Permit GraphShortlistSan Francisco building permits since 2000

Richard Zavala

License
570031
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Richlen Construction
Based in
Pacheco
On San Francisco permits
Jan 2000 to Nov 2026

1,291 permits since 2000 (contractor on 1,291 permits, authorized agent-others on 15 permits): 1,110 completed, 31 in progress, 66 never finaled, 84 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Bcci Construction Company (2)
Architects
Stanley H Lew (16), Scott E Clement (10), Lawrence Smith (9), Sashikala Murthy (9), Candace Chan (5), Yong Yin Park (5), Ashley G. Miller (4), Christopher Sullivan (2), Eric Ibsen (2), Liam Larkin (2), Paul Cooper (2), Suwanty Mulia (2), Koichi Tamaoki, Michael Castro, Michael Murphy, Xiang Liu
Engineers
Amit Wadhwa (6), Xiang Liu (5), Alexander Joseph Pacheco (4), Levi Abarte (4), Austin L Hilton (2), Matthew K Gordon (2), Rodolfo Bustos (2), Stephen Shafter (2), Alexander Pacheco, Carl Crizer, Edward Rivera, Hugh King, Jesus B Cabellon Jr, Joe Gulden, Julia A. Harberson, Kevin Kinoshita, Michael Murphy, Paul Cordova, Robin Paul Roderick, Ryann Menges, Shahla Saiidnia
Authorized agents
Joyce Mizuhara
Designers
Levi G. Abarte, Stanley H Lew

Most recent permits

Showing the 100 most recent of 1,291.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 16, 2026In progress
filed Nov 2026, not yet issued
201 California StRichlen Constructionconvert all (e) fan powered and vav box pneumatic controls to direct digital controls. install new occupancy sensors where shown. install new c02 sensors where shown. reconfigure low pressure ductwork devices, diffusers, and grilles to accommodate revised fl plan. demolish (e) idf room water....
Details
Permit
202611160798

convert all (e) fan powered and vav box pneumatic controls to direct digital controls. install new occupancy sensors where shown. install new c02 sensors where shown. reconfigure low pressure ductwork devices, diffusers, and grilles to accommodate revised fl plan. demolish (e) idf room water....

Open the permit page

$100,000
Oct 29, 2026In progress
issued Nov 2026
201 California StRichlen Construction2nd fl patio constructioin of trellis system with integrated lighting and heaters. interior construction of cabinetry, sink, wall finish. plumbing & electrical defered.
Details
Permit
202610290086
Permit issued
Nov 13, 2026

2nd fl patio constructioin of trellis system with integrated lighting and heaters. interior construction of cabinetry, sink, wall finish. plumbing & electrical defered.

Open the permit page

$95,471
Oct 29, 2026In progress
issued Nov 2026
201 Mission StRichlen Construction27th floor: ref pa#202610018880 instulation new sink and faucets at breakroom areas. replacing existing electric tank water heater serving core restroom fixtures for the associates level. replacing existing restroom fixtures with new low flow ones. adding leak protection devices to plumbing
Details
Permit
202610290097
Permit issued
Nov 5, 2026

27th floor: ref pa#202610018880 instulation new sink and faucets at breakroom areas. replacing existing electric tank water heater serving core restroom fixtures for the associates level. replacing existing restroom fixtures with new low flow ones. adding leak protection devices to plumbing

Open the permit page

$20,000
Oct 16, 2026In progress
issued Oct 2026
201 Mission StRichlen Constructionnew power and signal devices throughout the space. new 2025 tiltle 24 compliant lighting and controls
Details
Permit
202610169548
Permit issued
Oct 23, 2026

new power and signal devices throughout the space. new 2025 tiltle 24 compliant lighting and controls

Open the permit page

$752,879
Oct 16, 2026In progress
issued Oct 2026
201 Mission StRichlen Constructiondemo exist ductwork, diffusers, grilles and 4 wshps with associated ductwork and condenser water piping to bldg mains cap piping;retain vav boxes and health water piping.new work inst new hp/lp ductwork, vav plenums, insulation, diffusers, grilles, fire smoke damper,repair insulation, modify duct
Details
Permit
202610169529
Permit issued
Oct 29, 2026

demo exist ductwork, diffusers, grilles and 4 wshps with associated ductwork and condenser water piping to bldg mains cap piping;retain vav boxes and health water piping.new work inst new hp/lp ductwork, vav plenums, insulation, diffusers, grilles, fire smoke damper,repair insulation, modify duct

Open the permit page

$350,465
Oct 6, 2026In progress
issued Oct 2026
201 California StRichlen Construction2/f suite 200: new construction of conference rooms, huddle, phone and breakarea of non-structural elements. doors, finishes, ceilings, lighting, mechanical, electrical outlets, switches. existing space is in shell condition. mep and fire safety deferred.
Details
Permit
202610069085
Permit issued
Oct 8, 2026

2/f suite 200: new construction of conference rooms, huddle, phone and breakarea of non-structural elements. doors, finishes, ceilings, lighting, mechanical, electrical outlets, switches. existing space is in shell condition. mep and fire safety deferred.

Open the permit page

$900,000
Oct 1, 2026In progress
issued Oct 2026
201 Mission StRichlen Constructionsuites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812
Details
Permit
202610018880
Permit issued
Oct 5, 2026

suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812

Open the permit page

$715,000
Sep 24, 2026In progress
issued Oct 2026
343 Sansome StRichlen Construction9/fl- mechanical scope ti ductwork and air outlet modifications. (n) vav box , cooling only vav box. (n) lighting fixture and associated circuiting/controls. power and signal devices and associated wiring.
Details
Permit
202609248586
Permit issued
Oct 19, 2026

9/fl- mechanical scope ti ductwork and air outlet modifications. (n) vav box , cooling only vav box. (n) lighting fixture and associated circuiting/controls. power and signal devices and associated wiring.

Open the permit page

$195,000
Sep 17, 2026In progress
issued Sep 2026
50 California StRichlen Constructionexisting interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom.
Details
Permit
202609178254
Permit issued
Sep 24, 2026

existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom.

Open the permit page

$3,942,870
Sep 16, 2026In progress
issued Nov 2026
525 Market StRichlen Construction15th flr: office t.i. of an existing space includes new partitions, mechanical, electrical upgrade. demo under separate permit. restroom upgrade. seperate deferred submission for health review in regards to pntry; beverage station in breakroom.
Details
Permit
202609168214
Permit issued
Nov 12, 2026

15th flr: office t.i. of an existing space includes new partitions, mechanical, electrical upgrade. demo under separate permit. restroom upgrade. seperate deferred submission for health review in regards to pntry; beverage station in breakroom.

Open the permit page

$6,000,000
Sep 11, 2026In progress
issued Sep 2026
221 Main StRichlen Constructionnew lobby level security improvements-installing turnstiles
Details
Permit
202609117968
Permit issued
Sep 11, 2026

new lobby level security improvements-installing turnstiles

Open the permit page

$250,000
Sep 11, 2026In progress
issued Sep 2026
201 Mission StRichlen Constructionmech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref
Details
Permit
202609118019
Permit issued
Sep 16, 2026

mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref

Open the permit page

$337,875
Aug 25, 2026In progress
issued Sep 2026
201 Mission StRichlen Constructionref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.
Details
Permit
202608257109
Permit issued
Sep 1, 2026

ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.

Open the permit page

$322,135
Aug 20, 2026In progress
issued Sep 2026
525 Market StRichlen Construction15th fl - demo only permit (interior) accessibility per ab-017
Details
Permit
202608206959
Permit issued
Sep 24, 2026

15th fl - demo only permit (interior) accessibility per ab-017

Open the permit page

$30,000
Aug 20, 2026In progress
issued Sep 2026
50 California StRichlen Constructionsuit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.
Details
Permit
202608206891
Permit issued
Sep 24, 2026

suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.

Open the permit page

$859,574
Jul 14, 2026In progress
issued Jul 2026
201 California StRichlen Constructionste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel.
Details
Permit
202607144996
Permit issued
Jul 17, 2026

ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel.

Open the permit page

$1,335,500
Jul 7, 2026Completed
final sign-off Jul 2026
201 California StRichlen Constructionste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing.
Details
Permit
202607074622
Permit issued
Jul 13, 2026
Final sign-off
Jul 23, 2026

ste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing.

Open the permit page

Jun 25, 2026Completed
final sign-off Nov 2026
221 Main StRichlen Constructiondeferred electrical for 4th floor suite 400 office ti under permit 202604028757.
Details
Permit
202606253903
Permit issued
Jul 7, 2026
Final sign-off
Nov 12, 2026

deferred electrical for 4th floor suite 400 office ti under permit 202604028757.

Open the permit page

$175,000
Jun 25, 2026Completed
final sign-off Nov 2026
221 Main StRichlen Constructionsuite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan.
Details
Permit
202606253891
Permit issued
Jul 7, 2026
Final sign-off
Nov 12, 2026

suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan.

Open the permit page

$75,000
Jun 24, 2026In progress
issued Aug 2026
201 Mission StRichlen Construction14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.
Details
Permit
202606243869
Permit issued
Aug 21, 2026

14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.

Open the permit page

$285,000
Jun 23, 2026In progress
issued Jul 2026
650 California StRichlen Construction27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals.
Details
Permit
202606233738
Permit issued
Jul 9, 2026

27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals.

Open the permit page

$1,184,490
Jun 17, 2026Completed
final sign-off Jul 2026
201 Mission StRichlen Construction23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.
Details
Permit
202606173393
Permit issued
Jun 30, 2026
Final sign-off
Jul 24, 2026

23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.

Open the permit page

$56,543
Jun 5, 2026Completed
final sign-off Aug 2026
650 California StRichlen Construction20th floor: mechanical and electrical work install 2 new cooling vav vox and ductwork air distribution. provide new lighting. ref 202602246378
Details
Permit
202606052625
Permit issued
Jun 5, 2026
Final sign-off
Aug 5, 2026

20th floor: mechanical and electrical work install 2 new cooling vav vox and ductwork air distribution. provide new lighting. ref 202602246378

Open the permit page

$100,000
Jun 4, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices.
Details
Permit
202606042547
Permit issued
Jun 10, 2026
Final sign-off
Sep 10, 2026

21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices.

Open the permit page

$127,465
Jun 4, 2026Completed
final sign-off Oct 2026
575 Market StRichlen Construction3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference rooms and enclosed office.
Details
Permit
202606042529
Permit issued
Jun 4, 2026
Final sign-off
Oct 5, 2026

3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference rooms and enclosed office.

Open the permit page

$20,125
Jun 4, 2026Completed
final sign-off Aug 2026
201 Mission StRichlen Construction22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.
Details
Permit
202606042522
Permit issued
Jun 4, 2026
Final sign-off
Aug 27, 2026

22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.

Open the permit page

$190,288
Jun 4, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639
Details
Permit
202606042534
Permit issued
Jun 10, 2026
Final sign-off
Sep 10, 2026

21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639

Open the permit page

$60,000
May 20, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved
Details
Permit
202605201639
Permit issued
Jun 3, 2026
Final sign-off
Sep 10, 2026

21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved

Open the permit page

$218,435
May 7, 2026Completed
final sign-off Oct 2026
575 Market StRichlen Construction3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes
Details
Permit
202605070841
Permit issued
Jun 3, 2026
Final sign-off
Oct 5, 2026

3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes

Open the permit page

$200,000
Apr 23, 2026Completed
final sign-off Aug 2026
201 Mission StRichlen Constructionfloor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.
Details
Permit
202604239932
Permit issued
Apr 28, 2026
Final sign-off
Aug 27, 2026

floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.

Open the permit page

$341,000
Apr 7, 2026Completed
final sign-off Jul 2026
201 California StRichlen Construction15th fl - provide new lighting @ ste 1500 ref pa 202510026577
Details
Permit
202604079027
Permit issued
Apr 9, 2026
Final sign-off
Jul 23, 2026

15th fl - provide new lighting @ ste 1500 ref pa 202510026577

Open the permit page

$190,000
Apr 2, 2026Completed
final sign-off Aug 2026
631 Howard StRichlen Constructionbasement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets)
Details
Permit
202604028762
Permit issued
Apr 9, 2026
Final sign-off
Aug 13, 2026

basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets)

Open the permit page

$197,607
Apr 2, 2026Completed
final sign-off Nov 2026
221 Main StRichlen Construction4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work.
Details
Permit
202604028757
Permit issued
Apr 7, 2026
Final sign-off
Nov 12, 2026

4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work.

Open the permit page

$238,237
Mar 19, 2026Completed
final sign-off Jul 2026
575 Market StRichlen Construction30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610.
Details
Permit
202603197947
Permit issued
Mar 26, 2026
Final sign-off
Jul 7, 2026

30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610.

Open the permit page

$30,000
Mar 12, 2026Completed
final sign-off Oct 2026
631 Howard StRichlen Constructionbasement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existing
Details
Permit
202603127468
Permit issued
Apr 9, 2026
Final sign-off
Oct 21, 2026

basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existing

Open the permit page

$155,000
Mar 9, 2026Completed
final sign-off Jun 2026
201 Mission StRichlen Constructionsuite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing.
Details
Permit
202603097157
Permit issued
Mar 12, 2026
Final sign-off
Jun 29, 2026

suite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing.

Open the permit page

$25,000
Feb 24, 2026Completed
final sign-off Aug 2026
650 California StRichlen Constructionste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, landscaping or parking changes. fire life safety are deferred
Details
Permit
202602246378
Permit issued
Mar 3, 2026
Final sign-off
Aug 5, 2026

ste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, landscaping or parking changes. fire life safety are deferred

Open the permit page

$707,557
Feb 5, 2026Completed
final sign-off Mar 2026
201 Mission StRichlen Constructionpatio demo. remove exisitng planting beds & security fencing
Details
Permit
202602055297
Permit issued
Mar 12, 2026
Final sign-off
Mar 19, 2026

patio demo. remove exisitng planting beds & security fencing

Open the permit page

$46,484
Jan 27, 2026Completed
final sign-off Jul 2026
575 Market StRichlen Construction30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred.
Details
Permit
202601274610
Permit issued
Feb 12, 2026
Final sign-off
Jul 7, 2026

30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred.

Open the permit page

$194,288
Jan 22, 2026Completed
final sign-off Jul 2026
201 Mission StRichlen Construction23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608.
Details
Permit
202601224304
Permit issued
Feb 12, 2026
Final sign-off
Jul 20, 2026

23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608.

Open the permit page

$249,348
Jan 21, 2026Completed
final sign-off Jun 2026
201 Mission StRichlen Constructionste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits
Details
Permit
202601214223
Permit issued
Feb 2, 2026
Final sign-off
Jun 29, 2026

ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits

Open the permit page

$255,000
Dec 22, 2025Completed
final sign-off Aug 2026
631 Howard StRichlen Construction2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms.
Details
Permit
202512222436
Permit issued
Feb 23, 2026
Final sign-off
Aug 13, 2026

2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms.

Open the permit page

$112,400
Dec 19, 2025Completed
final sign-off Oct 2026
631 Howard StRichlen Constructionbasement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibility
Details
Permit
202512192339
Permit issued
Feb 23, 2026
Final sign-off
Oct 21, 2026

basement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibility

Open the permit page

$275,900
Dec 18, 2025In progress
issued Jul 2026
201 Mission StRichlen Construction1st floor: convert 2449 sqft of retail space to office to provide tenant amenities.
Details
Permit
202512182148
Permit issued
Jul 7, 2026

1st floor: convert 2449 sqft of retail space to office to provide tenant amenities.

Open the permit page

$550,000
Dec 15, 2025In progress
issued Jul 2026
343 Sansome StRichlen Construction#950: new t.i. on 9th floor:includes demolition of existing office space: non structural partitions, doors, glazing, ceiling, lighting, millwork and finishes. mechanical, electrical, & plumbing submittals to be deferred.
Details
Permit
202512151745
Permit issued
Jul 29, 2026

#950: new t.i. on 9th floor:includes demolition of existing office space: non structural partitions, doors, glazing, ceiling, lighting, millwork and finishes. mechanical, electrical, & plumbing submittals to be deferred.

Open the permit page

$840,000
Dec 11, 2025Completed
final sign-off Aug 2026
901 Battery StRichlen Construction1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.
Details
Permit
202512111590
Permit issued
Jan 20, 2026
Final sign-off
Aug 10, 2026

1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.

Open the permit page

$1,000,000
Nov 19, 2025Completed
final sign-off Jan 2026
575 Market StRichlen Construction39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.
Details
Permit
202511190015
Permit issued
Nov 25, 2025
Final sign-off
Jan 9, 2026

39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.

Open the permit page

$10,000
Nov 7, 2025Completed
final sign-off Jan 2026
201 Mission StRichlen Construction5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828.
Details
Permit
202511079208
Permit issued
Jan 12, 2026
Final sign-off
Jan 20, 2026

5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828.

Open the permit page

Nov 4, 2025Completed
final sign-off Jan 2026
50 California StRichlen Construction35th floor: to obtain final inspection for work approved under pa# 202406245061. all work is complete.
Details
Permit
202511048875
Permit issued
Nov 4, 2025
Final sign-off
Jan 5, 2026

35th floor: to obtain final inspection for work approved under pa# 202406245061. all work is complete.

Open the permit page

Oct 30, 2025Completed
final sign-off Jul 2026
201 Mission StRichlen Construction23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant.
Details
Permit
202510308608
Permit issued
Nov 6, 2025
Final sign-off
Jul 20, 2026

23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant.

Open the permit page

$657,000
Oct 22, 2025Completed
final sign-off Apr 2026
217 Montgomery StRichlen Constructionebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes.
Details
Permit
202510227905
Permit issued
Feb 12, 2026
Final sign-off
Apr 29, 2026

ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes.

Open the permit page

$125,000
Oct 16, 2025Completed
final sign-off May 2026
125 03rd StRichlen Constructionrevision 202503273212 for (n) storage room
Details
Permit
202510167555
Permit issued
Oct 27, 2025
Final sign-off
May 7, 2026

revision 202503273212 for (n) storage room

Open the permit page

$5,000
Oct 15, 2025Completed
final sign-off Mar 2026
575 Market StRichlen Constructionsuite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures
Details
Permit
202510157452
Permit issued
Oct 20, 2025
Final sign-off
Mar 4, 2026

suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures

Open the permit page

$426,300
Oct 6, 2025Completed
final sign-off Jan 2026
201 Mission StRichlen Constructionsuite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures.
Details
Permit
202510066828
Permit issued
Oct 29, 2025
Final sign-off
Jan 20, 2026

suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures.

Open the permit page

$220,000
Oct 2, 2025Completed
final sign-off Jul 2026
201 California StRichlen Construction15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred.
Details
Permit
202510026577
Permit issued
Oct 10, 2025
Final sign-off
Jul 23, 2026

15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred.

Open the permit page

$601,994
Aug 7, 2025Completed
final sign-off Sep 2025
343 Sansome StRichlen Construction5/fl- ti 202507160889-lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring
Details
Permit
202508072569
Permit issued
Aug 8, 2025
Final sign-off
Sep 9, 2025

5/fl- ti 202507160889-lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring

Open the permit page

$20,000
Jul 17, 2025Completed
final sign-off Sep 2025
201 Mission StRichlen Constructionsuite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures.
Details
Permit
202507171031
Permit issued
Jul 21, 2025
Final sign-off
Sep 8, 2025

suite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures.

Open the permit page

$120,000
Jul 16, 2025Completed
final sign-off Sep 2025
343 Sansome StRichlen Constructionsuite #550: demolition of non-structural partitions, reception desk, casework, light fixtures, and finishes. construction of non-structural partitions, doors, interior glazing system, casework, light fixtures and finishes. patch and repair existing ceilings as required. no plumbing fixtures.
Details
Permit
202507160889
Permit issued
Jul 17, 2025
Final sign-off
Sep 9, 2025

suite #550: demolition of non-structural partitions, reception desk, casework, light fixtures, and finishes. construction of non-structural partitions, doors, interior glazing system, casework, light fixtures and finishes. patch and repair existing ceilings as required. no plumbing fixtures.

Open the permit page

$144,000
Apr 16, 2025Completed
final sign-off Aug 2025
101 California StRichlen Constructionsuite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred.
Details
Permit
202504164515
Permit issued
Apr 18, 2025
Final sign-off
Aug 6, 2025

suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred.

Open the permit page

$422,171
Mar 27, 2025Completed
final sign-off May 2026
125 03rd StRichlen Constructioninterior renovation of (e) spa @ 5th & 6th floors.
Details
Permit
202503273212
Permit issued
Aug 5, 2025
Final sign-off
May 7, 2026

interior renovation of (e) spa @ 5th & 6th floors.

Open the permit page

$652,844
Feb 7, 2025In progress
issued Feb 2025
50 California StRichlen Construction2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes.
Details
Permit
202502079855
Permit issued
Feb 13, 2025

2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes.

Open the permit page

$14,000
Jan 29, 2025In progress
issued Mar 2025
73 Erie StBcci Construction Company, Richlen Constructionrevision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail.
Details
Permit
202501299316
Permit issued
Mar 3, 2025

revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail.

Open the permit page

Jan 29, 2025In progress
issued Mar 2025
55 Erie StBcci Construction Company, Richlen Constructionrevision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detail
Details
Permit
202501299327
Permit issued
Mar 3, 2025

revision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detail

Open the permit page

Jan 16, 2025Completed
final sign-off Jul 2025
1 California StRichlen Constructionhvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783
Details
Permit
202501168465
Permit issued
Jan 16, 2025
Final sign-off
Jul 10, 2025

hvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783

Open the permit page

$871,153
Dec 12, 2024Completed
final sign-off Sep 2025
201 California StRichlen Construction2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includes path of travel and restrooms).
Details
Permit
202412126681
Permit issued
Feb 26, 2025
Final sign-off
Sep 23, 2025

2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includes path of travel and restrooms).

Open the permit page

$400,000
Nov 6, 2024Completed
final sign-off Jun 2025
45 Fremont StRichlen Construction34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom.
Details
Permit
202411064499
Permit issued
Dec 4, 2024
Final sign-off
Jun 26, 2025

34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom.

Open the permit page

$350,000
Oct 25, 2024Completed
final sign-off Jul 2025
1 California StRichlen Construction2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrades, new drinking fountain. mep deferred
Details
Permit
202410253783
Permit issued
Oct 29, 2024
Final sign-off
Jul 10, 2025

2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrades, new drinking fountain. mep deferred

Open the permit page

$1,816,064
Oct 24, 2024Completed
final sign-off Dec 2024
201 Mission StRichlen Construction13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work
Details
Permit
202410243686
Permit issued
Nov 1, 2024
Final sign-off
Dec 17, 2024

13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work

Open the permit page

$40,000
Oct 3, 2024Completed
final sign-off Dec 2024
225 Bush StRichlen Constructionste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit only
Details
Permit
202410032219
Permit issued
Oct 15, 2024
Final sign-off
Dec 10, 2024

ste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit only

Open the permit page

Oct 3, 2024Completed
final sign-off Mar 2025
221 Main StRichlen Construction5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does not affect fixture quantities, occupant load or path of travel.
Details
Permit
202410032275
Permit issued
Oct 23, 2024
Final sign-off
Mar 27, 2025

5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does not affect fixture quantities, occupant load or path of travel.

Open the permit page

$291,009
Oct 2, 2024Completed
final sign-off Dec 2024
201 Mission StRichlen Construction13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area
Details
Permit
202410022144
Permit issued
Oct 23, 2024
Final sign-off
Dec 17, 2024

13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area

Open the permit page

$139,748
Sep 26, 2024Completed
final sign-off Apr 2025
201 California StRichlen Constructioninterior demoltion of 16/17 floor at 201 california. includes demo of non-structural interior partitions, doors, mechanical/electrical outlets, switches, millwork, lighting, dropped ceiling, and flooring. per ab-017 occupancy/exiting to be address under separate permit. fire sprinkler pa 20240919112
Details
Permit
202409261653
Permit issued
Oct 3, 2024
Final sign-off
Apr 3, 2025

interior demoltion of 16/17 floor at 201 california. includes demo of non-structural interior partitions, doors, mechanical/electrical outlets, switches, millwork, lighting, dropped ceiling, and flooring. per ab-017 occupancy/exiting to be address under separate permit. fire sprinkler pa 20240919112

Open the permit page

$533,583
Aug 15, 2024Completed
final sign-off Mar 2025
180 Howard StRichlen Construction6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural work building exterior site landscape or parking changes are proposed no mech elec or plumbing
Details
Permit
202408158726
Permit issued
Aug 16, 2024
Final sign-off
Mar 5, 2025

6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural work building exterior site landscape or parking changes are proposed no mech elec or plumbing

Open the permit page

$139,924
Aug 12, 2024In progress
issued Jan 2025
998 Sansome StRichlen Constructionabe upgrade including providing level landing at top and bottom of existing stair, new level accessible van loading zone and modified curb cuts at existing sidewalk. abe 202306157591
Details
Permit
202408128412
Permit issued
Jan 23, 2025

abe upgrade including providing level landing at top and bottom of existing stair, new level accessible van loading zone and modified curb cuts at existing sidewalk. abe 202306157591

Open the permit page

$126,000
Aug 8, 2024In progress
issued Dec 2024
901 Battery StRichlen Constructionabe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108
Details
Permit
202408088219
Permit issued
Dec 4, 2024

abe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108

Open the permit page

$147,000
Aug 7, 2024Completed
final sign-off May 2025
50 California StRichlen Construction24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferred
Details
Permit
202408078122
Permit issued
Aug 21, 2024
Final sign-off
May 22, 2025

24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferred

Open the permit page

$195,721
Aug 5, 2024Completed
final sign-off Dec 2024
1 California StRichlen Construction12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (d.a. checklist)
Details
Permit
202408057985
Permit issued
Aug 29, 2024
Final sign-off
Dec 26, 2024

12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (d.a. checklist)

Open the permit page

$115,538
Jul 30, 2024Completed
final sign-off Nov 2024
201 California StRichlen Construction3/f: ti, adding 1-large office, 1-small wellness room and vestible, installign new ceiling, lighting, finshes and power. mep and life safety plans will be submitted as a separate permit. suite 325
Details
Permit
202407307560
Permit issued
Aug 1, 2024
Final sign-off
Nov 6, 2024

3/f: ti, adding 1-large office, 1-small wellness room and vestible, installign new ceiling, lighting, finshes and power. mep and life safety plans will be submitted as a separate permit. suite 325

Open the permit page

$266,000
Jul 24, 2024In progress
issued Aug 2024
225 Bush StRichlen Constructionsuite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit.
Details
Permit
202407247143
Permit issued
Aug 29, 2024

suite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit.

Open the permit page

$322,998
Jun 24, 2024In progress
issued Jul 2024
50 California StRichlen Construction35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.
Details
Permit
202406245061
Permit issued
Jul 12, 2024

35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.

Open the permit page

$192,560
Jun 11, 2024In progress
issued Mar 2025
650 California StRichlen Constructionretire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system to
Details
Permit
202405021241
Permit issued
Mar 24, 2025

retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system to

Open the permit page

$1,786,903
Jun 10, 2024Completed
final sign-off Nov 2024
275 Battery StRichlen Constructionexisting suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation of (e) light fixtures and related elctrical work
Details
Permit
202406104025
Permit issued
Jun 18, 2024
Final sign-off
Nov 1, 2024

existing suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation of (e) light fixtures and related elctrical work

Open the permit page

$98,103
Jun 5, 2024Completed
final sign-off Dec 2024
345 California StRichlen Construction29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system.
Details
Permit
202406053743
Permit issued
Jun 17, 2024
Final sign-off
Dec 18, 2024

29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system.

Open the permit page

$200,000
May 29, 2024Completed
final sign-off Nov 2024
345 California StRichlen Construction11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor
Details
Permit
202405293214
Permit issued
Jun 3, 2024
Final sign-off
Nov 6, 2024

11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor

Open the permit page

$300,000
Mar 26, 2024In progress
issued Mar 2024
401 Mason StRichlen Constructionnew lighting in restrooms and lounge. pa #2021-0305-5990
Details
Permit
202403268633
Permit issued
Mar 26, 2024

new lighting in restrooms and lounge. pa #2021-0305-5990

Open the permit page

$30,000
Mar 20, 2024Completed
final sign-off Sep 2024
100 01st StRichlen Constructionrestaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes
Details
Permit
202403208233
Permit issued
Jun 21, 2024
Final sign-off
Sep 17, 2024

restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes

Open the permit page

$75,000
Mar 14, 2024Completed
final sign-off May 2024
201 Mission StRichlen Constructionrevision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.
Details
Permit
202403147792
Permit issued
Mar 20, 2024
Final sign-off
May 2, 2024

revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.

Open the permit page

Feb 28, 2024Completed
final sign-off Jul 2024
201 California StRichlen Construction6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferred
Details
Permit
202402286726
Permit issued
Mar 6, 2024
Final sign-off
Jul 26, 2024

6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferred

Open the permit page

$214,819
Feb 28, 2024Completed
final sign-off Jun 2024
201 Mission StRichlen Constructioninterior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit.
Details
Permit
202402286712
Permit issued
Mar 20, 2024
Final sign-off
Jun 5, 2024

interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit.

Open the permit page

$60,000
Feb 28, 2024Completed
final sign-off Jun 2024
201 Mission StRichlen Constructioninterior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit.
Details
Permit
202402286715
Permit issued
Mar 20, 2024
Final sign-off
Jun 5, 2024

interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit.

Open the permit page

$158,000
Feb 14, 2024Completed
final sign-off May 2024
201 Mission StRichlen Construction18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or
Details
Permit
202402145870
Permit issued
Mar 6, 2024
Final sign-off
May 29, 2024

18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or

Open the permit page

$216,353
Feb 8, 2024In progress
issued Feb 2024
221 Main StRichlen Construction1st fl suite 102 replacement of existing hood with a new hood at existing current location within suite
Details
Permit
202402085559
Permit issued
Feb 8, 2024

1st fl suite 102 replacement of existing hood with a new hood at existing current location within suite

Open the permit page

$5,000
Feb 1, 2024Completed
final sign-off May 2024
201 Mission StRichlen Construction22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered.
Details
Permit
202402015053
Permit issued
Feb 6, 2024
Final sign-off
May 20, 2024

22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered.

Open the permit page

Jan 4, 2024Completed
final sign-off Apr 2024
201 Mission StRichlen Constructionadding ada passenger drop-off/ loading zone in parking lot.
Details
Permit
202401043425
Permit issued
Feb 16, 2024
Final sign-off
Apr 1, 2024

adding ada passenger drop-off/ loading zone in parking lot.

Open the permit page

$500
Nov 9, 2023Completed
final sign-off Apr 2024
201 Mission StRichlen Constructionsuite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes.
Details
Permit
202311090512
Permit issued
Jan 23, 2024
Final sign-off
Apr 29, 2024

suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes.

Open the permit page

$486,433
Nov 9, 2023Completed
final sign-off May 2024
201 Mission StRichlen Construction22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.
Details
Permit
202311090499
Permit issued
Jan 23, 2024
Final sign-off
May 20, 2024

22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.

Open the permit page

$442,270
Nov 9, 2023Completed
final sign-off May 2024
201 Mission StRichlen Construction7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.
Details
Permit
202311090493
Permit issued
Jan 23, 2024
Final sign-off
May 2, 2024

7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.

Open the permit page

$504,622
Oct 25, 2023Completed
final sign-off Apr 2024
650 California StRichlen Construction27th fl:interior demolition of select partitions, finishes, and ceilings. relocation of some (e) light fixtures to accomodate new layout. new construction includes new private offices and dropped ceiling with lighting. patching of (e) finishes. mep and fls are deffered submittals.
Details
Permit
202310259410
Permit issued
Nov 17, 2023
Final sign-off
Apr 22, 2024

27th fl:interior demolition of select partitions, finishes, and ceilings. relocation of some (e) light fixtures to accomodate new layout. new construction includes new private offices and dropped ceiling with lighting. patching of (e) finishes. mep and fls are deffered submittals.

Open the permit page

$284,292
Aug 8, 2023Completed
final sign-off Feb 2024
188 Spear StRichlen Constructionselective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.
Details
Permit
202308083954
Permit issued
Sep 1, 2023
Final sign-off
Feb 2, 2024

selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.

Open the permit page

$225,000
Jul 28, 2023Completed
final sign-off Aug 2023
45 Fremont StRichlen Construction28th flr: recommencement and completion of work approved under pa #201507222162.
Details
Permit
202307283217
Permit issued
Jul 28, 2023
Final sign-off
Aug 14, 2023

28th flr: recommencement and completion of work approved under pa #201507222162.

Open the permit page