Julia Nelson

License
C31838
Look the license up with the state
Listed as
architect, authorized agent-others, engineer
Firm
Hooks Design
Based in
San Francisco
On San Francisco permits
Feb 2000 to Mar 2012

67 permits since 2000 (architect on 62 permits, authorized agent-others on 3 permits, engineer on 2 permits): 61 completed, 3 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 13, 2012Completed
final sign-off May 2012
505 Montgomery StBcci Construction Company6th floor-add new partitions to create 4 new offices. mechanical, electrical, sprinkler & life safety under seperate permit
Details
Permit
201203135938
Status
complete
Filed
Mar 13, 2012
Permit issued
Mar 14, 2012
Final sign-off
May 4, 2012
Declared cost
$56,000
Address
505 Montgomery St

6th floor-add new partitions to create 4 new offices. mechanical, electrical, sprinkler & life safety under seperate permit

Open the permit page

$56,000
Oct 5, 2011Never finaled
issued Oct 2011, no final
75 BroadwayNovo Construction Inc1st floor-t.i. include demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build, if determined necessary & submitted for permit seperately
Details
Permit
201110056151
Status
issued
Filed
Oct 5, 2011
Permit issued
Oct 24, 2011
Declared cost
$25,000
Address
75 Broadway

1st floor-t.i. include demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build, if determined necessary & submitted for permit seperately

Open the permit page

$25,000
Aug 17, 2011Completed
final sign-off Feb 2012
1 Kearny StGci, Inc7th floor-t.i. includes demolition of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will ne design build & submitted for permit seperately. building is fully sprinklered
Details
Permit
201108172603
Status
complete
Filed
Aug 17, 2011
Permit issued
Sep 12, 2011
Final sign-off
Feb 27, 2012
Declared cost
$370,000
Address
1 Kearny St

7th floor-t.i. includes demolition of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will ne design build & submitted for permit seperately. building is fully sprinklered

Open the permit page

$370,000
Aug 3, 2011Completed
final sign-off Dec 2011
500 Washington StNovo Construction Incoffice ti on 2nd fl. ste 200 - demo of non struc, partitions, and building new non struc partitions. all new or revised hvac, elec, plbg and life safety will be dsign build and will be sumitted under separate permit. building fully sprinklered
Details
Permit
201108031666
Status
complete
Filed
Aug 3, 2011
Permit issued
Aug 18, 2011
Final sign-off
Dec 8, 2011
Declared cost
$57,000
Address
500 Washington St

office ti on 2nd fl. ste 200 - demo of non struc, partitions, and building new non struc partitions. all new or revised hvac, elec, plbg and life safety will be dsign build and will be sumitted under separate permit. building fully sprinklered

Open the permit page

$57,000
May 18, 2011Expired or cancelled
cancelled Jan 2026
75 Broadway1st floor-revision to pa# 2010-1215-6760-inspector reviewed in the field the d.a. parking. the parking we had is not acceptable, directly outside is a compliant d.a parking. documenting for permit only, no work being done
Details
Permit
201105186268
Status
cancelled
Filed
May 18, 2011
Address
75 Broadway

1st floor-revision to pa# 2010-1215-6760-inspector reviewed in the field the d.a. parking. the parking we had is not acceptable, directly outside is a compliant d.a parking. documenting for permit only, no work being done

Open the permit page

Apr 15, 2011Completed
final sign-off Nov 2011
150 Spear StT C B Builders Inc11th floor revision to pa #201102029511 - hardship added to use automatic stall openers in restrooms.
Details
Permit
201104154143
Status
complete
Filed
Apr 15, 2011
Permit issued
Sep 1, 2011
Final sign-off
Nov 9, 2011
Declared cost
$7,000
Address
150 Spear St

11th floor revision to pa #201102029511 - hardship added to use automatic stall openers in restrooms.

Open the permit page

$7,000
Dec 14, 2010Completed
final sign-off Jan 2011
2 Embarcadero Centerrefer pa# 2010-1105-4424-remodeling (e) vav zones, relocate (e) supply & return grilles as shown, install 1 new exhaust fan, install new supply & return grilles
Details
Permit
201012146666
Status
complete
Filed
Dec 14, 2010
Permit issued
Dec 16, 2010
Final sign-off
Jan 24, 2011
Declared cost
$16,000
Address
2 Embarcadero Center

refer pa# 2010-1105-4424-remodeling (e) vav zones, relocate (e) supply & return grilles as shown, install 1 new exhaust fan, install new supply & return grilles

Open the permit page

$16,000
Oct 20, 2010Completed
final sign-off Mar 2011
116 New Montgomery StField Construction Inc.5th floor-t.i. includes demolition of non-structural partitions & build, new non-structural partitions. all new or revised hvac, electrical, lighting, plumbing & life safety work will be design build & submitted for permit seperately. building is partially sprinklered
Details
Permit
201010203398
Status
complete
Filed
Oct 20, 2010
Permit issued
Nov 4, 2010
Final sign-off
Mar 18, 2011
Declared cost
$276,880
Address
116 New Montgomery St

5th floor-t.i. includes demolition of non-structural partitions & build, new non-structural partitions. all new or revised hvac, electrical, lighting, plumbing & life safety work will be design build & submitted for permit seperately. building is partially sprinklered

Open the permit page

$276,880
Oct 8, 2010Completed
final sign-off Mar 2011
455 Market StRudolph Commercial Interiors Inc, Rci16th floor t.i. demolistion of partitions (non-structural) & build back of non-structural prtitions. all new or revised hvac, electrical, plumbing, life safety & sprinklers will be design build & submitted under separate permit.
Details
Permit
201010082613
Status
complete
Filed
Oct 8, 2010
Permit issued
Oct 14, 2010
Final sign-off
Mar 28, 2011
Declared cost
$42,039
Address
455 Market St

16th floor t.i. demolistion of partitions (non-structural) & build back of non-structural prtitions. all new or revised hvac, electrical, plumbing, life safety & sprinklers will be design build & submitted under separate permit.

Open the permit page

$42,039
Sep 21, 2010Completed
final sign-off Mar 2011
800 Market StBcci Construction Company7th floor- constuct 6 offices and 1 pantry. mech and electrical are included
Details
Permit
201009211268
Status
complete
Filed
Sep 21, 2010
Permit issued
Sep 23, 2010
Final sign-off
Mar 14, 2011
Declared cost
$150,000
Address
800 Market St

7th floor- constuct 6 offices and 1 pantry. mech and electrical are included

Open the permit page

$150,000
Aug 25, 2010Completed
final sign-off Jan 2011
1 Market StGci, Inc13th floor-t.i new non-structural full height & ceiling height partitions. m.e.p, sprinklers, fire alarm will be submitted under seperate permit. building fully sprinklered. this permit includes demoliotion
Details
Permit
201008259537
Status
complete
Filed
Aug 25, 2010
Permit issued
Sep 8, 2010
Final sign-off
Jan 6, 2011
Declared cost
$170,000
Address
1 Market St

13th floor-t.i new non-structural full height & ceiling height partitions. m.e.p, sprinklers, fire alarm will be submitted under seperate permit. building fully sprinklered. this permit includes demoliotion

Open the permit page

$170,000
Aug 20, 2010Completed
final sign-off Oct 2010
201 03rd StRudolph Commercial Interiors Inc, Rci(9th floor) t.i. includes demolition of non-structural partitions and building six(6)new offices and two(2)meeting rooms.all existing flooring, ceilings, and lighting to remain. all new or revised hvac.electrical,plumbing,sprinklers and life safety work will be designbuild and submitted
Details
Permit
201008209236
Status
complete
Filed
Aug 20, 2010
Permit issued
Aug 25, 2010
Final sign-off
Oct 28, 2010
Declared cost
$150,000
Address
201 03rd St

(9th floor) t.i. includes demolition of non-structural partitions and building six(6)new offices and two(2)meeting rooms.all existing flooring, ceilings, and lighting to remain. all new or revised hvac.electrical,plumbing,sprinklers and life safety work will be designbuild and submitted

Open the permit page

$150,000
Aug 13, 2010Completed
final sign-off Apr 2013
50 Fremont StC B 2 Builders Incorporated22nd fl: ti from shell space to include non struct demoliton of partitions. new elec, ceiling grid and lighting and mep. sprinkler, and life safety work will be submitted under separate permit. building is fully sprinkered
Details
Permit
201008138734
Status
complete
Filed
Aug 13, 2010
Permit issued
Sep 7, 2010
Final sign-off
Apr 22, 2013
Declared cost
$33,780
Address
50 Fremont St

22nd fl: ti from shell space to include non struct demoliton of partitions. new elec, ceiling grid and lighting and mep. sprinkler, and life safety work will be submitted under separate permit. building is fully sprinkered

Open the permit page

$33,780
Aug 10, 2010Completed
final sign-off Sep 2010
22 04th StCci Com'l Constr & Improv**See 985808***7th fl: ti includes demo of non structural partitoins and building new non struct partitions. new or revised hvac, elec, plumbing, life safety work will be design build and submitted on separate permit. bldg is fully sprinklered.
Details
Permit
201008108513
Status
complete
Filed
Aug 10, 2010
Permit issued
Aug 19, 2010
Final sign-off
Sep 24, 2010
Declared cost
$102,000
Address
22 04th St

7th fl: ti includes demo of non structural partitoins and building new non struct partitions. new or revised hvac, elec, plumbing, life safety work will be design build and submitted on separate permit. bldg is fully sprinklered.

Open the permit page

$102,000
Jul 29, 2010Completed
final sign-off Oct 2010
101 02nd StPeacock Construction Inc16th fl :ti includes demo of non struct partitons and building new non struc partitions. all new or revised. hvac,elec,plumb, life safety work design build sep permit. building fully sprinklered
Details
Permit
201007297738
Status
complete
Filed
Jul 29, 2010
Permit issued
Aug 17, 2010
Final sign-off
Oct 18, 2010
Declared cost
$130,000
Address
101 02nd St

16th fl :ti includes demo of non struct partitons and building new non struc partitions. all new or revised. hvac,elec,plumb, life safety work design build sep permit. building fully sprinklered

Open the permit page

$130,000
Jul 23, 2010Completed
final sign-off Sep 2010
44 Montgomery StGreene Builders Incoffice ti on the 8th floor- suite# 850 includes demo. of non structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plbg and ls will be design build and submitted under separate permit. bldg is fully sprinklered
Details
Permit
201007237338
Status
complete
Filed
Jul 23, 2010
Permit issued
Jul 29, 2010
Final sign-off
Sep 24, 2010
Declared cost
$95,000
Address
44 Montgomery St

office ti on the 8th floor- suite# 850 includes demo. of non structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plbg and ls will be design build and submitted under separate permit. bldg is fully sprinklered

Open the permit page

$95,000
Jul 19, 2010Completed
final sign-off Nov 2010
44 Montgomery StRudolph Commercial Interiors Inc, Rci30th floor - oluntary barrier removal mens & womens restrms. ab-006-womens eliminate one (1)toilet fixtures,relocate (1) toilet,new ceiling lghts.fire sprinkler heads,hvac outlets etc, men's new door threshold,new toilets,lavatories,urinals,new stone shelf & wall fixtures,modify (e)plbg chase wall.
Details
Permit
201007196928
Status
complete
Filed
Jul 19, 2010
Permit issued
Aug 4, 2010
Final sign-off
Nov 3, 2010
Declared cost
$110,000
Address
44 Montgomery St

30th floor - oluntary barrier removal mens & womens restrms. ab-006-womens eliminate one (1)toilet fixtures,relocate (1) toilet,new ceiling lghts.fire sprinkler heads,hvac outlets etc, men's new door threshold,new toilets,lavatories,urinals,new stone shelf & wall fixtures,modify (e)plbg chase wall.

Open the permit page

$110,000
Jul 19, 2010Completed
final sign-off Nov 2010
44 Montgomery StRudolph Commercial Interiors Inc, Rci24th floor -voluntary barrier removal men's & womens restroom. ab-006 womens eliminating one (1) toilet, relocate one (1) toilet to obtain the disabled access stall, etc; mens - new door threshold, new toilets, lavatories, urinals, new stone shelf, etc.
Details
Permit
201007196924
Status
complete
Filed
Jul 19, 2010
Permit issued
Aug 4, 2010
Final sign-off
Nov 3, 2010
Declared cost
$110,000
Address
44 Montgomery St

24th floor -voluntary barrier removal men's & womens restroom. ab-006 womens eliminating one (1) toilet, relocate one (1) toilet to obtain the disabled access stall, etc; mens - new door threshold, new toilets, lavatories, urinals, new stone shelf, etc.

Open the permit page

$110,000
Jul 6, 2010Completed
final sign-off Oct 2010
180 Geary StField Construction Inc.6th. flr. t.i. includes the demolition o nonstructural partitions & building (n) nonstructural partitions. all (n) or revised hvac, elec., plumbing & life safety work will be design build & submitted for permit separately. bldg. is full sprinklered.
Details
Permit
201007065980
Status
complete
Filed
Jul 6, 2010
Permit issued
Jul 26, 2010
Final sign-off
Oct 18, 2010
Declared cost
$175,000
Address
180 Geary St

6th. flr. t.i. includes the demolition o nonstructural partitions & building (n) nonstructural partitions. all (n) or revised hvac, elec., plumbing & life safety work will be design build & submitted for permit separately. bldg. is full sprinklered.

Open the permit page

$175,000
Jul 2, 2010Completed
final sign-off Sep 2010
44 Montgomery StBridge City Builders24th floor t.i. includes the demolition of non-structural partitions, and bldg new-non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for separate permit. bldg is fully sprinklered.
Details
Permit
201007025891
Status
complete
Filed
Jul 2, 2010
Permit issued
Jul 26, 2010
Final sign-off
Sep 1, 2010
Declared cost
$90,000
Address
44 Montgomery St

24th floor t.i. includes the demolition of non-structural partitions, and bldg new-non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for separate permit. bldg is fully sprinklered.

Open the permit page

$90,000
Jul 2, 2010Completed
final sign-off Oct 2010
153 Kearny StCci Com'l Constr & Improv**See 985808***5th floor t.i. unclude demolition of non-structural partitions & bldg new non-structural paritions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted separately. bldg is historical class 1 bldg & not sprinklered.
Details
Permit
201007025892
Status
complete
Filed
Jul 2, 2010
Permit issued
Jul 22, 2010
Final sign-off
Oct 27, 2010
Declared cost
$60,000
Address
153 Kearny St

5th floor t.i. unclude demolition of non-structural partitions & bldg new non-structural paritions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted separately. bldg is historical class 1 bldg & not sprinklered.

Open the permit page

$60,000
Jun 21, 2010Completed
final sign-off Jul 2010
116 New Montgomery StField Construction Inc.6th fl: tenant improvement includes demo of non structural partitons, new non structural partitions. hvac,elec,plumb,ls sep permit. bufilding is partially sprinklered
Details
Permit
201006214907
Status
complete
Filed
Jun 21, 2010
Permit issued
Jun 25, 2010
Final sign-off
Jul 30, 2010
Declared cost
$36,000
Address
116 New Montgomery St

6th fl: tenant improvement includes demo of non structural partitons, new non structural partitions. hvac,elec,plumb,ls sep permit. bufilding is partially sprinklered

Open the permit page

$36,000
Jun 16, 2010Completed
final sign-off Aug 2011
250 Sutter StSkyline Construction3rd floor-t.i. includes demo of non-structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperatly. building fully sprinklered. work included common corridor. upgrade restrooms
Details
Permit
201006164599
Status
complete
Filed
Jun 16, 2010
Permit issued
Jul 6, 2010
Final sign-off
Aug 5, 2011
Declared cost
$95,000
Address
250 Sutter St

3rd floor-t.i. includes demo of non-structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperatly. building fully sprinklered. work included common corridor. upgrade restrooms

Open the permit page

$95,000
May 21, 2010Completed
final sign-off Sep 2010
88 Kearny StHathaway Dinwiddie Co.19th. flr. t.i.: includes demo of partition & bldg. (n) non-structural partitions. all (n) or revised. hvac electrical, plumbing & life safety will be design build & submitted under separate permit. (bldg. is fully sprinklered).
Details
Permit
201005212969
Status
complete
Filed
May 21, 2010
Permit issued
Jun 10, 2010
Final sign-off
Sep 15, 2010
Declared cost
$201,919
Address
88 Kearny St

19th. flr. t.i.: includes demo of partition & bldg. (n) non-structural partitions. all (n) or revised. hvac electrical, plumbing & life safety will be design build & submitted under separate permit. (bldg. is fully sprinklered).

Open the permit page

$201,919
May 18, 2010Completed
final sign-off Sep 2010
235 Pine StPeacock Construction Inc16th floor t.i. included th ebldg of a new non-structural partition. all new or revised. hvac, electrical, plumbing & life safety work will be design build & submitted under separate permit.( building fully sprinklered).
Details
Permit
201005182660
Status
complete
Filed
May 18, 2010
Permit issued
May 19, 2010
Final sign-off
Sep 2, 2010
Declared cost
$37,750
Address
235 Pine St

16th floor t.i. included th ebldg of a new non-structural partition. all new or revised. hvac, electrical, plumbing & life safety work will be design build & submitted under separate permit.( building fully sprinklered).

Open the permit page

$37,750
May 5, 2010Completed
final sign-off Sep 2010
55 Francisco StCannon Constructors North Inc7th floor t.i. including new full height & ceiling height non-structural partitions, new electrical & lighting to accomodate new construction & new millwork. all new or modified hvac, plbg & life safety work will be designed build & submitted under separate permit.
Details
Permit
201005051738
Status
complete
Filed
May 5, 2010
Permit issued
May 21, 2010
Final sign-off
Sep 2, 2010
Declared cost
$250,000
Address
55 Francisco St

7th floor t.i. including new full height & ceiling height non-structural partitions, new electrical & lighting to accomodate new construction & new millwork. all new or modified hvac, plbg & life safety work will be designed build & submitted under separate permit.

Open the permit page

$250,000
Mar 10, 2010Completed
final sign-off Sep 2010
114 Sansome StBridge City Builders(8th. flr.) 1-office made into two 2-offices. includes demolition of non-structural partitions. bldg. (n) non-structural partions. all (n) or revised hvac, electrical, plumbing & life safety work will be design-build & submitted for permit separately. (bldg. is fully sprinklered)
Details
Permit
201003107884
Status
complete
Filed
Mar 10, 2010
Permit issued
Apr 7, 2010
Final sign-off
Sep 24, 2010
Declared cost
$12,000
Address
114 Sansome St

(8th. flr.) 1-office made into two 2-offices. includes demolition of non-structural partitions. bldg. (n) non-structural partions. all (n) or revised hvac, electrical, plumbing & life safety work will be design-build & submitted for permit separately. (bldg. is fully sprinklered)

Open the permit page

$12,000
Feb 26, 2010Completed
final sign-off May 2010
116 New Montgomery StAyoob & Peery Plumbing Co Inc7th floor-relocate & removed fire sprinkler heads per tenant improvement-1 relocate & 3 removed
Details
Permit
201002267238
Status
complete
Filed
Feb 26, 2010
Permit issued
Mar 1, 2010
Final sign-off
May 6, 2010
Declared cost
$1,000
Address
116 New Montgomery St

7th floor-relocate & removed fire sprinkler heads per tenant improvement-1 relocate & 3 removed

Open the permit page

$1,000
Dec 9, 2009Completed
final sign-off Feb 2010
44 Montgomery St42nd floor-tenant improvement-new non-structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted under seperate permit. building fully sprinklered
Details
Permit
200912092917
Status
complete
Filed
Dec 9, 2009
Permit issued
Dec 23, 2009
Final sign-off
Feb 12, 2010
Declared cost
$150,000
Address
44 Montgomery St

42nd floor-tenant improvement-new non-structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted under seperate permit. building fully sprinklered

Open the permit page

$150,000
Dec 9, 2009Completed
final sign-off Jun 2010
44 Montgomery StRudolph Commercial Interiors Inc, Rci42nd floor-complete men restroom upgrades & finishes to meet current accessibility codes (barrier removal)
Details
Permit
200912092915
Status
complete
Filed
Dec 9, 2009
Permit issued
Mar 16, 2010
Final sign-off
Jun 25, 2010
Declared cost
$150,000
Address
44 Montgomery St

42nd floor-complete men restroom upgrades & finishes to meet current accessibility codes (barrier removal)

Open the permit page

$150,000
Dec 2, 2009Completed
final sign-off Jan 2010
505 Montgomery StBcci Construction Companyrevision to appl #200909257644 room 615 walls to remain in original wall types.
Details
Permit
200912022450
Status
complete
Filed
Dec 2, 2009
Permit issued
Dec 2, 2009
Final sign-off
Jan 29, 2010
Declared cost
$500
Address
505 Montgomery St

revision to appl #200909257644 room 615 walls to remain in original wall types.

Open the permit page

$500
Oct 21, 2009Completed
final sign-off Jan 2010
50 Fremont StBcci Construction Company24th floor tenant improvement, demo non-structural paritions, new non-structural partitions, modification of lighting, electrical as required to accomodate new construction, new/ revised hvac, electrical, plumbing. (fully sprinklered building)
Details
Permit
200910219476
Status
complete
Filed
Oct 21, 2009
Permit issued
Oct 29, 2009
Final sign-off
Jan 14, 2010
Declared cost
$117,280
Address
50 Fremont St

24th floor tenant improvement, demo non-structural paritions, new non-structural partitions, modification of lighting, electrical as required to accomodate new construction, new/ revised hvac, electrical, plumbing. (fully sprinklered building)

Open the permit page

$117,280
Oct 8, 2009Completed
final sign-off Nov 2009
625 02nd StCannon Constructors North Inc4th floor tenant improvement one new non-structural partitions, door & sidelight. all new or revised hvac & electrical. work will be design build & submitted for permit separately. buildign is fully sprinklered.
Details
Permit
200910088595
Status
complete
Filed
Oct 8, 2009
Permit issued
Oct 14, 2009
Final sign-off
Nov 4, 2009
Declared cost
$6,500
Address
625 02nd St

4th floor tenant improvement one new non-structural partitions, door & sidelight. all new or revised hvac & electrical. work will be design build & submitted for permit separately. buildign is fully sprinklered.

Open the permit page

$6,500
Aug 17, 2009Completed
final sign-off Mar 2010
44 Montgomery StRudolph Commercial Interiors Inc, Rci2nd & 6th floors-womens restrm: remove one toilet,relocate one toilet,ceiling lights,fire sprinklers heads,hvac outlets to remain,align w/new fixtures & finishes. mens restrms: new flr plan,new door,threshold,new toilets,lavator,urinals,new stone shelf,wall fixtures,new ceiling lights,hvac,sprinkler
Details
Permit
200908174929
Status
complete
Filed
Aug 17, 2009
Permit issued
Oct 15, 2009
Final sign-off
Mar 9, 2010
Declared cost
$236,000
Address
44 Montgomery St

2nd & 6th floors-womens restrm: remove one toilet,relocate one toilet,ceiling lights,fire sprinklers heads,hvac outlets to remain,align w/new fixtures & finishes. mens restrms: new flr plan,new door,threshold,new toilets,lavator,urinals,new stone shelf,wall fixtures,new ceiling lights,hvac,sprinkler

Open the permit page

$236,000
Aug 17, 2009Completed
final sign-off Sep 2010
44 Montgomery StBridge City Builders21st floor t.i. includes demolition of non-structural partitions & bldg new non-structural partitions. ( all rewavel revised. hvac, electrical, plbg, & life safety work under separate permit). bldg is fully sprinklered. suites 2110, 2150.
Details
Permit
200908174926
Status
complete
Filed
Aug 17, 2009
Permit issued
Sep 10, 2009
Final sign-off
Sep 8, 2010
Declared cost
$80,190
Address
44 Montgomery St

21st floor t.i. includes demolition of non-structural partitions & bldg new non-structural partitions. ( all rewavel revised. hvac, electrical, plbg, & life safety work under separate permit). bldg is fully sprinklered. suites 2110, 2150.

Open the permit page

$80,190
Aug 17, 2009Completed
final sign-off Sep 2010
44 Montgomery StBridge City Builders40th floor existing suite shell condition with ceiling grid & lights. t.i. includes new non-structural partitions. (new hvac, electrical, plbg, & life safety work under separate permit). bldg is fully sprinklered. suite #4020.
Details
Permit
200908174928
Status
complete
Filed
Aug 17, 2009
Permit issued
Sep 10, 2009
Final sign-off
Sep 3, 2010
Declared cost
$85,250
Address
44 Montgomery St

40th floor existing suite shell condition with ceiling grid & lights. t.i. includes new non-structural partitions. (new hvac, electrical, plbg, & life safety work under separate permit). bldg is fully sprinklered. suite #4020.

Open the permit page

$85,250
May 19, 2009Completed
final sign-off Aug 2010
303 02nd StSkyline Construction7th fl & basement - north level "d": t.i. demo of non-structural partitions & build new non-structural partitions, new & revised mech, electric, plumb & life safety, generator and fuel system, sprinklers, life safety under separate permit.
Details
Permit
200905198677
Status
complete
Filed
May 19, 2009
Permit issued
Jul 16, 2009
Final sign-off
Aug 13, 2010
Declared cost
$921,149
Address
303 02nd St

7th fl & basement - north level "d": t.i. demo of non-structural partitions & build new non-structural partitions, new & revised mech, electric, plumb & life safety, generator and fuel system, sprinklers, life safety under separate permit.

Open the permit page

$921,149
Apr 30, 2009Expired or cancelled
cancelled Jan 2026
44 Montgomery Stsuite 2150: demo of non structural partitions and building new non structural partitions. all hvac,elec, plumbing, and life safety work will be design build and submitted for permit separately. building is fully sprinklered.
Details
Permit
200904307409
Status
cancelled
Filed
Apr 30, 2009
Declared cost
$123,895
Address
44 Montgomery St

suite 2150: demo of non structural partitions and building new non structural partitions. all hvac,elec, plumbing, and life safety work will be design build and submitted for permit separately. building is fully sprinklered.

Open the permit page

$123,895
Apr 10, 2009Completed
final sign-off Sep 2009
50 Fremont StField Construction Inc.22nd floor. interior demolition only ab-017, corridor and doors to corridor in this space will remain intact. no structural work. fire material on corridor will remain as is.
Details
Permit
200904106037
Status
complete
Filed
Apr 10, 2009
Permit issued
Jun 1, 2009
Final sign-off
Sep 2, 2009
Declared cost
$72,000
Address
50 Fremont St

22nd floor. interior demolition only ab-017, corridor and doors to corridor in this space will remain intact. no structural work. fire material on corridor will remain as is.

Open the permit page

$72,000
Mar 27, 2009Completed
final sign-off May 2009
1160 Polk Stto obtain final inspection for work approved under pa #200807146632. all work is complete
Details
Permit
200903274984
Status
complete
Filed
Mar 27, 2009
Permit issued
Mar 27, 2009
Final sign-off
May 21, 2009
Address
1160 Polk St

to obtain final inspection for work approved under pa #200807146632. all work is complete

Open the permit page

Mar 16, 2009Completed
final sign-off Jul 2009
101 California StNovo Construction Inctenant improvementincludes building out shell condition with non structural partitions. (arch, mechanical, electrical included.) lifety safety and fire sprinkler under separate permit.
Details
Permit
200903164202
Status
complete
Filed
Mar 16, 2009
Permit issued
Mar 18, 2009
Final sign-off
Jul 9, 2009
Declared cost
$647,790
Address
101 California St

tenant improvementincludes building out shell condition with non structural partitions. (arch, mechanical, electrical included.) lifety safety and fire sprinkler under separate permit.

Open the permit page

$647,790
Jan 29, 2009Completed
final sign-off May 2009
303 02nd StRudolph Commercial Interiors Inc, Rci2nd floor-tenant improvement includes a new file storage room in an (e) garage (parking lot) with new electrical & (e) lighting to accomodate new construction, building fully sprinklered. electrical on seperate permit if needed.
Details
Permit
200901291041
Status
complete
Filed
Jan 29, 2009
Permit issued
Jan 30, 2009
Final sign-off
May 11, 2009
Declared cost
$25,000
Address
303 02nd St

2nd floor-tenant improvement includes a new file storage room in an (e) garage (parking lot) with new electrical & (e) lighting to accomodate new construction, building fully sprinklered. electrical on seperate permit if needed.

Open the permit page

$25,000
Jan 28, 2009Never finaled
issued Jan 2009, no final
50 Fremont Strevision to pa# 2009-0122-0635-t.i. room is just a server room. changes are walls are not rated nor the door. remove fire smoke dampers and maechanical page.
Details
Permit
200901280991
Status
issued
Filed
Jan 28, 2009
Permit issued
Jan 30, 2009
Address
50 Fremont St

revision to pa# 2009-0122-0635-t.i. room is just a server room. changes are walls are not rated nor the door. remove fire smoke dampers and maechanical page.

Open the permit page

Jan 27, 2009Completed
final sign-off Apr 2009
1 Market StGci, Incat 18th fl: t.i. improvement to include new ceiling neight partitions. mech, electrical or fire sprinkler, life safety under seperate permit.
Details
Permit
200901270868
Status
complete
Filed
Jan 27, 2009
Permit issued
Jan 27, 2009
Final sign-off
Apr 3, 2009
Declared cost
$70,000
Address
1 Market St

at 18th fl: t.i. improvement to include new ceiling neight partitions. mech, electrical or fire sprinkler, life safety under seperate permit.

Open the permit page

$70,000
Jan 22, 2009Never finaled
issued Jan 2009, no final
50 Fremont Stat 24th fl: t.i. demo of non-structural partitions, building new non-structural partitions, modificating of lighting, electrical as required accomodate, new construction, all new or revised hvac, electrical, plumbing & life safety work. build is fully sprinklered, life safety under seperate permit.
Details
Permit
200901220635
Status
issued
Filed
Jan 22, 2009
Permit issued
Jan 22, 2009
Declared cost
$177,880
Address
50 Fremont St

at 24th fl: t.i. demo of non-structural partitions, building new non-structural partitions, modificating of lighting, electrical as required accomodate, new construction, all new or revised hvac, electrical, plumbing & life safety work. build is fully sprinklered, life safety under seperate permit.

Open the permit page

$177,880
Jan 12, 2009Completed
final sign-off Mar 2009
170 Grant Avt.i. at 5th fl, non-structural partion walls, for offices, conference rm and pantry, cabinets, counters, shelves. mechanical, electrical, plumb are under separate permit, building is fully sprinklered.
Details
Permit
200901129951
Status
complete
Filed
Jan 12, 2009
Permit issued
Jan 12, 2009
Final sign-off
Mar 30, 2009
Declared cost
$325,096
Address
170 Grant Av

t.i. at 5th fl, non-structural partion walls, for offices, conference rm and pantry, cabinets, counters, shelves. mechanical, electrical, plumb are under separate permit, building is fully sprinklered.

Open the permit page

$325,096
Dec 5, 2008Completed
final sign-off Feb 2009
101 02nd Stt.i. including demolition of non-structural partitions and re-working the ceiling lights. (mep under separate permit & life safety under separate permit. building is fully sprinklered.
Details
Permit
200812057876
Status
complete
Filed
Dec 5, 2008
Permit issued
Dec 5, 2008
Final sign-off
Feb 4, 2009
Declared cost
$55,000
Address
101 02nd St

t.i. including demolition of non-structural partitions and re-working the ceiling lights. (mep under separate permit & life safety under separate permit. building is fully sprinklered.

Open the permit page

$55,000
Oct 3, 2008Completed
final sign-off Mar 2009
135 Main StAyoob & Peery Plumbing Co Inc5th floor-relocate fire sprinkler heads per tenant improvement-relocated 14
Details
Permit
200810033300
Status
complete
Filed
Oct 3, 2008
Permit issued
Oct 3, 2008
Final sign-off
Mar 10, 2009
Declared cost
$3,500
Address
135 Main St

5th floor-relocate fire sprinkler heads per tenant improvement-relocated 14

Open the permit page

$3,500
Oct 3, 2008Completed
final sign-off Jun 2009
1 Sansome StAyoob & Peery Plumbing Co Inc29th floor-relocate fire sprinkler heads per tenant improvement-relocate 40, remove 1
Details
Permit
200810033301
Status
complete
Filed
Oct 3, 2008
Permit issued
Oct 3, 2008
Final sign-off
Jun 22, 2009
Declared cost
$7,200
Address
1 Sansome St

29th floor-relocate fire sprinkler heads per tenant improvement-relocate 40, remove 1

Open the permit page

$7,200
Sep 29, 2008Completed
final sign-off Jan 2009
50 Fremont StAyoob & Peery Plumbing Co Inc2nd floor-relocate fire sprinklers per tenant improvements-20 heads relocated, 8 heads removed
Details
Permit
200809292850
Status
complete
Filed
Sep 29, 2008
Permit issued
Sep 30, 2008
Final sign-off
Jan 22, 2009
Declared cost
$4,000
Address
50 Fremont St

2nd floor-relocate fire sprinklers per tenant improvements-20 heads relocated, 8 heads removed

Open the permit page

$4,000
Sep 29, 2008Completed
final sign-off Jan 2009
50 Fremont StAyoob & Peery Plumbing Co Inc2nd floor-relocate fire sprinklers per tenant improvements-30 heads relocated, 0 heads removed
Details
Permit
200809292853
Status
complete
Filed
Sep 29, 2008
Permit issued
Sep 30, 2008
Final sign-off
Jan 22, 2009
Declared cost
$6,000
Address
50 Fremont St

2nd floor-relocate fire sprinklers per tenant improvements-30 heads relocated, 0 heads removed

Open the permit page

$6,000
Aug 8, 2008Completed
final sign-off Oct 2008
1550 Bryant St3rd floor; suite #350-t.i. build out of a few full height & low height non-structural partitions. all new and/or revised hvac, electrical, life safety work will be done under seperate erpmit. building is fully sprinklered
Details
Permit
200808088760
Status
complete
Filed
Aug 8, 2008
Permit issued
Aug 21, 2008
Final sign-off
Oct 22, 2008
Declared cost
$205,000
Address
1550 Bryant St

3rd floor; suite #350-t.i. build out of a few full height & low height non-structural partitions. all new and/or revised hvac, electrical, life safety work will be done under seperate erpmit. building is fully sprinklered

Open the permit page

$205,000
Aug 1, 2008Completed
final sign-off Dec 2008
1 Embarcadero Center6th floor-floor is in shell condition. upgrades will include new non-structural full & partial height partitions, new ceiling, new lighting, electrical & mechanical is part of this permit (building is fully sprinklered)
Details
Permit
200808018207
Status
complete
Filed
Aug 1, 2008
Permit issued
Aug 4, 2008
Final sign-off
Dec 24, 2008
Declared cost
$721,089
Address
1 Embarcadero Center

6th floor-floor is in shell condition. upgrades will include new non-structural full & partial height partitions, new ceiling, new lighting, electrical & mechanical is part of this permit (building is fully sprinklered)

Open the permit page

$721,089
Jul 22, 2008Completed
final sign-off Sep 2008
114 Sansome StAyoob & Peery Plumbing Co Inc9th floor-relocate sprinkler heads per tenant improvement-3 heads relocated, 2 heads removed
Details
Permit
200807227287
Status
complete
Filed
Jul 22, 2008
Permit issued
Jul 23, 2008
Final sign-off
Sep 10, 2008
Declared cost
$600
Address
114 Sansome St

9th floor-relocate sprinkler heads per tenant improvement-3 heads relocated, 2 heads removed

Open the permit page

$600
Jul 14, 2008Expired or cancelled
expired Aug 2010
1160 Polk Strevision to appl #200606154151 - replace concrete slabs & beams supporting sidewalk & along polk street, sutter st, hemlock st.
Details
Permit
200807146632
Status
expired
Filed
Jul 14, 2008
Permit issued
Jul 14, 2008
Declared cost
$6,000
Address
1160 Polk St

revision to appl #200606154151 - replace concrete slabs & beams supporting sidewalk & along polk street, sutter st, hemlock st.

Open the permit page

$6,000
Jun 27, 2008Completed
final sign-off Sep 2008
114 Sansome StRudolph Commercial Interiors Inc, Rci9th floor-uni#910.tenant improvement includes building new non structural partitions. all new or revised hvac, electrical, sprinkler, plumbing and life safety work will be submitted for seperate permit
Details
Permit
200806275499
Status
complete
Filed
Jun 27, 2008
Permit issued
Jun 27, 2008
Final sign-off
Sep 10, 2008
Declared cost
$60,000
Address
114 Sansome St

9th floor-uni#910.tenant improvement includes building new non structural partitions. all new or revised hvac, electrical, sprinkler, plumbing and life safety work will be submitted for seperate permit

Open the permit page

$60,000
Jun 3, 2008Completed
final sign-off Jul 2008
50 Fremont StC B 2 Builders Incorporated22nd floor-make up air duct across corridor. install 2 new vav boxes with 2 row heating coils. new transfer duct. relocate supply grilles, remove 4 dampers and replace with new. remove 3 dampers and cap.ref #200804169835.
Details
Permit
200806033529
Status
complete
Filed
Jun 3, 2008
Permit issued
Jun 10, 2008
Final sign-off
Jul 23, 2008
Declared cost
$100,000
Address
50 Fremont St

22nd floor-make up air duct across corridor. install 2 new vav boxes with 2 row heating coils. new transfer duct. relocate supply grilles, remove 4 dampers and replace with new. remove 3 dampers and cap.ref #200804169835.

Open the permit page

$100,000
Jun 3, 2008Completed
final sign-off Jul 2008
50 Fremont StC B 2 Builders Incorporated22nd floor. t.i. install 2 new vav boxes with 2 row heating coils, new exhaust fan, relocate supply and return, relocate (e) and replace 2 new theromastats-ref pa# 2008-0416-9834. elec office space plan for lights. no panel change.
Details
Permit
200806033526
Status
complete
Filed
Jun 3, 2008
Permit issued
Jun 10, 2008
Final sign-off
Jul 23, 2008
Declared cost
$100,000
Address
50 Fremont St

22nd floor. t.i. install 2 new vav boxes with 2 row heating coils, new exhaust fan, relocate supply and return, relocate (e) and replace 2 new theromastats-ref pa# 2008-0416-9834. elec office space plan for lights. no panel change.

Open the permit page

$100,000
Feb 1, 2008Completed
final sign-off Feb 2008
55 02nd Strevision to disable access comliance status. documentation ab-056 p.a. 200310036547. provide additional documentation.
Details
Permit
200802013794
Status
complete
Filed
Feb 1, 2008
Permit issued
Feb 1, 2008
Final sign-off
Feb 26, 2008
Address
55 02nd St

revision to disable access comliance status. documentation ab-056 p.a. 200310036547. provide additional documentation.

Open the permit page

Nov 9, 2007Completed
final sign-off Aug 2008
114 Sansome Stoffice tenant improvent on 10th fl. new non rated partition. elec.under seperate permit. no mechanical under this permit
Details
Permit
200711097751
Status
complete
Filed
Nov 9, 2007
Permit issued
Nov 9, 2007
Final sign-off
Aug 4, 2008
Declared cost
$175,000
Address
114 Sansome St

office tenant improvent on 10th fl. new non rated partition. elec.under seperate permit. no mechanical under this permit

Open the permit page

$175,000
Oct 9, 2007Completed
final sign-off Feb 2008
75 Hawthorne StPlant Construction Company Lp3rd floor - t.i. to office spaces: included adding offices for demonstration, stroage, bread etc. demo. mechanical, electrical included. fire sprinkler, life safety under seperate permit. no increase in office space. no exterior modifications to building.
Details
Permit
200710094844
Status
complete
Filed
Oct 9, 2007
Permit issued
Oct 10, 2007
Final sign-off
Feb 12, 2008
Declared cost
$150,000
Address
75 Hawthorne St

3rd floor - t.i. to office spaces: included adding offices for demonstration, stroage, bread etc. demo. mechanical, electrical included. fire sprinkler, life safety under seperate permit. no increase in office space. no exterior modifications to building.

Open the permit page

$150,000
Jul 30, 2007Completed
final sign-off Jan 2008
900 North Point St1st floor-suite #100f-tenant improvement, change of use, yoga/dance room, indoor play ground, office, cafe. mechanical, electrical, life safety, sprinkler on seperate permit
Details
Permit
200707308180
Status
complete
Filed
Jul 30, 2007
Permit issued
Sep 19, 2007
Final sign-off
Jan 28, 2008
Declared cost
$235,250
Address
900 North Point St

1st floor-suite #100f-tenant improvement, change of use, yoga/dance room, indoor play ground, office, cafe. mechanical, electrical, life safety, sprinkler on seperate permit

Open the permit page

$235,250
Jun 12, 2007Completed
final sign-off Nov 2007
85 02nd Stoti-1, 2nd floor, el, me, ls, sp.
Details
Permit
200706123653
Status
complete
Filed
Jun 12, 2007
Permit issued
Jun 12, 2007
Final sign-off
Nov 2, 2007
Declared cost
$25,000
Address
85 02nd St

oti-1, 2nd floor, el, me, ls, sp.

Open the permit page

$25,000
Jun 12, 2007Completed
final sign-off Nov 2007
85 02nd Stoti-1, 5th floor, el, me, ls, sp.
Details
Permit
200706123650
Status
complete
Filed
Jun 12, 2007
Permit issued
Jun 12, 2007
Final sign-off
Nov 2, 2007
Declared cost
$45,000
Address
85 02nd St

oti-1, 5th floor, el, me, ls, sp.

Open the permit page

$45,000
Jan 24, 2007Completed
final sign-off Aug 2007
731 Market St3rd floor - demo (soft interior) doors & wall, install (n) 1 hour rated full height walls, (n) m & w restrooms.
Details
Permit
200701242455
Status
complete
Filed
Jan 24, 2007
Permit issued
Jan 24, 2007
Final sign-off
Aug 22, 2007
Declared cost
$190,000
Address
731 Market St

3rd floor - demo (soft interior) doors & wall, install (n) 1 hour rated full height walls, (n) m & w restrooms.

Open the permit page

$190,000
Dec 17, 2003Completed
final sign-off Feb 2006
3738 Geary Bldemolish 1 story cafe
Details
Permit
200312172481
Status
complete
Filed
Dec 17, 2003
Permit issued
May 10, 2005
Final sign-off
Feb 3, 2006
Address
3738 Geary Bl

demolish 1 story cafe

Open the permit page

Feb 16, 2000Completed
final sign-off Oct 2000
101 02nd Stoti-1 24th fl, electrical,mechanical,lifesafty,sprinkler
Details
Permit
200002162084
Status
complete
Filed
Feb 16, 2000
Permit issued
Mar 13, 2000
Final sign-off
Oct 27, 2000
Declared cost
$432,000
Address
101 02nd St

oti-1 24th fl, electrical,mechanical,lifesafty,sprinkler

Open the permit page

$432,000