Douglas Zucker
- License
- C12821
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C12821 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer, lessee
- Firm
- Gensler
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Jul 2025
600 permits since 2000 (architect on 563 permits, designer on 16 permits, engineer on 15 permits, authorized agent-others on 5 permits, lessee on 1 permit): 483 completed, 6 in progress, 79 never finaled, 32 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company (22), Hathaway Dinwiddie Co. (13), Skyline Construction (11), Level 10 Construction Lp (8), Principal Builders Inc. (5), Skyline Capital Builders Llc (4), Turner Construction Co (4), Centric Construction Inc (3), Dome Construction Corp (3), Source Planning And Construction Inc (3), Bana Construction Inc (2), Field Construction Inc. (2), Novo Construction Inc (2), Paradigm General Contractors (2), Peacock Construction (2), Richlen Construction (2), Cahill Contractors Llc., Clune Construction Company L P, Rossi Builders Inc., Skanska Usa Building Inc, T C B Builders Inc, Thomas Swan Sign Co Inc, Webcor Construction Lp
- Architects
- Bert Deviterbo (2), George Soskin (2), Greg Sheppard (2), Donnie Lam, Yi-Tso Jeff Chen
- Engineers
- Amit Wadhwa (2), Edward Rivera (2), Guil Orihuela (2), Jesus B Cabellon Jr (2), Jose Herrera (2), Levi G. Abarte (2), Mahmoud Maamouri (2), Aaron J. Strauch, David Strandberg, Jeffrey Brink, Jeffrey Sacks, Jillian P. Moritz, Jimmy Lau, Joshua Mcmmahan, Kevin T. O'keefe, Pablo Orozco, Paul Cordova, Philip M Tapia, Rodolfo Bustos Iii, Sherry Chaumpluke, Stephen Shafeer
- Authorized agents
- Alex Morin
Most recent permits
Showing the 100 most recent of 600.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2025 | Completed final sign-off Oct 2025 | 181 Fremont St | Level 10 Construction Lp | 17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures.Details
17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures. | $250,000 |
| Jan 14, 2025 | In progress issued Jun 2025 | 1 Market St | Field Construction Inc. | level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate.Details
level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate. | $8,000,000 |
| Dec 11, 2024 | In progress issued Dec 2024 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work.Details
lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work. | |
| Oct 16, 2024 | In progress issued Feb 2025 | 150 04th Ti St | Cahill Contractors Llc. | mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space.Details
mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space. | $40,000,000 |
| Jul 25, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting.Details
mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting. | $3,999,516 |
| Jun 24, 2024 | Completed final sign-off Nov 2024 | 475 Sansome St | Principal Builders Inc. | revision to bpa# 202405021310: to update millwork detail and depth per plans.Details
revision to bpa# 202405021310: to update millwork detail and depth per plans. | |
| May 2, 2024 | Completed final sign-off Nov 2024 | 475 Sansome St | Principal Builders Inc. | 8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.Details
8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep. | $3,051,349 |
| Feb 7, 2024 | In progress issued Apr 2024 | 560 Mission St | Turner Construction Co | revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices.Details
revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices. | $200,000 |
| Dec 13, 2023 | Completed final sign-off Apr 2024 | 1 Maritime Pz | Novo Construction Inc | 21/f- minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permitDetails
21/f- minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit | $190,000 |
| Dec 13, 2023 | Completed final sign-off Apr 2024 | 1 Maritime Pz | Novo Construction Inc | 20th fl - minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permitDetails
20th fl - minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit | $289,000 |
| Dec 4, 2023 | In progress issued Feb 2024 | 170 Valencia St | Thomas Swan Sign Co Inc | install 1 non-illuminated single face door sign " chan national queer arts center"Details
install 1 non-illuminated single face door sign " chan national queer arts center" | $2,000 |
| Aug 28, 2023 | In progress issued Nov 2023 | 560 Mission St | Turner Construction Co | 27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical workDetails
27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work | $115,000 |
| Jul 12, 2023 | Completed final sign-off Mar 2024 | 425 Market St | Skyline Construction | new commercial ti including: partition new acoustical ceilings, new finishes. deferred submittals: mep, fire life safety.Details
new commercial ti including: partition new acoustical ceilings, new finishes. deferred submittals: mep, fire life safety. | $2,127,220 |
| Jun 30, 2023 | Completed final sign-off Mar 2024 | 170 Valencia St | Skyline Construction | removal/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & doorDetails
removal/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & door | $105,000 |
| Jan 19, 2023 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Capital Builders Llc | revision to 202210265195: install non structural acoustic panel in great hall, new double ddors in pre-function space. new acoustic and gyp ceiling in grand hall. add new millwork folding doors at pantryDetails
revision to 202210265195: install non structural acoustic panel in great hall, new double ddors in pre-function space. new acoustic and gyp ceiling in grand hall. add new millwork folding doors at pantry | $20,000 |
| Oct 26, 2022 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Construction | new accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mepDetails
new accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mep | $250,000 |
| Oct 25, 2022 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Capital Builders Llc | demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17.Details
demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17. | $10,000 |
| Oct 25, 2022 | Never finaled issued Dec 2022, no final | 657 Mission St | new slab opening in level 1 slab of 657 portion of building. new 2-hr rated partition w/90 minute rated door will be installed @ lobby perimeter for exit separation.Details
new slab opening in level 1 slab of 657 portion of building. new 2-hr rated partition w/90 minute rated door will be installed @ lobby perimeter for exit separation. | $100,000 | |
| Oct 14, 2022 | Completed final sign-off May 2023 | 145 Leavenworth St | Centric Construction Inc | revision 201804136335 s3 to document the revised area with the mechanical room at roof levelDetails
revision 201804136335 s3 to document the revised area with the mechanical room at roof level | |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 3 Embarcadero Center | Peacock Construction | 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.Details
3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. | $1,025,089 |
| Jun 15, 2022 | Completed final sign-off Jul 2023 | 3 Embarcadero Center | Peacock Construction | 2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.Details
2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's. | $856,324 |
| May 2, 2022 | Completed final sign-off May 2023 | 465 California St | Rossi Builders Inc. | g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits.Details
g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits. | $32,000 |
| Mar 31, 2022 | Completed final sign-off Apr 2023 | 145 Leavenworth St | Centric Construction Inc | revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.Details
revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space. | |
| Mar 31, 2022 | Completed final sign-off Apr 2023 | 361 Turk St | Centric Construction Inc | revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.Details
revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space. | |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 3 Embarcadero Center | Dome Construction Corp | administrative permit. obtaining a fire assemble permit. no work to be done on this permitDetails
administrative permit. obtaining a fire assemble permit. no work to be done on this permit | |
| Dec 20, 2021 | Completed final sign-off Jan 2023 | 465 California St | Skyline Capital Builders Llc | revision to bpa# 2020.0903.3366. adjustment of new curb cut location off california st,due to structrual constraits.Details
revision to bpa# 2020.0903.3366. adjustment of new curb cut location off california st,due to structrual constraits. | |
| Nov 23, 2021 | Expired or cancelled cancelled Jan 2026 | 1 Market St | #1800: add security doors, localized patch and repari as req. for floor finishes and ceilings. no change to use, exit stair, egress path, elevator, fire sprinklers and life safety systems to remain operational.Details
#1800: add security doors, localized patch and repari as req. for floor finishes and ceilings. no change to use, exit stair, egress path, elevator, fire sprinklers and life safety systems to remain operational. | $10,000 | |
| Nov 8, 2021 | Never finaled filed Nov 2021, never issued | 33 Gough St | prj-21-0398. mou sfdpw. revision to pa #202107285327, prj 21-0375: decking and ada path reduction, relocation of certain structures due to location of fire lane and new cripple wall for dining unit. no intensification of occupancy.Details
prj-21-0398. mou sfdpw. revision to pa #202107285327, prj 21-0375: decking and ada path reduction, relocation of certain structures due to location of fire lane and new cripple wall for dining unit. no intensification of occupancy. | ||
| Oct 14, 2021 | Completed final sign-off Dec 2021 | 1 Sansome St | Clune Construction Company L P | 23rd fl - remove mechanical scope from 2018-0926-1516Details
23rd fl - remove mechanical scope from 2018-0926-1516 | |
| Sep 22, 2021 | Never finaled issued Nov 2021, no final | 560 Mission St | Turner Construction Co | ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.Details
ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep. | $1,500,000 |
| Sep 9, 2021 | Never finaled issued Oct 2021, no final | 595 Market St | Source Planning And Construction Inc | 8th flr/suite 810-remmodel and installation of interior non-bearing partitions and related finishes as per plans filed with no change of use or occupancy. upgrades to restrooms(existing mens and womens).Details
8th flr/suite 810-remmodel and installation of interior non-bearing partitions and related finishes as per plans filed with no change of use or occupancy. upgrades to restrooms(existing mens and womens). | $200,000 |
| Sep 1, 2021 | Completed final sign-off Jun 2022 | 595 Market St | Source Planning And Construction Inc | interior t.i. including non-load bearing wall, new ceilings, finishes. fire alarm and sprinklers on separate permit.Details
interior t.i. including non-load bearing wall, new ceilings, finishes. fire alarm and sprinklers on separate permit. | $850,000 |
| Aug 17, 2021 | Completed final sign-off Oct 2021 | 1 Market St | Bcci Construction Company | 18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower.Details
18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower. | $5,000 |
| Jul 28, 2021 | Never finaled filed Jul 2021, never issued | 33 Gough St | prj-21-0375. mou sfdpw. install 72 pre-fab units of interim homeless housing structures, 5 onsite offices, dining areas, & accomodate 3 stall shower trailer. (e) sink & portable toilets to remain. ancillary grade work to upgrade for ada path of travel, electrical, plumbing.Details
prj-21-0375. mou sfdpw. install 72 pre-fab units of interim homeless housing structures, 5 onsite offices, dining areas, & accomodate 3 stall shower trailer. (e) sink & portable toilets to remain. ancillary grade work to upgrade for ada path of travel, electrical, plumbing. | $750,000 | |
| May 18, 2021 | Never finaled filed May 2021, never issued | 495 Geary St | Hathaway Dinwiddie Co. | renovations to the existing clift hotel (type 1, article 11 bldg) to include a new main entry marquee. 1. add an open building marquee over the existing sidewalk along geary streetDetails
renovations to the existing clift hotel (type 1, article 11 bldg) to include a new main entry marquee. 1. add an open building marquee over the existing sidewalk along geary street | $1,100,000 |
| Apr 28, 2021 | Completed final sign-off Jun 2022 | 45 Fremont St | Richlen Construction | revision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01Details
revision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01 | $1,000 |
| Apr 26, 2021 | Completed final sign-off Sep 2021 | 427 Brannan St | Source Planning And Construction Inc | level 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work.Details
level 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work. | $48,000 |
| Feb 26, 2021 | Completed final sign-off Jun 2021 | 1 Market St | Bcci Construction Company | 20th fl: arch revision to construct new non-structural partition, ceiling, light fixtures and finishes. ref pa# 201909252656. revision reflecting conversion of reception area by elevators to two conference rooms.Details
20th fl: arch revision to construct new non-structural partition, ceiling, light fixtures and finishes. ref pa# 201909252656. revision reflecting conversion of reception area by elevators to two conference rooms. | $40,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 201 California St | Bcci Construction Company | exterior work to demo & construct ground level & level 2 storefronts and facade finishes. exterior lighting upgrade, sidewalks & new building signage. interior work includes replacement of non-structual partitions, doors, ceiling, millwork & lighting. mep deferred.Details
exterior work to demo & construct ground level & level 2 storefronts and facade finishes. exterior lighting upgrade, sidewalks & new building signage. interior work includes replacement of non-structual partitions, doors, ceiling, millwork & lighting. mep deferred. | $5,000,000 |
| Dec 18, 2020 | Completed final sign-off Dec 2022 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420.Details
deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420. | |
| Dec 18, 2020 | Completed final sign-off Dec 2022 | 2 Embarcadero Center | Hathaway Dinwiddie Co. | deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419.Details
deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419. | |
| Nov 18, 2020 | Completed final sign-off Jan 2023 | 72 Ellis St | Webcor Construction Lp | for health review only in relationship to pa #201508033157Details
for health review only in relationship to pa #201508033157 | |
| Nov 13, 2020 | Completed final sign-off Dec 2020 | 601 Townsend St | Bcci Construction Company | 1st fl room #1010: administrative permit only. no work. limited to providing occupancy for training room.Details
1st fl room #1010: administrative permit only. no work. limited to providing occupancy for training room. | $50,000 |
| Nov 6, 2020 | Completed final sign-off Mar 2021 | 333 Bush St | Dome Construction Corp | 4/f: deffered mep for 202002144567. maher n/a.Details
4/f: deffered mep for 202002144567. maher n/a. | |
| Sep 14, 2020 | Completed final sign-off Nov 2022 | 495 Geary St | Hathaway Dinwiddie Co. | renovation to the (e) clift hotel facade to include (n) doors & hardware in (e) locations, new wall sconces, power outlets for lightings & new paint.Details
renovation to the (e) clift hotel facade to include (n) doors & hardware in (e) locations, new wall sconces, power outlets for lightings & new paint. | $5,000 |
| Sep 3, 2020 | Completed final sign-off Jan 2023 | 465 California St | Skyline Capital Builders Llc | work on 1st floor to update storefront at main entry and leidesdorff st. entry, sidewalk replacement, lighting along leidesdorff st. hallway ceiling and lighting, art niche in central lobby, glazing and elecrical.Details
work on 1st floor to update storefront at main entry and leidesdorff st. entry, sidewalk replacement, lighting along leidesdorff st. hallway ceiling and lighting, art niche in central lobby, glazing and elecrical. | $1,500,000 |
| Jul 19, 2020 | Completed final sign-off May 2022 | 495 Geary St | Hathaway Dinwiddie Co. | revise occupancy load to previously approved pa# 201904248919 for the existing clift hotel. previous permit and construction work built under 2016 california bldg code. revised updates to occupancy comply with 2016 california bldg code per bldg permit.Details
revise occupancy load to previously approved pa# 201904248919 for the existing clift hotel. previous permit and construction work built under 2016 california bldg code. revised updates to occupancy comply with 2016 california bldg code per bldg permit. | |
| Feb 14, 2020 | Completed final sign-off Mar 2021 | 333 Bush St | Dome Construction Corp | 4th floor: interior t.i. including non load bearing walls, new ceilings, finishes mep, life safety, fire sprinkler modification will be under seperate permit.Details
4th floor: interior t.i. including non load bearing walls, new ceilings, finishes mep, life safety, fire sprinkler modification will be under seperate permit. | $2,500,000 |
| Dec 30, 2019 | Never finaled filed Dec 2019, never issued | 150 Minna St | Skyline Construction | tenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permitDetails
tenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit | $1,500,000 |
| Dec 19, 2019 | Completed final sign-off Oct 2021 | 1 Market St | Bcci Construction Company | 19th fl - office ti. new partitions, millwork & finishes. mep deferred.Details
19th fl - office ti. new partitions, millwork & finishes. mep deferred. | $980,000 |
| Dec 19, 2019 | Completed final sign-off Oct 2021 | 1 Market St | Bcci Construction Company | 18th fl - office ti. new partitions, millwork & finishes. mep deferred.Details
18th fl - office ti. new partitions, millwork & finishes. mep deferred. | $990,000 |
| Dec 9, 2019 | Completed final sign-off Jul 2020 | 555 California St | Principal Builders Inc. | 16/f: tenant improvement: work to include new non-structural partitions, doors, ceilings, finishes, casework, and furniture. new mep ductwork & lighting systems. fully sprinklered building. no plumbing.Details
16/f: tenant improvement: work to include new non-structural partitions, doors, ceilings, finishes, casework, and furniture. new mep ductwork & lighting systems. fully sprinklered building. no plumbing. | $1,104,564 |
| Dec 4, 2019 | Never finaled issued Mar 2020, no final | 150 Minna St | Skyline Construction | 6th fl - ti renovation including non-structural partitions, new ceiling and finishesDetails
6th fl - ti renovation including non-structural partitions, new ceiling and finishes | $1,500,000 |
| Nov 26, 2019 | Completed final sign-off Mar 2022 | 1 Market St | Bcci Construction Company | revision to approved stair pa# 2019-0829-0178: structural calcs for stair included.Details
revision to approved stair pa# 2019-0829-0178: structural calcs for stair included. | |
| Oct 24, 2019 | Completed final sign-off Oct 2020 | 1 Market St | Bcci Construction Company | 21st & 22nd floor: revised drawings to show rated exit passageways changes to reflect approved exit passageways on the 20th floor. ref app#201909252656 and 201909242582 and 201909242584 mep dererred. n/a for maherDetails
21st & 22nd floor: revised drawings to show rated exit passageways changes to reflect approved exit passageways on the 20th floor. ref app#201909252656 and 201909242582 and 201909242584 mep dererred. n/a for maher | |
| Oct 10, 2019 | Completed final sign-off Feb 2021 | 495 Geary St | Hathaway Dinwiddie Co. | tenant improvement for gr fl cafe in existing hotel with occupant loadDetails
tenant improvement for gr fl cafe in existing hotel with occupant load | $700,000 |
| Oct 3, 2019 | Completed final sign-off Dec 2022 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a**Details
lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a** | $2,250,000 |
| Oct 3, 2019 | Completed final sign-off Dec 2022 | 2 Embarcadero Center | Hathaway Dinwiddie Co. | lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a**Details
lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a** | $2,250,000 |
| Sep 25, 2019 | Never finaled issued Oct 2019, no final | 1 Market St | Bcci Construction Company | 20th flr. new non-structural partitions, ceilings, light fixtures, millwork and finishesDetails
20th flr. new non-structural partitions, ceilings, light fixtures, millwork and finishes | $1,000,000 |
| Sep 19, 2019 | Never finaled issued Oct 2019, no final | 555 California St | Turner Construction Co | 30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety systemDetails
30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system | $100,000 |
| Sep 3, 2019 | Completed final sign-off Jun 2025 | 415 Mission St | Bcci Construction Company | 34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890Details
34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890 | $40,000 |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 400 California St | Bana Construction Inc | scope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permitDetails
scope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permit | $13,200 |
| Aug 8, 2019 | Completed final sign-off Nov 2019 | 495 Geary St | Hathaway Dinwiddie Co. | 14, 15, 16 and 17th floors - ab-017 soft demoDetails
14, 15, 16 and 17th floors - ab-017 soft demo | $20,000 |
| Aug 6, 2019 | Completed final sign-off Sep 2019 | 1 Market St | Bcci Construction Company | 20th, 21st, 22nd flrs. demo of (e) non-structural partitions, ceilings, fixtures, millwork and finishes. mep demo also included. will comply with ab-017.Details
20th, 21st, 22nd flrs. demo of (e) non-structural partitions, ceilings, fixtures, millwork and finishes. mep demo also included. will comply with ab-017. | $150,000 |
| Jul 23, 2019 | Completed final sign-off Mar 2021 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | new bridge walkways at lobby level w/ glass guardrails.Details
new bridge walkways at lobby level w/ glass guardrails. | $200,000 |
| Jul 23, 2019 | Completed final sign-off Mar 2021 | 2 Embarcadero Center | Hathaway Dinwiddie Co. | new bridge walkways at lobby level w/ glass guardrails.Details
new bridge walkways at lobby level w/ glass guardrails. | $400,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2021 | 657 Mission St | Skyline Construction | revision to appln #201802272374. scope is to modify the use & separation (non-structural) of the ground fl according to the approved conditional use appln. work includes additional exterior lighting on minna stDetails
revision to appln #201802272374. scope is to modify the use & separation (non-structural) of the ground fl according to the approved conditional use appln. work includes additional exterior lighting on minna st | $1,000 |
| Jun 24, 2019 | Completed final sign-off Feb 2021 | 505 Howard St | Skanska Usa Building Inc | revision to pa #201710231998. structural revision to support plate b. not visible from exterior.Details
revision to pa #201710231998. structural revision to support plate b. not visible from exterior. | |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 400 California St | Bana Construction Inc | rev to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriutionDetails
rev to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriution | |
| Jun 3, 2019 | Completed final sign-off Jul 2019 | 555 Mission St | Bcci Construction Company | 34th fl - demo per ab-017 only permit to remove non-structural partitions, acoustical ceilings grid and tile, and lighting. mep demo included. sprinkler demo/turn up pa#201906143450. n/a for maher.Details
34th fl - demo per ab-017 only permit to remove non-structural partitions, acoustical ceilings grid and tile, and lighting. mep demo included. sprinkler demo/turn up pa#201906143450. n/a for maher. | $60,000 |
| May 31, 2019 | Expired or cancelled cancelled Jan 2026 | 415 Mission St | Bcci Construction Company | 34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipmentDetails
34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipment | $100,000 |
| May 23, 2019 | Completed final sign-off Dec 2019 | 1 Market St | Bcci Construction Company | demo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.Details
demo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher. | $5,000 |
| May 23, 2019 | Completed final sign-off Dec 2019 | 1 Market St | Bcci Construction Company | demo only. remove an (e) partitionDetails
demo only. remove an (e) partition | $2,000 |
| May 23, 2019 | Completed final sign-off Oct 2019 | 1 Market St | Bcci Construction Company | demo of (e) partition and light fixtures. new construction of room and upgrade lighting in areaDetails
demo of (e) partition and light fixtures. new construction of room and upgrade lighting in area | $25,000 |
| May 20, 2019 | Expired or cancelled cancelled Oct 2020 | 420 Montgomery St | T C B Builders Inc | 12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a.Details
12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a. | $9,000 |
| Apr 24, 2019 | Completed final sign-off Aug 2021 | 495 Geary St | Hathaway Dinwiddie Co. | floors 2-17; renovation of (e) guestroom & floor corridors.**maher n/a**Details
floors 2-17; renovation of (e) guestroom & floor corridors.**maher n/a** | $22,000,000 |
| Apr 11, 2019 | Completed final sign-off Jun 2022 | 45 Fremont St | Richlen Construction | selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity.Details
selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity. | $16,500,000 |
| Apr 4, 2019 | Completed final sign-off Apr 2019 | 1 Market St | Bcci Construction Company | 31st flr - demo of (e) partitions & removal of high density tile system per ab17Details
31st flr - demo of (e) partitions & removal of high density tile system per ab17 | $5,000 |
| Mar 28, 2019 | Completed final sign-off Sep 2021 | 657 Mission St | Skyline Construction | revision to 201802272374, revise toilets rooms on level 1-6 to a genderDetails
revision to 201802272374, revise toilets rooms on level 1-6 to a gender | $6,000 |
| Mar 26, 2019 | Completed final sign-off Mar 2021 | 601 Townsend St | Bcci Construction Company | patio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permitDetails
patio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permit | $350,000 |
| Mar 18, 2019 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | level 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep systemDetails
level 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep system | $8,000 |
| Mar 6, 2019 | Completed final sign-off Dec 2019 | 333 Bush St | Skyline Construction | revision to pa . 27th flr revision to unrate the idf roomDetails
revision to pa . 27th flr revision to unrate the idf room | |
| Mar 6, 2019 | Completed final sign-off Dec 2019 | 333 Bush St | Skyline Construction | revision to pa 201812208894. 30th flr revision to unrate the idf roomDetails
revision to pa 201812208894. 30th flr revision to unrate the idf room | |
| Mar 4, 2019 | Never finaled issued Mar 2019, no final | 181 Fremont St | Level 10 Construction Lp | 6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicationDetails
6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate application | $15,000 |
| Mar 4, 2019 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicattonDetails
5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicatton | $15,000 |
| Feb 20, 2019 | Completed final sign-off May 2019 | 560 Mission St | Paradigm General Contractors | revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall.Details
revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall. | $30,500 |
| Feb 6, 2019 | Completed final sign-off Aug 2019 | 555 Mission St | Bcci Construction Company | 6th fl t.i. add new service hallwaly to (e) training room area. mep deferred.Details
6th fl t.i. add new service hallwaly to (e) training room area. mep deferred. | $195,000 |
| Feb 1, 2019 | Completed final sign-off Aug 2019 | 555 Mission St | Bcci Construction Company | 14th fl: partial floor demo & ti build back. new partitions, conference rooms & pantry. n/a for maher.Details
14th fl: partial floor demo & ti build back. new partitions, conference rooms & pantry. n/a for maher. | $550,000 |
| Jan 24, 2019 | Completed final sign-off Feb 2019 | 988 Market St | Principal Builders Inc. | 7/f: construction of new non-load bearing partitions and glazing and new doors. mech/elec/sprinklers/alarm on sep permit. maher n/a.Details
7/f: construction of new non-load bearing partitions and glazing and new doors. mech/elec/sprinklers/alarm on sep permit. maher n/a. | $25,000 |
| Jan 14, 2019 | Completed final sign-off Jun 2019 | 2 Embarcadero Center | Bcci Construction Company | 16th flr - partial floor ti construction of non structural walls, ceiling lightinf and finishes mep deferred maher na.Details
16th flr - partial floor ti construction of non structural walls, ceiling lightinf and finishes mep deferred maher na. | $1,077,796 |
| Dec 20, 2018 | Completed final sign-off Dec 2019 | 333 Bush St | Skyline Construction | full floor ti on 30th fl to include new non-load bearing partitions ceiling and floor finishes. mep, fire sprinkler and life safety under sep. permit.Details
full floor ti on 30th fl to include new non-load bearing partitions ceiling and floor finishes. mep, fire sprinkler and life safety under sep. permit. | $70,000 |
| Dec 12, 2018 | Completed final sign-off May 2019 | 135 Main St | Field Construction Inc. | 21st and 22nd floor: interior tenant improvement demo only; per ab-017 defer accessibility compliance and remain vacant until separate tenant improvement permit is completed to provide accessibility compliance.Details
21st and 22nd floor: interior tenant improvement demo only; per ab-017 defer accessibility compliance and remain vacant until separate tenant improvement permit is completed to provide accessibility compliance. | $91,000 |
| Dec 5, 2018 | Completed final sign-off Feb 2020 | 333 Bush St | Skyline Construction | 28th fl - full floor ti. new non-load bearing partitions, ceiing and floor finishes. mep, life safety under separate permit.Details
28th fl - full floor ti. new non-load bearing partitions, ceiing and floor finishes. mep, life safety under separate permit. | $820,000 |
| Dec 3, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | health only routing. bldg review uner #2018.0816.7576Details
health only routing. bldg review uner #2018.0816.7576 | |
| Nov 30, 2018 | Completed final sign-off Apr 2021 | 495 Geary St | renovations to the (e) clift hotel. to include enclosure of the roof level & spanish suite terrace per city legislation file no 161068 determine occupant load for assembly space.Details
renovations to the (e) clift hotel. to include enclosure of the roof level & spanish suite terrace per city legislation file no 161068 determine occupant load for assembly space. | $750,000 | |
| Nov 30, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48ppDetails
7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48pp | |
| Nov 27, 2018 | Expired or cancelled cancelled Jan 2026 | 560 Mission St | Paradigm General Contractors | revision to da checklist for pa #201710060625 | |
| Nov 21, 2018 | Completed final sign-off Jun 2019 | 2 Embarcadero Center | Bcci Construction Company | 16th fl - demo of partitions, ceiling system, power/data, and flooring. demo of existing ductwork. per ab-017 ada deferred. relocation of sprinklers from pendent to upright because of removal of lower ceiling under pa 2018-1130-7087Details
16th fl - demo of partitions, ceiling system, power/data, and flooring. demo of existing ductwork. per ab-017 ada deferred. relocation of sprinklers from pendent to upright because of removal of lower ceiling under pa 2018-1130-7087 | $35,000 |
| Nov 7, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 6th floor - mep only arch approved under pa# 201808298666 - installation of dining area grease duct term on 4th floor fire alarm & sprinklers under seperate permit. ** maher: n/a **Details
6th floor - mep only arch approved under pa# 201808298666 - installation of dining area grease duct term on 4th floor fire alarm & sprinklers under seperate permit. ** maher: n/a ** | $10,000 |
| Nov 7, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 5th floor - mep only arch approved under pa# 201808298664 - installation of dining area & servery for employee use. ** maher: n/a **Details
5th floor - mep only arch approved under pa# 201808298664 - installation of dining area & servery for employee use. ** maher: n/a ** | $10,000 |