Guil Orihuela
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Glumac
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Sep 2026
103 permits since 2000 (engineer on 97 permits, architect on 4 permits, authorized agent-others on 1 permit, designer on 1 permit): 88 completed, 1 in progress, 7 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 103.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | new grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen & rooftop equipment is part of separate permit. accessibility deferred due to hvac work only.Details
new grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen & rooftop equipment is part of separate permit. accessibility deferred due to hvac work only. | $44,730 | |
| Dec 12, 2024 | Completed final sign-off Mar 2025 | 188 The Embarcadero | Novo Construction Inc | revision to pa 202409120601 and 202411044348 to add roof drains. plumbing plans added for drainage details low rise buildingDetails
revision to pa 202409120601 and 202411044348 to add roof drains. plumbing plans added for drainage details low rise building | |
| Jun 12, 2024 | Completed final sign-off Feb 2025 | 188 The Embarcadero | Novo Construction Inc | 1st floor: revision to pa#202212198621 to include modification to dry food storage, furniture storage and storage closet. construction of non-load bearing partitions, new glazing and door frame, new ceiling and light fixtures. modified reception desk, modifiication in basement.Details
1st floor: revision to pa#202212198621 to include modification to dry food storage, furniture storage and storage closet. construction of non-load bearing partitions, new glazing and door frame, new ceiling and light fixtures. modified reception desk, modifiication in basement. | $500,000 |
| Jan 31, 2024 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | revision to pa #202311100598 to revise plumbing and electrical. ref mep pa #202311100598 ref arch pa#202212198622Details
revision to pa #202311100598 to revise plumbing and electrical. ref mep pa #202311100598 ref arch pa#202212198622 | |
| Jan 30, 2024 | Completed final sign-off Feb 2024 | 188 The Embarcadero | Novo Construction Inc | 5th fl - revision to pa 202311171022 to revise mechanical and electrical ref pa 2024-0111-3803Details
5th fl - revision to pa 202311171022 to revise mechanical and electrical ref pa 2024-0111-3803 | |
| Jan 25, 2024 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | revision to pa# 202311171037 to revise plumbing and electrical. ref arch# 202207279364Details
revision to pa# 202311171037 to revise plumbing and electrical. ref arch# 202207279364 | |
| Nov 17, 2023 | Completed final sign-off Jun 2024 | 188 The Embarcadero | Novo Construction Inc | 5/f: mechanical/electrical work for t.i. improvement. ref bpa#202310239228Details
5/f: mechanical/electrical work for t.i. improvement. ref bpa#202310239228 | $125,000 |
| Nov 17, 2023 | Completed final sign-off Jun 2024 | 188 The Embarcadero | Novo Construction Inc | 2nd fl: mech and elec work for tenant improbement. ref arch pa# 202310199071.Details
2nd fl: mech and elec work for tenant improbement. ref arch pa# 202310199071. | $125,000 |
| Nov 10, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | 3/f: mechanical/electrical work for t.i. ref bpa#202212198622Details
3/f: mechanical/electrical work for t.i. ref bpa#202212198622 | $150,000 |
| Sep 6, 2023 | Completed final sign-off May 2024 | 300 Clay St | Bcci Construction Company | 13th fl - revision to pa 2021-0604-1685. replace fsd 13-06 and fsd-13-07 wirth fire dampersDetails
13th fl - revision to pa 2021-0604-1685. replace fsd 13-06 and fsd-13-07 wirth fire dampers | |
| Jun 7, 2023 | Completed final sign-off Mar 2024 | 300 Clay St | Bcci Construction Company | 11/f: mep submittal to support approved arch permit, new urf systems and associated ductwork. ref bpa#202104078029Details
11/f: mep submittal to support approved arch permit, new urf systems and associated ductwork. ref bpa#202104078029 | $10,000 |
| Jun 6, 2023 | Completed final sign-off Mar 2024 | 300 Clay St | Bcci Construction Company | 15/f: mep submittal to support approved t.i. pa 202206025505. new vrf systems and associated ductwork. maher n.a,Details
15/f: mep submittal to support approved t.i. pa 202206025505. new vrf systems and associated ductwork. maher n.a, | $10,000 |
| Aug 23, 2022 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | 7/f: deferred mep for bpa#202207067840Details
7/f: deferred mep for bpa#202207067840 | $400,000 |
| Aug 11, 2022 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | deferred mep for 202207198766. new vav boxes. no fsd's. fire alarm under sep permit.Details
deferred mep for 202207198766. new vav boxes. no fsd's. fire alarm under sep permit. | $400,000 |
| Aug 11, 2022 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | deferred mep submittal for pa 202207279364.Details
deferred mep submittal for pa 202207279364. | $400,000 |
| Jun 15, 2022 | Completed final sign-off Jul 2023 | 3 Embarcadero Center | Peacock Construction | 2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.Details
2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's. | $856,324 |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 3 Embarcadero Center | Peacock Construction | 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.Details
3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. | $1,025,089 |
| Jun 2, 2022 | Completed final sign-off Nov 2022 | 300 Clay St | Bcci Construction Company | 15th fl: revision to pa# 201912230299. addition of non-structural partitions and minor door modifications.Details
15th fl: revision to pa# 201912230299. addition of non-structural partitions and minor door modifications. | $20,000 |
| May 17, 2022 | Completed final sign-off Nov 2022 | 300 Clay St | Bcci Construction Company | 16th fl: revision to pa# 201912230299. addition of non-structural partition and minor door modifications. mep included.Details
16th fl: revision to pa# 201912230299. addition of non-structural partition and minor door modifications. mep included. | $450,000 |
| Feb 18, 2022 | Completed final sign-off Jan 2023 | 300 Clay St | Hathaway Dinwiddie Co. | mep for bpa #202111122237Details
mep for bpa #202111122237 | |
| Jan 12, 2022 | Completed final sign-off Aug 2022 | 4 Embarcadero Center | Gci, Inc | 12th fl: interior t.i. upgraded office area including restrooms & mep.Details
12th fl: interior t.i. upgraded office area including restrooms & mep. | $2,000,000 |
| Dec 22, 2021 | Completed final sign-off Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | revision to pa# 2018-0504-8215 addendum #8 update elevator matrixDetails
revision to pa# 2018-0504-8215 addendum #8 update elevator matrix | |
| Dec 10, 2021 | Completed final sign-off Aug 2022 | 1 Market St | Gci, Inc | 10/f: interior t.i.: selective demo and construction of non-structural partitions, doors and sidelights, ceilings, lighting, power, millwork and finishes. no change in occupancy, use or area.Details
10/f: interior t.i.: selective demo and construction of non-structural partitions, doors and sidelights, ceilings, lighting, power, millwork and finishes. no change in occupancy, use or area. | $966,899 |
| Nov 12, 2021 | Completed final sign-off Jan 2023 | 300 Clay St | Hathaway Dinwiddie Co. | this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler.Details
this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler. | $2,682,163 |
| Nov 6, 2020 | Completed final sign-off Feb 2021 | 1 Embarcadero Center | D Kelly Construction Inc. | 23/f: install one vav box and associated duct work at (e) tenant spaceDetails
23/f: install one vav box and associated duct work at (e) tenant space | $16,500 |
| Nov 6, 2020 | Completed final sign-off Feb 2021 | 1 Embarcadero Center | D Kelly Construction Inc. | 24/f: install 2 new vav boxes and duct work. move one existing thermostat. reroute control to one existing induction unitDetails
24/f: install 2 new vav boxes and duct work. move one existing thermostat. reroute control to one existing induction unit | $16,500 |
| Nov 2, 2020 | Completed final sign-off Jun 2021 | 945 Bryant St | Field Construction Inc. | 2nd fl: mep deferred submittal ref pa# 202007069646. ti remodel. reuse hvac with modifications to distribution. new lighting & controls. new power & signal outlets. new breakroom and restroom plumbing.Details
2nd fl: mep deferred submittal ref pa# 202007069646. ti remodel. reuse hvac with modifications to distribution. new lighting & controls. new power & signal outlets. new breakroom and restroom plumbing. | |
| Oct 31, 2020 | Completed final sign-off Jun 2021 | 945 Bryant St | Field Construction Inc. | 1/f: remodel, mep deferred submittal, ref bpa#202007069645. reuse hvac w/modification to distribution, new lighting/controls, power, signal outlets, breakroom, restroom plumbingDetails
1/f: remodel, mep deferred submittal, ref bpa#202007069645. reuse hvac w/modification to distribution, new lighting/controls, power, signal outlets, breakroom, restroom plumbing | |
| Oct 22, 2020 | Expired or cancelled cancelled Jan 2026 | 300 Clay St | Hathaway Dinwiddie Co. | deferred approved for installation of radiant in-slab heating & displacement ventilation system until completion of t.i. of cade room. ref to pa # 2019 0124 1154Details
deferred approved for installation of radiant in-slab heating & displacement ventilation system until completion of t.i. of cade room. ref to pa # 2019 0124 1154 | |
| Oct 6, 2020 | Completed final sign-off Jun 2021 | 945 Bryant St | Field Construction Inc. | (mep) 3rd fl tenant t.i for revised hvac, new lighting w/ controls, new power outlets, new plumbing to restroom and break area. ref arch pa 202007069650Details
(mep) 3rd fl tenant t.i for revised hvac, new lighting w/ controls, new power outlets, new plumbing to restroom and break area. ref arch pa 202007069650 | |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 211 Main St | Dome Construction Corp | 16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a.Details
16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a. | $2,597,000 |
| Jul 9, 2020 | Completed final sign-off Oct 2020 | 211 Main St | Deb Construction Llc | new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with newDetails
new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with new | $465,000 |
| Dec 18, 2019 | Completed final sign-off Feb 2021 | 211 Main St | Dome Construction Corp | 6th fl: commercial ti to include new conference storefronts, offices, breakroom, finishes, and ada upgrades in restrooms. new lighting throughout.Details
6th fl: commercial ti to include new conference storefronts, offices, breakroom, finishes, and ada upgrades in restrooms. new lighting throughout. | $1,200,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2020 | 50 Beale St | Field Construction Inc. | addition of ventilation fan to existing as meter room in basementDetails
addition of ventilation fan to existing as meter room in basement | $50,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2020 | 50 Beale St | Field Construction Inc. | mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing.Details
mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing. | $5,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2020 | 1 Embarcadero Center | fl. 34 & 35; remodel of (e) office space for new office needs n/a maher includes mepDetails
fl. 34 & 35; remodel of (e) office space for new office needs n/a maher includes mep | $3,700,000 | |
| Jun 13, 2019 | Never finaled issued Jul 2019, no final | 50 Beale St | Skyline Construction | ref pa# 201903145206; ahu replacement on 3rd fl.Details
ref pa# 201903145206; ahu replacement on 3rd fl. | $510,000 |
| May 29, 2019 | Completed final sign-off Nov 2022 | 495 Geary St | Hathaway Dinwiddie Co. | mep for 201904258919Details
mep for 201904258919 | |
| May 22, 2019 | Completed final sign-off Oct 2021 | 3251 20th Av | Vcc, Llc | removal of existing water heater combustion and fire pvc vents through shout facde. instlal new water heater and combustion and flue pvc vents teminating at east facade. all interior work.Details
removal of existing water heater combustion and fire pvc vents through shout facde. instlal new water heater and combustion and flue pvc vents teminating at east facade. all interior work. | $2,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window.Details
renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window. | $650,000 |
| Sep 28, 2018 | Never finaled issued Nov 2018, no final | 50 Beale St | Gci, Inc | interior tenant improvement lobby remodel, including all new finishes & lighting. no structural. no exterior work. maher naDetails
interior tenant improvement lobby remodel, including all new finishes & lighting. no structural. no exterior work. maher na | $1,519,200 |
| Dec 20, 2017 | Completed final sign-off Dec 2018 | 1 Market St | Dpr Construction | 12th fl amep ti full floor. no structural, soft demo under separate pa #201712085901, new office, meeting rooms, new restrooms. no changes to bldg core. 2-hr horizontal exit . n/a maher ordinance.Details
12th fl amep ti full floor. no structural, soft demo under separate pa #201712085901, new office, meeting rooms, new restrooms. no changes to bldg core. 2-hr horizontal exit . n/a maher ordinance. | $3,200,000 |
| Sep 8, 2017 | Completed final sign-off Jul 2018 | 601 Montgomery St | Rossi Builders Inc. | 7/f partial floor spec suite #770- commercial t.i. to include demo non-structural partitions, lighting and finishes. construction of non-structural partitions includes mep. n/a ordinance #155-13. ref pa 201704285167 for rated corridor to meet exit separation reqts, fire under separate permit(s)Details
7/f partial floor spec suite #770- commercial t.i. to include demo non-structural partitions, lighting and finishes. construction of non-structural partitions includes mep. n/a ordinance #155-13. ref pa 201704285167 for rated corridor to meet exit separation reqts, fire under separate permit(s) | $40,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 1 Embarcadero Center | D Kelly Construction Inc. | 24th floor #2440 - tenant improvement to (e) 3385 sq ft office suite. remove & replace (e) finishes. (n) t-24 compliant lighting, (n) partitions (non-structural), relocate (1) sink, make ada accessible . no exterior work. (e) restrooms accessible. n/a maher ordinanceDetails
24th floor #2440 - tenant improvement to (e) 3385 sq ft office suite. remove & replace (e) finishes. (n) t-24 compliant lighting, (n) partitions (non-structural), relocate (1) sink, make ada accessible . no exterior work. (e) restrooms accessible. n/a maher ordinance | $265,000 |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 211 Main St | Swinerton Builders | tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinanceDetails
tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinance | $1,200,000 |
| Jun 15, 2017 | Never finaled issued Jun 2017, no final | 300 Clay St | Gci, Inc | 14th fl: tenant improvement demolition and construction of mech, ele, plumbing. no structural to be performed. life safety deferred. ref 2017-0526-7759.Details
14th fl: tenant improvement demolition and construction of mech, ele, plumbing. no structural to be performed. life safety deferred. ref 2017-0526-7759. | $329,000 |
| Jun 12, 2017 | Never finaled issued Jul 2017, no final | 580 California St | Richlen Construction | 4/f- demolition of select interior partitions and millwork, construction of new conference rooms, new millwork, power/data, finishes throughout. space currently unoccupied . sprinkler system modification under sep permit maher not reqDetails
4/f- demolition of select interior partitions and millwork, construction of new conference rooms, new millwork, power/data, finishes throughout. space currently unoccupied . sprinkler system modification under sep permit maher not req | $800,000 |
| Oct 14, 2016 | Never finaled issued Nov 2016, no final | 601 Montgomery St | High Level Construction Co | commercial tenant improvement which includes demo of non-structural partitions, lighting, and finshes. construction of non-structural partitions. includes mep.Details
commercial tenant improvement which includes demo of non-structural partitions, lighting, and finshes. construction of non-structural partitions. includes mep. | $375,600 |
| Sep 8, 2016 | Completed final sign-off Oct 2017 | 1 Market St | Dpr Construction | 37/f- selective interior non-structural demo, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy or use and no change in floor area. horizontal exit seperation proided, fire barrier & standpipes required as shown. n/a maherDetails
37/f- selective interior non-structural demo, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy or use and no change in floor area. horizontal exit seperation proided, fire barrier & standpipes required as shown. n/a maher | $2,444,160 |
| Jul 15, 2016 | Completed final sign-off Oct 2016 | 601 Montgomery St | Rossi Builders Inc. | #1450 - commercial tenant improvement which includes demolition of non-structural partitions, lighting, & finishes. construction of non-structural partitions includes mechanical, electrical & plumbing.Details
#1450 - commercial tenant improvement which includes demolition of non-structural partitions, lighting, & finishes. construction of non-structural partitions includes mechanical, electrical & plumbing. | $259,690 |
| May 19, 2016 | Completed final sign-off Dec 2016 | 1 Market St | Dpr Construction | spear tower: selective interior non-structural demolition, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical and hvac. no change in occupancy, use or floor area. n/a ordinance #155-13Details
spear tower: selective interior non-structural demolition, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical and hvac. no change in occupancy, use or floor area. n/a ordinance #155-13 | $131,040 |
| Feb 2, 2016 | Completed final sign-off Sep 2016 | 1 Market St | Dpr Construction | selective interior non-structural demolition, new non-structural partitions doors, ceiling, lights, millwork finishes, electrical, plumbing and hvac. no change in occupancy or use and no change in floor area. n/a ordinance #155-13Details
selective interior non-structural demolition, new non-structural partitions doors, ceiling, lights, millwork finishes, electrical, plumbing and hvac. no change in occupancy or use and no change in floor area. n/a ordinance #155-13 | $537,360 |
| Nov 13, 2015 | Completed final sign-off Jul 2016 | 1 Market St | Dpr Construction | spear tower, 19th floor - demolition of walls, flooring, mechanical and electrical systems, ceiling tiles per ab-17. n/a ordinance #155-13Details
spear tower, 19th floor - demolition of walls, flooring, mechanical and electrical systems, ceiling tiles per ab-17. n/a ordinance #155-13 | $110,000 |
| Nov 12, 2015 | Completed final sign-off Aug 2016 | 1 Market St | Dpr Construction | 7th floor: mep workscope associated with previously approved arch app# 201511031519. no change in use. n/a for maher.Details
7th floor: mep workscope associated with previously approved arch app# 201511031519. no change in use. n/a for maher. | $1,000,000 |
| Oct 22, 2015 | Completed final sign-off May 2016 | 1 Market St | Dpr Construction | mep revision to pa# 201508063547, revision to (n) toilet exhaust system. n/a ordinance #155-13. 201509036020Details
mep revision to pa# 201508063547, revision to (n) toilet exhaust system. n/a ordinance #155-13. 201509036020 | |
| Oct 22, 2015 | Completed final sign-off May 2016 | 1 Market St | Dpr Construction | mep revision to pa# 201508043216, revision to (n) toilet exhaust system. n/a ordinance #155-13 201508073619Details
mep revision to pa# 201508043216, revision to (n) toilet exhaust system. n/a ordinance #155-13 201508073619 | |
| Oct 22, 2015 | Completed final sign-off May 2016 | 1 Market St | Dpr Construction | mep revision to pa# 201508053357, revision to (n) toilet exhaust system. n/a ordinance #155-13 201508134139Details
mep revision to pa# 201508053357, revision to (n) toilet exhaust system. n/a ordinance #155-13 201508134139 | |
| Sep 3, 2015 | Completed final sign-off May 2016 | 1 Market St | Dpr Construction | 13th flr: mep ref pa 2015 0806 3547 - adding fsd's for horitontal exit that was created. life safety deffered. maher naDetails
13th flr: mep ref pa 2015 0806 3547 - adding fsd's for horitontal exit that was created. life safety deffered. maher na | |
| Jul 28, 2015 | Completed final sign-off Aug 2017 | 1155 Market St | Dpr Construction | new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal.Details
new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal. | $455,800 |
| May 29, 2015 | Completed final sign-off Jun 2016 | 1 Market St | Dpr Construction | work on 4th & 6th floor. mep modification for new cafe in (e) high rise office. ** maher: compliance with ordinance no# 155-13 not required **Details
work on 4th & 6th floor. mep modification for new cafe in (e) high rise office. ** maher: compliance with ordinance no# 155-13 not required ** | $200,000 |
| Apr 9, 2015 | Completed final sign-off Feb 2016 | 1 Market St | Dpr Construction | mep 201503029652 new lights, 4 fsds, and ductwork for office spaceDetails
mep 201503029652 new lights, 4 fsds, and ductwork for office space | $1,000,000 |
| Mar 5, 2015 | Completed final sign-off Feb 2016 | 1 Market St | Dpr Construction | mechanical & electrical work for pa#201502239006. n/a ordinance #155-13 adding 5 fire smoke dampers and detectionDetails
mechanical & electrical work for pa#201502239006. n/a ordinance #155-13 adding 5 fire smoke dampers and detection | $800,000 |
| Jan 13, 2015 | Completed final sign-off Dec 2015 | 101 California St | Novo Construction Inc | mechanical and electrical work for tenant improvement on the 43rd floor. referenced ti 2015.0113.5557Details
mechanical and electrical work for tenant improvement on the 43rd floor. referenced ti 2015.0113.5557 | $200,000 |
| Dec 3, 2012 | Completed final sign-off Jul 2013 | 1 Market St | Dpr Construction | steuart tower - 3rd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire alarm & fire sprinkler under separate permit.Details
steuart tower - 3rd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire alarm & fire sprinkler under separate permit. | $3,268,920 |
| Dec 3, 2012 | Completed final sign-off Jul 2013 | 1 Market St | Dpr Construction | steuart tower, 2nd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire sprinkler, fire alarm & life safety under separate permit.Details
steuart tower, 2nd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire sprinkler, fire alarm & life safety under separate permit. | $1,925,520 |
| May 28, 2009 | Completed final sign-off Feb 2014 | 1 Market St | Bcci Construction Company | 20th floor-mechanical & electrical work associated with approved pa# 2009-0507-7893 including lighting, power & signalDetails
20th floor-mechanical & electrical work associated with approved pa# 2009-0507-7893 including lighting, power & signal | $185,000 |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200703085731, all work has been completed.Details
to obtain final inspection for work approved under #200703085731, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200609273478, all work has been completed.Details
to obtain final inspection for work approved under #200609273478, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200702164372, all work has been completed.Details
to obtain final inspection for work approved under #200702164372, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to botain final inspection for work approved under #200609273477, all work has been completed.Details
to botain final inspection for work approved under #200609273477, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200609273482, all work has been completed.Details
to obtain final inspection for work approved under #200609273482, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | 17th fl - to obtain final inspection for work approved under #200609273475, all work has been completed.Details
17th fl - to obtain final inspection for work approved under #200609273475, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200703085733, all work has been completed.Details
to obtain final inspection for work approved under #200703085733, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200702164370, all work has been completed.Details
to obtain final inspection for work approved under #200702164370, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200701030890, all work has been completed.Details
to obtain final inspection for work approved under #200701030890, all work has been completed. | |
| Jan 12, 2009 | Expired or cancelled expired Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200703226961, all work has been completed.Details
to obtain final inspection for work approved under #200703226961, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200703226959, all work has been completed.Details
to obtain final inspection for work approved under #200703226959, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200612210344, all work has been completed.Details
to obtain final inspection for work approved under #200612210344, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200609243478, all work has been completed.Details
to obtain final inspection for work approved under #200609243478, all work has been completed. | |
| Jan 12, 2009 | Completed final sign-off Feb 2009 | 1 Embarcadero Center | Principal Builders Inc. | to obtain final inspection for work approved under #200612210345, all work has been completed.Details
to obtain final inspection for work approved under #200612210345, all work has been completed. | |
| Aug 25, 2008 | Completed final sign-off Nov 2008 | 2 Embarcadero Center | Peacock Construction Inc | 13th fl: installation of ac unitDetails
13th fl: installation of ac unit | $8,000 |
| Aug 19, 2008 | Completed final sign-off Mar 2009 | 601 Montgomery St | 20th floor: mechanical, electrical, plumbing associated with construction of 3 show suitesDetails
20th floor: mechanical, electrical, plumbing associated with construction of 3 show suites | $150,000 | |
| May 30, 2008 | Expired or cancelled expired Jan 2010 | 900 North Point St | Abco Mechanical Contr Inc **See Notes** | heat dump /hvac and install hood.Details
heat dump /hvac and install hood. | $60,000 |
| Apr 15, 2008 | Completed final sign-off Jul 2008 | 345 California St | Turner Construction Co | decommisioning of schwab's independent stand by power generator fuel tank, cooling tower, tower pump, computer room hvac unit on the 4/f,9/f,19/f. remove all piping, ducts, wiring, etc. patching all walls, shafts, slab penetrations as required. retain original fire rating of all walls.Details
decommisioning of schwab's independent stand by power generator fuel tank, cooling tower, tower pump, computer room hvac unit on the 4/f,9/f,19/f. remove all piping, ducts, wiring, etc. patching all walls, shafts, slab penetrations as required. retain original fire rating of all walls. | $359,267 |
| Oct 2, 2007 | Completed final sign-off Nov 2007 | 1 Embarcadero Center | D Kelly Construction Inc. | ac unit addition on 24th floor. revision to approved pa# 2007.07.31.8271Details
ac unit addition on 24th floor. revision to approved pa# 2007.07.31.8271 | $15,000 |
| Aug 7, 2007 | Completed final sign-off Jan 2008 | 1 Market St | Pankow Special Projects Lp | remodel (e) office, 4,660 s.f.to include new offices, workstations, conference rooms, pantry, copy room, equipment room including (n) electrical work with (n) lighting, power/data, (n) mechanical registers & (n) plumbing pipes for (e) sinks. fire alarm/life safety & sprinkler under seperate permitDetails
remodel (e) office, 4,660 s.f.to include new offices, workstations, conference rooms, pantry, copy room, equipment room including (n) electrical work with (n) lighting, power/data, (n) mechanical registers & (n) plumbing pipes for (e) sinks. fire alarm/life safety & sprinkler under seperate permit | $400,000 |
| Dec 7, 2006 | Completed final sign-off Jan 2007 | 1 Embarcadero Center | oti-2, 23rd fl, el, me.Details
oti-2, 23rd fl, el, me. | $47,000 | |
| Nov 20, 2006 | Completed final sign-off Mar 2007 | 601 Montgomery St | michanical and electical work associated ith remodel of office suite. oti-2, 3rd floor, el, meDetails
michanical and electical work associated ith remodel of office suite. oti-2, 3rd floor, el, me | $54,000 | |
| Aug 29, 2006 | Completed final sign-off Oct 2006 | 345 California St | Gci, Inc | oti-2 31st floor el, me.Details
oti-2 31st floor el, me. | $12,000 |
| Aug 21, 2006 | Expired or cancelled expired Jan 2009 | 4 Embarcadero Center | Ward Alan Emery Construction Inc. | mep. permit: hvac, plumbing and electrical. hvac-relocate existing components,sfds existing. plumbing-break room sink and dishwasher connections. electrical-41 duplex, fluorescent fixtures -50(n), 15 (r).Details
mep. permit: hvac, plumbing and electrical. hvac-relocate existing components,sfds existing. plumbing-break room sink and dishwasher connections. electrical-41 duplex, fluorescent fixtures -50(n), 15 (r). | $187,000 |
| Aug 18, 2006 | Expired or cancelled withdrawn Jun 2007 | 4 Embarcadero Center | cut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650.Details
cut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650. | $524,641 | |
| Aug 14, 2006 | Expired or cancelled expired Apr 2008 | 4 Embarcadero Center | Ward Alan Emery Construction Inc. | t.i. (architectural only). non-structural drywall partitions, acoustic ceiling, doors ,cabinetry and finishes.Details
t.i. (architectural only). non-structural drywall partitions, acoustic ceiling, doors ,cabinetry and finishes. | $234,000 |
| Jul 6, 2006 | Completed final sign-off Jan 2007 | 2 Embarcadero Center | Gci, Inc | oti-2, 23rd floor, me. for partial tenant improvement. life safety included in mep.Details
oti-2, 23rd floor, me. for partial tenant improvement. life safety included in mep. | $124,000 |
| Apr 19, 2006 | Completed final sign-off Nov 2006 | 580 California St | Richlen Construction | oti-2 13th floor, el, me. alter existing & install new mechanical, electrical, plumbing, fire sprinkler & fire life safety devices/systems to achieve completed office tenant space.Details
oti-2 13th floor, el, me. alter existing & install new mechanical, electrical, plumbing, fire sprinkler & fire life safety devices/systems to achieve completed office tenant space. | $125,000 |
| Apr 7, 2006 | Completed final sign-off Apr 2006 | 601 Montgomery St | oti-2 14th flDetails
oti-2 14th fl | $100 | |
| Feb 16, 2006 | Expired or cancelled expired Dec 2006 | 4 Embarcadero Center | Gci, Inc | oti-2 31st/fl-me, el.Details
oti-2 31st/fl-me, el. | $8,000 |
| Jan 6, 2006 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | oti-2 on 7th fl only, = el, meDetails
oti-2 on 7th fl only, = el, me | $20,000 | |
| Oct 28, 2005 | Completed final sign-off May 2006 | 345 California St | oti-1, 12th floor, el, me, ls, sp.Details
oti-1, 12th floor, el, me, ls, sp. | $124,000 | |
| Oct 26, 2005 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | Turner Construction Co | oti-2 7/f el, meDetails
oti-2 7/f el, me | $196,470 |
| Jun 27, 2005 | Completed final sign-off Jan 2006 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | oti-4,3rd/fl-el,me.Details
oti-4,3rd/fl-el,me. | $115,000 |