Block 6968, lot 011
5016 Mission St
- City’s use
- Commercial Retail
- Built
- 1952
- Stories
- 1
- Building
- 4,325 sq ft
- Lot
- 2,461 sq ft
- Zoning
- NC3
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 5016 Mission St | street spaceDetails
street space | ||
| Jan 3, 2019 | Completed final sign-off May 2019 | 5016 Mission St | Sederap's Drywall Inc. | installation of new electric system throughout entire building. ref permit: 2017-0407-3503Details
installation of new electric system throughout entire building. ref permit: 2017-0407-3503 | $2,000 |
| Dec 6, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Value Fire Protection Inc | install underground fire line approx 12' ref 201809281805 & 201704073503Details
install underground fire line approx 12' ref 201809281805 & 201704073503 | $6,300 |
| Nov 27, 2018 | Never finaled issued Nov 2018, no final | 5016 Mission St | street spaceDetails
street space | ||
| Sep 28, 2018 | Completed final sign-off Apr 2019 | 5016 Mission St | Value Fire Protection Inc | above ground fire sprinkler installation at new day care 100 heads ref 201704073503 r1, 735 gpm @ 74 psi required. bfp included under this scope underground under separate permit. maher naDetails
above ground fire sprinkler installation at new day care 100 heads ref 201704073503 r1, 735 gpm @ 74 psi required. bfp included under this scope underground under separate permit. maher na | $37,300 |
| Sep 13, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Arana Group, Inc. | administrative rev to pa201704073503: revision to layout/configuration of front buiding facade, retain (e) facace wall. revt to (n) storefront system layout including structural revision sheets s1-s7Details
administrative rev to pa201704073503: revision to layout/configuration of front buiding facade, retain (e) facace wall. revt to (n) storefront system layout including structural revision sheets s1-s7 | |
| Sep 12, 2018 | Completed final sign-off Apr 2019 | 5016 Mission St | Battalion One Fire Protection | installation of new fire alarm system with fire control panel. radio communicator, smoke det, pull station by panel in fully sprinklered bldg. install monitor module to tie in flow and tamper switch to new panel 201704073503Details
installation of new fire alarm system with fire control panel. radio communicator, smoke det, pull station by panel in fully sprinklered bldg. install monitor module to tie in flow and tamper switch to new panel 201704073503 | $10,000 |
| Jun 15, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Arana Group, Inc., Sederap's Drywall Inc. | new electrical system for entire building. ref ba # 201704073503Details
new electrical system for entire building. ref ba # 201704073503 | $25,000 |
| Jun 5, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Sederap's Drywall Inc. | install four furnances model carrier. install five bathroom exhaust fans, install 1 kitchen hood, plum for 5 bathrooms, ref 201704073503 maher naDetails
install four furnances model carrier. install five bathroom exhaust fans, install 1 kitchen hood, plum for 5 bathrooms, ref 201704073503 maher na | $25,000 |
| May 14, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Arana Group, Inc. | structural improvement for app#201704073503 for t.i.Details
structural improvement for app#201704073503 for t.i. | $200,000 |
| May 1, 2018 | Never finaled issued May 2018, no final | 5016 Mission St | street spaceDetails
street space | ||
| Jan 24, 2018 | Completed final sign-off Mar 2018 | 5016 Mission St | Arana Group, Inc. | ground flr & mezzanine:5271 sqft soft demo for ti (ref 201704073503) maher naDetails
ground flr & mezzanine:5271 sqft soft demo for ti (ref 201704073503) maher na | |
| Apr 7, 2017 | Completed final sign-off May 2019 | 5016 Mission St | 1st & (n)2nd flrl ti - remodel of (e) mezz, replace w/1134 st (gross) 2nd flr: new pre-k and unisex restrooms. front & rear facade work, insulate the roof, re-roof. new stucco. structural & mep/sprinkler under separate permitDetails
1st & (n)2nd flrl ti - remodel of (e) mezz, replace w/1134 st (gross) 2nd flr: new pre-k and unisex restrooms. front & rear facade work, insulate the roof, re-roof. new stucco. structural & mep/sprinkler under separate permit | $1,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Arana Group, Inc. (4), Sederap's Drywall Inc. (3), Value Fire Protection Inc (2), Battalion One Fire Protection
- Architects
- Steve Suzuki (3)
- Engineers
- Dennis Cheung
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.