Robert Remiker
- Listed as
- architect, designer, engineer
- Firm
- Robert Remiker Architect
- Based in
- Berkeley
- On San Francisco permits
- Aug 2004 to Dec 2019
12 permits since 2000 (architect on 10 permits, designer on 1 permit, engineer on 1 permit): 11 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 6, 2019 | Completed final sign-off Jul 2020 | 1796 Union St | R 3 Builders Inc., Centric Building Inc. | 1/f: tenant improvement of existing restaurant. cosmetic, title 24 upgrades.Details
1/f: tenant improvement of existing restaurant. cosmetic, title 24 upgrades. | $75,000 |
| Dec 20, 2017 | Completed final sign-off Mar 2019 | 631 Howard St | Centric Construction Inc | b,1,2: tenant improvement, interior 1,592 sqft. no exterior, landscape or signage work, no structural, no change of occupancy. mech, lighting & electrical under sep permit.Details
b,1,2: tenant improvement, interior 1,592 sqft. no exterior, landscape or signage work, no structural, no change of occupancy. mech, lighting & electrical under sep permit. | $140,000 |
| Dec 12, 2017 | Never finaled issued Feb 2018, no final | 1 Embarcadero Center | D Kelly Construction Inc. | ste 2410-2440 - 3995 sq ft ti including elect/mech/plumbing. fully accessible, no occ class change. no exterior planting, signage, landscape or roof top work. maher naDetails
ste 2410-2440 - 3995 sq ft ti including elect/mech/plumbing. fully accessible, no occ class change. no exterior planting, signage, landscape or roof top work. maher na | $487,111 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 1 Embarcadero Center | D Kelly Construction Inc. | 24th floor #2440 - tenant improvement to (e) 3385 sq ft office suite. remove & replace (e) finishes. (n) t-24 compliant lighting, (n) partitions (non-structural), relocate (1) sink, make ada accessible . no exterior work. (e) restrooms accessible. n/a maher ordinanceDetails
24th floor #2440 - tenant improvement to (e) 3385 sq ft office suite. remove & replace (e) finishes. (n) t-24 compliant lighting, (n) partitions (non-structural), relocate (1) sink, make ada accessible . no exterior work. (e) restrooms accessible. n/a maher ordinance | $265,000 |
| Jun 1, 2015 | Completed final sign-off Aug 2016 | 832 Diamond St | Mcmahon Construction | convert the (e) unconditioned space on the ground floor into a new bathroom, family room and utility area.Details
convert the (e) unconditioned space on the ground floor into a new bathroom, family room and utility area. | $225,000 |
| Jun 25, 2014 | Completed final sign-off Nov 2014 | 631 Howard St | Centric Construction Inc | 3rd floor interior tenant improvements, partitoins, doors, hardware, finishes.Details
3rd floor interior tenant improvements, partitoins, doors, hardware, finishes. | $600,000 |
| May 21, 2014 | Completed final sign-off Nov 2014 | 631 Howard St | Centric Construction Inc | new 3rd fl restrooms in advance of tenant improvements. mep under separate permit (revised 5-22-14)Details
new 3rd fl restrooms in advance of tenant improvements. mep under separate permit (revised 5-22-14) | $350,000 |
| Feb 25, 2014 | Completed final sign-off Jun 2014 | 631 Howard St | Rossi Builders Inc. | demolition of existing non-sturctural walls, ceilings, flooring base, doors frames hardware, millwork, lighting, ductwork, hvac. patch concrete at removed doors. cap plumbing, hvac demo, & electrical demo. per ab-017.Details
demolition of existing non-sturctural walls, ceilings, flooring base, doors frames hardware, millwork, lighting, ductwork, hvac. patch concrete at removed doors. cap plumbing, hvac demo, & electrical demo. per ab-017. | $85,000 |
| Aug 10, 2012 | Completed final sign-off Jun 2014 | 631 Howard St | revision to pa 201203075597, new work is demo to non-struct walls on flrs 3,4,5. seismic upgrade to flrs 3,4,5. all iimprovements confined to shell of bldg. no tenant improvement under this permit. fire protection under separate permit.Details
revision to pa 201203075597, new work is demo to non-struct walls on flrs 3,4,5. seismic upgrade to flrs 3,4,5. all iimprovements confined to shell of bldg. no tenant improvement under this permit. fire protection under separate permit. | $650,000 | |
| Jul 27, 2012 | Completed final sign-off Jun 2013 | 631 Howard St | Centric Construction Inc | exit modifications, maintenance & management offices, shell improvements in advance of tenant improvement.Details
exit modifications, maintenance & management offices, shell improvements in advance of tenant improvement. | $125,000 |
| Mar 7, 2012 | Completed final sign-off Apr 2013 | 631 Howard St | Centric Construction Inc | int. voluntary seismic & shell improvements on basement, 1st & 2nd flrs.work includes demo of (e)slabs (n) concrete reinforcing panels, strengthening floor diaphragms. (n) partitions (n) bathrooms.(n) concrete stairways. no exterior work. fire protection under separate permit.Details
int. voluntary seismic & shell improvements on basement, 1st & 2nd flrs.work includes demo of (e)slabs (n) concrete reinforcing panels, strengthening floor diaphragms. (n) partitions (n) bathrooms.(n) concrete stairways. no exterior work. fire protection under separate permit. | $420,000 |
| Aug 31, 2004 | Completed final sign-off Dec 2005 | 990 Monterey Bl | interior remodel:1 new exterior window, addition of bath & guestroom in (e) storage area, exteriorDetails
interior remodel:1 new exterior window, addition of bath & guestroom in (e) storage area, exterior | $200,000 |