2016-0307-1382. maher na

Open the permit page

$500
May 20, 2016Completed
final sign-off Jan 2017
945 Market StPlant Construction Co, Lprevision to ref pa 2010 1108 4497 s3: stevenson st facade eliminate the areas of refuge per cbc 1007.3 & 1007.4. change wall railing between passenger elevator & service elevator & other various cordination related modifications. maher na
Details
Permit
201605207995
Status
complete
Filed
May 20, 2016
Permit issued
Jul 21, 2016
Final sign-off
Jan 27, 2017
Address
945 Market St

revision to ref pa 2010 1108 4497 s3: stevenson st facade eliminate the areas of refuge per cbc 1007.3 & 1007.4. change wall railing between passenger elevator & service elevator & other various cordination related modifications. maher na

Open the permit page

May 16, 2016Completed
final sign-off Jan 2017
945 Market StSwinerton Builders, Plant Construction Co, Lpground fl: revision to pa#2010-1108-4497 to make fire pump room door 60-minute fire rated. n/a ordinance #155-13
Details
Permit
201605167524
Status
complete
Filed
May 16, 2016
Permit issued
May 17, 2016
Final sign-off
Jan 27, 2017
Address
945 Market St

ground fl: revision to pa#2010-1108-4497 to make fire pump room door 60-minute fire rated. n/a ordinance #155-13

Open the permit page

Apr 19, 2016Never finaled
issued Apr 2017, no final
18 Geary StBuild Group Inc., Michilli Incexterior storefront improvement for new retail store. existing brick facade to remain. interior t.i. under separate permit pa#2016 0419 5148 ** maher: n/a **
Details
Permit
201604195171
Status
issued
Filed
Apr 19, 2016
Permit issued
Apr 5, 2017
Declared cost
$80,000
Address
18 Geary St

exterior storefront improvement for new retail store. existing brick facade to remain. interior t.i. under separate permit pa#2016 0419 5148 ** maher: n/a **

Open the permit page

$80,000
Apr 11, 2016Completed
final sign-off Jun 2017
2095 Union StAp- Build Incminor ti changes in restroom & locker area, including new plumbing and electrical, display platform & retail area.
Details
Permit
201604114426
Status
complete
Filed
Apr 11, 2016
Permit issued
May 25, 2016
Final sign-off
Jun 13, 2017
Declared cost
$77,900
Address
2095 Union St

minor ti changes in restroom & locker area, including new plumbing and electrical, display platform & retail area.

Open the permit page

$77,900
Mar 7, 2016Never finaled
issued Mar 2016, no final
2 Stockton StShawmut Woodworking & Supply Incfacade minor modification set to app 1 facade downlight. ref 201601046306, 201504073020
Details
Permit
201603071382
Status
issued
Filed
Mar 7, 2016
Permit issued
Mar 10, 2016
Declared cost
$500
Address
2 Stockton St

facade minor modification set to app 1 facade downlight. ref 201601046306, 201504073020

Open the permit page

$500
Feb 18, 2016Never finaled
issued Dec 2016, no final
222 Sansome StHathaway Dinwiddie Co.interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13
Details
Permit
201602189863
Status
issued
Filed
Feb 18, 2016
Permit issued
Dec 28, 2016
Declared cost
$850,000
Address
222 Sansome St

interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13

Open the permit page

$850,000
Jul 17, 2015Never finaled
issued Jul 2015, no final
77 Ofarrell StShawmut Woodworking & Supply Increvision to pa#201504174004 for updated ab-010 documentation for communicating opening @ 77 o'farrell & 2 stockton.
Details
Permit
201507171830
Status
issued
Filed
Jul 17, 2015
Permit issued
Jul 21, 2015
Address
77 Ofarrell St

revision to pa#201504174004 for updated ab-010 documentation for communicating opening @ 77 o'farrell & 2 stockton.

Open the permit page

Jun 19, 2015Completed
final sign-off Apr 2017
222 Mason StGoike Construction Management5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly.
Details
Permit
201506199436
Status
complete
Filed
Jun 19, 2015
Permit issued
Jul 7, 2015
Final sign-off
Apr 7, 2017
Declared cost
$110,000
Address
222 Mason St

5/f: reroofing of (e) roof deck, partial demolitoin of (e) storefront for (n) storefront entrances, (n) ext. roof deck w/paver assembly.

Open the permit page

$110,000
Jun 2, 2015Never finaled
issued Jun 2015, no final
77 Ofarrell StShawmut Woodworking & Supply Incti portion of 3rd fl only. will include partital non structural demo and minor renovation to retail and stock areas where indicated
Details
Permit
201506027845
Status
issued
Filed
Jun 2, 2015
Permit issued
Jun 12, 2015
Declared cost
$250,000
Address
77 Ofarrell St

ti portion of 3rd fl only. will include partital non structural demo and minor renovation to retail and stock areas where indicated

Open the permit page

$250,000
May 27, 2015Expired or cancelled
cancelled Aug 2016
222 Mason StGoike Construction Managementretroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion.
Details
Permit
201505277322
Status
cancelled
Filed
May 27, 2015
Permit issued
Jun 18, 2015
Declared cost
$5,000
Address
222 Mason St

retroactively convert 14 parking spaces on level b3 into 6 storage areas, 5 of which will be used for bldg maintenance purposed. transfer "floor area gross" from level b3 to level 5 via parking space to bldg. maintenance storage conversion.

Open the permit page

$5,000
Apr 17, 2015Never finaled
issued Jul 2015, no final
2 Stockton StShawmut Woodworking & Supply Inct.i of portion of g/f; full basement to serve as retail; stock rms & offices. work also includes communicating openings btw (e) lower level retail space @ 48 stockton & (n) retail area @ 2 stockton. structural and mep work included.
Details
Permit
201504173986
Status
issued
Filed
Apr 17, 2015
Permit issued
Jul 23, 2015
Declared cost
$3,500,000
Address
2 Stockton St

t.i of portion of g/f; full basement to serve as retail; stock rms & offices. work also includes communicating openings btw (e) lower level retail space @ 48 stockton & (n) retail area @ 2 stockton. structural and mep work included.

Open the permit page

$3,500,000
Feb 27, 2015Completed
final sign-off May 2015
2 Folsom StSwinerton Buildersgallery t.i to ground floor gallery/studio space including new partitions, electrical, plumbing, painting and lighting. no change of occupancy type. minor accessible upgrades. maher n/a. life safety deferred submittal.
Details
Permit
201502279613
Status
complete
Filed
Feb 27, 2015
Permit issued
Mar 12, 2015
Final sign-off
May 29, 2015
Declared cost
$454,901
Address
2 Folsom St

gallery t.i to ground floor gallery/studio space including new partitions, electrical, plumbing, painting and lighting. no change of occupancy type. minor accessible upgrades. maher n/a. life safety deferred submittal.

Open the permit page

$454,901
Jan 29, 2015Completed
final sign-off Feb 2016
371 Hayes StSsw Construction Corpexterior facade renovation and interior soft demo in advance of t.i.
Details
Permit
201501296996
Status
complete
Filed
Jan 29, 2015
Permit issued
Apr 8, 2015
Final sign-off
Feb 19, 2016
Declared cost
$125,000
Address
371 Hayes St

exterior facade renovation and interior soft demo in advance of t.i.

Open the permit page

$125,000
Dec 17, 2014Expired or cancelled
cancelled Aug 2016
222 Mason StGoike Construction Managementlevel b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal.
Details
Permit
201412173899
Status
cancelled
Filed
Dec 17, 2014
Permit issued
Dec 19, 2014
Declared cost
$200,000
Address
222 Mason St

level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal.

Open the permit page

$200,000
Nov 18, 2014Never finaled
issued Jan 2015, no final
945 Market StSwinerton Buildersrevision to pa 201011084497-s3 to include approved smoke control report only; maher n/a
Details
Permit
201411181808
Status
issued
Filed
Nov 18, 2014
Permit issued
Jan 28, 2015
Address
945 Market St

revision to pa 201011084497-s3 to include approved smoke control report only; maher n/a

Open the permit page

Oct 24, 2014Completed
final sign-off Jun 2015
400 Castro StAp- Build Incchange of use from m to a-3, new cycling gym, in conjunction with pending c.u.case #2014-0985.
Details
Permit
201410249846
Status
complete
Filed
Oct 24, 2014
Permit issued
Mar 12, 2015
Final sign-off
Jun 19, 2015
Declared cost
$310,000
Address
400 Castro St

change of use from m to a-3, new cycling gym, in conjunction with pending c.u.case #2014-0985.

Open the permit page

$310,000
Oct 3, 2014Never finaled
issued Oct 2014, no final
222 Mason StGoike Construction Managementrevision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. n/a maher ordinance
Details
Permit
201410038020
Status
issued
Filed
Oct 3, 2014
Permit issued
Oct 17, 2014
Address
222 Mason St

revision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. n/a maher ordinance

Open the permit page

Sep 5, 2014Completed
final sign-off Oct 2014
901 Market StFisher Development Incnon structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13
Details
Permit
201409055544
Status
complete
Filed
Sep 5, 2014
Permit issued
Sep 8, 2014
Final sign-off
Oct 24, 2014
Declared cost
$10,000
Address
901 Market St

non structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13

Open the permit page

$10,000
Jun 20, 2014Completed
final sign-off Jan 2015
555 California StBcci Construction Company50th floor t.i. removal of 1 interior door. installation of 2 new interior doors. patching and repairing of area around removal office door. no change to occupancy. electrical, fire sprinkler and fire alarm modifications under separate permit. maher n/a.
Details
Permit
201406208951
Status
complete
Filed
Jun 20, 2014
Permit issued
Jun 20, 2014
Final sign-off
Jan 27, 2015
Declared cost
$93,944
Address
555 California St

50th floor t.i. removal of 1 interior door. installation of 2 new interior doors. patching and repairing of area around removal office door. no change to occupancy. electrical, fire sprinkler and fire alarm modifications under separate permit. maher n/a.

Open the permit page

$93,944
May 23, 2014Completed
final sign-off Mar 2017
901 Market StFisher Development Incbasement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinance
Details
Permit
201405236667
Status
complete
Filed
May 23, 2014
Permit issued
Oct 21, 2014
Final sign-off
Mar 22, 2017
Declared cost
$900,000
Address
901 Market St

basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinance

Open the permit page

$900,000
Apr 22, 2014Completed
final sign-off Aug 2014
680 Folsom StTurner Construction Conew cafe bakery resstaurant at gr fl. new interior non bearing partitions, celing finishes. new kitchen and food prep parea. new mech units duct work and register. new electrical/plumbing. fully sprinkler. fire protection/alarm sep permit. change of use m to a2.
Details
Permit
201404223803
Status
complete
Filed
Apr 22, 2014
Permit issued
May 29, 2014
Final sign-off
Aug 13, 2014
Declared cost
$400,000
Address
680 Folsom St

new cafe bakery resstaurant at gr fl. new interior non bearing partitions, celing finishes. new kitchen and food prep parea. new mech units duct work and register. new electrical/plumbing. fully sprinkler. fire protection/alarm sep permit. change of use m to a2.

Open the permit page

$400,000
Apr 18, 2014Completed
final sign-off Jul 2014
2 Folsom StSwinerton Builders11th floor - minor commercial office tenant interior improvement & upgrades to accessible parking. parking upgrades on parking level. mep, fire alarm deferred submittals. compliance with ordinance #155-13 not required
Details
Permit
201404183595
Status
complete
Filed
Apr 18, 2014
Permit issued
Apr 18, 2014
Final sign-off
Jul 24, 2014
Declared cost
$107,000
Address
2 Folsom St

11th floor - minor commercial office tenant interior improvement & upgrades to accessible parking. parking upgrades on parking level. mep, fire alarm deferred submittals. compliance with ordinance #155-13 not required

Open the permit page

$107,000
Mar 7, 2014Completed
final sign-off Apr 2014
2 Harrison StBcci Construction Companybarrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not required
Details
Permit
201403070168
Status
complete
Filed
Mar 7, 2014
Permit issued
Mar 7, 2014
Final sign-off
Apr 10, 2014
Declared cost
$6,500
Address
2 Harrison St

barrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not required

Open the permit page

$6,500
Mar 6, 2014Completed
final sign-off Oct 2014
767 Market StPlant Construction Company Lpexisting vacant retail space - installation of new elevator & escalator, selective demolition. tenant improvements under separate permit. sprinkler & fire alarm under separate permit. to remain vacant until tenant improvement permit.
Details
Permit
201403060063
Status
complete
Filed
Mar 6, 2014
Permit issued
Mar 24, 2014
Final sign-off
Oct 15, 2014
Declared cost
$650,000
Address
767 Market St

existing vacant retail space - installation of new elevator & escalator, selective demolition. tenant improvements under separate permit. sprinkler & fire alarm under separate permit. to remain vacant until tenant improvement permit.

Open the permit page

$650,000
Feb 12, 2014Completed
final sign-off Jan 2015
50 03rd StPlant Construction Company Lpconvert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab.
Details
Permit
201402128356
Status
complete
Filed
Feb 12, 2014
Permit issued
Feb 24, 2014
Final sign-off
Jan 23, 2015
Declared cost
$210,000
Address
50 03rd St

convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab.

Open the permit page

$210,000
Feb 11, 2014Completed
final sign-off May 2014
101 New Montgomery StTurner Construction Cochange of use from b to a-2 in existing restaunt space due to increase in seating. remodel of the kitchen & dining area, no exterior work to be done, compliance with ordinance 155-13 not required. occupant verification required.
Details
Permit
201402118282
Status
complete
Filed
Feb 11, 2014
Permit issued
Apr 4, 2014
Final sign-off
May 30, 2014
Declared cost
$75,000
Address
101 New Montgomery St

change of use from b to a-2 in existing restaunt space due to increase in seating. remodel of the kitchen & dining area, no exterior work to be done, compliance with ordinance 155-13 not required. occupant verification required.

Open the permit page

$75,000
Dec 2, 2013Completed
final sign-off May 2014
1075 California StHathaway Dinwiddie Co.remodel of existing guestrooms to provide accessible requirements and minor remodel to remaining guestrooms. mep as shown on drawings. life safety permits separate.
Details
Permit
201312023132
Status
complete
Filed
Dec 2, 2013
Permit issued
Jan 10, 2014
Final sign-off
May 15, 2014
Declared cost
$4,700,000
Address
1075 California St

remodel of existing guestrooms to provide accessible requirements and minor remodel to remaining guestrooms. mep as shown on drawings. life safety permits separate.

Open the permit page

$4,700,000
Nov 7, 2013Expired or cancelled
expired Aug 2021
222 Mason StGoike Construction Managementrenovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals.
Details
Permit
201311071358
Status
expired
Filed
Nov 7, 2013
Permit issued
Nov 19, 2013
Declared cost
$580,000
Address
222 Mason St

renovation of 107 guestrms (flrs b2, 6-20, 21 & 23)including accessible guest rooms w/roll-in showers, replace (e) bathtubs w/showers, new plumbing fixtures, new finishes, new millwork, & new partitions,combine 2 guestrm to 1 accessible. elec,plbg,mech,fire sprinkler,fire alarm deferred submittals.

Open the permit page

$580,000
Nov 5, 2013Expired or cancelled
cancelled Mar 2020
901 Market Stexterior stone cladding system installation & anchorage. refer to pa# 2009-0709-2282
Details
Permit
201311051176
Status
cancelled
Filed
Nov 5, 2013
Address
901 Market St

exterior stone cladding system installation & anchorage. refer to pa# 2009-0709-2282

Open the permit page

Oct 30, 2013Expired or cancelled
withdrawn Nov 2013
1075 California Stt.i. to guestrooms, including plumbing & elecrical upgrades. guestroom count reduced from 147 rooms to 134 rooms.
Details
Permit
201310300708
Status
withdrawn
Filed
Oct 30, 2013
Declared cost
$4,700,000
Address
1075 California St

t.i. to guestrooms, including plumbing & elecrical upgrades. guestroom count reduced from 147 rooms to 134 rooms.

Open the permit page

$4,700,000
Sep 19, 2013Expired or cancelled
cancelled Jan 2026
1075 California Stmain entry canopy painting, lighting upgrades, and signage upgrades. replacement in kind of 2 aditional canopies with new canvas & signage
Details
Permit
201309197193
Status
cancelled
Filed
Sep 19, 2013
Declared cost
$7,500
Address
1075 California St

main entry canopy painting, lighting upgrades, and signage upgrades. replacement in kind of 2 aditional canopies with new canvas & signage

Open the permit page

$7,500
Aug 14, 2013Completed
final sign-off Oct 2013
2222 Fillmore StKdc Constructioninterior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment.
Details
Permit
201308144350
Status
complete
Filed
Aug 14, 2013
Permit issued
Sep 19, 2013
Final sign-off
Oct 16, 2013
Declared cost
$226,000
Address
2222 Fillmore St

interior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment.

Open the permit page

$226,000
May 21, 2013Completed
final sign-off May 2014
1075 California StHathaway Dinwiddie Co.penthouse: 13th floor-elevator modernization related work consisting of new partitions, new electrical & new hvac for elevator machine room
Details
Permit
201305217471
Status
complete
Filed
May 21, 2013
Permit issued
Jun 14, 2013
Final sign-off
May 15, 2014
Declared cost
$107,138
Address
1075 California St

penthouse: 13th floor-elevator modernization related work consisting of new partitions, new electrical & new hvac for elevator machine room

Open the permit page

$107,138
Apr 15, 2013Completed
final sign-off May 2014
50 03rd StPlant Construction Company Lplobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit.
Details
Permit
201304154588
Status
complete
Filed
Apr 15, 2013
Permit issued
May 13, 2013
Final sign-off
May 16, 2014
Declared cost
$600,000
Address
50 03rd St

lobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit.

Open the permit page

$600,000
Apr 5, 2013Completed
final sign-off Nov 2013
50 03rd Stref to approved pa# 201212035334. modified layout for the accessible parking spaces in the basement parking gargae.
Details
Permit
201304053878
Status
complete
Filed
Apr 5, 2013
Permit issued
Apr 10, 2013
Final sign-off
Nov 25, 2013
Declared cost
$15,000
Address
50 03rd St

ref to approved pa# 201212035334. modified layout for the accessible parking spaces in the basement parking gargae.

Open the permit page

$15,000
Apr 2, 2013Completed
final sign-off Jul 2013
359 Grant AvWells Construction Incminor improvement to existing cafe, relocation of exisitng equipments, new finishes, light fixtures & plumbing fixtures, new hi-lo automatic door opener at front door. signage, fire alarn, sprinklers unde separate permit.
Details
Permit
201304023602
Status
complete
Filed
Apr 2, 2013
Permit issued
May 17, 2013
Final sign-off
Jul 5, 2013
Declared cost
$150,000
Address
359 Grant Av

minor improvement to existing cafe, relocation of exisitng equipments, new finishes, light fixtures & plumbing fixtures, new hi-lo automatic door opener at front door. signage, fire alarn, sprinklers unde separate permit.

Open the permit page

$150,000
Mar 26, 2013Completed
final sign-off Mar 2014
901 Market StFisher Development Incstruc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr.
Details
Permit
201303263069
Status
complete
Filed
Mar 26, 2013
Permit issued
Jul 10, 2013
Final sign-off
Mar 20, 2014
Declared cost
$1,500,000
Address
901 Market St

struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr.

Open the permit page

$1,500,000
Mar 21, 2013Completed
final sign-off Dec 2013
1 Market StGci, Inc6th floor-interior t.i to include new non load bearing partitions, ceiling & finshes. fire sprinkler & life safety under seperate permit. mep under seperate permit.
Details
Permit
201303212718
Status
complete
Filed
Mar 21, 2013
Permit issued
Apr 19, 2013
Final sign-off
Dec 23, 2013
Declared cost
$2,604,228
Address
1 Market St

6th floor-interior t.i to include new non load bearing partitions, ceiling & finshes. fire sprinkler & life safety under seperate permit. mep under seperate permit.

Open the permit page

$2,604,228
Mar 15, 2013Completed
final sign-off Mar 2014
343 Sansome StT C B Builders Incinterior t.i. to extg starbucks coffee shop. no mechanical work.
Details
Permit
201303152356
Status
complete
Filed
Mar 15, 2013
Permit issued
Aug 15, 2013
Final sign-off
Mar 19, 2014
Declared cost
$234,575
Address
343 Sansome St

interior t.i. to extg starbucks coffee shop. no mechanical work.

Open the permit page

$234,575
Mar 12, 2013Completed
final sign-off Jul 2013
5455 Geary BlKdc Constructionminor cosmetic improvement - consisting of re-facing of cabinets, millwork and flooring. minor electrical improvement consisting of replacing specific light fixtures and new power outlets.
Details
Permit
201303121989
Status
complete
Filed
Mar 12, 2013
Permit issued
Apr 5, 2013
Final sign-off
Jul 25, 2013
Declared cost
$80,000
Address
5455 Geary Bl

minor cosmetic improvement - consisting of re-facing of cabinets, millwork and flooring. minor electrical improvement consisting of replacing specific light fixtures and new power outlets.

Open the permit page

$80,000
Feb 15, 2013Never finaled
issued Feb 2013, no final
365 Main StTruebeck Construction- -` 1st/3rd flrs reference 201206072090 and 201206082234; demo only of non load bearing partitions ceiling etc, mech, elec and plmbg eqpt in lobby and 3rd flr, mgt offices, areas are vacant space as per ab-017 interior work only
Details
Permit
201302150300
Status
issued
Filed
Feb 15, 2013
Permit issued
Feb 15, 2013
Declared cost
$1,000
Address
365 Main St

- -` 1st/3rd flrs reference 201206072090 and 201206082234; demo only of non load bearing partitions ceiling etc, mech, elec and plmbg eqpt in lobby and 3rd flr, mgt offices, areas are vacant space as per ab-017 interior work only

Open the permit page

$1,000
Dec 5, 2012Completed
final sign-off Sep 2016
949 Market StSwinerton Buildersto demolish 3 stories, retail building.
Details
Permit
201212055561
Status
complete
Filed
Dec 5, 2012
Permit issued
Mar 12, 2013
Final sign-off
Sep 21, 2016
Declared cost
$5,000
Address
949 Market St

to demolish 3 stories, retail building.

Open the permit page

$5,000
Dec 5, 2012Completed
final sign-off Sep 2016
939 Market StSwinerton Buildersto demolish 6 stories, office building.
Details
Permit
201212055558
Status
complete
Filed
Dec 5, 2012
Permit issued
Mar 12, 2013
Final sign-off
Sep 21, 2016
Declared cost
$5,000
Address
939 Market St

to demolish 6 stories, office building.

Open the permit page

$5,000
Dec 5, 2012Completed
final sign-off Sep 2016
943 Market StSwinerton Buildersto demolish 1 story, office building.
Details
Permit
201212055560
Status
complete
Filed
Dec 5, 2012
Permit issued
Mar 12, 2013
Final sign-off
Sep 21, 2016
Declared cost
$5,000
Address
943 Market St

to demolish 1 story, office building.

Open the permit page

$5,000
Dec 3, 2012Completed
final sign-off Mar 2013
901 Market StCommercial Interior Builders Inc4th floor suite 470 - interior non-structural tenant improvement to existing office space, demolitoin of partitions, carpet & reconfigure offices within tanant space.
Details
Permit
201212035348
Status
complete
Filed
Dec 3, 2012
Permit issued
Jan 3, 2013
Final sign-off
Mar 7, 2013
Declared cost
$250,000
Address
901 Market St

4th floor suite 470 - interior non-structural tenant improvement to existing office space, demolitoin of partitions, carpet & reconfigure offices within tanant space.

Open the permit page

$250,000
Dec 3, 2012Completed
final sign-off Mar 2013
901 Market StCommercial Interior Builders Inc4th floor suite 460 - interior non-structural tenant improvement to existing office space, demolitoin of some interior partitions, carpet & reconfigure offices within space.
Details
Permit
201212035346
Status
complete
Filed
Dec 3, 2012
Permit issued
Jan 3, 2013
Final sign-off
Mar 7, 2013
Declared cost
$100,000
Address
901 Market St

4th floor suite 460 - interior non-structural tenant improvement to existing office space, demolitoin of some interior partitions, carpet & reconfigure offices within space.

Open the permit page

$100,000
Nov 26, 2012Expired or cancelled
expired Dec 2014
201 03rd StT C B Builders Incinstallation of temporary trailer for retail coffee service. connectin of electrical , freshwater, waste water to facililites in existing starbucks
Details
Permit
201211264797
Status
expired
Filed
Nov 26, 2012
Permit issued
Jan 3, 2013
Declared cost
$5,000
Address
201 03rd St

installation of temporary trailer for retail coffee service. connectin of electrical , freshwater, waste water to facililites in existing starbucks

Open the permit page

$5,000
Nov 5, 2012Completed
final sign-off Dec 2012
901 Market StCommercial Interior Builders Incinterior non structural tenant improvement on the existing office space on the 3rd floor. mep and fire safety under separate permit
Details
Permit
201211053549
Status
complete
Filed
Nov 5, 2012
Permit issued
Nov 7, 2012
Final sign-off
Dec 26, 2012
Declared cost
$425,000
Address
901 Market St

interior non structural tenant improvement on the existing office space on the 3rd floor. mep and fire safety under separate permit

Open the permit page

$425,000
Sep 12, 2012Completed
final sign-off Oct 2012
3350 Sacramento StStroub Constructiondemo of non-structural walls, new finish throughout, 1 new floor monument, relocate 2 outlets
Details
Permit
201209129566
Status
complete
Filed
Sep 12, 2012
Permit issued
Sep 14, 2012
Final sign-off
Oct 29, 2012
Declared cost
$30,000
Address
3350 Sacramento St

demo of non-structural walls, new finish throughout, 1 new floor monument, relocate 2 outlets

Open the permit page

$30,000
Aug 30, 2012Never finaled
issued Oct 2012, no final
345 Stockton Strevision to 201108222979. revise landscape along stockton street frontage
Details
Permit
201208308613
Status
issued
Filed
Aug 30, 2012
Permit issued
Oct 30, 2012
Address
345 Stockton St

revision to 201108222979. revise landscape along stockton street frontage

Open the permit page

Aug 28, 2012Never finaled
issued Aug 2012, no final
375 Sutter StHathaway Dinwiddie Co.construct restroom in lower level usning (e) plumbng lnes & hvac exhaust / supply. revision to pa# 201108192814
Details
Permit
201208288448
Status
issued
Filed
Aug 28, 2012
Permit issued
Aug 30, 2012
Declared cost
$20,000
Address
375 Sutter St

construct restroom in lower level usning (e) plumbng lnes & hvac exhaust / supply. revision to pa# 201108192814

Open the permit page

$20,000
Aug 15, 2012Never finaled
issued Aug 2012, no final
111 Powell StShawmut Woodworking & Supply Increvision to pa# 2012-0417-8515-new work includes modifications to previously approved design on all floors to reduce construction cost
Details
Permit
201208157436
Status
issued
Filed
Aug 15, 2012
Permit issued
Aug 28, 2012
Address
111 Powell St

revision to pa# 2012-0417-8515-new work includes modifications to previously approved design on all floors to reduce construction cost

Open the permit page

Jul 16, 2012Completed
final sign-off Oct 2012
2201 Fillmore StKdc Constructioninterior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation.
Details
Permit
201207164934
Status
complete
Filed
Jul 16, 2012
Permit issued
Jul 16, 2012
Final sign-off
Oct 19, 2012
Declared cost
$14,500
Address
2201 Fillmore St

interior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation.

Open the permit page

$14,500
Jul 3, 2012Completed
final sign-off Feb 2013
4094 18th StWells Construction Incti to existing cafe of existing starbucks. update walls, floors, furniture, casework, bar equipment, new lighting, mechanical diffusers. new storefront location and finishes
Details
Permit
201207034029
Status
complete
Filed
Jul 3, 2012
Permit issued
Aug 13, 2012
Final sign-off
Feb 21, 2013
Declared cost
$600,000
Address
4094 18th St

ti to existing cafe of existing starbucks. update walls, floors, furniture, casework, bar equipment, new lighting, mechanical diffusers. new storefront location and finishes

Open the permit page

$600,000
Jun 29, 2012Never finaled
issued Jun 2012, no final
391 Sutter StT C B Builders Incinvestigative demolition of existing stucco facade treatment in selective areas " starbucks".
Details
Permit
201206293811
Status
issued
Filed
Jun 29, 2012
Permit issued
Jun 29, 2012
Declared cost
$15,580
Address
391 Sutter St

investigative demolition of existing stucco facade treatment in selective areas " starbucks".

Open the permit page

$15,580
Jun 13, 2012Never finaled
issued Jun 2012, no final
111 Powell StShawmut Woodworking & Supply Incremove & store 9e) storefront for future reinstallation after core & shell work under pa#201205301485 & pa#2012060519021-s completed.
Details
Permit
201206132558
Status
issued
Filed
Jun 13, 2012
Permit issued
Jun 13, 2012
Declared cost
$2,500
Address
111 Powell St

remove & store 9e) storefront for future reinstallation after core & shell work under pa#201205301485 & pa#2012060519021-s completed.

Open the permit page

$2,500
Jun 8, 2012Completed
final sign-off Jul 2013
365 Main StTruebeck Constructiontenant improvements: non load bearing partitions, ceilings, furnishings and modifications to (e) doors, modifications to (e) mechanical, electrical & plumbing distribution systems with design build.
Details
Permit
201206082234
Status
complete
Filed
Jun 8, 2012
Permit issued
Jan 7, 2013
Final sign-off
Jul 12, 2013
Declared cost
$850,000
Address
365 Main St

tenant improvements: non load bearing partitions, ceilings, furnishings and modifications to (e) doors, modifications to (e) mechanical, electrical & plumbing distribution systems with design build.

Open the permit page

$850,000
Jun 7, 2012Never finaled
issued Jul 2012, no final
166 Grant AvPlant Construction Company Lpreplace entry doors & transom window, with new door. no other work.
Details
Permit
201206072091
Status
issued
Filed
Jun 7, 2012
Permit issued
Jul 26, 2012
Declared cost
$10,000
Address
166 Grant Av

replace entry doors & transom window, with new door. no other work.

Open the permit page

$10,000
Jun 7, 2012Completed
final sign-off Jul 2013
365 Main StTruebeck Constructiontenant improvement: non-load bearing partitions, ceilings, furnishings & modifications to (e) doos, modifications to (e) mechanical, electrical & plumbing distribution systems.
Details
Permit
201206072090
Status
complete
Filed
Jun 7, 2012
Permit issued
Jan 7, 2013
Final sign-off
Jul 12, 2013
Declared cost
$1,300,000
Address
365 Main St

tenant improvement: non-load bearing partitions, ceilings, furnishings & modifications to (e) doos, modifications to (e) mechanical, electrical & plumbing distribution systems.

Open the permit page

$1,300,000
May 25, 2012Completed
final sign-off Aug 2012
2801 Jones StWells Construction Increvision to pa# 2012-0106-1833-revisions to exterior canopy support
Details
Permit
201205251262
Status
complete
Filed
May 25, 2012
Permit issued
May 25, 2012
Final sign-off
Aug 17, 2012
Declared cost
$4,000
Address
2801 Jones St

revision to pa# 2012-0106-1833-revisions to exterior canopy support

Open the permit page

$4,000