Block 0329, lot 001
800 Market St
- City’s use
- Commercial Retail
- Built
- 1908
- Stories
- 8
- Rooms
- 14 bathrooms
- Building
- 50,163 sq ft
- Lot
- 5,937 sq ft
- Zoning
- C3R
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
94 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 13, 2022 | Never finaled issued Oct 2022, no final | 800 Market St | M C S Construction Services | mechaninc and electrical scope of work under ti bldg permit ref pa#2022-0809-0154Details
mechaninc and electrical scope of work under ti bldg permit ref pa#2022-0809-0154 | $128,000 |
| Sep 28, 2022 | Completed final sign-off Oct 2022 | 800 Market St | Golden Gate Fire Protection Inc | 3/f: fire sprinklers. relocate 31 uprights. ref permit 202208090154Details
3/f: fire sprinklers. relocate 31 uprights. ref permit 202208090154 | $16,275 |
| Sep 28, 2022 | Completed final sign-off Mar 2023 | 800 Market St | Siemens Industry, Inc. | fire work only for the spec suite remodel on floor 3, 2 speaker strobes added and 7 existing speaker strobes relocated ref 202208090154Details
fire work only for the spec suite remodel on floor 3, 2 speaker strobes added and 7 existing speaker strobes relocated ref 202208090154 | $3,500 |
| Aug 9, 2022 | Completed final sign-off Mar 2023 | 800 Market St | M C S Construction Services | 3/f: t.i. : interior demo of non-structural elecments. new interior partiti8ons, doors, finishes, ceilings, lighting, mechanical & electrical receptacles, switches. mechanical & electrical under separate permit.Details
3/f: t.i. : interior demo of non-structural elecments. new interior partiti8ons, doors, finishes, ceilings, lighting, mechanical & electrical receptacles, switches. mechanical & electrical under separate permit. | $350,000 |
| Jul 9, 2021 | Completed final sign-off Jul 2021 | 800 Market St | Siemens Industry, Inc. | fire only as built drawings to reflect the actual installation for the diesel remodels on floors 2 and 3, initial fire alarm 201908279894Details
fire only as built drawings to reflect the actual installation for the diesel remodels on floors 2 and 3, initial fire alarm 201908279894 | |
| Sep 26, 2020 | Expired or cancelled withdrawn Oct 2021 | 800 Market St | 3/f: t.i: non-structural partitions, flooring, finisehs, fixturse. memorialize cua 2019-014033 to change from m to b occupancy.Details
3/f: t.i: non-structural partitions, flooring, finisehs, fixturse. memorialize cua 2019-014033 to change from m to b occupancy. | $556,768 | |
| Dec 20, 2019 | Completed final sign-off Mar 2020 | 800 Market St | M C S Construction Services | 6th fl - revision to pa 2019-0503-9707 to capture installation of new wall and door. no change to other floors in building or (e) egress path to street. all mpe, fire alarm, fire sprinkler and structural work shall be under separate permitDetails
6th fl - revision to pa 2019-0503-9707 to capture installation of new wall and door. no change to other floors in building or (e) egress path to street. all mpe, fire alarm, fire sprinkler and structural work shall be under separate permit | $5,000 |
| Oct 30, 2019 | Expired or cancelled withdrawn Mar 2020 | 800 Market St | Peacock Construction | 2nd floor: revision to app#2019-0415-7969 and 2019-0304-4279.relocate lights and toilets partitions for new layout.Details
2nd floor: revision to app#2019-0415-7969 and 2019-0304-4279.relocate lights and toilets partitions for new layout. | |
| Oct 4, 2019 | Completed final sign-off Mar 2020 | 800 Market St | M C S Construction Services | 6th fl - ref pa 2019-0503-9707, low voltage drawings: data, av, security; new idf room cabling , new card readers & cameras, new hdmi av connectionsDetails
6th fl - ref pa 2019-0503-9707, low voltage drawings: data, av, security; new idf room cabling , new card readers & cameras, new hdmi av connections | |
| Sep 4, 2019 | Completed final sign-off Sep 2019 | 800 Market St | R L H Fire Protection Inc | 6th fl fire sprinkler ti/upgrade of the exising fire sprinkler system: 2 relocate pendent sprinklers, and 2 additional pendent sprinklers. ref pa #201905039707.Details
6th fl fire sprinkler ti/upgrade of the exising fire sprinkler system: 2 relocate pendent sprinklers, and 2 additional pendent sprinklers. ref pa #201905039707. | $1,000 |
| Aug 27, 2019 | Completed final sign-off Jul 2021 | 800 Market St | Siemens Industry, Inc. | fire alarm -remodel floor 2 - demo work on 3rd flr, add 1 smk det, 2 modules and 6 speaker/strobesDetails
fire alarm -remodel floor 2 - demo work on 3rd flr, add 1 smk det, 2 modules and 6 speaker/strobes | $5,445 |
| Aug 26, 2019 | Completed final sign-off Mar 2020 | 800 Market St | Siemens Industry, Inc. | fire alarm "wework" 6th flr - add 3 smk det, 7 speaker/strobes ref 201905039707Details
fire alarm "wework" 6th flr - add 3 smk det, 7 speaker/strobes ref 201905039707 | $6,350 |
| May 3, 2019 | Completed final sign-off May 2020 | 800 Market St | M C S Construction Services | 6th flr - non structural ti . new partitions, flooring, lighting, furnisihngs and finishes. no change to other floors or common area all fire sprinkler/alarm under sep permitDetails
6th flr - non structural ti . new partitions, flooring, lighting, furnisihngs and finishes. no change to other floors or common area all fire sprinkler/alarm under sep permit | $500,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 800 Market St | Peacock Construction | revision to pa 2018-0618-2124 and 2019-0304-4279 to reduce scope of workDetails
revision to pa 2018-0618-2124 and 2019-0304-4279 to reduce scope of work | |
| Mar 4, 2019 | Never finaled issued Mar 2019, no final | 800 Market St | Peacock Construction | 2nd floor: revision to app#201806182124. relocate tele.com rack to 2nd floor from 3rd floor into extg managers office.Details
2nd floor: revision to app#201806182124. relocate tele.com rack to 2nd floor from 3rd floor into extg managers office. | $6,000 |
| Feb 1, 2019 | Completed final sign-off Feb 2019 | 800 Market St | Siemens Industry, Inc. | 4th fl - fire alarm "as built" permit for the "wework" remodel floor 4 per the sffd testing inspectors, drawings reflect the addition of 1 smoke detector and relay module. ref pa 2018-0904-9051Details
4th fl - fire alarm "as built" permit for the "wework" remodel floor 4 per the sffd testing inspectors, drawings reflect the addition of 1 smoke detector and relay module. ref pa 2018-0904-9051 | $1,135 |
| Jan 2, 2019 | Completed final sign-off Jun 2019 | 800 Market St | Dome Construction Corp | 4th fl office ti modify hvac, new lighting and controls. new power outlets plumbing connections for break area ref 201809049051Details
4th fl office ti modify hvac, new lighting and controls. new power outlets plumbing connections for break area ref 201809049051 | $200,000 |
| Dec 19, 2018 | Completed final sign-off Feb 2019 | 800 Market St | Siemens Industry, Inc. | fire alarm work for the "wework" remodel on floor 4; additions are 9 speaker/strobes. ref pa #201809049051.Details
fire alarm work for the "wework" remodel on floor 4; additions are 9 speaker/strobes. ref pa #201809049051. | $5,700 |
| Nov 6, 2018 | Completed final sign-off Nov 2018 | 800 Market St | Red Hawk Fire & Security Ca Llc | demo/plug drops after ceiling cloud is removed. install new ssu/ssp as required by new floor plan/rcpDetails
demo/plug drops after ceiling cloud is removed. install new ssu/ssp as required by new floor plan/rcp | $8,000 |
| Sep 4, 2018 | Completed final sign-off Jun 2019 | 800 Market St | Sajo, Inc. | fourth fl ti interior only. work includes new partitons, new floor, ceiling finishes and bathroom finishes. mep, f/a and sprinklers under separate permit.Details
fourth fl ti interior only. work includes new partitons, new floor, ceiling finishes and bathroom finishes. mep, f/a and sprinklers under separate permit. | $500,000 |
| Aug 22, 2018 | Expired or cancelled cancelled Jan 2026 | 800 Market St | shelving for retail tenant improvement ref arch 201806182124Details
shelving for retail tenant improvement ref arch 201806182124 | $10,000 | |
| Jun 18, 2018 | Never finaled issued Aug 2018, no final | 800 Market St | Peacock Construction | 2nd and 3rd floors - interior remodel to return 3rd flr of existing diesel retail store back to building owner. demo & infill of existing stair opening between 2nd & 3rd flrs. non-structural demo at 3rd flr. new non-structural partitions at 2nd flr to relocate stock room. replacement of lightingDetails
2nd and 3rd floors - interior remodel to return 3rd flr of existing diesel retail store back to building owner. demo & infill of existing stair opening between 2nd & 3rd flrs. non-structural demo at 3rd flr. new non-structural partitions at 2nd flr to relocate stock room. replacement of lighting | $157,960 |
| Feb 7, 2018 | Completed final sign-off Apr 2018 | 800 Market St | Peacock Construction | 5th fl: t-24 electrical for work under pa #201710171413.Details
5th fl: t-24 electrical for work under pa #201710171413. | $8,000 |
| Jan 12, 2018 | Completed final sign-off Apr 2018 | 800 Market St | Peacock Construction | t-24 mech for work under 201710171413Details
t-24 mech for work under 201710171413 | $18,000 |
| Nov 16, 2017 | Completed final sign-off Dec 2017 | 800 Market St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 2 pendents, add 1 upright for spec suite on the 5th fl. ref #201710312736.Details
fire sprinkler only - relocate 2 pendents, add 1 upright for spec suite on the 5th fl. ref #201710312736. | $1,000 |
| Nov 14, 2017 | Completed final sign-off Mar 2018 | 800 Market St | Siemens Industry, Inc. | 5/f: fire alarm work for the "spec suite" remodel on fifth floor. add 2 speaker/strobes and relocate 13 speaker/strobes. ref t.i. pa#201710312736.Details
5/f: fire alarm work for the "spec suite" remodel on fifth floor. add 2 speaker/strobes and relocate 13 speaker/strobes. ref t.i. pa#201710312736. | $4,070 |
| Oct 31, 2017 | Completed final sign-off Apr 2018 | 800 Market St | Peacock Construction | 5th floor - project involves modification of existing tenantn improvements to include construction of non-load bearing partitions, modifications to ceiling grid & tile, new light fixtures, reuse of existing doors, new millwork, relcoation of (e) sink, & new finishes.Details
5th floor - project involves modification of existing tenantn improvements to include construction of non-load bearing partitions, modifications to ceiling grid & tile, new light fixtures, reuse of existing doors, new millwork, relcoation of (e) sink, & new finishes. | $449,000 |
| Oct 17, 2017 | Completed final sign-off Apr 2018 | 800 Market St | Peacock Construction | 5/f- project involves demolition & removal of non load bearing partitions, selective demo of ceiling grid/tile, light fixtures, millwork, electrical, plumbing finishes & door. per ab-017, t.i. will followDetails
5/f- project involves demolition & removal of non load bearing partitions, selective demo of ceiling grid/tile, light fixtures, millwork, electrical, plumbing finishes & door. per ab-017, t.i. will follow | $75,000 |
| Sep 17, 2015 | Completed final sign-off Oct 2015 | 800 Market St | Siemens Industry, Inc. | floor 7 - fire alarm work for the "global fund for women: ti remodel on floor 7; additions are 1 speaker and 3 speaker/strobes, as well as the relocation of 2 speaker/strobes. no ref numberDetails
floor 7 - fire alarm work for the "global fund for women: ti remodel on floor 7; additions are 1 speaker and 3 speaker/strobes, as well as the relocation of 2 speaker/strobes. no ref number | $2,500 |
| Mar 20, 2014 | Never finaled issued Apr 2014, no final | 800 Market St | Novo Construction Inc | proposed revocation of office unit consisting of replacing main entry and exterior door. add new closets. remove (e) partitions.Details
proposed revocation of office unit consisting of replacing main entry and exterior door. add new closets. remove (e) partitions. | $15,000 |
| May 13, 2013 | Never finaled issued May 2013, no final | 800 Market St | street spaceDetails
street space | ||
| Aug 1, 2012 | Completed final sign-off Nov 2012 | 800 Market St | Madesin General Contractors Inc | install new interior stairs from lower basement level to 1st floor (ground) floor ref: #201204269208Details
install new interior stairs from lower basement level to 1st floor (ground) floor ref: #201204269208 | $15,000 |
| Aug 1, 2012 | Completed final sign-off Sep 2012 | 800 Market St | Siemens Industry, Inc. | addition of 10 sprinklers/strobes and 2 strobes for the "game shop" tenant remodel in the basement level and the ground floor. all devices connect onto the fire alarm system.Details
addition of 10 sprinklers/strobes and 2 strobes for the "game shop" tenant remodel in the basement level and the ground floor. all devices connect onto the fire alarm system. | $4,800 |
| Jul 24, 2012 | Completed final sign-off Jul 2012 | 800 Market St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per t.i. add 7 and relocate 2.Details
add & relocate fire sprinkler heads per t.i. add 7 and relocate 2. | $4,806 |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 800 Market St | Madesin General Contractors Inc | revision to pa# 2012-0426-9208-relocating bathrooms, revised mechanical supply & returns, ada complaint ramp. non bearing interior walls, electrical sub-panel- sprinkler and fire alarm separate permitDetails
revision to pa# 2012-0426-9208-relocating bathrooms, revised mechanical supply & returns, ada complaint ramp. non bearing interior walls, electrical sub-panel- sprinkler and fire alarm separate permit | |
| Jun 19, 2012 | Expired or cancelled cancelled Nov 2016 | 800 Market St | Northwest Signs | new illuminated sign attached to existing metal awning frameDetails
new illuminated sign attached to existing metal awning frame | $7,500 |
| May 30, 2012 | Completed final sign-off Jul 2012 | 800 Market St | Bcci Construction Company | ground floor:barrier removal provision of ramp steps and shell improvements, accessible restroom is not included in scope and will be provided with t.i. for new tenant. sp, fire alarm, mep's under seperate permit. demolishing and building some new nonstructural partitions. building fully sprnklered.Details
ground floor:barrier removal provision of ramp steps and shell improvements, accessible restroom is not included in scope and will be provided with t.i. for new tenant. sp, fire alarm, mep's under seperate permit. demolishing and building some new nonstructural partitions. building fully sprnklered. | $293,000 |
| Apr 26, 2012 | Completed final sign-off Nov 2012 | 800 Market St | Madesin General Contractors Inc | interior remodel:new walls, new electrical, new plumbing. structural work for new metal pan stairs to lower level sales area to be under separate permit.Details
interior remodel:new walls, new electrical, new plumbing. structural work for new metal pan stairs to lower level sales area to be under separate permit. | $150,000 |
| Nov 7, 2011 | Completed final sign-off Nov 2011 | 800 Market St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade: relocate 3 pendent sprinkler heads on the 8th floor.Details
fire sprinkler system upgrade: relocate 3 pendent sprinkler heads on the 8th floor. | $1,545 |
| Oct 21, 2011 | Never finaled issued Oct 2011, no final | 800 Market St | Skyline Construction | mechanical and electrical work for tenant improvement on the 8th floor. ref: architect 2011-1005-6160Details
mechanical and electrical work for tenant improvement on the 8th floor. ref: architect 2011-1005-6160 | $150,000 |
| Oct 18, 2011 | Completed final sign-off Dec 2011 | 800 Market St | Siemens Industry, Inc. | addition of 4 smoke detectors, 2 relay modules, 4 speakers, 6 speaker strobes, 1 strobe, 2 door holders, for the obvious corporation remodel on floor 8. all new devices connect onto fire alarm systemDetails
addition of 4 smoke detectors, 2 relay modules, 4 speakers, 6 speaker strobes, 1 strobe, 2 door holders, for the obvious corporation remodel on floor 8. all new devices connect onto fire alarm system | $8,800 |
| Oct 5, 2011 | Completed final sign-off Jan 2012 | 800 Market St | Skyline Construction | 8th floor select demo, construction of new walls, finishes, electrical, lighting , mech & plbg. mech, electrical, plumbing, life safety under separate permit.Details
8th floor select demo, construction of new walls, finishes, electrical, lighting , mech & plbg. mech, electrical, plumbing, life safety under separate permit. | $680,000 |
| Apr 21, 2011 | Never finaled issued Dec 2011, no final | 800 Market St | Metropolitan Electrical Construction | install e-911 panel antenna as required by fcc & dept of homeland security.Details
install e-911 panel antenna as required by fcc & dept of homeland security. | $5,000 |
| Mar 14, 2011 | Completed final sign-off Jul 2011 | 800 Market St | Siemens Industry, Inc. | basement - addition of 3 smoke detector, 3 monitor module, 7 speaker/strobes, 1 strobe and 1 firefighter's phone jack ( fire pump room) for the "basement easment" project. all new devices connect into the existing fire alarm system.Details
basement - addition of 3 smoke detector, 3 monitor module, 7 speaker/strobes, 1 strobe and 1 firefighter's phone jack ( fire pump room) for the "basement easment" project. all new devices connect into the existing fire alarm system. | $7,000 |
| Mar 7, 2011 | Completed final sign-off Jul 2011 | 800 Market St | Socha Visual Inc | install new evacuation maps for floors 4 and 5Details
install new evacuation maps for floors 4 and 5 | $2,500 |
| Feb 7, 2011 | Completed final sign-off Jun 2011 | 800 Market St | Socha Visual Inc | install new evacuation (maps) sign to code floors 6-7Details
install new evacuation (maps) sign to code floors 6-7 | $2,000 |
| Feb 4, 2011 | Completed final sign-off Nov 2022 | 800 Market St | Ayoob & Peery Plumbing Co Inc | relocate existing fire pump to new location, demo 19 heads, add 12 heads, relocate 4 and plug off 2Details
relocate existing fire pump to new location, demo 19 heads, add 12 heads, relocate 4 and plug off 2 | $94,000 |
| Jan 7, 2011 | Completed final sign-off Sep 2011 | 800 Market St | Richlen Construction | demolition of existing partitions, doors and associated architectural items per ab 017. no structural work,Details
demolition of existing partitions, doors and associated architectural items per ab 017. no structural work, | $30,000 |
| Dec 13, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Bcci Construction Company | revision to pa #2010-0706-5972 and associate revised mechanical & electrical.Details
revision to pa #2010-0706-5972 and associate revised mechanical & electrical. | $40,000 |
| Dec 7, 2010 | Expired or cancelled cancelled Dec 2010 | 800 Market St | Anderson, Rowe & Buckley, Inc. | relocate 3 sprinklers in existing fire systemDetails
relocate 3 sprinklers in existing fire system | $1,500 |
| Nov 29, 2010 | Expired or cancelled cancelled Jan 2026 | 800 Market St | Richlen Construction | sub sidewalk & basement level demolition of "e" utility rooms, partitoins, doors & (e) plumbing equipment, piping, mechanical, & electrical equipment & related system components. ab-017.Details
sub sidewalk & basement level demolition of "e" utility rooms, partitoins, doors & (e) plumbing equipment, piping, mechanical, & electrical equipment & related system components. ab-017. | $25,000 |
| Sep 21, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Bcci Construction Company | 7th floor- constuct 6 offices and 1 pantry. mech and electrical are includedDetails
7th floor- constuct 6 offices and 1 pantry. mech and electrical are included | $150,000 |
| Jul 15, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Anderson, Rowe & Buckley, Inc. | 6th. flr.: t.i. to the (e) fire sprinkler system. 28-relocated sprinklers.Details
6th. flr.: t.i. to the (e) fire sprinkler system. 28-relocated sprinklers. | $5,600 |
| Jul 15, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Anderson, Rowe & Buckley, Inc. | 3rd., 4th. & 5th. flr.: t.i. to the (e) fire sprinkler system. relocate 20-sprinklers, added 8-sprinklers.Details
3rd., 4th. & 5th. flr.: t.i. to the (e) fire sprinkler system. relocate 20-sprinklers, added 8-sprinklers. | $6,400 |
| Jul 15, 2010 | Completed final sign-off Sep 2010 | 800 Market St | Siemens Industry, Inc. | addition of 3 duct detectors, 2 relay modules, 33 speaker strobes,4 strobes for study group remodels on floors 3,4,5Details
addition of 3 duct detectors, 2 relay modules, 33 speaker strobes,4 strobes for study group remodels on floors 3,4,5 | $14,700 |
| Jul 15, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Anderson, Rowe & Buckley, Inc. | 7th. flr.: t.i. to the (e) fire sprinkler system. 28-relocated sprinklers.Details
7th. flr.: t.i. to the (e) fire sprinkler system. 28-relocated sprinklers. | $5,600 |
| Jul 15, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Siemens Industry, Inc. | addition of 14 speaker/strobes for the spec suite remodels on floor 6/7Details
addition of 14 speaker/strobes for the spec suite remodels on floor 6/7 | $4,900 |
| Jul 6, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Bcci Construction Company | 7th. flr.: t.i. include building (n) non-structural partitions. all (n) or revised hvac, elec., plumbing & life safety work is design build & included in this permit submittal. bldg. is fully sprinklered.Details
7th. flr.: t.i. include building (n) non-structural partitions. all (n) or revised hvac, elec., plumbing & life safety work is design build & included in this permit submittal. bldg. is fully sprinklered. | $220,000 |
| Jul 6, 2010 | Completed final sign-off Mar 2011 | 800 Market St | Bcci Construction Company | office ti on the 6th fl incl, new non struc. partitions. all new or revised hvac, elec, plbg and life safety work is design build and included in this permit submittal, building is fully sprinklered.Details
office ti on the 6th fl incl, new non struc. partitions. all new or revised hvac, elec, plbg and life safety work is design build and included in this permit submittal, building is fully sprinklered. | $220,000 |
| May 17, 2010 | Completed final sign-off Sep 2010 | 800 Market St | Bcci Construction Company | 3th, 4th & 5th floors t.i. including new non-structural partitions, all new or revised hvac, electrical, plumbing & life safety work will be fully built engineered. mech & elect in this permit. building fully sprinklered.Details
3th, 4th & 5th floors t.i. including new non-structural partitions, all new or revised hvac, electrical, plumbing & life safety work will be fully built engineered. mech & elect in this permit. building fully sprinklered. | $890,000 |
| May 4, 2010 | Completed final sign-off Sep 2011 | 800 Market St | Richlen Construction | abandonment of sub-sidewalk space along ellis street. utility relocations for the central subway project. demolition work under separate permit. handicapped access upgrade to restrooms service the area of remodel.Details
abandonment of sub-sidewalk space along ellis street. utility relocations for the central subway project. demolition work under separate permit. handicapped access upgrade to restrooms service the area of remodel. | $900,000 |
| Feb 11, 2010 | Completed final sign-off May 2010 | 800 Market St | Fine Line Group Inc | revision to pa# 2008.12.19.8917. provude new landing at ground / street level (e) main stair.Details
revision to pa# 2008.12.19.8917. provude new landing at ground / street level (e) main stair. | $2,500 |
| Jul 1, 2009 | Completed final sign-off May 2010 | 800 Market St | Anderson, Rowe & Buckley, Inc. | tenant improvments to existing fire speaker system, 4 new sidewalls, 4 removed upgrightsDetails
tenant improvments to existing fire speaker system, 4 new sidewalls, 4 removed upgrights | $1,000 |
| May 21, 2009 | Never finaled issued Sep 2009, no final | 800 Market St | Sign & Sign Again | erect a double faced electric projecting wall sign.Details
erect a double faced electric projecting wall sign. | $10,000 |
| May 21, 2009 | Completed final sign-off Nov 2009 | 800 Market St | Sign & Sign Again | erect a six lettering single faced electric projecting wall sign. "diesel"Details
erect a six lettering single faced electric projecting wall sign. "diesel" | $10,000 |
| Apr 24, 2009 | Expired or cancelled cancelled Jan 2026 | 800 Market St | Fine Line Group Inc | install high density shelving on 3rd floor for retail tenant. tenant improvement permit# 2008-1219-8917Details
install high density shelving on 3rd floor for retail tenant. tenant improvement permit# 2008-1219-8917 | $12,000 |
| Apr 13, 2009 | Completed final sign-off May 2010 | 800 Market St | E. J. Weber Elect.Co Inc | fire alarm system in basement thru 3rd floor. add 3 relay modules, 5 smoke dtectors, 2 heat detectors, 1 pull station, 29 speaker strobes, 20 strobesDetails
fire alarm system in basement thru 3rd floor. add 3 relay modules, 5 smoke dtectors, 2 heat detectors, 1 pull station, 29 speaker strobes, 20 strobes | $22,000 |
| Apr 8, 2009 | Completed final sign-off May 2010 | 800 Market St | Anderson, Rowe & Buckley, Inc. | tenant improvements to the existing fire sprinkler system: 62 added sprinklers, 55 removed sprinklers, 16 reinstalled sprinklers. basement to 3rd flDetails
tenant improvements to the existing fire sprinkler system: 62 added sprinklers, 55 removed sprinklers, 16 reinstalled sprinklers. basement to 3rd fl | $26,000 |
| Mar 31, 2009 | Completed final sign-off May 2010 | 800 Market St | Fine Line Group Inc | m.e.p work for new retail store in basement, 1st, 2nd & 3rd floor. t.i. permit with full ada compliance on pa# 2008-1219-8917, m.e.p. work only. fire protection under seperate permitDetails
m.e.p work for new retail store in basement, 1st, 2nd & 3rd floor. t.i. permit with full ada compliance on pa# 2008-1219-8917, m.e.p. work only. fire protection under seperate permit | $65,000 |
| Mar 23, 2009 | Completed final sign-off May 2010 | 800 Market St | Fine Line Group Inc | structural work, installation of elevator in ground floor, retail space previously approved under appl. 200812198917. purpose of this permit to allow construction of elevator in advance of full t.i. permit. no exterior or other work.Details
structural work, installation of elevator in ground floor, retail space previously approved under appl. 200812198917. purpose of this permit to allow construction of elevator in advance of full t.i. permit. no exterior or other work. | |
| Mar 19, 2009 | Never finaled issued Mar 2009, no final | 800 Market St | street space permit.Details
street space permit. | ||
| Feb 6, 2009 | Completed final sign-off May 2010 | 800 Market St | Fine Line Group Inc | slab cut-out in 2 locations: ground floor for n elevator pit. 3rd floor for n communicating stairway. work in advance of complete ti permi uner 200812198917. elevator under ti permit.Details
slab cut-out in 2 locations: ground floor for n elevator pit. 3rd floor for n communicating stairway. work in advance of complete ti permi uner 200812198917. elevator under ti permit. | $2,000 |
| Jan 23, 2009 | Never finaled issued Jan 2009, no final | 800 Market St | reduce 2 column sections (cladding) at east entrance on ground floor retail space. interior work onlyDetails
reduce 2 column sections (cladding) at east entrance on ground floor retail space. interior work only | $5,000 | |
| Dec 19, 2008 | Completed final sign-off May 2010 | 800 Market St | t.i. for new retail store on 1st., 2nd., 3rd. floors & basement. work includes installation of (n) egress stair (n) elevator (n) fixtures, finishes, furniture, millwork. (n) storefront section @ bldg. corner. mepincluded in this permit. fire protection under separate permits.Details
t.i. for new retail store on 1st., 2nd., 3rd. floors & basement. work includes installation of (n) egress stair (n) elevator (n) fixtures, finishes, furniture, millwork. (n) storefront section @ bldg. corner. mepincluded in this permit. fire protection under separate permits. | $850,000 | |
| Aug 4, 2008 | Completed final sign-off Apr 2009 | 800 Market St | energy compliance for new facade at ground and 2nd floors. facade alteration issued under seperate pa# 2008-0213-4729.Details
energy compliance for new facade at ground and 2nd floors. facade alteration issued under seperate pa# 2008-0213-4729. | $15,000 | |
| Jul 30, 2008 | Never finaled issued Jul 2008, no final | 800 Market St | street space permit only.Details
street space permit only. | ||
| Jun 30, 2008 | Completed final sign-off Apr 2009 | 800 Market St | revision to pa# 2007/04/18/9131's' to update the site permit regarding infilling the atrium. this application documents approval to infill the atrium on floors 5-8 as shown on addenda # 2. for recording purposes only. new no new work.Details
revision to pa# 2007/04/18/9131's' to update the site permit regarding infilling the atrium. this application documents approval to infill the atrium on floors 5-8 as shown on addenda # 2. for recording purposes only. new no new work. | ||
| Mar 6, 2008 | Completed final sign-off Apr 2009 | 800 Market St | new fire protection for entire building plus life safety installationDetails
new fire protection for entire building plus life safety installation | $290,000 | |
| Feb 13, 2008 | Completed final sign-off Apr 2009 | 800 Market St | exterior alteration of ground and second floors, retail facade. from 3rd to 8th floors, work under this permit consists of painting, facade repair in kind, and painting. mep. under seperate permit.Details
exterior alteration of ground and second floors, retail facade. from 3rd to 8th floors, work under this permit consists of painting, facade repair in kind, and painting. mep. under seperate permit. | $1,355,000 | |
| Jan 28, 2008 | Never finaled issued Jan 2008, no final | 800 Market St | street spaceDetails
street space | ||
| Jun 8, 2007 | Completed final sign-off Apr 2009 | 800 Market St | interior non structural demo on all floors in advance of (n) seismic upgrade and full bldg t.i. no exterior work no structural workDetails
interior non structural demo on all floors in advance of (n) seismic upgrade and full bldg t.i. no exterior work no structural work | $60,000 | |
| May 17, 2007 | Completed final sign-off Apr 2009 | 800 Market St | exterior temporary barricade surrounding building during construction work. no other work. core & shell upgrade on 200704189131. exploratory demo on 200704269811.Details
exterior temporary barricade surrounding building during construction work. no other work. core & shell upgrade on 200704189131. exploratory demo on 200704269811. | $7,500 | |
| Apr 26, 2007 | Completed final sign-off Apr 2009 | 800 Market St | interior exploratory demo in advance of seismic upgrade under separate permit maintain fire sprinklers and fire alarm during and after demo fire dept no structural work no const except core drill and testingDetails
interior exploratory demo in advance of seismic upgrade under separate permit maintain fire sprinklers and fire alarm during and after demo fire dept no structural work no const except core drill and testing | $15,000 | |
| Apr 18, 2007 | Completed final sign-off Apr 2009 | 800 Market St | core & shell upgrade on all floors of (e) building. to install new accessible elevators. new elevator lobbies and new accessible restrooms. mechanical & fire protection under separate permit.Details
core & shell upgrade on all floors of (e) building. to install new accessible elevators. new elevator lobbies and new accessible restrooms. mechanical & fire protection under separate permit. | $875,000 | |
| Mar 24, 2006 | Never finaled issued Mar 2006, no final | 830 Market St | streetspaceDetails
streetspace | ||
| Aug 22, 2005 | Completed final sign-off Oct 2005 | 800 Market St | barrier removal. work includes replace the (e) sliding door with a swing door to comply withDetails
barrier removal. work includes replace the (e) sliding door with a swing door to comply with | $4,800 | |
| Nov 12, 2004 | Never finaled issued Nov 2004, no final | 800 Market St | sidewalk repair permitDetails
sidewalk repair permit | ||
| Nov 8, 2004 | Never finaled issued Nov 2004, no final | 800 Market St | streetspaceDetails
streetspace | ||
| Apr 29, 2004 | Never finaled issued Apr 2004, no final | 800 Market St | street space permitDetails
street space permit | ||
| Jan 13, 2004 | Never finaled issued Jan 2004, no final | 800 Market St | street spaceDetails
street space | ||
| Jul 24, 2003 | Never finaled issued Jul 2003, no final | 800 Market St | street spaceDetails
street space | ||
| Apr 25, 2003 | Expired or cancelled expired Aug 2011 | 830 Market St | Peacock Construction Inc | fire pump & riser for high rise-existing building per high rise ordinance. ventication of room. sepaDetails
fire pump & riser for high rise-existing building per high rise ordinance. ventication of room. sepa | $150,000 |
| Jul 31, 2000 | Completed final sign-off Apr 2001 | 800 Market St | J L C Contracting Inc. | add concrete extensions to bearing points to accommodate new accessible entrance under #9927351 (revDetails
add concrete extensions to bearing points to accommodate new accessible entrance under #9927351 (rev | $2,000 |
| Mar 3, 2000 | Completed final sign-off Apr 2001 | 800 Market St | replace existing primary entrance w/new accessible entranceDetails
replace existing primary entrance w/new accessible entrance | $150,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.