David Herkowitz
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- Bcci Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2026
4,289 permits since 2000 (contractor on 4,289 permits, authorized agent-others on 24 permits, pmt consultant/expediter on 1 permit): 3,343 completed, 132 in progress, 333 never finaled, 481 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Carrie Byles (12), Wesley Herr (8), Scott E Clement (7), David De Valeria (5), Luda Hoe (5), Stephanie Kwan (3), Anna C Quezada (2), Daniel Baroni (2), Gregory A Weber (2), Marco Fung (2), Victoria Salgado (2), Alla Elkina, Andrew Ostrowski, Ariane Lebrilla, Ashley Miller, Breck Polley, Brian Milford, Erica Hayes, Evan Raabe, Ha-Pui Iris Chan, Joseph O'neill, Lawrence Smith, Marc Penninger, Michael Zelazek, Stanley Wong, Thoms R. Hughes
- Engineers
- Alexander Joseph Pacheco (8), Amit Wadhwa (5), Andrew Ostrowski (5), Christopher Jordan Malabed (5), Jillian Mcleod (5), Daniel Aaron Junker (3), Levi Abarte (3), Marc Andrew Steyer (3), Andrew Ostrovski (2), Arthur Metzler (2), David Ojala (2), Christopher Jones, David Rossi, Eric Long, Erica Hays, Glenn Friedman, James Tavernelli, Jeremy Klaas, Lars P. Mortensen, Luda Hoe, Mark P Sarkisian, Matthew Debevec, Rudolfo P Bustos Iii, Sherry Chaumpluke, Tareq Batarseh, William Hadinger
- Authorized agents
- Joyce Mizuhara, Michael Zelazek
Most recent permits
Showing the 100 most recent of 4,289.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 555 California St | Bcci Construction Company | 51st flr - structural deferred submittal to support approved architectural permit. ref#: 202610059017Details
51st flr - structural deferred submittal to support approved architectural permit. ref#: 202610059017 | $50,000 |
| Nov 13, 2026 | In progress filed Nov 2026, not yet issued | 353 Sacramento St | Bcci Construction Company | 3/f exterior: louver replacement along with its associated mechnical scope. ref 202604149358 for arch t.i. and 202607145028 for deffered mep scopes.Details
3/f exterior: louver replacement along with its associated mechnical scope. ref 202604149358 for arch t.i. and 202607145028 for deffered mep scopes. | $1,000,000 |
| Oct 30, 2026 | In progress issued Oct 2026 | 1455 Market St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202508273967. all work is complete.Details
to obtain final inspection for work approved under pa# 202508273967. all work is complete. | |
| Oct 29, 2026 | In progress issued Nov 2026 | 1 Maritime Pz | Bcci Construction Company | interior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project.Details
interior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project. | $572,440 |
| Oct 22, 2026 | In progress issued Nov 2026 | 121 Spear St | Bcci Construction Company | 1st f/ ste b18-19: selective interior demolition and new construction of elements including but not limited to interior partitions, door finishes, ceilings, light fixtures and millwork. mep, sprinklers system and life safety modifications to be undere separate permits. no building exterior...Details
1st f/ ste b18-19: selective interior demolition and new construction of elements including but not limited to interior partitions, door finishes, ceilings, light fixtures and millwork. mep, sprinklers system and life safety modifications to be undere separate permits. no building exterior... | $427,000 |
| Oct 22, 2026 | In progress issued Nov 2026 | 555 California St | Bcci Construction Company | 51th fl: mep deferred submittal to support approved arch permit. ref pa# 202610059017.Details
51th fl: mep deferred submittal to support approved arch permit. ref pa# 202610059017. | $691,200 |
| Oct 22, 2026 | In progress issued Oct 2026 | 560 Mission St | Bcci Construction Company | 24/f revision to pa#202603097160 & 202604068938: changing arktura specialty ceiling to baffle ceiling.Details
24/f revision to pa#202603097160 & 202604068938: changing arktura specialty ceiling to baffle ceiling. | |
| Oct 20, 2026 | In progress issued Oct 2026 | 600 Battery St | Bcci Construction Company | revision to 202512121681. interior tenant improvement at basement, selective demo of paritoins and doors, no change of use.Details
revision to 202512121681. interior tenant improvement at basement, selective demo of paritoins and doors, no change of use. | $164,800 |
| Oct 20, 2026 | In progress issued Oct 2026 | 101 California St | Bcci Construction Company | 25/f: removal of stand alone wall in pantry. removal & replacement of millwork & associated finishes. wall covering installation at reception.Details
25/f: removal of stand alone wall in pantry. removal & replacement of millwork & associated finishes. wall covering installation at reception. | $139,500 |
| Oct 19, 2026 | In progress issued Oct 2026 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa#: 202309156685, 202309156665, and 202306230736. all work is complete.Details
to obtain final inspection for work approved under pa#: 202309156685, 202309156665, and 202306230736. all work is complete. | |
| Oct 19, 2026 | In progress filed Oct 2026, not yet issued | 650 Davis St | Bcci Construction Company | 2nd floor: interior t.i. to construct private offices, workstations, meeting space, lounge, pantries, and refresh existing restrooms. mep deferredDetails
2nd floor: interior t.i. to construct private offices, workstations, meeting space, lounge, pantries, and refresh existing restrooms. mep deferred | $2,959,528 |
| Oct 15, 2026 | In progress issued Nov 2026 | 1455 Market St | Bcci Construction Company | 9/fl- ti 6500sf interior demo and (n) constructoin of interior partitions, doors, finishes, ceilings, lights fixtures, and millwork. no exterior alterations. no change of use or occupancy. no work in restrooms. mep deferredDetails
9/fl- ti 6500sf interior demo and (n) constructoin of interior partitions, doors, finishes, ceilings, lights fixtures, and millwork. no exterior alterations. no change of use or occupancy. no work in restrooms. mep deferred | $1,920,000 |
| Oct 8, 2026 | In progress issued Oct 2026 | 560 Mission St | Bcci Construction Company | 4/f: revision to 202512182157. previously proposed south mer room has been removed, existing storage to remain with no new work. previously proposed closet and equipment has been removed. the mechanical and electrical equipment in the ups room, server room and mdf room has been reconfigured.Details
4/f: revision to 202512182157. previously proposed south mer room has been removed, existing storage to remain with no new work. previously proposed closet and equipment has been removed. the mechanical and electrical equipment in the ups room, server room and mdf room has been reconfigured. | |
| Oct 7, 2026 | In progress issued Oct 2026 | 50 California St | Bcci Construction Company | to obtain final inspection for work approved under pa# 2024-1218-7084. all work is complete.Details
to obtain final inspection for work approved under pa# 2024-1218-7084. all work is complete. | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 25 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114.Details
t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114. | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514.Details
t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514. | $15,000,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 555 California St | Bcci Construction Company | 51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.Details
51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred. | $1,935,000 |
| Sep 22, 2026 | In progress issued Oct 2026 | 555 California St | Bcci Construction Company | 51st floor deferred mep for 202608186758Details
51st floor deferred mep for 202608186758 | $350,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 235 02nd St | Bcci Construction Company | revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules.Details
revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules. | |
| Sep 16, 2026 | In progress issued Oct 2026 | 1455 Market St | Bcci Construction Company | floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.Details
floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed. | $225,000 |
| Sep 16, 2026 | In progress issued Oct 2026 | 1455 Market St | Bcci Construction Company | floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electricDetails
floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric | $85,000 |
| Sep 11, 2026 | Completed final sign-off Oct 2026 | 353 Sacramento St | Bcci Construction Company | 16th fl revision to 202512222377. removeal and replacement of existing guardrail in terrace. guardrail shall increase in height to be code compliant. structual drawingsand calcs includedDetails
16th fl revision to 202512222377. removeal and replacement of existing guardrail in terrace. guardrail shall increase in height to be code compliant. structual drawingsand calcs included | $27,000 |
| Sep 3, 2026 | In progress issued Sep 2026 | 353 Sacramento St | Bcci Construction Company | 22nd fl: mep submittal to support approved pa: 202606253937 - new hvac and ductwork for new office layout. new lighting and power.Details
22nd fl: mep submittal to support approved pa: 202606253937 - new hvac and ductwork for new office layout. new lighting and power. | $600,000 |
| Aug 27, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994Details
50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994 | $1,500,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Details
51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. | $1,935,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 560 Mission St | Bcci Construction Company | 24th floor: mechanical and electrical revision to permits #202605097160 and #202604068938Details
24th floor: mechanical and electrical revision to permits #202605097160 and #202604068938 | |
| Aug 10, 2026 | In progress issued Aug 2026 | 50 California St | Bcci Construction Company | interior tenant improvement, demo and new interior non load bearing partitions, new doors, door frames, tempered glazing sidlelites. elec, life safety, mech and sprinkler work under sep permitDetails
interior tenant improvement, demo and new interior non load bearing partitions, new doors, door frames, tempered glazing sidlelites. elec, life safety, mech and sprinkler work under sep permit | $75,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 525 Market St | Bcci Construction Company | installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqftDetails
installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft | $35,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1455 Market St | Bcci Construction Company | 5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work.Details
5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work. | $2,364,489 |
| Aug 4, 2026 | In progress issued Aug 2026 | 560 Mission St | Bcci Construction Company | 5th fl - mep revision to pa 202603057034 & 202604209713Details
5th fl - mep revision to pa 202603057034 & 202604209713 | |
| Aug 3, 2026 | In progress issued Aug 2026 | 560 Mission St | Bcci Construction Company | 3rd fl/ mep revision to bpa 2026-0225-6475.Details
3rd fl/ mep revision to bpa 2026-0225-6475. | |
| Aug 3, 2026 | In progress issued Sep 2026 | 525 Market St | Bcci Construction Company | anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sfDetails
anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sf | $8,500 |
| Jul 29, 2026 | In progress issued Oct 2026 | 100 Stockton St | Bcci Construction Company | 1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing.Details
1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing. | $14,150,000 |
| Jul 29, 2026 | In progress issued Aug 2026 | 55 Spear St | Bcci Construction Company | administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007Details
administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007 | |
| Jul 28, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th and 28th floors: mep submittal to support approved arch. permit. #202607175188Details
27th and 28th floors: mep submittal to support approved arch. permit. #202607175188 | $202,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 555 California St | Bcci Construction Company | 46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.Details
46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening. | |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 1001 Front St | Bcci Construction Company | basement, 1st flr, 2nd floor - demo only permit per ab017Details
basement, 1st flr, 2nd floor - demo only permit per ab017 | $150,000 |
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 1050 Battery St | Bcci Construction Company | basement, 1st, 2nd, & 3rd floors: demo only permit per ab-17Details
basement, 1st, 2nd, & 3rd floors: demo only permit per ab-17 | $150,000 |
| Jul 20, 2026 | In progress issued Oct 2026 | 525 Market St | Bcci Construction Company | l27- office t.i. demo existing and install new non structural partitions, millwork, and finishes.Details
l27- office t.i. demo existing and install new non structural partitions, millwork, and finishes. | $2,668,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout.Details
27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout. | $751,283 |
| Jul 15, 2026 | In progress issued Jul 2026 | 560 Mission St | Bcci Construction Company | 3rd fl revision to 202602256475. existing toilet and associated accessories in the ada stall will be relocatedDetails
3rd fl revision to 202602256475. existing toilet and associated accessories in the ada stall will be relocated | |
| Jul 15, 2026 | In progress issued Jul 2026 | 560 Mission St | Bcci Construction Company | 5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated.Details
5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated. | |
| Jul 14, 2026 | In progress issued Jul 2026 | 353 Sacramento St | Bcci Construction Company | 3rd floor:mep submittal to support approved architectural pert#2026-0414-9358. new ductwork and lighting and power throughout the floor.Details
3rd floor:mep submittal to support approved architectural pert#2026-0414-9358. new ductwork and lighting and power throughout the floor. | $745,416 |
| Jul 14, 2026 | In progress issued Jul 2026 | 555 California St | Bcci Construction Company | 50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.Details
50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855. | $3,800,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 4 Embarcadero Center | Bcci Construction Company | 37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork.Details
37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork. | $161,850 |
| Jul 1, 2026 | In progress issued Jul 2026 | 560 Mission St | Bcci Construction Company | 4th fl mep plan to support approved arch 202605141273. new ducts, mech equipment, lighting and powerDetails
4th fl mep plan to support approved arch 202605141273. new ducts, mech equipment, lighting and power | $1,615,500 |
| Jun 25, 2026 | In progress issued Jun 2026 | 353 Sacramento St | Bcci Construction Company | ste 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferredDetails
ste 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferred | $2,486,065 |
| Jun 25, 2026 | In progress issued Jul 2026 | 235 02nd St | Bcci Construction Company | level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain.Details
level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain. | $2,900,000 |
| Jun 24, 2026 | Completed final sign-off Sep 2026 | 601 Townsend St | Bcci Construction Company | 1/f: dishwasher replacement. structural, electrical and mep drawings included.Details
1/f: dishwasher replacement. structural, electrical and mep drawings included. | $224,342 |
| Jun 18, 2026 | Completed final sign-off Nov 2026 | 555 Market St | Bcci Construction Company | deferred submittal for pa#: 202512121719 for review of climbing walls.Details
deferred submittal for pa#: 202512121719 for review of climbing walls. | |
| Jun 18, 2026 | In progress issued Jul 2026 | 4 Embarcadero Center | Bcci Construction Company | 28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833.Details
28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833. | $500,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 4 Embarcadero Center | Bcci Construction Company | 28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishesDetails
28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishes | $7,650,300 |
| Jun 9, 2026 | In progress issued Jun 2026 | 555 California St | Bcci Construction Company | 50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep.Details
50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep. | $50,000 |
| Jun 8, 2026 | Completed final sign-off Jul 2026 | 353 Sacramento St | Bcci Construction Company | 23/f: electrical only permit to add new lighting and controls for office tenant "white box". ref bpa 202605211746Details
23/f: electrical only permit to add new lighting and controls for office tenant "white box". ref bpa 202605211746 | $25,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 345 Montgomery St | Bcci Construction Company | non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies.Details
non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies. | $50,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 560 Mission St | Bcci Construction Company | 4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures.Details
4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures. | $250,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 120 Kearny St | Bcci Construction Company | structural design of demantable partitions. structural supplemental package to approved application 202602125795Details
structural design of demantable partitions. structural supplemental package to approved application 202602125795 | $80,000 |
| May 21, 2026 | Completed final sign-off Jul 2026 | 353 Sacramento St | Bcci Construction Company | 23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughoutDetails
23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughout | $150,000 |
| May 14, 2026 | In progress issued Jun 2026 | 560 Mission St | Bcci Construction Company | 4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred.Details
4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred. | $4,250,000 |
| May 14, 2026 | In progress filed May 2026, not yet issued | 1455 Market St | Bcci Construction Company | 4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be doneDetails
4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be done | |
| May 13, 2026 | Completed final sign-off Aug 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202208170721, 202210214935, & 202211015646. all work is complete.Details
to obtain final inspection for work approved under pa# 202208170721, 202210214935, & 202211015646. all work is complete. | |
| May 13, 2026 | Completed final sign-off Sep 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202207188709, 202212239136, & 202210265240. all work is complete.Details
to obtain final inspection for work approved under pa# 202207188709, 202212239136, & 202210265240. all work is complete. | |
| May 13, 2026 | Completed final sign-off Aug 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202207188695, 202211076004, & 202208019661. all work is complete.Details
to obtain final inspection for work approved under pa# 202207188695, 202211076004, & 202208019661. all work is complete. | |
| May 5, 2026 | Completed final sign-off Jun 2026 | 425 Market St | Bcci Construction Company | 25/f: mechanical only permit to support approved architectural permit 201908169078. (2) new heat pumps and (1) new condenser water pump is being added. ref permit 201908169078.Details
25/f: mechanical only permit to support approved architectural permit 201908169078. (2) new heat pumps and (1) new condenser water pump is being added. ref permit 201908169078. | $72,000 |
| May 1, 2026 | Completed final sign-off Aug 2026 | 353 Sacramento St | Bcci Construction Company | 12th/f: mep submittal to t.i. 202603057008, new ductwork & lighting for new office layoutDetails
12th/f: mep submittal to t.i. 202603057008, new ductwork & lighting for new office layout | $250,000 |
| Apr 14, 2026 | In progress issued Jul 2026 | 353 Sacramento St | Bcci Construction Company | 3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferredDetails
3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred | $1,596,000 |
| Apr 8, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | new fire smoke dampers and power ref approved mech permit: 202602236308.Details
new fire smoke dampers and power ref approved mech permit: 202602236308. | $50,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa # 202211297317, 202207128306, 202211156540. all work is complete.Details
to obtain final inspection for work approved under pa # 202211297317, 202207128306, 202211156540. all work is complete. | |
| Apr 6, 2026 | In progress issued Apr 2026 | 560 Mission St | Bcci Construction Company | 24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160Details
24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160 | $1,400,000 |
| Mar 30, 2026 | In progress issued Mar 2026 | 120 Kearny St | Bcci Construction Company | 34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.Details
34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power. | $150,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716Details
8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 301 Howard St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202501148268. all work is complete.Details
to obtain final inspection for work approved under pa# 202501148268. all work is complete. | |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345Details
21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271Details
29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271 | |
| Mar 26, 2026 | In progress issued Sep 2026 | 1455 Market St | Bcci Construction Company | 7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required.Details
7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required. | $257,580 |
| Mar 25, 2026 | In progress issued Apr 2026 | 650 Davis St | Bcci Construction Company | 2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep includedDetails
2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included | $2,959,528 |
| Mar 20, 2026 | Completed final sign-off Oct 2026 | 353 Sacramento St | Bcci Construction Company | 16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377Details
16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377 | $250,000 |
| Mar 19, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor.Details
3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor. | $500,000 |
| Mar 18, 2026 | In progress issued Mar 2026 | 1 Front St | Bcci Construction Company | basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd.Details
basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd. | |
| Mar 13, 2026 | In progress issued Mar 2026 | 4 Embarcadero Center | Bcci Construction Company | 28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017.Details
28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017. | $150,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred.Details
24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred. | $4,250,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferredDetails
5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred | $4,250,000 |
| Mar 5, 2026 | Completed final sign-off Aug 2026 | 353 Sacramento St | Bcci Construction Company | 12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferredDetails
12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferred | $650,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 101 California St | Bcci Construction Company | 44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lightingDetails
44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting | $501,665 |
| Feb 25, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferredDetails
3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferred | $4,250,000 |
| Feb 24, 2026 | In progress issued Feb 2026 | 650 Davis St | Bcci Construction Company | 2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru.Details
2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru. | $110,000 |
| Feb 23, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | 2nd fl ref pa #2025-1215-1741: mep permit to add new lighting, power, air & ducts.Details
2nd fl ref pa #2025-1215-1741: mep permit to add new lighting, power, air & ducts. | $450,000 |
| Feb 23, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | deferred mep for 15th floor office ti. ref pa 202602176020; 202511109274Details
deferred mep for 15th floor office ti. ref pa 202602176020; 202511109274 | $80,000 |
| Feb 17, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274Details
ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274 | |
| Feb 12, 2026 | In progress issued Mar 2026 | 120 Kearny St | Bcci Construction Company | ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled.Details
ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled. | $486,000 |
| Feb 9, 2026 | In progress issued Feb 2026 | 560 Mission St | Bcci Construction Company | 8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air.Details
8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air. | $75,000 |
| Feb 2, 2026 | Expired or cancelled cancelled Apr 2026 | 50 Hawthorne St | Bcci Construction Company | stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.Details
stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings. | $350,000 |
| Jan 28, 2026 | In progress issued Jun 2026 | 345 Montgomery St | Bcci Construction Company | change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23.Details
change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23. | $21,000,000 |
| Jan 26, 2026 | In progress issued Feb 2026 | 555 California St | Bcci Construction Company | revision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifitionDetails
revision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifition | |
| Jan 21, 2026 | In progress issued Feb 2026 | 560 Mission St | Bcci Construction Company | 8th floor- revision to include new partitions & door hardware. ref. pa#202507140716Details
8th floor- revision to include new partitions & door hardware. ref. pa#202507140716 | $50,000 |
| Jan 14, 2026 | In progress issued Feb 2026 | 353 Sacramento St | Bcci Construction Company | 3rd/fl- structural permit submittal to reinforce 3rd floor slabDetails
3rd/fl- structural permit submittal to reinforce 3rd floor slab | $50,000 |
| Jan 12, 2026 | Completed final sign-off Jun 2026 | 350 Bush St | Bcci Construction Company | installing and anchoring furniture phone booths on office floor 7.Details
installing and anchoring furniture phone booths on office floor 7. | $20,000 |
| Dec 30, 2025 | In progress issued Oct 2026 | 150 14th St | Bcci Construction Company | structural anchorage of automatic vehicle charging system. non-street facing.Details
structural anchorage of automatic vehicle charging system. non-street facing. | $6,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 555 California St | Bcci Construction Company | l45-46 interconnecting stair. new finishes & banquette platform landingDetails
l45-46 interconnecting stair. new finishes & banquette platform landing | $125,000 |
| Dec 22, 2025 | Completed final sign-off Oct 2026 | 353 Sacramento St | Bcci Construction Company | 16th fl: demolition of non structural elements. construction of new partitions, doors, finishes, ceilings, lighting and millwork. new (2) ada compliant gnrs. mep will be separate permit. pot previously approved per pa # 2025-1110-9274.Details
16th fl: demolition of non structural elements. construction of new partitions, doors, finishes, ceilings, lighting and millwork. new (2) ada compliant gnrs. mep will be separate permit. pot previously approved per pa # 2025-1110-9274. | $1,250,000 |