Dennis Cheung
- Listed as
- architect, attorney, engineer
- Firm
- C & N Engineers, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Dec 2025
159 permits since 2000 (engineer on 153 permits, architect on 4 permits, attorney on 2 permits): 104 completed, 4 in progress, 43 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 159.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2025 | In progress issued Apr 2026 | 988 Market St | revision to pa #2025-0327-3203: remove act ceilings, (n) air handler unit and add mep drawings.Details
revision to pa #2025-0327-3203: remove act ceilings, (n) air handler unit and add mep drawings. | ||
| Sep 25, 2025 | Completed final sign-off Feb 2026 | 2 New Montgomery St | Northern Sun Associates | ground fl: minor interior remodel of selected work of ghirardelli at the palace hotel. replace spot lights wiht new track lighting. replace and relocate island display in the sales area. remove and replace the backsplash at counter area. work is below ada state valuation threshold.Details
ground fl: minor interior remodel of selected work of ghirardelli at the palace hotel. replace spot lights wiht new track lighting. replace and relocate island display in the sales area. remove and replace the backsplash at counter area. work is below ada state valuation threshold. | $70,000 |
| May 28, 2025 | Completed final sign-off Jun 2026 | 450 Irwin St | Field Construction Inc. | 2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor, and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation.Details
2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor, and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation. | $180,000 |
| May 14, 2025 | In progress issued Oct 2025 | 99 Rhode Island St | Swinerton Builders | full building renovation and change ofuse from office to private school (k-12) and group e childcare (+36mos).(e) on-site parking convert to outdoor play yard for students. mandatory seismic upgrade.Details
full building renovation and change ofuse from office to private school (k-12) and group e childcare (+36mos).(e) on-site parking convert to outdoor play yard for students. mandatory seismic upgrade. | $15,000,000 |
| Oct 3, 2024 | In progress issued Oct 2024 | 228 Diamond St | Cpb Construction Corporation | relocate pg&e electrical meters & alter laundry roomDetails
relocate pg&e electrical meters & alter laundry room | $5,000 |
| Oct 2, 2024 | Completed final sign-off Aug 2025 | 3251 20th Av | Bejarano Construction 9inc | 1st flr. suite 172. t.i. for an existing restaurant inside a shopping mall. (1) interior alteration. modify kitchen. keep (e) employee restroom. remodel guest seating area. (2) work includes, modify ceiling, electrical, mechanical, and plumbing at sales area, kitchen, adding equipments.Details
1st flr. suite 172. t.i. for an existing restaurant inside a shopping mall. (1) interior alteration. modify kitchen. keep (e) employee restroom. remodel guest seating area. (2) work includes, modify ceiling, electrical, mechanical, and plumbing at sales area, kitchen, adding equipments. | $160,000 |
| Sep 26, 2023 | In progress issued Feb 2025 | 4485 Mission St | Kitami | ti: new kitchen equipment, millwork, finishes, restroom, lighting.Details
ti: new kitchen equipment, millwork, finishes, restroom, lighting. | $138,000 |
| Sep 21, 2022 | Completed final sign-off May 2024 | 184 Hooper St | Johnstone - Mc Auliffe Const. Inc. | new dust collector for school woodshop - 2nd flr exterior. ref 202204222827.Details
new dust collector for school woodshop - 2nd flr exterior. ref 202204222827. | $50,000 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | Capitol Electric Const | provide lighting & title 24 compliance for common area on 13th fl. ref pa# 2021-1215-4469Details
provide lighting & title 24 compliance for common area on 13th fl. ref pa# 2021-1215-4469 | $8,530 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | Capitol Electric Const | provide lighting title compliance for common area on 12th fl. ref pa# 2021-1215-4443Details
provide lighting title compliance for common area on 12th fl. ref pa# 2021-1215-4443 | $8,530 |
| Jul 21, 2022 | Completed final sign-off Dec 2022 | 201 California St | Peacock Construction | suite 450 - title 24: power & lighting & signal for t.i. pa 202203024032. maher n/a.Details
suite 450 - title 24: power & lighting & signal for t.i. pa 202203024032. maher n/a. | $10,000 |
| Jun 6, 2022 | Completed final sign-off Sep 2023 | 4 Embarcadero Center | M C S Construction Services | suite 3660: deferred mechanical & electrical permit. ref t.i. pa 202203170209. maher n/a.Details
suite 3660: deferred mechanical & electrical permit. ref t.i. pa 202203170209. maher n/a. | |
| Mar 22, 2022 | Completed final sign-off Apr 2023 | 33 New Montgomery St | Peacock Construction | basement/fitness center: mechanical & electrical work for tenant improvement to include replacement of water source heat pump. new exhaust system. revision to (e) ductwork. provide lighting of fitness gym space. ref pa# 202112094084 & 202205063684Details
basement/fitness center: mechanical & electrical work for tenant improvement to include replacement of water source heat pump. new exhaust system. revision to (e) ductwork. provide lighting of fitness gym space. ref pa# 202112094084 & 202205063684 | $20,000 |
| Mar 22, 2022 | Completed final sign-off Feb 2023 | 33 New Montgomery St | Peacock Construction | ste 350: mechanical & electrical work for tenant improvement. replace low pressure distrubution ductwork. install new distribution ductwork. relocate vav-2. new exhaust fans. relocate 4 vav unit thermostats. provide lighting for t.i. ref pa# 202201055400.Details
ste 350: mechanical & electrical work for tenant improvement. replace low pressure distrubution ductwork. install new distribution ductwork. relocate vav-2. new exhaust fans. relocate 4 vav unit thermostats. provide lighting for t.i. ref pa# 202201055400. | $15,000 |
| Jan 31, 2022 | Completed final sign-off Sep 2022 | 100 Pine St | Principal Builders Inc. | 33/f: deferred mep to permit 202112073825. install 2 new vav with reheat coil. install 1 new heat pump, low pressure ductwork, hydronic piping and 1 new exhaust fan. lighting and power to ti.Details
33/f: deferred mep to permit 202112073825. install 2 new vav with reheat coil. install 1 new heat pump, low pressure ductwork, hydronic piping and 1 new exhaust fan. lighting and power to ti. | |
| Jan 18, 2022 | Completed final sign-off May 2022 | 140 New Montgomery St | Team Commercial Construction Inc. | 15th fl - provide lighting tenant improvements to 4150 square feet of office area. ref pa 2021-0723-4999Details
15th fl - provide lighting tenant improvements to 4150 square feet of office area. ref pa 2021-0723-4999 | $31,274 |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 22 04th St | Metropolitan Electrical Construction | retrofit from flourescent to led. provide lighting t.i. to 7800sq ft of open office and enclosed office in new scope area. ref# pa#201805088466.Details
retrofit from flourescent to led. provide lighting t.i. to 7800sq ft of open office and enclosed office in new scope area. ref# pa#201805088466. | $65,000 |
| Nov 30, 2021 | Completed final sign-off Aug 2022 | 255 California St | Richlen Construction | revision of permit 202108257128. install light fixtures for t-24 to match previous permit.Details
revision of permit 202108257128. install light fixtures for t-24 to match previous permit. | |
| Nov 4, 2021 | Completed final sign-off Dec 2021 | 50 California St | Capitol Electric Const | provide power and lighting for restrooms and vistibule area on 11th and 12th fl 202012161094Details
provide power and lighting for restrooms and vistibule area on 11th and 12th fl 202012161094 | $8,530 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 100 Pine St | Team Commercial Construction Inc. | suite 3050: provide power and lighting t.i. to 3,521 sq ft of office space. ref. pa 202108096056Details
suite 3050: provide power and lighting t.i. to 3,521 sq ft of office space. ref. pa 202108096056 | $4,820 |
| Aug 25, 2021 | Completed final sign-off Aug 2022 | 255 California St | Richlen Construction | interior renovation of the ground and 2nd fl lobby & 2nd fl common areasDetails
interior renovation of the ground and 2nd fl lobby & 2nd fl common areas | $750,000 |
| Jun 29, 2021 | Completed final sign-off Jan 2022 | 201 California St | Bcci Construction Company | 3/f: electrical only permit to support approved architectural. provide power and lighting. ref pa 202101223152. maher n/a.Details
3/f: electrical only permit to support approved architectural. provide power and lighting. ref pa 202101223152. maher n/a. | $60,000 |
| Jun 2, 2021 | Completed final sign-off May 2022 | 100 Pine St | Team Commercial Construction Inc. | 23/f: provide power & lighting t.i to 9890sf of office area. ref t.i. pa202101192912. maher n/a.Details
23/f: provide power & lighting t.i to 9890sf of office area. ref t.i. pa202101192912. maher n/a. | $41,735 |
| May 21, 2021 | Completed final sign-off Sep 2021 | 255 California St | Richlen Construction | 4th fl suite 450: mep for ti. provide power and lighting ti to 3662 sf of office. provide update hvac to 3622 sf of office. ref ti pa# 202011179080.Details
4th fl suite 450: mep for ti. provide power and lighting ti to 3662 sf of office. provide update hvac to 3622 sf of office. ref ti pa# 202011179080. | $50,000 |
| May 6, 2021 | Never finaled issued May 2021, no final | 100 Pine St | Team Commercial Construction Inc. | ste 500: electrical - provide power + lighting tenant improvements to 5,670 sqft of office areas. ref pa# 202101293673.Details
ste 500: electrical - provide power + lighting tenant improvements to 5,670 sqft of office areas. ref pa# 202101293673. | $8,011 |
| Apr 15, 2021 | Completed final sign-off Feb 2022 | 201 California St | Bcci Construction Company | 3rd fl, ste 350 tenant inprovement: demo and build back of non structural partitions, power, flooring, millwork and finishes. electrical pages incluced.Details
3rd fl, ste 350 tenant inprovement: demo and build back of non structural partitions, power, flooring, millwork and finishes. electrical pages incluced. | $215,000 |
| Mar 8, 2021 | Completed final sign-off Oct 2021 | 405 Howard St | Peacock Construction | install 1 new condensing unit. install 1 new fan coil unit. install low pressure duct. install 5 fire/smoke dampers. electrical- power, lighting & signal. ref pa# 201912300993.Details
install 1 new condensing unit. install 1 new fan coil unit. install low pressure duct. install 5 fire/smoke dampers. electrical- power, lighting & signal. ref pa# 201912300993. | |
| Jan 21, 2021 | Completed final sign-off Aug 2021 | 150 California St | Team Commercial Construction Inc. | tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683.Details
tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683. | $20,742 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | 18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731.Details
18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731. | $46,782 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636.Details
provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636. | $53,901 |
| Nov 24, 2020 | Never finaled issued Jan 2021, no final | 234 Balboa St | M L S Builder Inc. | electrical plan check only. install electrical lights, & wall outlets per title 24 energy report (electrical installation requires sep permit). ref pa201802080824.Details
electrical plan check only. install electrical lights, & wall outlets per title 24 energy report (electrical installation requires sep permit). ref pa201802080824. | $3,000 |
| Sep 1, 2020 | Never finaled issued Oct 2020, no final | 100 Pine St | Peacock Construction | 1/f: t.i. to (e) commercial office, no change in use. revision to bpa#201912260696: demo, new partitions, electrical/mechanical duct work only. plumbing, new finishes & structural modification to slabDetails
1/f: t.i. to (e) commercial office, no change in use. revision to bpa#201912260696: demo, new partitions, electrical/mechanical duct work only. plumbing, new finishes & structural modification to slab | |
| Mar 3, 2020 | Completed final sign-off Aug 2020 | 255 California St | Richlen Construction | provide power and lighting tenant improvements to 332 sq ft of office restroom area. ref 202001031199Details
provide power and lighting tenant improvements to 332 sq ft of office restroom area. ref 202001031199 | |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 77 Maiden Ln | Peacock Construction | t-24 electrical for work under pa #201909131632Details
t-24 electrical for work under pa #201909131632 | |
| Jan 16, 2020 | Completed final sign-off Sep 2020 | 100 Pine St | Team Commercial Construction Inc. | provide power and lighting tenant improvement to 1836 sq ft of office area ref 201911278310Details
provide power and lighting tenant improvement to 1836 sq ft of office area ref 201911278310 | $11,842 |
| Dec 26, 2019 | Never finaled issued Jun 2020, no final | 100 Pine St | Peacock Construction | ground fl: ti scope to include demo, new partitions, mep (duct work only), new finishes. maher naDetails
ground fl: ti scope to include demo, new partitions, mep (duct work only), new finishes. maher na | $565,930 |
| Oct 3, 2019 | Completed final sign-off Sep 2020 | 150 California St | Team Commercial Construction Inc. | 8th flr. provide lighting improvements to 1,153 sq ft of office spaceDetails
8th flr. provide lighting improvements to 1,153 sq ft of office space | $11,940 |
| Sep 10, 2019 | Completed final sign-off Jun 2020 | 88 Kearny St | Peacock Construction | 14/f:t-24 mechanical and electrical for work under pa# 201904258913Details
14/f:t-24 mechanical and electrical for work under pa# 201904258913 | |
| Jul 26, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Capitol Electric Const | provide lighting for the ti on 28th fl. ref ti #201907246771.Details
provide lighting for the ti on 28th fl. ref ti #201907246771. | $11,725 |
| Jun 7, 2019 | Completed final sign-off Sep 2019 | 150 Oak St | Cahill Const Service Inc | non-structural ti work, no change in use, interior remodel w/new non-structural partition wall & finishes, work shall be limited to the 3rd & 4th fl only. no exterior work.Details
non-structural ti work, no change in use, interior remodel w/new non-structural partition wall & finishes, work shall be limited to the 3rd & 4th fl only. no exterior work. | $230,000 |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 1010 16th St | Dajani Construction | built out new 823 sf commercial kitchen "whole cakes bakery" in existing retail space with (n) 126 sf mezzanine. add a type 2 hood, new plumbing, electrical and finishes as requiredDetails
built out new 823 sf commercial kitchen "whole cakes bakery" in existing retail space with (n) 126 sf mezzanine. add a type 2 hood, new plumbing, electrical and finishes as required | $90,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 303 02nd St | A S F Electric Inc | electrical t-24all gender restroom 4th floor ref 201901039518 maher naDetails
electrical t-24all gender restroom 4th floor ref 201901039518 maher na | $1,500 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 303 02nd St | A S F Electric Inc | electrical t-24 4th flr bmp ref 201810123050 maher naDetails
electrical t-24 4th flr bmp ref 201810123050 maher na | $1,500 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 299 Fremont St | A S F Electric Inc | t-24 electrical. ref pa #201807114243.Details
t-24 electrical. ref pa #201807114243. | $1,500 |
| Feb 15, 2019 | Completed final sign-off Apr 2019 | 33 New Montgomery St | A S F Electric Inc | t-24 electrical. ref pa #201812289310.Details
t-24 electrical. ref pa #201812289310. | $1,500 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 22 04th St | Metropolitan Electrical Construction | change out lights, flourescent to led install controlsDetails
change out lights, flourescent to led install controls | $44,850 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 22 04th St | Metropolitan Electrical Construction | change out lights, flourescent to led. install enlighded controls alsoDetails
change out lights, flourescent to led. install enlighded controls also | $48,774 |
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 50 California St | Peacock Construction | t-24 - mechanical & electrical for work under pa #201812117945. 27th fl. maher naDetails
t-24 - mechanical & electrical for work under pa #201812117945. 27th fl. maher na | $3,000 |
| Jan 16, 2019 | Completed final sign-off Mar 2019 | 201 California St | Peacock Construction | t-24 - mechanical & electrical for work under pa #201810193657 & #201811024830. 15th fl. maher naDetails
t-24 - mechanical & electrical for work under pa #201810193657 & #201811024830. 15th fl. maher na | $21,000 |
| Jan 11, 2019 | Completed final sign-off Jul 2019 | 150 California St | Team Commercial Construction Inc. | 2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancingDetails
2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancing | $57,373 |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 303 02nd St | Gci, Inc | lighting, power & signalDetails
lighting, power & signal | $200,000 |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 1 Front St | Capitol Electric Const | suite 1900: replace existing 2x4 fluorescent light with led liner light. replace existing 4" recessed light with led recessed light. all lights are replaced in existing location.Details
suite 1900: replace existing 2x4 fluorescent light with led liner light. replace existing 4" recessed light with led recessed light. all lights are replaced in existing location. | $2,850 |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 875 Howard St | Capitol Electric Const | 3rd fl: replace existing fluorescent lights with new led lights in same location.Details
3rd fl: replace existing fluorescent lights with new led lights in same location. | $3,493 |
| Jun 15, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Arana Group, Inc., Sederap's Drywall Inc. | new electrical system for entire building. ref ba # 201704073503Details
new electrical system for entire building. ref ba # 201704073503 | $25,000 |
| Feb 20, 2018 | Completed final sign-off Jun 2018 | 101 02nd St | Source Planning And Construction Inc | 12th fl suites 1200/1275 mech and electrical permit 201712186753Details
12th fl suites 1200/1275 mech and electrical permit 201712186753 | $300,000 |
| Dec 22, 2017 | Completed final sign-off Jun 2018 | 388 Market St | Rossi Builders Inc. | ste 100: provide lighting and power ti to 433 sq ft. of retail space. ref #201710050533. maher naDetails
ste 100: provide lighting and power ti to 433 sq ft. of retail space. ref #201710050533. maher na | $35,000 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 100 Pine St | Team Commercial Construction Inc. | 7th fl, ste 775 - provide lighting ti to 1531 sq ft of office space. ref pa 2017-0519-7086Details
7th fl, ste 775 - provide lighting ti to 1531 sq ft of office space. ref pa 2017-0519-7086 | $10,200 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 275 Battery St | Hathaway Dinwiddie Co. | #1250- provide new lighting to 1,065 sq.ft. of office space. n/a ordinance #155-13Details
#1250- provide new lighting to 1,065 sq.ft. of office space. n/a ordinance #155-13 | $30,000 |
| Aug 7, 2017 | Completed final sign-off Oct 2018 | 275 Battery St | Hathaway Dinwiddie Co. | parking level a,b,c - provide electrical tenant improvements to 4,310 sq ft of garage space. n/a maher ordinanceDetails
parking level a,b,c - provide electrical tenant improvements to 4,310 sq ft of garage space. n/a maher ordinance | $55,000 |
| Aug 7, 2017 | Completed final sign-off Apr 2018 | 1160 Battery St | Vulcan Construction Inc | 1/f #100- electrical for t.i. pa#201706199695. n/a ordinance #155-13Details
1/f #100- electrical for t.i. pa#201706199695. n/a ordinance #155-13 | |
| Jun 14, 2017 | Completed final sign-off Apr 2018 | 150 Oak St | perform egress revisions to allow forcompliance to cbc 452.1.4 exception for pre-app meeting letter dated 5/31/2016. (fire alarm separate permit) see pa# 2017-0614-9319.Details
perform egress revisions to allow forcompliance to cbc 452.1.4 exception for pre-app meeting letter dated 5/31/2016. (fire alarm separate permit) see pa# 2017-0614-9319. | $75,000 | |
| May 18, 2017 | Completed final sign-off Aug 2017 | 55 02nd St | Principal Builders Inc. | 18th floor - title- 24 mep to relocate & add new equipment. ref pa #201705116308. no new fsd's. n/a maher ordinanceDetails
18th floor - title- 24 mep to relocate & add new equipment. ref pa #201705116308. no new fsd's. n/a maher ordinance | $290,000 |
| May 4, 2017 | Completed final sign-off Aug 2017 | 275 Battery St | Hathaway Dinwiddie Co. | 12/f #1200- mechanical & electrical work for t.i. pa#201704275043. n/a ordinance #155-13, no new fsd'sDetails
12/f #1200- mechanical & electrical work for t.i. pa#201704275043. n/a ordinance #155-13, no new fsd's | $225,000 |
| Mar 22, 2017 | Never finaled issued Nov 2017, no final | 1 Harding Rd | G E C M S Inc | site & utility for future (n) modular building. construct (n) concrete foundation, provide water & electrical service to (n) building. (n) sump pump & connect to (e) sump pump on site. vacant lot within lake merced pistol range, adjacent to lake merced. ** maher: yes! route to dph **Details
site & utility for future (n) modular building. construct (n) concrete foundation, provide water & electrical service to (n) building. (n) sump pump & connect to (e) sump pump on site. vacant lot within lake merced pistol range, adjacent to lake merced. ** maher: yes! route to dph ** | $400,000 |
| Feb 3, 2017 | Completed final sign-off May 2017 | 222 Mason St | Cahill Contractors Inc | 2nd & 3rd floor - revision to pa #201610281401: reduce quantity of lighting fixture & receptacle.Details
2nd & 3rd floor - revision to pa #201610281401: reduce quantity of lighting fixture & receptacle. | |
| Oct 28, 2016 | Completed final sign-off May 2017 | 222 Mason St | Cahill Contractors Llc. | 2/f 3/f- work includes remodel of select public space areas specially lobby & meeting rooms, selective demo and install walls, ceiling, light fixtures & finishes. no exterior work or change in occupancy. fire, life safety under seperate permit.Details
2/f 3/f- work includes remodel of select public space areas specially lobby & meeting rooms, selective demo and install walls, ceiling, light fixtures & finishes. no exterior work or change in occupancy. fire, life safety under seperate permit. | $108,000 |
| Oct 27, 2016 | Never finaled issued Oct 2016, no final | 55 02nd St | C B 2 Builders Incorporated | 1st floor - title 24 lighting, ref 20160906850Details
1st floor - title 24 lighting, ref 20160906850 | |
| Oct 20, 2016 | Completed final sign-off Feb 2017 | 22 04th St | Metropolitan Electrical Construction | 6th floor - furniture power - title 24. n/a maher ordinanceDetails
6th floor - furniture power - title 24. n/a maher ordinance | $32,000 |
| Oct 20, 2016 | Completed final sign-off Feb 2017 | 22 04th St | Metropolitan Electrical Construction | 5th floor - furniture power - title 24. n/a maher ordinanceDetails
5th floor - furniture power - title 24. n/a maher ordinance | $30,000 |
| Oct 6, 2016 | Never finaled issued Oct 2016, no final | 500 Washington St | Team Commercial Construction Inc. | 4th floor - mechanical & electrical work from deferred pa #201608034058.Details
4th floor - mechanical & electrical work from deferred pa #201608034058. | $22,000 |
| Sep 19, 2016 | Completed final sign-off Mar 2017 | 633 Battery St | Hathaway Dinwiddie Co. | 4/f & 6/f- electrical scope for pa#201607273475. n/a ordinance #155-13Details
4/f & 6/f- electrical scope for pa#201607273475. n/a ordinance #155-13 | $40,000 |
| Aug 8, 2016 | Completed final sign-off Nov 2016 | 275 Battery St | Hathaway Dinwiddie Co. | 30th floor - mechanical & electrical for scope of work. ref pa #2016-0520-8044. n/a maher ordinance. life safety deferred.Details
30th floor - mechanical & electrical for scope of work. ref pa #2016-0520-8044. n/a maher ordinance. life safety deferred. | $450,000 |
| Aug 5, 2016 | Never finaled issued Aug 2016, no final | 100 Pine St | Rudolph And Sletten Inc | a/mep no new fsd's 11/f- demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new non structural partitions, doors, frames, millwork & finishes. no structural work. fire life safety & sprinkler seperate design build. n/a maherDetails
a/mep no new fsd's 11/f- demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new non structural partitions, doors, frames, millwork & finishes. no structural work. fire life safety & sprinkler seperate design build. n/a maher | $123,960 |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 100 Pine St | Rudolph And Sletten Inc | a/mep no new fsd's 9/f - demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new construct of non structural partitions, doors, frames, millwork & finishes. no structural work. fire, life safety & sprinkler separate design build. n/a maherDetails
a/mep no new fsd's 9/f - demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new construct of non structural partitions, doors, frames, millwork & finishes. no structural work. fire, life safety & sprinkler separate design build. n/a maher | $1,215,000 |
| Jul 25, 2016 | Never finaled issued Jul 2016, no final | 1715 Octavia St | D Kelly Construction Inc. | on 2nd floor - electrical and mechanical t-24. ref pa 2016-0321-2640. fire under seperate permit.Details
on 2nd floor - electrical and mechanical t-24. ref pa 2016-0321-2640. fire under seperate permit. | $96,500 |
| Jun 16, 2016 | Completed final sign-off Jul 2016 | 22 04th St | Sc Builders, Inc | 11th floor - furniture electrical distribution and audio-visual electrical distribution. n/a ordinance #155-13Details
11th floor - furniture electrical distribution and audio-visual electrical distribution. n/a ordinance #155-13 | $60,000 |
| Jun 13, 2016 | Completed final sign-off May 2017 | 222 Mason St | various fl:selective demo and refinishing of walls, floors, ceilings, remove and replace plumbing fixtures, lighting, outlets, casework. no change in occupancy, occ load , or egress. no exterior work, fire life safety under sep permit maher not req.Details
various fl:selective demo and refinishing of walls, floors, ceilings, remove and replace plumbing fixtures, lighting, outlets, casework. no change in occupancy, occ load , or egress. no exterior work, fire life safety under sep permit maher not req. | $720,000 | |
| Jun 3, 2016 | Never finaled issued Jun 2016, no final | 275 Battery St | Hathaway Dinwiddie Co. | #1120- mechanical & electrical work to arch. pa#2016-0519-7853. n/a ordinance #155-13Details
#1120- mechanical & electrical work to arch. pa#2016-0519-7853. n/a ordinance #155-13 | $30,000 |
| Apr 13, 2016 | Completed final sign-off Jul 2016 | 275 Battery St | Hathaway Dinwiddie Co. | electrical permit work to accompany arch. pa#201601086666. n/a ordinance #155-13Details
electrical permit work to accompany arch. pa#201601086666. n/a ordinance #155-13 | $50,000 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 22 04th St | Sc Builders, Inc | electrical furniture feeds & av power. n/a ordinance #155-13Details
electrical furniture feeds & av power. n/a ordinance #155-13 | $20,000 |
| Jan 5, 2016 | Expired or cancelled cancelled Jan 2026 | 1170 Market St | title 24 compliance for floors 1 and 2, ref. to t.i. pa# 201512013879Details
title 24 compliance for floors 1 and 2, ref. to t.i. pa# 201512013879 | ||
| Dec 29, 2015 | Completed final sign-off Apr 2016 | 22 04th St | Sc Builders, Inc | 4th flr: addition of electrical furniture feeds. maher not req. ref. to app#2015-0903-6112Details
4th flr: addition of electrical furniture feeds. maher not req. ref. to app#2015-0903-6112 | $20,000 |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | 12th flr: meps for pa 201509177337 and revision pa 201511122448; maher n/aDetails
12th flr: meps for pa 201509177337 and revision pa 201511122448; maher n/a | $150,000 |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | 12th flr: revision to 201509177337; added two new room, changed some lighting fixtures etc. meps under separate permit; maher n/aDetails
12th flr: revision to 201509177337; added two new room, changed some lighting fixtures etc. meps under separate permit; maher n/a | $25,000 |
| Oct 22, 2015 | Completed final sign-off Apr 2016 | 315 Montgomery St | Bcci Construction Company | 10th floor - mep associated with approved pa #201507292752 including new lighting & ductwork. n/a maher ordinance. n/a maher ordinanceDetails
10th floor - mep associated with approved pa #201507292752 including new lighting & ductwork. n/a maher ordinance. n/a maher ordinance | $82,500 |
| Aug 7, 2015 | Completed final sign-off Mar 2016 | 100 Pine St | Team Commercial Construction Inc. | 4th floor suite 400: non-structural demo. new non-structural partitions, ceiling lighting, elect, finishes & millwork. mech & elect under the same permit - no structural work included in scope. life safety & sprinkler to be design build under sep permit. maher naDetails
4th floor suite 400: non-structural demo. new non-structural partitions, ceiling lighting, elect, finishes & millwork. mech & elect under the same permit - no structural work included in scope. life safety & sprinkler to be design build under sep permit. maher na | $563,520 |
| Jul 2, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Metropolitan Electrical Construction | 6th floor: tenant improvement for lighting upgrade. n/a for maher ordinance. ref #201504224272Details
6th floor: tenant improvement for lighting upgrade. n/a for maher ordinance. ref #201504224272 | $30,000 |
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 22 04th St | Metropolitan Electrical Construction | title 24, electrical improvements to upgrade office space on 3/f and 10/f. n/a ordinance #155-13Details
title 24, electrical improvements to upgrade office space on 3/f and 10/f. n/a ordinance #155-13 | $500,000 |
| May 20, 2014 | Completed final sign-off Sep 2014 | 1 Market St | Gci, Inc | one new vav box, new exhaust fan, adjust existing mechanical to match new architectural system. new lighting. ref. pa#201402208954. n/a ordinance #155-13.Details
one new vav box, new exhaust fan, adjust existing mechanical to match new architectural system. new lighting. ref. pa#201402208954. n/a ordinance #155-13. | $15,000 |
| May 14, 2014 | Expired or cancelled cancelled Jan 2020 | 2430 Mission St | Rossi Builders Inc. | basement, 1st & 2nd floor - mechanical & electrical for t.i. to install & relocate equipment. refer to pa #2013.0628.0805 for t.i.work.Details
basement, 1st & 2nd floor - mechanical & electrical for t.i. to install & relocate equipment. refer to pa #2013.0628.0805 for t.i.work. | $180,000 |
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 100 Pine St | Team Commercial Construction Inc. | unit #3050: engineered fire alarm drawings for office ti per arch 201312265025. as built required. compliance with ordinance #155-13 not required.Details
unit #3050: engineered fire alarm drawings for office ti per arch 201312265025. as built required. compliance with ordinance #155-13 not required. | $6,000 |
| Dec 31, 2013 | Never finaled issued Feb 2014, no final | 100 Pine St | Team Commercial Construction Inc. | suite 230 - engineered electrical/lighting & mechanical hvac drawings for office t.i. ref pa #201311252703. compliance with ordinance #155-13 not required.Details
suite 230 - engineered electrical/lighting & mechanical hvac drawings for office t.i. ref pa #201311252703. compliance with ordinance #155-13 not required. | $11,260 |
| Dec 31, 2013 | Completed final sign-off Nov 2018 | 100 Pine St | Team Commercial Construction Inc. | suite 230 - engineered fire alarm drawings for office ti 201311252703. compliance with ordinance #155-13 not requiredDetails
suite 230 - engineered fire alarm drawings for office ti 201311252703. compliance with ordinance #155-13 not required | $3,472 |
| Dec 11, 2013 | Completed final sign-off Jul 2014 | 50 California St | Richlen Construction | #3525- electical title 24 only and main project #201310048485. provide ti lighting improvements recessed 2x2 fixture.Details
#3525- electical title 24 only and main project #201310048485. provide ti lighting improvements recessed 2x2 fixture. | $58,000 |
| Dec 10, 2013 | Never finaled issued Dec 2013, no final | 100 Pine St | Team Commercial Construction Inc. | 24th floor - fire alarm t.i.: relocate (2) strobes, add (1) strobe ref arch #2013.1022.9854Details
24th floor - fire alarm t.i.: relocate (2) strobes, add (1) strobe ref arch #2013.1022.9854 | $1,400 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 100 Pine St | Team Commercial Construction Inc. | 24th floor - engineered electrical/lighting & mechanical hvac for office t.i., ref arch #2013.10.22.9854. including elevator lobby lock approvalDetails
24th floor - engineered electrical/lighting & mechanical hvac for office t.i., ref arch #2013.10.22.9854. including elevator lobby lock approval | $18,720 |
| Dec 3, 2013 | Completed final sign-off Jan 2014 | 100 Pine St | Team Commercial Construction Inc. | 19th floor #1900 - engineered electrical/lighting & mechanical hvac for office t.i., ref arch #2013.10.07.8592.Details
19th floor #1900 - engineered electrical/lighting & mechanical hvac for office t.i., ref arch #2013.10.07.8592. | $18,200 |
| Jul 17, 2013 | Never finaled issued Jul 2013, no final | 300 Clay St | Richlen Construction | 11th floor: original permit app#201306119252. title 24 permit provide lighting t.i. for 1297 sq ft. add new switches occupancy sensors. pendent lights and relocate 8 2x4 fixtures.Details
11th floor: original permit app#201306119252. title 24 permit provide lighting t.i. for 1297 sq ft. add new switches occupancy sensors. pendent lights and relocate 8 2x4 fixtures. | $20,000 |
| Jun 10, 2013 | Completed final sign-off Oct 2013 | 555 California St | Gci, Inc | 19th floor suite a & b - electrical t-24 permit to install new lighting fixtures & outlets. ref pa #2013.05.08.6383Details
19th floor suite a & b - electrical t-24 permit to install new lighting fixtures & outlets. ref pa #2013.05.08.6383 | $75,000 |
| Oct 22, 2012 | Completed final sign-off Oct 2012 | 100 Pine St | Team Commercial Construction Inc. | provide power and lighting tenant improvement for 4906 square feet of office space. rework hvac for new space. rework & add fire alarm devices for new space. ref ti pa# 201208227971Details
provide power and lighting tenant improvement for 4906 square feet of office space. rework hvac for new space. rework & add fire alarm devices for new space. ref ti pa# 201208227971 | $13,274 |