Permit GraphShortlistSan Francisco building permits since 2000

Habtom Nugusse Tewelde

License
M39065
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M39065 at the Board for Professional Engineers
Listed as
designer, engineer
Firm
Innovative Mechanical
Based in
South San Francisco
On San Francisco permits
Mar 2018 to Apr 2026

95 permits since 2000 (engineer on 94 permits, designer on 1 permit): 78 completed, 8 in progress, 8 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Skyline Construction (15), Gci, Inc (12), Novo Construction Inc (10), Sc Builders, Inc (9), Innovative Mechanical Inc (8), M C S Construction Services (8), Bcci Construction Company (7), Field Construction Inc. (5), Centric Building Inc. (3), Rossi Builders Inc. (3), Rylko Builders Inc. (3), Source Planning And Construction Inc (3), Hitt Contracting Inc. (2), Capitol Electric Const, Mc Carthy Building Companies Inc, Peacock Construction
Architects
David De Valeria (2), Enrique Cisneros (2), Douglas Hilberman, Guion Chilldress, Lawrence Rugg, Leon Felns, Melissa Pesci, Michael Zelazek, Sashikala Murthy, Shane Curnyn
Engineers
Stephen Shaffer (18), Alexander Joseph Pacheco (7), Elisabeth M Allen (3), Alexander Pacheco (2), Brad Hollub (2), Jesus B Cabellon Jr (2), Prabhjeet Grewal (2), C B F Inc, Cbf, Inc, Craig Laws, David Johnson, Dean Macy, Dennis Cheung, Matthew Tropp, Sean Shafer, Zack Kardon
Authorized agents
Carol Leytem, Robert Kastelic

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 16, 2026Completed
final sign-off May 2026
250 Sutter StGci, Inc2/f: air distribution for new floor layout. mech only . ref 202512121666.
Details
Permit
202604169575
Permit issued
Apr 23, 2026
Final sign-off
May 1, 2026

2/f: air distribution for new floor layout. mech only . ref 202512121666.

Open the permit page

$125,000
Jan 27, 2026Completed
final sign-off Apr 2026
1 Embarcadero CenterSkyline Construction16th/f ste#1600: the project generally consists of interior t.i. of ste# 1600 on 16th/f of an e) multi-story building
Details
Permit
202601274597
Permit issued
Feb 5, 2026
Final sign-off
Apr 10, 2026

16th/f ste#1600: the project generally consists of interior t.i. of ste# 1600 on 16th/f of an e) multi-story building

Open the permit page

$85,000
Jan 6, 2026Completed
final sign-off Feb 2026
44 Montgomery StM C S Construction Services11/f. deferred mech and electrical permit. ref pa# 202509175447. mech. install 18 vav boxes, insall (1) split heads pump for it room. duct work for new floor layout. electr: lighting with associated circuits and controls power and signal with assoc circuits and wiring.
Details
Permit
202601063279
Permit issued
Jan 6, 2026
Final sign-off
Feb 20, 2026

11/f. deferred mech and electrical permit. ref pa# 202509175447. mech. install 18 vav boxes, insall (1) split heads pump for it room. duct work for new floor layout. electr: lighting with associated circuits and controls power and signal with assoc circuits and wiring.

Open the permit page

$650,000
Dec 9, 2025In progress
issued Apr 2026
221 Main StGci, Inc6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct
Details
Permit
202512091310
Permit issued
Apr 3, 2026

6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct

Open the permit page

$6,158,186
Dec 3, 2025Completed
final sign-off Apr 2026
468 Jackson StCentric Building Inc.deferred mep for 202408198960 and 202408198963 and revision to bpa#'s 202408198960 and 202408198963
Details
Permit
202512030804
Permit issued
Feb 24, 2026
Final sign-off
Apr 15, 2026

deferred mep for 202408198960 and 202408198963 and revision to bpa#'s 202408198960 and 202408198963

Open the permit page

$270,000
Dec 2, 2025Completed
final sign-off Feb 2026
1 California StSkyline Construction2nd floor: mechanical and electrical work for t.i. ref pa #202511048880
Details
Permit
202512020695
Permit issued
Dec 23, 2025
Final sign-off
Feb 11, 2026

2nd floor: mechanical and electrical work for t.i. ref pa #202511048880

Open the permit page

$20,000
Oct 21, 2025Completed
final sign-off Jan 2026
333 Bush StSource Planning And Construction Incref 202504164519- 25/fl- mep work only.
Details
Permit
202510217779
Permit issued
Oct 22, 2025
Final sign-off
Jan 16, 2026

ref 202504164519- 25/fl- mep work only.

Open the permit page

$60,000
Sep 30, 2025Completed
final sign-off Jan 2026
535 Mission StM C S Construction Services8th floor: deferred mech and electrical permit ref app# 202508122835. mechanical- install 3 vav box with reheat, duct work for view floor layout. electrical-lighting fixtures & associated circuiting controls. power and signal devices and associated wiring.
Details
Permit
202509306372
Permit issued
Sep 30, 2025
Final sign-off
Jan 5, 2026

8th floor: deferred mech and electrical permit ref app# 202508122835. mechanical- install 3 vav box with reheat, duct work for view floor layout. electrical-lighting fixtures & associated circuiting controls. power and signal devices and associated wiring.

Open the permit page

$450,000
Sep 26, 2025Completed
final sign-off Jan 2026
465 California StInnovative Mechanical Inc14/fl- ti 202508253785- to include instal (n) exhaust fan, air distribution and ductwork for (n) floor layout and relocation of 3 (e) thermostate
Details
Permit
202509266209
Permit issued
Oct 14, 2025
Final sign-off
Jan 7, 2026

14/fl- ti 202508253785- to include instal (n) exhaust fan, air distribution and ductwork for (n) floor layout and relocation of 3 (e) thermostate

Open the permit page

$50,000
Sep 2, 2025Completed
final sign-off Nov 2025
35 South ParkNovo Construction Inc1st floor:mechanical and electrical work for t.i. ref pa #202506249355
Details
Permit
202509024337
Permit issued
Sep 22, 2025
Final sign-off
Nov 19, 2025

1st floor:mechanical and electrical work for t.i. ref pa #202506249355

Open the permit page

$21,000
Aug 12, 2025Completed
final sign-off Oct 2025
350 California StField Construction Inc.14/f- deferred mep submittal for bpa# 202506249354.
Details
Permit
202508122816
Permit issued
Sep 10, 2025
Final sign-off
Oct 31, 2025

14/f- deferred mep submittal for bpa# 202506249354.

Open the permit page

$20,000
Aug 7, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc7/f: deffered mep to pa 202507281741.
Details
Permit
202508072566
Permit issued
Aug 28, 2025
Final sign-off
Apr 17, 2026

7/f: deffered mep to pa 202507281741.

Open the permit page

$1,200,000
Jul 29, 2025Completed
final sign-off Mar 2026
88 Kearny StSkyline Construction5th fl - mechanical & electrical work for ti ref pa 202505055774
Details
Permit
202507291812
Permit issued
Aug 8, 2025
Final sign-off
Mar 11, 2026

5th fl - mechanical & electrical work for ti ref pa 202505055774

Open the permit page

$24,000
Jul 18, 2025Completed
final sign-off Jul 2026
685 Market StSc Builders, Inclevel 1: deferred mep for permit 202506168762
Details
Permit
202507181134
Permit issued
Aug 6, 2025
Final sign-off
Jul 16, 2026

level 1: deferred mep for permit 202506168762

Open the permit page

$257,040
Jul 1, 2025Completed
final sign-off Oct 2025
135 Main StSkyline Constructionsuite 800: mechanical, electrical, and plumbing for t.i. on the 8th floor. t.i. #202505156521.
Details
Permit
202507019885
Permit issued
Jul 10, 2025
Final sign-off
Oct 8, 2025

suite 800: mechanical, electrical, and plumbing for t.i. on the 8th floor. t.i. #202505156521.

Open the permit page

$120,000
Jun 24, 2025Completed
final sign-off Aug 2025
4 Embarcadero CenterSkyline Construction19th/f: mep for previously approved arch #202506098227.install air distribution and new ductwork for office ti. lighting and power and signal.
Details
Permit
202506249344
Permit issued
Jun 27, 2025
Final sign-off
Aug 25, 2025

19th/f: mep for previously approved arch #202506098227.install air distribution and new ductwork for office ti. lighting and power and signal.

Open the permit page

$10,000
Jun 17, 2025Completed
final sign-off Jun 2026
685 Market StSc Builders, Inc2nd fl deferred mep for pa # 2025-0410-4123
Details
Permit
202506178843
Permit issued
Jul 21, 2025
Final sign-off
Jun 22, 2026

2nd fl deferred mep for pa # 2025-0410-4123

Open the permit page

$1,635,840
May 19, 2025Completed
final sign-off Jul 2025
135 Main StSkyline Construction19/f suite 1950 - mechanical work for t.i. ref permit 202503263082
Details
Permit
202505196786
Permit issued
May 27, 2025
Final sign-off
Jul 8, 2025

19/f suite 1950 - mechanical work for t.i. ref permit 202503263082

Open the permit page

$75,000
May 19, 2025Completed
final sign-off Jun 2025
350 Rhode Island StInnovative Mechanical Incsuite 240.install (2) new vav boxes with reheat coil. air distribution and ductwork for new floor layout.
Details
Permit
202505196746
Permit issued
May 20, 2025
Final sign-off
Jun 30, 2025

suite 240.install (2) new vav boxes with reheat coil. air distribution and ductwork for new floor layout.

Open the permit page

$20,000
Apr 30, 2025Completed
final sign-off Jul 2025
580 California StSkyline Construction8th/f: mechanical work for t.i. to included relcoatation of existing. ref to t.i. 202503061673
Details
Permit
202504305527
Permit issued
Jun 10, 2025
Final sign-off
Jul 22, 2025

8th/f: mechanical work for t.i. to included relcoatation of existing. ref to t.i. 202503061673

Open the permit page

$12,000
Apr 30, 2025Completed
final sign-off Oct 2025
100 California StSc Builders, Inc6/f: deferred mechanical and electrical for t.i permit 202503071767
Details
Permit
202504305504
Permit issued
Apr 30, 2025
Final sign-off
Oct 3, 2025

6/f: deferred mechanical and electrical for t.i permit 202503071767

Open the permit page

$58,000
Apr 18, 2025Completed
final sign-off Dec 2025
1 Embarcadero CenterGci, Inc12th/f: ref t.i. 202502130258. mech & electrical for t.i.
Details
Permit
202504184750
Permit issued
May 6, 2025
Final sign-off
Dec 2, 2025

12th/f: ref t.i. 202502130258. mech & electrical for t.i.

Open the permit page

$10,000
Apr 11, 2025Completed
final sign-off Mar 2026
1 Sansome StInnovative Mechanical Inc22nd fl suite 2200 ref pa: 2025-0318-2433 install 2 new vav box with reheat core, 1 new incline transfer exhaust fan, 4 new fire smoke detectors, air distribution and ductwork for new floor layout ref# 2025-0318- 2433(mep deffered).
Details
Permit
202504114203
Permit issued
Apr 22, 2025
Final sign-off
Mar 10, 2026

22nd fl suite 2200 ref pa: 2025-0318-2433 install 2 new vav box with reheat core, 1 new incline transfer exhaust fan, 4 new fire smoke detectors, air distribution and ductwork for new floor layout ref# 2025-0318- 2433(mep deffered).

Open the permit page

$50,000
Apr 11, 2025Completed
final sign-off Mar 2026
1 Sansome StInnovative Mechanical Inc14th fl work to include installing (1) new cooling only vav box and installing air distribution system and ductwork for new floor layout ref pa 202503263039
Details
Permit
202504114192
Permit issued
Apr 11, 2025
Final sign-off
Mar 10, 2026

14th fl work to include installing (1) new cooling only vav box and installing air distribution system and ductwork for new floor layout ref pa 202503263039

Open the permit page

$75,000
Apr 11, 2025Completed
final sign-off Mar 2026
1 Sansome StInnovative Mechanical Inc22nd fl ste 2250 deferred mechanical for pa # 2025-0324-2851. install (1) new cooling only vav box, air distribution and ductwork for new floor layout. install 2 new fire smoke dampers
Details
Permit
202504114198
Permit issued
Apr 11, 2025
Final sign-off
Mar 10, 2026

22nd fl ste 2250 deferred mechanical for pa # 2025-0324-2851. install (1) new cooling only vav box, air distribution and ductwork for new floor layout. install 2 new fire smoke dampers

Open the permit page

$45,000
Apr 9, 2025Completed
final sign-off Jul 2025
35 South ParkNovo Construction Incmechanical and electrical work for tenant improvement at 1/f. ref pa# 202501249023.
Details
Permit
202504094045
Permit issued
Apr 14, 2025
Final sign-off
Jul 1, 2025

mechanical and electrical work for tenant improvement at 1/f. ref pa# 202501249023.

Open the permit page

$15,000
Apr 2, 2025In progress
issued Apr 2025
300 California StGci, Inc4th floor: reference pa #202410293978. install 3 new vav boxes. air distribution, ductwork piping for new floor layout.
Details
Permit
202504023550
Permit issued
Apr 9, 2025

4th floor: reference pa #202410293978. install 3 new vav boxes. air distribution, ductwork piping for new floor layout.

Open the permit page

$10,000
Apr 2, 2025Completed
final sign-off Aug 2025
50 Fremont StGci, Inc35th fl ref pa# 2025-0317-1773: air distribution & ductwork modification for new floor layout
Details
Permit
202504023574
Permit issued
Apr 9, 2025
Final sign-off
Aug 14, 2025

35th fl ref pa# 2025-0317-1773: air distribution & ductwork modification for new floor layout

Open the permit page

$30,000
Mar 24, 2025Completed
final sign-off Sep 2025
730 Montgomery StNovo Construction Incmechanical and electrical work for tenant improvement at level 1, 2 & mezzaine ref 202502210771
Details
Permit
202503242853
Permit issued
Apr 24, 2025
Final sign-off
Sep 19, 2025

mechanical and electrical work for tenant improvement at level 1, 2 & mezzaine ref 202502210771

Open the permit page

$45,000
Mar 14, 2025Completed
final sign-off Apr 2025
201 Filbert StBcci Construction Companysuite 200: mechanical & electrical to support arch permit # 2024-1230-7516
Details
Permit
202503142299
Permit issued
Mar 17, 2025
Final sign-off
Apr 29, 2025

suite 200: mechanical & electrical to support arch permit # 2024-1230-7516

Open the permit page

$120,000
Mar 13, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc8th /f: mechanical & electrical ref to t.i. 202501138213
Details
Permit
202503132156
Permit issued
Mar 17, 2025
Final sign-off
Apr 20, 2026

8th /f: mechanical & electrical ref to t.i. 202501138213

Open the permit page

Mar 6, 2025In progress
issued Apr 2025
300 California StGci, Inc4th fl, ste 450 mechanical air distribution, ductwork & piping for new floor layout
Details
Permit
202503061722
Permit issued
Apr 1, 2025

4th fl, ste 450 mechanical air distribution, ductwork & piping for new floor layout

Open the permit page

$70,182
Feb 21, 2025In progress
issued Feb 2025
430 California StInnovative Mechanical Inc12th - 17th fl demo (12) existing cooling van boxes (2) boxes per floor. demo and installation of ductwork for new floor layout. furnish and install (12) new cooling only van boxes
Details
Permit
202502210755
Permit issued
Feb 21, 2025

12th - 17th fl demo (12) existing cooling van boxes (2) boxes per floor. demo and installation of ductwork for new floor layout. furnish and install (12) new cooling only van boxes

Open the permit page

$30,000
Feb 19, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc9/f: mech & electrical for pa-202501138214.
Details
Permit
202502190616
Permit issued
Mar 17, 2025
Final sign-off
Apr 21, 2026

9/f: mech & electrical for pa-202501138214.

Open the permit page

$90,000
Feb 19, 2025Completed
final sign-off Apr 2026
685 Market StSc Builders, Inc10/f: mech & electrical for pa-202501138215
Details
Permit
202502190618
Permit issued
Mar 17, 2025
Final sign-off
Apr 21, 2026

10/f: mech & electrical for pa-202501138215

Open the permit page

$90,000
Dec 30, 2024Completed
final sign-off Mar 2025
649 Front StGci, Inc2/f: mechanical and electrical - ref bpa# 202410102713
Details
Permit
202412307534
Permit issued
Feb 21, 2025
Final sign-off
Mar 12, 2025

2/f: mechanical and electrical - ref bpa# 202410102713

Open the permit page

$10,000
Dec 10, 2024Completed
final sign-off Mar 2025
44 Montgomery StNovo Construction Inc30/fl-ref 202410243639- mechanical and electrical for ti for suite 3000
Details
Permit
202412106506
Permit issued
Dec 11, 2024
Final sign-off
Mar 28, 2025

30/fl-ref 202410243639- mechanical and electrical for ti for suite 3000

Open the permit page

$175,000
Nov 5, 2024Completed
final sign-off Feb 2025
333 Bush StSource Planning And Construction Inc15/fl-install air distribiution and duct work for new layout relocate (e) t-stat and vav boxes new power and signal devices throughout the space new 2022 title 24 compliant lighting and controls. deferred portion of pa# 202409050103
Details
Permit
202411054453
Permit issued
Nov 15, 2024
Final sign-off
Feb 25, 2025

15/fl-install air distribiution and duct work for new layout relocate (e) t-stat and vav boxes new power and signal devices throughout the space new 2022 title 24 compliant lighting and controls. deferred portion of pa# 202409050103

Open the permit page

$125,000
Oct 22, 2024Completed
final sign-off Jan 2025
135 Main StSkyline Construction3/fl-ref 202407257231- electrical dn plumbing work for ti
Details
Permit
202410223428
Permit issued
Dec 10, 2024
Final sign-off
Jan 17, 2025

3/fl-ref 202407257231- electrical dn plumbing work for ti

Open the permit page

$150,000
Oct 9, 2024Completed
final sign-off Jan 2025
350 California StField Construction Inc.ref pa # 2024-0822-9227 fgic project #44-094 deferred mechanical & eletrical upgrade submittal
Details
Permit
202410092613
Permit issued
Oct 9, 2024
Final sign-off
Jan 3, 2025

ref pa # 2024-0822-9227 fgic project #44-094 deferred mechanical & eletrical upgrade submittal

Open the permit page

$135,000
Sep 26, 2024In progress
issued Sep 2024
1 Sansome StInnovative Mechanical Inc9th floor. demo (1) vav (varirable air volume box) install (1) new vav. modify duct distribution. upgrade (13) vav's to ddc. ref: 202408098305
Details
Permit
202409261682
Permit issued
Sep 26, 2024

9th floor. demo (1) vav (varirable air volume box) install (1) new vav. modify duct distribution. upgrade (13) vav's to ddc. ref: 202408098305

Open the permit page

$50,000
Aug 28, 2024Completed
final sign-off Oct 2024
160 Spear StSc Builders, Inc14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible locker
Details
Permit
202408289614
Permit issued
Sep 13, 2024
Final sign-off
Oct 30, 2024

14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible locker

Open the permit page

$93,408
Aug 28, 2024Completed
final sign-off Oct 2024
160 Spear StSc Builders, Inc3rd fl tenant improvement construction of non load bearing walls, celings & lighting
Details
Permit
202408289611
Permit issued
Sep 5, 2024
Final sign-off
Oct 30, 2024

3rd fl tenant improvement construction of non load bearing walls, celings & lighting

Open the permit page

$454,164
May 31, 2024Completed
final sign-off Jan 2025
1 Bush StSource Planning And Construction Incste 1150-ref pa# 2024-0321-8357 deferred mep submittal (fully sprinklered bldg)
Details
Permit
202405313436
Permit issued
Jun 11, 2024
Final sign-off
Jan 21, 2025

ste 1150-ref pa# 2024-0321-8357 deferred mep submittal (fully sprinklered bldg)

Open the permit page

$159,120
May 7, 2024Completed
final sign-off Aug 2024
400 Geary StField Construction Inc.install 1 exhaust fan
Details
Permit
202405071564
Permit issued
May 8, 2024
Final sign-off
Aug 27, 2024

install 1 exhaust fan

Open the permit page

$15,000
May 1, 2024Completed
final sign-off Jun 2024
350 California StField Construction Inc.16/f: mechanical - demo supply duct, ceiling diffusers and transfer grilles, rebalance cfms as necessary, relocated t-stats and c02 sensors. electrical power lighting and signal reference.
Details
Permit
202405011129
Permit issued
May 2, 2024
Final sign-off
Jun 26, 2024

16/f: mechanical - demo supply duct, ceiling diffusers and transfer grilles, rebalance cfms as necessary, relocated t-stats and c02 sensors. electrical power lighting and signal reference.

Open the permit page

$130,000
Apr 30, 2024Completed
final sign-off Nov 2024
135 Main StSkyline Construction12/f suite 1250: mechanical and electrical work for ti permit 202403298905.
Details
Permit
202404301042
Permit issued
May 14, 2024
Final sign-off
Nov 13, 2024

12/f suite 1250: mechanical and electrical work for ti permit 202403298905.

Open the permit page

$125,000
Apr 24, 2024In progress
issued Jun 2024
633 Beach StHitt Contracting Inc.deferred mep drawings for pa# 2024-0311-7515 ti construction of existing space
Details
Permit
202404240654
Permit issued
Jun 13, 2024

deferred mep drawings for pa# 2024-0311-7515 ti construction of existing space

Open the permit page

$125,000
Apr 10, 2024Completed
final sign-off Nov 2024
1 Sansome StMc Carthy Building Companies Incsuite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom.
Details
Permit
202404109678
Permit issued
May 1, 2024
Final sign-off
Nov 15, 2024

suite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom.

Open the permit page

$3,100,000
Mar 5, 2024Completed
final sign-off Jan 2025
560 Mission StSkyline Constructionref pa# 202312152617 deferred mep install air distribution system with ductwork & lighting
Details
Permit
202403057159
Permit issued
Apr 25, 2024
Final sign-off
Jan 17, 2025

ref pa# 202312152617 deferred mep install air distribution system with ductwork & lighting

Open the permit page

$80,000
Feb 13, 2024In progress
issued Feb 2024
940 Howard StGci, Incinstall 2 heat pumps, ductwork & piping for new floor layout. lighting with associated ckts & controls, power & signal with associated circuits & wiring.
Details
Permit
202402135803
Permit issued
Feb 21, 2024

install 2 heat pumps, ductwork & piping for new floor layout. lighting with associated ckts & controls, power & signal with associated circuits & wiring.

Open the permit page

Jan 19, 2024Completed
final sign-off Apr 2024
888 Brannan StNovo Construction Inc3/f: mechanical and electrical work for tenant improvement on 3rd flr, ref pa# 202312112268.
Details
Permit
202401194281
Permit issued
Jan 19, 2024
Final sign-off
Apr 18, 2024

3/f: mechanical and electrical work for tenant improvement on 3rd flr, ref pa# 202312112268.

Open the permit page

$42,000
Jan 9, 2024In progress
issued Jan 2024
900 Kearny Stinstall 1 vrf condensing unit & 6 fan coils- air distribution, ductrowrk & piping for basement & 1st flr layout, mep for pa# 202312182690.
Details
Permit
202401093648
Permit issued
Jan 29, 2024

install 1 vrf condensing unit & 6 fan coils- air distribution, ductrowrk & piping for basement & 1st flr layout, mep for pa# 202312182690.

Open the permit page

$190,000
Jan 3, 2024Completed
final sign-off Jul 2024
650 California StGci, Inc28th fl - mechanical install (1) vav box, ductowrk for new floor layout; electrical - power & lighting. ref pa 2023-1011-8403
Details
Permit
202401033365
Permit issued
Jan 9, 2024
Final sign-off
Jul 8, 2024

28th fl - mechanical install (1) vav box, ductowrk for new floor layout; electrical - power & lighting. ref pa 2023-1011-8403

Open the permit page

$100,000
Oct 19, 2023Completed
final sign-off Feb 2025
101 California StNovo Construction Inc25/f: mechanical/electrical for t.i., ref bpa#202212228954
Details
Permit
202310199039
Permit issued
Oct 24, 2023
Final sign-off
Feb 12, 2025

25/f: mechanical/electrical for t.i., ref bpa#202212228954

Open the permit page

$150,000
Oct 18, 2023Completed
final sign-off Feb 2024
101 California StNovo Construction Inc28/f: mechanical and electrical work for tenant improvement on the 28th fl ref 202212218831
Details
Permit
202310188952
Permit issued
Oct 19, 2023
Final sign-off
Feb 16, 2024

28/f: mechanical and electrical work for tenant improvement on the 28th fl ref 202212218831

Open the permit page

$75,000
Aug 24, 2023Completed
final sign-off Apr 2025
1155 Mission StNovo Construction Incmechanical electrical work. install new dx split system to service basement. ref pa# 2023-0320-4017.
Details
Permit
202308245124
Permit issued
Aug 28, 2023
Final sign-off
Apr 4, 2025

mechanical electrical work. install new dx split system to service basement. ref pa# 2023-0320-4017.

Open the permit page

$38,000
Aug 3, 2023Completed
final sign-off Jan 2024
1 Embarcadero CenterM C S Construction Services41/f: deferred electrical & mechanical: retrofit lighting fixtures & associated circuting/controls, power & signal devices & associated wiring, install (2) 4-pipe fan coil, duct work for new flr layout. ref pa# 202306089520.
Details
Permit
202308033624
Permit issued
Aug 7, 2023
Final sign-off
Jan 22, 2024

41/f: deferred electrical & mechanical: retrofit lighting fixtures & associated circuting/controls, power & signal devices & associated wiring, install (2) 4-pipe fan coil, duct work for new flr layout. ref pa# 202306089520.

Open the permit page

$50,000
Jul 17, 2023Completed
final sign-off Oct 2023
4 Embarcadero CenterM C S Construction Servicesste 710 - 7th flr: deferred mechanical + electrical (demo low pressure cooling branch ducts, exhaust fans + duct + pneumatic vav boxes, install new vav boxes, ltg, fixtures, and associated circuiting/controls, power + signal devices. ref pa# 2023-0530-8775.
Details
Permit
202307172304
Permit issued
Jul 18, 2023
Final sign-off
Oct 6, 2023

ste 710 - 7th flr: deferred mechanical + electrical (demo low pressure cooling branch ducts, exhaust fans + duct + pneumatic vav boxes, install new vav boxes, ltg, fixtures, and associated circuiting/controls, power + signal devices. ref pa# 2023-0530-8775.

Open the permit page

$195,000
Jun 21, 2023Completed
final sign-off Feb 2024
1 Embarcadero CenterM C S Construction Services25/f: deferred electrical lighting & mechanical ductwork, ref pa# 2023-0316-3759.
Details
Permit
202306210470
Permit issued
Aug 21, 2023
Final sign-off
Feb 22, 2024

25/f: deferred electrical lighting & mechanical ductwork, ref pa# 2023-0316-3759.

Open the permit page

$125,000
May 31, 2023Completed
final sign-off Apr 2025
1155 Mission StNovo Construction Incmechanical and electrical work for tenant improvement on the basement for 1st, 2nd, and 3rd flr. ref#: 202304075319
Details
Permit
202305318908
Permit issued
Jun 6, 2023
Final sign-off
Apr 4, 2025

mechanical and electrical work for tenant improvement on the basement for 1st, 2nd, and 3rd flr. ref#: 202304075319

Open the permit page

$175,000
May 30, 2023Completed
final sign-off Sep 2023
33 New Montgomery StRylko Builders Inc.19/f: mechanical/electrical work for t.i. ref bpa#202304044986
Details
Permit
202305308800
Permit issued
Jun 1, 2023
Final sign-off
Sep 26, 2023

19/f: mechanical/electrical work for t.i. ref bpa#202304044986

Open the permit page

$10,000
May 22, 2023Completed
final sign-off Sep 2023
33 New Montgomery StRylko Builders Inc.suite 1850: mech demo branch ducts/vavs to match new room/space layout, redistribute (e) vav boxes for new zoning, install new inline exhaust fans for increased ventilation, electrical lighting fixtures/associated circuiting/controls, power & signal. ref bpa#202303224138
Details
Permit
202305228247
Permit issued
Jun 1, 2023
Final sign-off
Sep 11, 2023

suite 1850: mech demo branch ducts/vavs to match new room/space layout, redistribute (e) vav boxes for new zoning, install new inline exhaust fans for increased ventilation, electrical lighting fixtures/associated circuiting/controls, power & signal. ref bpa#202303224138

Open the permit page

$115,000
May 16, 2023Completed
final sign-off Jul 2023
430 California StRylko Builders Inc.alteration to mechanical and electrical for new office tenant improvement layout. ref ti permit 202301240619
Details
Permit
202305167847
Permit issued
May 16, 2023
Final sign-off
Jul 21, 2023

alteration to mechanical and electrical for new office tenant improvement layout. ref ti permit 202301240619

Open the permit page

$90,000
May 16, 2023Completed
final sign-off Nov 2023
185 Berry StSkyline Construction4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.
Details
Permit
202305167807
Permit issued
May 22, 2023
Final sign-off
Nov 30, 2023

4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.

Open the permit page

$175,000
Apr 21, 2023Completed
final sign-off Sep 2023
33 New Montgomery StCapitol Electric Const14th fl - ti work to inlcude new lighting & mechanical work @ 14th fl. ref pa 2023-0309-3307
Details
Permit
202304216183
Permit issued
Apr 26, 2023
Final sign-off
Sep 6, 2023

14th fl - ti work to inlcude new lighting & mechanical work @ 14th fl. ref pa 2023-0309-3307

Open the permit page

$500,000
Apr 20, 2023Completed
final sign-off Dec 2023
100 California StSkyline Construction6/f ste 600: deferred submittal of mechanical and electrical work for t.i. ref pa# 202212138185
Details
Permit
202304206093
Permit issued
May 4, 2023
Final sign-off
Dec 11, 2023

6/f ste 600: deferred submittal of mechanical and electrical work for t.i. ref pa# 202212138185

Open the permit page

$125,000
Apr 10, 2023Completed
final sign-off May 2023
135 Main StSkyline Construction12/f - suite 1200: mechanical & electrical work for t.i. ref arch 202302131868.
Details
Permit
202304105371
Permit issued
Apr 18, 2023
Final sign-off
May 18, 2023

12/f - suite 1200: mechanical & electrical work for t.i. ref arch 202302131868.

Open the permit page

$150,000
Mar 28, 2023Never finaled
issued Apr 2023, no final
1 Sansome StPeacock Constructionmechanical-demo branch ducts & vav's to match (n) room/space layout. redistribute (e) vav boxes for new zoning. install new vav boxes for new zoning. 36th flr does not affect the popos area.
Details
Permit
202303284549
Permit issued
Apr 6, 2023

mechanical-demo branch ducts & vav's to match (n) room/space layout. redistribute (e) vav boxes for new zoning. install new vav boxes for new zoning. 36th flr does not affect the popos area.

Open the permit page

$175,000
Jan 10, 2023Completed
final sign-off Apr 2023
303 02nd StField Construction Inc.install 1 vav box, ductwork for new floor layout, lighting fistures and associated circuiting/controls, power and signal devices and wiring ref 202210043682
Details
Permit
202301109935
Permit issued
Jan 12, 2023
Final sign-off
Apr 24, 2023

install 1 vav box, ductwork for new floor layout, lighting fistures and associated circuiting/controls, power and signal devices and wiring ref 202210043682

Open the permit page

$170,000
Oct 19, 2022Completed
final sign-off Mar 2023
135 Main StSkyline Constructionmechanical and electrical for tenant improvement on the 17th floor ref arch 202205255010
Details
Permit
202210194704
Permit issued
Nov 14, 2022
Final sign-off
Mar 9, 2023

mechanical and electrical for tenant improvement on the 17th floor ref arch 202205255010

Open the permit page

$195,000
Jul 13, 2022Completed
final sign-off Aug 2022
655 Montgomery StM C S Construction Services14/f: deferred mechanical & electrical. ref bpa#202205063687
Details
Permit
202207138322
Permit issued
Jul 13, 2022
Final sign-off
Aug 11, 2022

14/f: deferred mechanical & electrical. ref bpa#202205063687

Open the permit page

$100,000
Jul 11, 2022Completed
final sign-off Dec 2023
1480 Folsom StBcci Construction Company1st floor: mep deferred submittal to support approved arch drawing 202110251080. new mechanical systems and fans.
Details
Permit
202207118200
Permit issued
Aug 25, 2022
Final sign-off
Dec 6, 2023

1st floor: mep deferred submittal to support approved arch drawing 202110251080. new mechanical systems and fans.

Open the permit page

$300,000
Jun 7, 2022Completed
final sign-off Apr 2023
250 Montgomery StNovo Construction Incmechanical, electrical, and plumbing for tenant improvement on the 15th floor. ref arch 202205093778
Details
Permit
202206075762
Permit issued
Jun 27, 2022
Final sign-off
Apr 6, 2023

mechanical, electrical, and plumbing for tenant improvement on the 15th floor. ref arch 202205093778

Open the permit page

$55,000
Jun 6, 2022Completed
final sign-off Sep 2023
4 Embarcadero CenterM C S Construction Servicessuite 3660: deferred mechanical & electrical permit. ref t.i. pa 202203170209. maher n/a.
Details
Permit
202206065644
Permit issued
Jun 6, 2022
Final sign-off
Sep 8, 2023

suite 3660: deferred mechanical & electrical permit. ref t.i. pa 202203170209. maher n/a.

Open the permit page

May 27, 2022Never finaled
issued Jun 2022, no final
436 Bryant StHitt Contracting Inc.construction of new idf room in existing space. adjustment of branch mechanical and new fan to serve the new room. new branch electrical for a single rack. no change in occupancy, use, or area.
Details
Permit
202205275197
Permit issued
Jun 8, 2022

construction of new idf room in existing space. adjustment of branch mechanical and new fan to serve the new room. new branch electrical for a single rack. no change in occupancy, use, or area.

Open the permit page

$7,866
May 18, 2022Never finaled
filed May 2022, never issued
1128 Market StRossi Builders Inc.2/f spec suite: t.i. & infrastucture upgrades on roof & mechanical rooms on each floor
Details
Permit
202205184490

2/f spec suite: t.i. & infrastucture upgrades on roof & mechanical rooms on each floor

Open the permit page

$1,896,195
May 18, 2022Expired or cancelled
suspend Jan 2023
1128 Market StRossi Builders Inc.ground floor: tenant improvement. roof: infrastructure upgrades. new mech on rooftop.
Details
Permit
202205184492
Permit issued
Jan 10, 2023

ground floor: tenant improvement. roof: infrastructure upgrades. new mech on rooftop.

Open the permit page

$1,867,147
May 2, 2022Completed
final sign-off Sep 2024
659 Pine StInnovative Mechanical Incinstallation of (9) mitsubish ductless heat pump wall units.
Details
Permit
202205023394
Permit issued
May 3, 2022
Final sign-off
Sep 10, 2024

installation of (9) mitsubish ductless heat pump wall units.

Open the permit page

$135,000
Apr 22, 2022Completed
final sign-off Jun 2023
1045 Sansome StBcci Construction Company4th fl: mep. deferred submittal to support approved arch drawings. install supply fan, vrf condensing unit, exhaust vrf fan coils, ductwork for new floor layout. ref pa# 202010025777.
Details
Permit
202204222828
Permit issued
May 6, 2022
Final sign-off
Jun 26, 2023

4th fl: mep. deferred submittal to support approved arch drawings. install supply fan, vrf condensing unit, exhaust vrf fan coils, ductwork for new floor layout. ref pa# 202010025777.

Open the permit page

$75,000
Apr 6, 2022Completed
final sign-off Aug 2022
1700 California StCentric Building Inc.revision to pa#202203220591. mechanical revision to duct work. #570
Details
Permit
202204061716
Permit issued
Apr 18, 2022
Final sign-off
Aug 3, 2022

revision to pa#202203220591. mechanical revision to duct work. #570

Open the permit page

Mar 22, 2022Completed
final sign-off Aug 2022
1700 California StCentric Building Inc.5th fl, ste 570 deferred mechanical work for pa 2019-1227-0850
Details
Permit
202203220591
Permit issued
Mar 29, 2022
Final sign-off
Aug 3, 2022

5th fl, ste 570 deferred mechanical work for pa 2019-1227-0850

Open the permit page

Mar 9, 2022Completed
final sign-off Aug 2024
140 Sutter StBcci Construction Companyrevision bpa#202103226995 - 1/f: reivision to ductwork, floor construction, elevations & minor work
Details
Permit
202203099554
Permit issued
Mar 10, 2022
Final sign-off
Aug 29, 2024

revision bpa#202103226995 - 1/f: reivision to ductwork, floor construction, elevations & minor work

Open the permit page

Feb 24, 2022Completed
final sign-off Apr 2022
595 Market StBcci Construction Company25/f: mep submittal to support approved arch drawings. ref pa 202201105661.
Details
Permit
202202248639
Permit issued
Feb 24, 2022
Final sign-off
Apr 15, 2022

25/f: mep submittal to support approved arch drawings. ref pa 202201105661.

Open the permit page

$70,000
Jan 11, 2022Never finaled
issued Jan 2022, no final
735 Montgomery StM C S Construction Servicesdeferred mechanical & electrical. ref pa# 201909232440.
Details
Permit
202201115736
Permit issued
Jan 11, 2022

deferred mechanical & electrical. ref pa# 201909232440.

Open the permit page

$148,675
Dec 22, 2021Never finaled
filed Dec 2021, never issued
425 Mission Stproj-21-0399; tjpa-ti; suite# 123. deferred mep for approved pa# 201902284054. cost paid under arch p.a. #2019-0228-4054/r1.
Details
Permit
202112224858

proj-21-0399; tjpa-ti; suite# 123. deferred mep for approved pa# 201902284054. cost paid under arch p.a. #2019-0228-4054/r1.

Open the permit page

Nov 29, 2021Completed
final sign-off Apr 2022
4 Embarcadero CenterRossi Builders Inc.32/f: ref #202109178613. mep deferred
Details
Permit
202111293203
Permit issued
Dec 2, 2021
Final sign-off
Apr 25, 2022

32/f: ref #202109178613. mep deferred

Open the permit page

$295,000
Oct 13, 2021Completed
final sign-off Feb 2022
201 03rd StGci, Inc10/f: install (1) inline exhaust fan in the all gender bathroom in level 10, redistrution ductwork lighting & power. "landlord" ref t.i. 202107234982.
Details
Permit
202110130360
Permit issued
Oct 18, 2021
Final sign-off
Feb 17, 2022

10/f: install (1) inline exhaust fan in the all gender bathroom in level 10, redistrution ductwork lighting & power. "landlord" ref t.i. 202107234982.

Open the permit page

$100,000
Oct 13, 2021Completed
final sign-off Mar 2022
201 03rd StGci, Inc10/f: insatll 1 water source heatpump fan coile for service room on level 10, redistribute ductwork, lighting, power. "climate corp" ref t.i. 202107234982.
Details
Permit
202110130364
Permit issued
Oct 26, 2021
Final sign-off
Mar 2, 2022

10/f: insatll 1 water source heatpump fan coile for service room on level 10, redistribute ductwork, lighting, power. "climate corp" ref t.i. 202107234982.

Open the permit page

$100,000
Oct 13, 2021Never finaled
issued Oct 2021, no final
555 Market StGci, Inc5/f: install 2 chilled water fan coil for df room on level 5. ductwork for new fc5-1 & fc5-2. maher n/a
Details
Permit
202110130368
Permit issued
Oct 20, 2021

5/f: install 2 chilled water fan coil for df room on level 5. ductwork for new fc5-1 & fc5-2. maher n/a

Open the permit page

$15,000
Sep 8, 2021Never finaled
filed Sep 2021, never issued
425 Mission Stproj-21-0380; tjpa-ti; suite# 139. deferred mep for b-occupancy restaurant / food service. reference pa# 201903044320.
Details
Permit
202109087934

proj-21-0380; tjpa-ti; suite# 139. deferred mep for b-occupancy restaurant / food service. reference pa# 201903044320.

Open the permit page

Aug 9, 2021Never finaled
issued Aug 2021, no final
1 Market StBcci Construction Company27/f: mep deferred submittal to support approved architecture permit. ref pa 202107144345.
Details
Permit
202108096082
Permit issued
Aug 16, 2021

27/f: mep deferred submittal to support approved architecture permit. ref pa 202107144345.

Open the permit page

$40,000
Aug 4, 2021Completed
final sign-off Nov 2021
50 Fremont StSkyline Construction40/f: mechanical, electrical for t.i. pa202106081912. maher n/a.
Details
Permit
202108045720
Permit issued
Aug 10, 2021
Final sign-off
Nov 16, 2021

40/f: mechanical, electrical for t.i. pa202106081912. maher n/a.

Open the permit page

$175,000
Jun 16, 2021Completed
final sign-off Jan 2022
121 Spear StBcci Construction Company2nd floor: mep deferred submittal to support architectural permit. relocate wshp and redistribute ductwork. ref. bldg pa 202103166616.
Details
Permit
202106162595
Permit issued
Jun 18, 2021
Final sign-off
Jan 7, 2022

2nd floor: mep deferred submittal to support architectural permit. relocate wshp and redistribute ductwork. ref. bldg pa 202103166616.

Open the permit page

$50,000
Mar 20, 2018Completed
final sign-off Jan 2025
843 Howard Stground floor ti of (e) cannabis retail (ooc permit #c12877, planning case no. 2018-004518-prj, & pa# 201803204187. change of use to cannabis retail.
Details
Permit
201803204187
Permit issued
Oct 6, 2023
Final sign-off
Jan 21, 2025

ground floor ti of (e) cannabis retail (ooc permit #c12877, planning case no. 2018-004518-prj, & pa# 201803204187. change of use to cannabis retail.

Open the permit page