Block 0293, lot 002
153 Kearny St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
54 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 153 Kearny St | Everest Waterproofing & Restoration Inc. | remove rust from roof beam, approx 5' below parapet on west side lightwell & on beam 2' below parapet on south wall. treat beams with corrison inhabitor. rebuild in kind. attach plate to underside of south wall beamDetails
remove rust from roof beam, approx 5' below parapet on west side lightwell & on beam 2' below parapet on south wall. treat beams with corrison inhabitor. rebuild in kind. attach plate to underside of south wall beam | $64,000 |
| Dec 8, 2011 | Expired or cancelled cancelled Jan 2026 | 141 Kearny St | new interior decor package in sales area. new refrigerated cases in sales area. new millwork,shelves and fixtures. new beverage bar in sales area with new handsink and 3 comp. sink in all area. paint ceiling grid and replace ceiling tiles in sales & pharmacy. new condenser on roof.Details
new interior decor package in sales area. new refrigerated cases in sales area. new millwork,shelves and fixtures. new beverage bar in sales area with new handsink and 3 comp. sink in all area. paint ceiling grid and replace ceiling tiles in sales & pharmacy. new condenser on roof. | $432,000 | |
| Oct 21, 2011 | Completed final sign-off Jan 2012 | 217 Sutter St | Commercial Building Maintenance Dba Cbm | 1/f - install new floor covering, upgrading 1 circuit & install 1 new circuit for hand dryer. replace hand sink, install new wall coveringDetails
1/f - install new floor covering, upgrading 1 circuit & install 1 new circuit for hand dryer. replace hand sink, install new wall covering | $17,000 |
| May 18, 2011 | Completed final sign-off May 2012 | 153 Kearny St | Marina Mechanical Services | 2nd fl. ti improvement hvac add vav hw rh zones and distribution duct to existing base system.Details
2nd fl. ti improvement hvac add vav hw rh zones and distribution duct to existing base system. | $77,000 |
| May 17, 2011 | Completed final sign-off Jun 2011 | 153 Kearny St | Carter Brothers Fire & Life Safety | 2nd floor & mezz level - add to an existing fire alarm system new fa devices in the t.i. space (t.i. pa #201103313180). this includes 2 smokes, 1 duct detector, 17 horn strobes, 4 strobes.Details
2nd floor & mezz level - add to an existing fire alarm system new fa devices in the t.i. space (t.i. pa #201103313180). this includes 2 smokes, 1 duct detector, 17 horn strobes, 4 strobes. | $5,800 |
| May 17, 2011 | Never finaled issued May 2011, no final | 153 Kearny St | Carter Brothers Fire & Life Safety | mezz & basement core - add to an existing fire alarm system new fa devices in the core area of the basement & mezz levels. this includes 5 horn storbes & 1 strobe.Details
mezz & basement core - add to an existing fire alarm system new fa devices in the core area of the basement & mezz levels. this includes 5 horn storbes & 1 strobe. | $5,400 |
| Apr 5, 2011 | Completed final sign-off Jan 2014 | 153 Kearny St | Carter Brothers Fire & Life Safety | add new fire alarm devices to existing fa system in new rth fl ti space (ti 201102180412) includes 11 horn/strobes, 1 smk, 1 duct det)Details
add new fire alarm devices to existing fa system in new rth fl ti space (ti 201102180412) includes 11 horn/strobes, 1 smk, 1 duct det) | $5,200 |
| Mar 31, 2011 | Completed final sign-off May 2012 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | 2nd floor & mezzanine-t.i. to (e) office space including new office, conference rooms, reception, video studio & kitchenette; mep under separate permitDetails
2nd floor & mezzanine-t.i. to (e) office space including new office, conference rooms, reception, video studio & kitchenette; mep under separate permit | $450,000 |
| Mar 30, 2011 | Completed final sign-off May 2012 | 153 Kearny St | Marina Mechanical Services | ti improvement for hvac. add vav hot water reheat zones and distribution duct to extg base system. reference permit #201102180512Details
ti improvement for hvac. add vav hot water reheat zones and distribution duct to extg base system. reference permit #201102180512 | $54,000 |
| Mar 7, 2011 | Never finaled issued Mar 2011, no final | 153 Kearny St | street spaceDetails
street space | ||
| Mar 1, 2011 | Completed final sign-off Jun 2011 | 153 Kearny St | Carter Brothers Fire & Life Safety | add new fire alrm devices to an extg fa system in empty tenant spaces on 2nd and 4th floor.this includes 4 smoke detectors,3 duct detectors, 5 horn strobes, and 4 strobes. t i #201009241603.Details
add new fire alrm devices to an extg fa system in empty tenant spaces on 2nd and 4th floor.this includes 4 smoke detectors,3 duct detectors, 5 horn strobes, and 4 strobes. t i #201009241603. | $6,400 |
| Feb 18, 2011 | Completed final sign-off May 2012 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | 4th floor-t.i. to (e) suite #1, tenant space divided into 2 suites, new non structural interior partitions. m.e.p under seperate permitDetails
4th floor-t.i. to (e) suite #1, tenant space divided into 2 suites, new non structural interior partitions. m.e.p under seperate permit | $200,000 |
| Feb 8, 2011 | Completed final sign-off May 2012 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | 2nd. & 4th. flr.: revision to app#201009241603.remove walls @ corridor, enlarge bathroom.Details
2nd. & 4th. flr.: revision to app#201009241603.remove walls @ corridor, enlarge bathroom. | |
| Jan 7, 2011 | Never finaled issued Mar 2011, no final | 153 Kearny St | install 2 smoke detectors and 2 heat detectors for elevator recall and elev shunt on 1st floorDetails
install 2 smoke detectors and 2 heat detectors for elevator recall and elev shunt on 1st floor | $1,500 | |
| Oct 22, 2010 | Completed final sign-off Jan 2014 | 153 Kearny St | Carter Brothers Fire & Life Safety | add 2 new smoke detectors to existing fire alarm system on the 5th flr elevator lobby for existing door holders releaseDetails
add 2 new smoke detectors to existing fire alarm system on the 5th flr elevator lobby for existing door holders release | $3,700 |
| Oct 5, 2010 | Expired or cancelled withdrawn Feb 2014 | 153 Kearny St | C B F Inc | 5th floor-life safety modifications-adding 2 smoke detectorsDetails
5th floor-life safety modifications-adding 2 smoke detectors | $50,000 |
| Sep 24, 2010 | Completed final sign-off May 2011 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | office ti on the 2nd and 4th floor. new floor finish, rated enclosures at stairs, renovated and new restrooms. new hvac system.life safty/sprnkr/fire alarm associated work shall be under seperate permit.Details
office ti on the 2nd and 4th floor. new floor finish, rated enclosures at stairs, renovated and new restrooms. new hvac system.life safty/sprnkr/fire alarm associated work shall be under seperate permit. | $250,000 |
| Jul 2, 2010 | Completed final sign-off Oct 2010 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | 5th floor t.i. unclude demolition of non-structural partitions & bldg new non-structural paritions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted separately. bldg is historical class 1 bldg & not sprinklered.Details
5th floor t.i. unclude demolition of non-structural partitions & bldg new non-structural paritions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted separately. bldg is historical class 1 bldg & not sprinklered. | $60,000 |
| May 7, 2007 | Expired or cancelled withdrawn Aug 2007 | 153 Kearny St | selective structural demo per plan to enable structural engineer to prepare plan for full seismic upgradeDetails
selective structural demo per plan to enable structural engineer to prepare plan for full seismic upgrade | $150,000 | |
| May 2, 2007 | Never finaled issued May 2007, no final | 153 Kearny St | 1) non-structural interior demolition,2) per administrative bulletin no. ab-017, a full accessibility will be provided under seperate permitDetails
1) non-structural interior demolition,2) per administrative bulletin no. ab-017, a full accessibility will be provided under seperate permit | $105,000 | |
| Mar 28, 2006 | Expired or cancelled withdrawn Aug 2007 | 153 Kearny St | convert existing office to residential condominiums. existing retail will remain on ground floor. associated bldg services will remain at basement and 2nd floor.Details
convert existing office to residential condominiums. existing retail will remain on ground floor. associated bldg services will remain at basement and 2nd floor. | $750,000 | |
| Oct 13, 2004 | Expired or cancelled cancelled Apr 2009 | 217 Sutter St | Sign Designs Inc. | remove (e) illeg awning + frame work. install new fabric awning + new frames with 7-11 copy on fabric + install lighting.Details
remove (e) illeg awning + frame work. install new fabric awning + new frames with 7-11 copy on fabric + install lighting. | $6,000 |
| May 10, 2004 | Expired or cancelled expired Jun 2007 | 217 Sutter St | C B F Inc | 1/f- furnish & install duct detector @ 7-11Details
1/f- furnish & install duct detector @ 7-11 | $800 |
| Mar 16, 2004 | Completed final sign-off Apr 2004 | 217 Sutter St | rev#200311251156. minor revision including coffee irland orientation condensers unit relocation chanDetails
rev#200311251156. minor revision including coffee irland orientation condensers unit relocation chan | ||
| Mar 8, 2004 | Never finaled issued Mar 2004, no final | 153 Kearny St | James Construction**See Note*** | build approx 6' of wall patch (e) walls & fire tape.demo approx 50' of wallDetails
build approx 6' of wall patch (e) walls & fire tape.demo approx 50' of wall | $5,000 |
| Jan 14, 2004 | Completed final sign-off Apr 2004 | 217 Sutter St | erect non structural signDetails
erect non structural sign | $1,000 | |
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 217 Sutter St | street space permitDetails
street space permit | ||
| Dec 2, 2003 | Completed final sign-off Apr 2004 | 217 Sutter St | move (e) retail entrance door 3' into building from its orig. location to complyDetails
move (e) retail entrance door 3' into building from its orig. location to comply | $6,000 | |
| Nov 25, 2003 | Completed final sign-off Apr 2004 | 217 Sutter St | t.i for a retail store. remove (e) non bearing wall, & contruct new non bearing wall for a back roomDetails
t.i for a retail store. remove (e) non bearing wall, & contruct new non bearing wall for a back room | $75,000 | |
| Nov 21, 2003 | Never finaled issued Nov 2003, no final | 217 Sutter St | address assignmentDetails
address assignment | ||
| May 22, 2002 | Completed final sign-off May 2002 | 153 Kearny St | renew pa#2000/01/18/255,2000/02/29/3034,2000/04/03/6148 for final insp.Details
renew pa#2000/01/18/255,2000/02/29/3034,2000/04/03/6148 for final insp. | ||
| May 22, 2002 | Completed final sign-off May 2002 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | to renew app#2000/11/14/5617,2001/02/22/2651 & 2001/12/05/4565 for final inspection.Details
to renew app#2000/11/14/5617,2001/02/22/2651 & 2001/12/05/4565 for final inspection. | |
| May 22, 2002 | Completed final sign-off May 2002 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | to renew app#2001/01/18/259,2000/02/29/3035 & 2000/04/03/6175 for finalinspection.Details
to renew app#2001/01/18/259,2000/02/29/3035 & 2000/04/03/6175 for finalinspection. | |
| Mar 29, 2002 | Expired or cancelled expired Dec 2003 | 153 Kearny St | James Construction**See Note*** | install 2 handicap rstrooms one @ 2/f 1 @ 4/f mechanical wrk under sep permitDetails
install 2 handicap rstrooms one @ 2/f 1 @ 4/f mechanical wrk under sep permit | $30,000 |
| Dec 5, 2001 | Completed final sign-off May 2002 | 153 Kearny St | Cal-Air Inc | flor a/c unit in place on 3/f replace existingDetails
flor a/c unit in place on 3/f replace existing | $11,000 |
| May 18, 2001 | Expired or cancelled expired Oct 2001 | 153 Kearny St | C B F Inc | life safety modification-ground fl. mezzannieDetails
life safety modification-ground fl. mezzannie | $4,500 |
| May 8, 2001 | Completed final sign-off Apr 2002 | 153 Kearny St | Gci, Inc | oti-3 3rd floor ls onlyDetails
oti-3 3rd floor ls only | $10,000 |
| Mar 29, 2001 | Completed final sign-off Apr 2002 | 153 Kearny St | Gci, Inc | oti-2 3rd floor, el & meDetails
oti-2 3rd floor, el & me | $150,000 |
| Mar 8, 2001 | Completed final sign-off Apr 2002 | 153 Kearny St | oti-1 3rd floor, el, meDetails
oti-1 3rd floor, el, me | $300,000 | |
| Feb 22, 2001 | Completed final sign-off Jun 2001 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | oti-1 3rd fl el,meDetails
oti-1 3rd fl el,me | $20,000 |
| Feb 22, 2001 | Expired or cancelled expired Sep 2001 | 153 Kearny St | Cci Com'l Constr & Improv**See 985808*** | oti-1 basement el,me,spDetails
oti-1 basement el,me,sp | $20,000 |
| Nov 30, 2000 | Expired or cancelled expired Dec 2001 | 153 Kearny St | oti-1 basement el, me, l/s, spDetails
oti-1 basement el, me, l/s, sp | $200,000 | |
| Nov 14, 2000 | Expired or cancelled expired Dec 2001 | 153 Kearny St | oti-1 3rd floor el meDetails
oti-1 3rd floor el me | $100,000 | |
| Jul 6, 2000 | Completed final sign-off Jan 2001 | 153 Kearny St | oti-1, me, el, mezzanine levelDetails
oti-1, me, el, mezzanine level | $50,000 | |
| May 30, 2000 | Expired or cancelled expired Jan 2001 | 153 Kearny St | C B F Inc | life safety modifications 5th floorDetails
life safety modifications 5th floor | $7,500 |
| May 30, 2000 | Expired or cancelled expired Jan 2001 | 153 Kearny St | C B F Inc | life safety modifications on 6th flDetails
life safety modifications on 6th fl | $7,500 |
| Apr 3, 2000 | Expired or cancelled expired Oct 2000 | 153 Kearny St | oti-2, el, me, 6th floorDetails
oti-2, el, me, 6th floor | $25,000 | |
| Apr 3, 2000 | Expired or cancelled expired Oct 2000 | 153 Kearny St | oti-2, el, me, 5th floorDetails
oti-2, el, me, 5th floor | $25,000 | |
| Feb 29, 2000 | Expired or cancelled expired Mar 2002 | 153 Kearny St | oti-1 5th floor el meDetails
oti-1 5th floor el me | $400,000 | |
| Feb 29, 2000 | Expired or cancelled expired Mar 2002 | 153 Kearny St | 071- 1 6th fl el meDetails
071- 1 6th fl el me | $400,000 | |
| Feb 28, 2000 | Expired or cancelled expired Mar 2001 | 153 Kearny St | addition of fire escape remove of (e)glazingDetails
addition of fire escape remove of (e)glazing | $50,000 | |
| Feb 23, 2000 | Expired or cancelled expired Jun 2000 | 153 Kearny St | street space useDetails
street space use | ||
| Jan 18, 2000 | Expired or cancelled expired Feb 2001 | 153 Kearny St | oti-1 el me lsDetails
oti-1 el me ls | $200,000 | |
| Jan 18, 2000 | Expired or cancelled expired Feb 2001 | 153 Kearny St | oti-1 6/f el me l/sDetails
oti-1 6/f el me l/s | $200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cci Com'l Constr & Improv**See 985808*** (9), C B F Inc (5), Carter Brothers Fire & Life Safety (5), Gci, Inc (2), James Construction**See Note*** (2), Marina Mechanical Services (2), Cal-Air Inc, Commercial Building Maintenance Dba Cbm, Everest Waterproofing & Restoration Inc., Sign Designs Inc.
- Architects
- Daniel Huntsmen, Julia Nelson, Sign Designs, Inc.
- Engineers
- Vincent Aiello
- Authorized agent-otherss
- O+A, Inc O+A, Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.