Permit GraphShortlistSan Francisco building permits since 2000

Douglas Zucker

License
C12821
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C12821 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, designer, engineer, lessee
Firm
Gensler
Based in
San Francisco
On San Francisco permits
Jul 2001 to Jul 2025

600 permits since 2000 (architect on 563 permits, designer on 16 permits, engineer on 15 permits, authorized agent-others on 5 permits, lessee on 1 permit): 483 completed, 6 in progress, 79 never finaled, 32 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Bcci Construction Company (22), Hathaway Dinwiddie Co. (13), Skyline Construction (11), Level 10 Construction Lp (8), Principal Builders Inc. (5), Skyline Capital Builders Llc (4), Turner Construction Co (4), Centric Construction Inc (3), Dome Construction Corp (3), Source Planning And Construction Inc (3), Bana Construction Inc (2), Field Construction Inc. (2), Novo Construction Inc (2), Paradigm General Contractors (2), Peacock Construction (2), Richlen Construction (2), Cahill Contractors Llc., Clune Construction Company L P, Rossi Builders Inc., Skanska Usa Building Inc, T C B Builders Inc, Thomas Swan Sign Co Inc, Webcor Construction Lp
Architects
Bert Deviterbo (2), George Soskin (2), Greg Sheppard (2), Donnie Lam, Yi-Tso Jeff Chen
Engineers
Amit Wadhwa (2), Edward Rivera (2), Guil Orihuela (2), Jesus B Cabellon Jr (2), Jose Herrera (2), Levi G. Abarte (2), Mahmoud Maamouri (2), Aaron J. Strauch, David Strandberg, Jeffrey Brink, Jeffrey Sacks, Jillian P. Moritz, Jimmy Lau, Joshua Mcmmahan, Kevin T. O'keefe, Pablo Orozco, Paul Cordova, Philip M Tapia, Rodolfo Bustos Iii, Sherry Chaumpluke, Stephen Shafeer
Authorized agents
Alex Morin

Most recent permits

Showing the 100 most recent of 600.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 3, 2025Completed
final sign-off Oct 2025
181 Fremont StLevel 10 Construction Lp17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures.
Details
Permit
202507030191
Permit issued
Jul 11, 2025
Final sign-off
Oct 28, 2025

17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures.

Open the permit page

$250,000
Jan 14, 2025In progress
issued Jun 2025
1 Market StField Construction Inc.level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate.
Details
Permit
202501148331
Permit issued
Jun 6, 2025

level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate.

Open the permit page

$8,000,000
Dec 11, 2024In progress
issued Dec 2024
3 Embarcadero CenterHathaway Dinwiddie Co.lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work.
Details
Permit
202412116604
Permit issued
Dec 20, 2024

lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work.

Open the permit page

Oct 16, 2024In progress
issued Feb 2025
150 04th Ti StCahill Contractors Llc.mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space.
Details
Permit
202403258532
Permit issued
Feb 14, 2025

mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space.

Open the permit page

$40,000,000
Jul 25, 2024Completed
final sign-off Apr 2025
1515 03rd StPrincipal Builders Inc.mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting.
Details
Permit
202407257306
Permit issued
Sep 16, 2024
Final sign-off
Apr 4, 2025

mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting.

Open the permit page

$3,999,516
Jun 24, 2024Completed
final sign-off Nov 2024
475 Sansome StPrincipal Builders Inc.revision to bpa# 202405021310: to update millwork detail and depth per plans.
Details
Permit
202406245067
Permit issued
Jun 27, 2024
Final sign-off
Nov 21, 2024

revision to bpa# 202405021310: to update millwork detail and depth per plans.

Open the permit page

May 2, 2024Completed
final sign-off Nov 2024
475 Sansome StPrincipal Builders Inc.8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.
Details
Permit
202405021310
Permit issued
May 22, 2024
Final sign-off
Nov 21, 2024

8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.

Open the permit page

$3,051,349
Feb 7, 2024In progress
issued Apr 2024
560 Mission StTurner Construction Corevision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices.
Details
Permit
202402075383
Permit issued
Apr 24, 2024

revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices.

Open the permit page

$200,000
Dec 13, 2023Completed
final sign-off Apr 2024
1 Maritime PzNovo Construction Inc21/f- minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit
Details
Permit
202312132478
Permit issued
Dec 14, 2023
Final sign-off
Apr 12, 2024

21/f- minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit

Open the permit page

$190,000
Dec 13, 2023Completed
final sign-off Apr 2024
1 Maritime PzNovo Construction Inc20th fl - minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit
Details
Permit
202312132475
Permit issued
Dec 14, 2023
Final sign-off
Apr 12, 2024

20th fl - minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit

Open the permit page

$289,000
Dec 4, 2023In progress
issued Feb 2024
170 Valencia StThomas Swan Sign Co Incinstall 1 non-illuminated single face door sign " chan national queer arts center"
Details
Permit
202312041890
Permit issued
Feb 20, 2024

install 1 non-illuminated single face door sign " chan national queer arts center"

Open the permit page

$2,000
Aug 28, 2023In progress
issued Nov 2023
560 Mission StTurner Construction Co27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work
Details
Permit
202308285394
Permit issued
Nov 20, 2023

27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work

Open the permit page

$115,000
Jul 12, 2023Completed
final sign-off Mar 2024
425 Market StSkyline Constructionnew commercial ti including: partition new acoustical ceilings, new finishes. deferred submittals: mep, fire life safety.
Details
Permit
202307121973
Permit issued
Aug 1, 2023
Final sign-off
Mar 14, 2024

new commercial ti including: partition new acoustical ceilings, new finishes. deferred submittals: mep, fire life safety.

Open the permit page

$2,127,220
Jun 30, 2023Completed
final sign-off Mar 2024
170 Valencia StSkyline Constructionremoval/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & door
Details
Permit
202306301346
Permit issued
Aug 7, 2023
Final sign-off
Mar 15, 2024

removal/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & door

Open the permit page

$105,000
Jan 19, 2023Completed
final sign-off Oct 2023
170 Valencia StSkyline Capital Builders Llcrevision to 202210265195: install non structural acoustic panel in great hall, new double ddors in pre-function space. new acoustic and gyp ceiling in grand hall. add new millwork folding doors at pantry
Details
Permit
202301190393
Permit issued
Feb 8, 2023
Final sign-off
Oct 27, 2023

revision to 202210265195: install non structural acoustic panel in great hall, new double ddors in pre-function space. new acoustic and gyp ceiling in grand hall. add new millwork folding doors at pantry

Open the permit page

$20,000
Oct 26, 2022Completed
final sign-off Oct 2023
170 Valencia StSkyline Constructionnew accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mep
Details
Permit
202210265195
Permit issued
Jan 10, 2023
Final sign-off
Oct 27, 2023

new accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mep

Open the permit page

$250,000
Oct 25, 2022Completed
final sign-off Oct 2023
170 Valencia StSkyline Capital Builders Llcdemolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17.
Details
Permit
202210255081
Permit issued
Oct 26, 2022
Final sign-off
Oct 27, 2023

demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17.

Open the permit page

$10,000
Oct 25, 2022Never finaled
issued Dec 2022, no final
657 Mission Stnew slab opening in level 1 slab of 657 portion of building. new 2-hr rated partition w/90 minute rated door will be installed @ lobby perimeter for exit separation.
Details
Permit
202210255097
Permit issued
Dec 7, 2022

new slab opening in level 1 slab of 657 portion of building. new 2-hr rated partition w/90 minute rated door will be installed @ lobby perimeter for exit separation.

Open the permit page

$100,000
Oct 14, 2022Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Increvision 201804136335 s3 to document the revised area with the mechanical room at roof level
Details
Permit
202210144426
Permit issued
Nov 17, 2022
Final sign-off
May 16, 2023

revision 201804136335 s3 to document the revised area with the mechanical room at roof level

Open the permit page

Jun 15, 2022Completed
final sign-off Jun 2023
3 Embarcadero CenterPeacock Construction3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.
Details
Permit
202206156376
Permit issued
Jul 8, 2022
Final sign-off
Jun 29, 2023

3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.

Open the permit page

$1,025,089
Jun 15, 2022Completed
final sign-off Jul 2023
3 Embarcadero CenterPeacock Construction2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.
Details
Permit
202206156401
Permit issued
Jul 12, 2022
Final sign-off
Jul 11, 2023

2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.

Open the permit page

$856,324
May 2, 2022Completed
final sign-off May 2023
465 California StRossi Builders Inc.g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits.
Details
Permit
202205023396
Permit issued
Jun 21, 2022
Final sign-off
May 4, 2023

g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits.

Open the permit page

$32,000
Mar 31, 2022Completed
final sign-off Apr 2023
145 Leavenworth StCentric Construction Increvision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
Details
Permit
202203311305
Permit issued
Apr 7, 2023
Final sign-off
Apr 24, 2023

revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.

Open the permit page

Mar 31, 2022Completed
final sign-off Apr 2023
361 Turk StCentric Construction Increvision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
Details
Permit
202203311289
Permit issued
Apr 25, 2023
Final sign-off
Apr 26, 2023

revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.

Open the permit page

Jan 26, 2022Never finaled
issued Jan 2022, no final
3 Embarcadero CenterDome Construction Corpadministrative permit. obtaining a fire assemble permit. no work to be done on this permit
Details
Permit
202201266689
Permit issued
Jan 26, 2022

administrative permit. obtaining a fire assemble permit. no work to be done on this permit

Open the permit page

Dec 20, 2021Completed
final sign-off Jan 2023
465 California StSkyline Capital Builders Llcrevision to bpa# 2020.0903.3366. adjustment of new curb cut location off california st,due to structrual constraits.
Details
Permit
202112204712
Permit issued
Feb 16, 2022
Final sign-off
Jan 11, 2023

revision to bpa# 2020.0903.3366. adjustment of new curb cut location off california st,due to structrual constraits.

Open the permit page

Nov 23, 2021Expired or cancelled
cancelled Jan 2026
1 Market St#1800: add security doors, localized patch and repari as req. for floor finishes and ceilings. no change to use, exit stair, egress path, elevator, fire sprinklers and life safety systems to remain operational.
Details
Permit
202111232987

#1800: add security doors, localized patch and repari as req. for floor finishes and ceilings. no change to use, exit stair, egress path, elevator, fire sprinklers and life safety systems to remain operational.

Open the permit page

$10,000
Nov 8, 2021Never finaled
filed Nov 2021, never issued
33 Gough Stprj-21-0398. mou sfdpw. revision to pa #202107285327, prj 21-0375: decking and ada path reduction, relocation of certain structures due to location of fire lane and new cripple wall for dining unit. no intensification of occupancy.
Details
Permit
202111082003

prj-21-0398. mou sfdpw. revision to pa #202107285327, prj 21-0375: decking and ada path reduction, relocation of certain structures due to location of fire lane and new cripple wall for dining unit. no intensification of occupancy.

Open the permit page

Oct 14, 2021Completed
final sign-off Dec 2021
1 Sansome StClune Construction Company L P23rd fl - remove mechanical scope from 2018-0926-1516
Details
Permit
202110140481
Permit issued
Oct 22, 2021
Final sign-off
Dec 9, 2021

23rd fl - remove mechanical scope from 2018-0926-1516

Open the permit page

Sep 22, 2021Never finaled
issued Nov 2021, no final
560 Mission StTurner Construction Coti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.
Details
Permit
202109228950
Permit issued
Nov 9, 2021

ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.

Open the permit page

$1,500,000
Sep 9, 2021Never finaled
issued Oct 2021, no final
595 Market StSource Planning And Construction Inc8th flr/suite 810-remmodel and installation of interior non-bearing partitions and related finishes as per plans filed with no change of use or occupancy. upgrades to restrooms(existing mens and womens).
Details
Permit
202109098037
Permit issued
Oct 14, 2021

8th flr/suite 810-remmodel and installation of interior non-bearing partitions and related finishes as per plans filed with no change of use or occupancy. upgrades to restrooms(existing mens and womens).

Open the permit page

$200,000
Sep 1, 2021Completed
final sign-off Jun 2022
595 Market StSource Planning And Construction Incinterior t.i. including non-load bearing wall, new ceilings, finishes. fire alarm and sprinklers on separate permit.
Details
Permit
202109017588
Permit issued
Sep 30, 2021
Final sign-off
Jun 15, 2022

interior t.i. including non-load bearing wall, new ceilings, finishes. fire alarm and sprinklers on separate permit.

Open the permit page

$850,000
Aug 17, 2021Completed
final sign-off Oct 2021
1 Market StBcci Construction Company18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower.
Details
Permit
202108176520
Permit issued
Aug 17, 2021
Final sign-off
Oct 26, 2021

18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower.

Open the permit page

$5,000
Jul 28, 2021Never finaled
filed Jul 2021, never issued
33 Gough Stprj-21-0375. mou sfdpw. install 72 pre-fab units of interim homeless housing structures, 5 onsite offices, dining areas, & accomodate 3 stall shower trailer. (e) sink & portable toilets to remain. ancillary grade work to upgrade for ada path of travel, electrical, plumbing.
Details
Permit
202107285327

prj-21-0375. mou sfdpw. install 72 pre-fab units of interim homeless housing structures, 5 onsite offices, dining areas, & accomodate 3 stall shower trailer. (e) sink & portable toilets to remain. ancillary grade work to upgrade for ada path of travel, electrical, plumbing.

Open the permit page

$750,000
May 18, 2021Never finaled
filed May 2021, never issued
495 Geary StHathaway Dinwiddie Co.renovations to the existing clift hotel (type 1, article 11 bldg) to include a new main entry marquee. 1. add an open building marquee over the existing sidewalk along geary street
Details
Permit
202105180539

renovations to the existing clift hotel (type 1, article 11 bldg) to include a new main entry marquee. 1. add an open building marquee over the existing sidewalk along geary street

Open the permit page

$1,100,000
Apr 28, 2021Completed
final sign-off Jun 2022
45 Fremont StRichlen Constructionrevision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01
Details
Permit
202104289498
Permit issued
May 17, 2021
Final sign-off
Jun 7, 2022

revision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01

Open the permit page

$1,000
Apr 26, 2021Completed
final sign-off Sep 2021
427 Brannan StSource Planning And Construction Inclevel 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work.
Details
Permit
202104269362
Permit issued
Jun 3, 2021
Final sign-off
Sep 17, 2021

level 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work.

Open the permit page

$48,000
Feb 26, 2021Completed
final sign-off Jun 2021
1 Market StBcci Construction Company20th fl: arch revision to construct new non-structural partition, ceiling, light fixtures and finishes. ref pa# 201909252656. revision reflecting conversion of reception area by elevators to two conference rooms.
Details
Permit
202102265433
Permit issued
Apr 23, 2021
Final sign-off
Jun 3, 2021

20th fl: arch revision to construct new non-structural partition, ceiling, light fixtures and finishes. ref pa# 201909252656. revision reflecting conversion of reception area by elevators to two conference rooms.

Open the permit page

$40,000
Feb 23, 2021Never finaled
filed Feb 2021, never issued
201 California StBcci Construction Companyexterior work to demo & construct ground level & level 2 storefronts and facade finishes. exterior lighting upgrade, sidewalks & new building signage. interior work includes replacement of non-structual partitions, doors, ceiling, millwork & lighting. mep deferred.
Details
Permit
202102235152

exterior work to demo & construct ground level & level 2 storefronts and facade finishes. exterior lighting upgrade, sidewalks & new building signage. interior work includes replacement of non-structual partitions, doors, ceiling, millwork & lighting. mep deferred.

Open the permit page

$5,000,000
Dec 18, 2020Completed
final sign-off Dec 2022
3 Embarcadero CenterHathaway Dinwiddie Co.deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420.
Details
Permit
202012181300
Permit issued
Apr 9, 2021
Final sign-off
Dec 30, 2022

deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420.

Open the permit page

Dec 18, 2020Completed
final sign-off Dec 2022
2 Embarcadero CenterHathaway Dinwiddie Co.deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419.
Details
Permit
202012181301
Permit issued
Apr 9, 2021
Final sign-off
Dec 30, 2022

deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419.

Open the permit page

Nov 18, 2020Completed
final sign-off Jan 2023
72 Ellis StWebcor Construction Lpfor health review only in relationship to pa #201508033157
Details
Permit
202011189224
Permit issued
Feb 5, 2021
Final sign-off
Jan 13, 2023

for health review only in relationship to pa #201508033157

Open the permit page

Nov 13, 2020Completed
final sign-off Dec 2020
601 Townsend StBcci Construction Company1st fl room #1010: administrative permit only. no work. limited to providing occupancy for training room.
Details
Permit
202011138827
Permit issued
Dec 1, 2020
Final sign-off
Dec 22, 2020

1st fl room #1010: administrative permit only. no work. limited to providing occupancy for training room.

Open the permit page

$50,000
Nov 6, 2020Completed
final sign-off Mar 2021
333 Bush StDome Construction Corp4/f: deffered mep for 202002144567. maher n/a.
Details
Permit
202011068432
Permit issued
Dec 17, 2020
Final sign-off
Mar 23, 2021

4/f: deffered mep for 202002144567. maher n/a.

Open the permit page

Sep 14, 2020Completed
final sign-off Nov 2022
495 Geary StHathaway Dinwiddie Co.renovation to the (e) clift hotel facade to include (n) doors & hardware in (e) locations, new wall sconces, power outlets for lightings & new paint.
Details
Permit
202009144160
Permit issued
May 27, 2021
Final sign-off
Nov 21, 2022

renovation to the (e) clift hotel facade to include (n) doors & hardware in (e) locations, new wall sconces, power outlets for lightings & new paint.

Open the permit page

$5,000
Sep 3, 2020Completed
final sign-off Jan 2023
465 California StSkyline Capital Builders Llcwork on 1st floor to update storefront at main entry and leidesdorff st. entry, sidewalk replacement, lighting along leidesdorff st. hallway ceiling and lighting, art niche in central lobby, glazing and elecrical.
Details
Permit
202009033366
Permit issued
Aug 18, 2021
Final sign-off
Jan 11, 2023

work on 1st floor to update storefront at main entry and leidesdorff st. entry, sidewalk replacement, lighting along leidesdorff st. hallway ceiling and lighting, art niche in central lobby, glazing and elecrical.

Open the permit page

$1,500,000
Jul 19, 2020Completed
final sign-off May 2022
495 Geary StHathaway Dinwiddie Co.revise occupancy load to previously approved pa# 201904248919 for the existing clift hotel. previous permit and construction work built under 2016 california bldg code. revised updates to occupancy comply with 2016 california bldg code per bldg permit.
Details
Permit
202007190468
Permit issued
Nov 16, 2020
Final sign-off
May 26, 2022

revise occupancy load to previously approved pa# 201904248919 for the existing clift hotel. previous permit and construction work built under 2016 california bldg code. revised updates to occupancy comply with 2016 california bldg code per bldg permit.

Open the permit page

Feb 14, 2020Completed
final sign-off Mar 2021
333 Bush StDome Construction Corp4th floor: interior t.i. including non load bearing walls, new ceilings, finishes mep, life safety, fire sprinkler modification will be under seperate permit.
Details
Permit
202002144567
Permit issued
Feb 24, 2020
Final sign-off
Mar 23, 2021

4th floor: interior t.i. including non load bearing walls, new ceilings, finishes mep, life safety, fire sprinkler modification will be under seperate permit.

Open the permit page

$2,500,000
Dec 30, 2019Never finaled
filed Dec 2019, never issued
150 Minna StSkyline Constructiontenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit
Details
Permit
201912300883

tenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit

Open the permit page

$1,500,000
Dec 19, 2019Completed
final sign-off Oct 2021
1 Market StBcci Construction Company19th fl - office ti. new partitions, millwork & finishes. mep deferred.
Details
Permit
201912190040
Permit issued
Jan 7, 2020
Final sign-off
Oct 26, 2021

19th fl - office ti. new partitions, millwork & finishes. mep deferred.

Open the permit page

$980,000
Dec 19, 2019Completed
final sign-off Oct 2021
1 Market StBcci Construction Company18th fl - office ti. new partitions, millwork & finishes. mep deferred.
Details
Permit
201912190043
Permit issued
Jan 7, 2020
Final sign-off
Oct 26, 2021

18th fl - office ti. new partitions, millwork & finishes. mep deferred.

Open the permit page

$990,000
Dec 9, 2019Completed
final sign-off Jul 2020
555 California StPrincipal Builders Inc.16/f: tenant improvement: work to include new non-structural partitions, doors, ceilings, finishes, casework, and furniture. new mep ductwork & lighting systems. fully sprinklered building. no plumbing.
Details
Permit
201912099031
Permit issued
Dec 23, 2019
Final sign-off
Jul 30, 2020

16/f: tenant improvement: work to include new non-structural partitions, doors, ceilings, finishes, casework, and furniture. new mep ductwork & lighting systems. fully sprinklered building. no plumbing.

Open the permit page

$1,104,564
Dec 4, 2019Never finaled
issued Mar 2020, no final
150 Minna StSkyline Construction6th fl - ti renovation including non-structural partitions, new ceiling and finishes
Details
Permit
201912048610
Permit issued
Mar 11, 2020

6th fl - ti renovation including non-structural partitions, new ceiling and finishes

Open the permit page

$1,500,000
Nov 26, 2019Completed
final sign-off Mar 2022
1 Market StBcci Construction Companyrevision to approved stair pa# 2019-0829-0178: structural calcs for stair included.
Details
Permit
201911268217
Permit issued
Dec 4, 2019
Final sign-off
Mar 11, 2022

revision to approved stair pa# 2019-0829-0178: structural calcs for stair included.

Open the permit page

Oct 24, 2019Completed
final sign-off Oct 2020
1 Market StBcci Construction Company21st & 22nd floor: revised drawings to show rated exit passageways changes to reflect approved exit passageways on the 20th floor. ref app#201909252656 and 201909242582 and 201909242584 mep dererred. n/a for maher
Details
Permit
201910245516
Permit issued
Oct 31, 2019
Final sign-off
Oct 28, 2020

21st & 22nd floor: revised drawings to show rated exit passageways changes to reflect approved exit passageways on the 20th floor. ref app#201909252656 and 201909242582 and 201909242584 mep dererred. n/a for maher

Open the permit page

Oct 10, 2019Completed
final sign-off Feb 2021
495 Geary StHathaway Dinwiddie Co.tenant improvement for gr fl cafe in existing hotel with occupant load
Details
Permit
201910104132
Permit issued
Jul 6, 2020
Final sign-off
Feb 22, 2021

tenant improvement for gr fl cafe in existing hotel with occupant load

Open the permit page

$700,000
Oct 3, 2019Completed
final sign-off Dec 2022
3 Embarcadero CenterHathaway Dinwiddie Co.lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a**
Details
Permit
201910033420
Permit issued
Jul 28, 2020
Final sign-off
Dec 30, 2022

lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a**

Open the permit page

$2,250,000
Oct 3, 2019Completed
final sign-off Dec 2022
2 Embarcadero CenterHathaway Dinwiddie Co.lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a**
Details
Permit
201910033419
Permit issued
Jul 28, 2020
Final sign-off
Dec 30, 2022

lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a**

Open the permit page

$2,250,000
Sep 25, 2019Never finaled
issued Oct 2019, no final
1 Market StBcci Construction Company20th flr. new non-structural partitions, ceilings, light fixtures, millwork and finishes
Details
Permit
201909252656
Permit issued
Oct 9, 2019

20th flr. new non-structural partitions, ceilings, light fixtures, millwork and finishes

Open the permit page

$1,000,000
Sep 19, 2019Never finaled
issued Oct 2019, no final
555 California StTurner Construction Co30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system
Details
Permit
201909192166
Permit issued
Oct 9, 2019

30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system

Open the permit page

$100,000
Sep 3, 2019Completed
final sign-off Jun 2025
415 Mission StBcci Construction Company34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890
Details
Permit
201909030441
Permit issued
Sep 24, 2019
Final sign-off
Jun 20, 2025

34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890

Open the permit page

$40,000
Aug 15, 2019Never finaled
issued Aug 2019, no final
400 California StBana Construction Incscope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permit
Details
Permit
201908158866
Permit issued
Aug 23, 2019

scope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permit

Open the permit page

$13,200
Aug 8, 2019Completed
final sign-off Nov 2019
495 Geary StHathaway Dinwiddie Co.14, 15, 16 and 17th floors - ab-017 soft demo
Details
Permit
201908088255
Permit issued
Aug 9, 2019
Final sign-off
Nov 27, 2019

14, 15, 16 and 17th floors - ab-017 soft demo

Open the permit page

$20,000
Aug 6, 2019Completed
final sign-off Sep 2019
1 Market StBcci Construction Company20th, 21st, 22nd flrs. demo of (e) non-structural partitions, ceilings, fixtures, millwork and finishes. mep demo also included. will comply with ab-017.
Details
Permit
201908068009
Permit issued
Aug 6, 2019
Final sign-off
Sep 6, 2019

20th, 21st, 22nd flrs. demo of (e) non-structural partitions, ceilings, fixtures, millwork and finishes. mep demo also included. will comply with ab-017.

Open the permit page

$150,000
Jul 23, 2019Completed
final sign-off Mar 2021
3 Embarcadero CenterHathaway Dinwiddie Co.new bridge walkways at lobby level w/ glass guardrails.
Details
Permit
201907236725
Permit issued
Jan 3, 2020
Final sign-off
Mar 29, 2021

new bridge walkways at lobby level w/ glass guardrails.

Open the permit page

$200,000
Jul 23, 2019Completed
final sign-off Mar 2021
2 Embarcadero CenterHathaway Dinwiddie Co.new bridge walkways at lobby level w/ glass guardrails.
Details
Permit
201907236731
Permit issued
Jan 3, 2020
Final sign-off
Mar 29, 2021

new bridge walkways at lobby level w/ glass guardrails.

Open the permit page

$400,000
Jul 8, 2019Completed
final sign-off Sep 2021
657 Mission StSkyline Constructionrevision to appln #201802272374. scope is to modify the use & separation (non-structural) of the ground fl according to the approved conditional use appln. work includes additional exterior lighting on minna st
Details
Permit
201907085316
Permit issued
Sep 3, 2019
Final sign-off
Sep 1, 2021

revision to appln #201802272374. scope is to modify the use & separation (non-structural) of the ground fl according to the approved conditional use appln. work includes additional exterior lighting on minna st

Open the permit page

$1,000
Jun 24, 2019Completed
final sign-off Feb 2021
505 Howard StSkanska Usa Building Increvision to pa #201710231998. structural revision to support plate b. not visible from exterior.
Details
Permit
201906244204
Permit issued
Sep 25, 2019
Final sign-off
Feb 3, 2021

revision to pa #201710231998. structural revision to support plate b. not visible from exterior.

Open the permit page

Jun 7, 2019Never finaled
issued Jun 2019, no final
400 California StBana Construction Increv to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriution
Details
Permit
201906072807
Permit issued
Jun 13, 2019

rev to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriution

Open the permit page

Jun 3, 2019Completed
final sign-off Jul 2019
555 Mission StBcci Construction Company34th fl - demo per ab-017 only permit to remove non-structural partitions, acoustical ceilings grid and tile, and lighting. mep demo included. sprinkler demo/turn up pa#201906143450. n/a for maher.
Details
Permit
201906032283
Permit issued
Jun 18, 2019
Final sign-off
Jul 24, 2019

34th fl - demo per ab-017 only permit to remove non-structural partitions, acoustical ceilings grid and tile, and lighting. mep demo included. sprinkler demo/turn up pa#201906143450. n/a for maher.

Open the permit page

$60,000
May 31, 2019Expired or cancelled
cancelled Jan 2026
415 Mission StBcci Construction Company34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipment
Details
Permit
201905312144

34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipment

Open the permit page

$100,000
May 23, 2019Completed
final sign-off Dec 2019
1 Market StBcci Construction Companydemo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.
Details
Permit
201905231553
Permit issued
May 30, 2019
Final sign-off
Dec 16, 2019

demo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.

Open the permit page

$5,000
May 23, 2019Completed
final sign-off Dec 2019
1 Market StBcci Construction Companydemo only. remove an (e) partition
Details
Permit
201905231552
Permit issued
May 28, 2019
Final sign-off
Dec 16, 2019

demo only. remove an (e) partition

Open the permit page

$2,000
May 23, 2019Completed
final sign-off Oct 2019
1 Market StBcci Construction Companydemo of (e) partition and light fixtures. new construction of room and upgrade lighting in area
Details
Permit
201905231554
Permit issued
Jun 6, 2019
Final sign-off
Oct 24, 2019

demo of (e) partition and light fixtures. new construction of room and upgrade lighting in area

Open the permit page

$25,000
May 20, 2019Expired or cancelled
cancelled Oct 2020
420 Montgomery StT C B Builders Inc12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a.
Details
Permit
201905201046
Permit issued
Jun 17, 2019

12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a.

Open the permit page

$9,000
Apr 24, 2019Completed
final sign-off Aug 2021
495 Geary StHathaway Dinwiddie Co.floors 2-17; renovation of (e) guestroom & floor corridors.**maher n/a**
Details
Permit
201904248784
Permit issued
Sep 23, 2019
Final sign-off
Aug 13, 2021

floors 2-17; renovation of (e) guestroom & floor corridors.**maher n/a**

Open the permit page

$22,000,000
Apr 11, 2019Completed
final sign-off Jun 2022
45 Fremont StRichlen Constructionselective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity.
Details
Permit
201904117722
Permit issued
Nov 12, 2019
Final sign-off
Jun 1, 2022

selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity.

Open the permit page

$16,500,000
Apr 4, 2019Completed
final sign-off Apr 2019
1 Market StBcci Construction Company31st flr - demo of (e) partitions & removal of high density tile system per ab17
Details
Permit
201904047104
Permit issued
Apr 4, 2019
Final sign-off
Apr 25, 2019

31st flr - demo of (e) partitions & removal of high density tile system per ab17

Open the permit page

$5,000
Mar 28, 2019Completed
final sign-off Sep 2021
657 Mission StSkyline Constructionrevision to 201802272374, revise toilets rooms on level 1-6 to a gender
Details
Permit
201903286514
Permit issued
Aug 15, 2019
Final sign-off
Sep 1, 2021

revision to 201802272374, revise toilets rooms on level 1-6 to a gender

Open the permit page

$6,000
Mar 26, 2019Completed
final sign-off Mar 2021
601 Townsend StBcci Construction Companypatio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permit
Details
Permit
201903266194
Permit issued
Feb 13, 2020
Final sign-off
Mar 18, 2021

patio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permit

Open the permit page

$350,000
Mar 18, 2019Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep system
Details
Permit
201903185531
Permit issued
Mar 19, 2019
Final sign-off
May 18, 2021

level 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep system

Open the permit page

$8,000
Mar 6, 2019Completed
final sign-off Dec 2019
333 Bush StSkyline Constructionrevision to pa . 27th flr revision to unrate the idf room
Details
Permit
201903064487
Permit issued
Mar 11, 2019
Final sign-off
Dec 31, 2019

revision to pa . 27th flr revision to unrate the idf room

Open the permit page

Mar 6, 2019Completed
final sign-off Dec 2019
333 Bush StSkyline Constructionrevision to pa 201812208894. 30th flr revision to unrate the idf room
Details
Permit
201903064488
Permit issued
Mar 11, 2019
Final sign-off
Dec 31, 2019

revision to pa 201812208894. 30th flr revision to unrate the idf room

Open the permit page

Mar 4, 2019Never finaled
issued Mar 2019, no final
181 Fremont StLevel 10 Construction Lp6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate application
Details
Permit
201903044266
Permit issued
Mar 5, 2019

6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate application

Open the permit page

$15,000
Mar 4, 2019Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicatton
Details
Permit
201903044264
Permit issued
Mar 5, 2019
Final sign-off
May 18, 2021

5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicatton

Open the permit page

$15,000
Feb 20, 2019Completed
final sign-off May 2019
560 Mission StParadigm General Contractorsrevision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall.
Details
Permit
201902203323
Permit issued
Feb 21, 2019
Final sign-off
May 23, 2019

revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall.

Open the permit page

$30,500
Feb 6, 2019Completed
final sign-off Aug 2019
555 Mission StBcci Construction Company6th fl t.i. add new service hallwaly to (e) training room area. mep deferred.
Details
Permit
201902062211
Permit issued
Feb 6, 2019
Final sign-off
Aug 13, 2019

6th fl t.i. add new service hallwaly to (e) training room area. mep deferred.

Open the permit page

$195,000
Feb 1, 2019Completed
final sign-off Aug 2019
555 Mission StBcci Construction Company14th fl: partial floor demo & ti build back. new partitions, conference rooms & pantry. n/a for maher.
Details
Permit
201902011881
Permit issued
Feb 4, 2019
Final sign-off
Aug 13, 2019

14th fl: partial floor demo & ti build back. new partitions, conference rooms & pantry. n/a for maher.

Open the permit page

$550,000
Jan 24, 2019Completed
final sign-off Feb 2019
988 Market StPrincipal Builders Inc.7/f: construction of new non-load bearing partitions and glazing and new doors. mech/elec/sprinklers/alarm on sep permit. maher n/a.
Details
Permit
201901241157
Permit issued
Jan 24, 2019
Final sign-off
Feb 11, 2019

7/f: construction of new non-load bearing partitions and glazing and new doors. mech/elec/sprinklers/alarm on sep permit. maher n/a.

Open the permit page

$25,000
Jan 14, 2019Completed
final sign-off Jun 2019
2 Embarcadero CenterBcci Construction Company16th flr - partial floor ti construction of non structural walls, ceiling lightinf and finishes mep deferred maher na.
Details
Permit
201901140263
Permit issued
Feb 6, 2019
Final sign-off
Jun 24, 2019

16th flr - partial floor ti construction of non structural walls, ceiling lightinf and finishes mep deferred maher na.

Open the permit page

$1,077,796
Dec 20, 2018Completed
final sign-off Dec 2019
333 Bush StSkyline Constructionfull floor ti on 30th fl to include new non-load bearing partitions ceiling and floor finishes. mep, fire sprinkler and life safety under sep. permit.
Details
Permit
201812208894
Permit issued
Feb 5, 2019
Final sign-off
Dec 31, 2019

full floor ti on 30th fl to include new non-load bearing partitions ceiling and floor finishes. mep, fire sprinkler and life safety under sep. permit.

Open the permit page

$70,000
Dec 12, 2018Completed
final sign-off May 2019
135 Main StField Construction Inc.21st and 22nd floor: interior tenant improvement demo only; per ab-017 defer accessibility compliance and remain vacant until separate tenant improvement permit is completed to provide accessibility compliance.
Details
Permit
201812128098
Permit issued
Dec 21, 2018
Final sign-off
May 23, 2019

21st and 22nd floor: interior tenant improvement demo only; per ab-017 defer accessibility compliance and remain vacant until separate tenant improvement permit is completed to provide accessibility compliance.

Open the permit page

$91,000
Dec 5, 2018Completed
final sign-off Feb 2020
333 Bush StSkyline Construction28th fl - full floor ti. new non-load bearing partitions, ceiing and floor finishes. mep, life safety under separate permit.
Details
Permit
201812057508
Permit issued
Jan 24, 2019
Final sign-off
Feb 7, 2020

28th fl - full floor ti. new non-load bearing partitions, ceiing and floor finishes. mep, life safety under separate permit.

Open the permit page

$820,000
Dec 3, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lphealth only routing. bldg review uner #2018.0816.7576
Details
Permit
201812037254
Permit issued
Jan 4, 2019
Final sign-off
May 24, 2021

health only routing. bldg review uner #2018.0816.7576

Open the permit page

Nov 30, 2018Completed
final sign-off Apr 2021
495 Geary Strenovations to the (e) clift hotel. to include enclosure of the roof level & spanish suite terrace per city legislation file no 161068 determine occupant load for assembly space.
Details
Permit
201811307127
Permit issued
Jan 10, 2019
Final sign-off
Apr 27, 2021

renovations to the (e) clift hotel. to include enclosure of the roof level & spanish suite terrace per city legislation file no 161068 determine occupant load for assembly space.

Open the permit page

$750,000
Nov 30, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48pp
Details
Permit
201811307170
Permit issued
Dec 18, 2018
Final sign-off
May 18, 2021

7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48pp

Open the permit page

Nov 27, 2018Expired or cancelled
cancelled Jan 2026
560 Mission StParadigm General Contractorsrevision to da checklist for pa #201710060625
Details
Permit
201811276791

revision to da checklist for pa #201710060625

Open the permit page

Nov 21, 2018Completed
final sign-off Jun 2019
2 Embarcadero CenterBcci Construction Company16th fl - demo of partitions, ceiling system, power/data, and flooring. demo of existing ductwork. per ab-017 ada deferred. relocation of sprinklers from pendent to upright because of removal of lower ceiling under pa 2018-1130-7087
Details
Permit
201811216543
Permit issued
Dec 4, 2018
Final sign-off
Jun 24, 2019

16th fl - demo of partitions, ceiling system, power/data, and flooring. demo of existing ductwork. per ab-017 ada deferred. relocation of sprinklers from pendent to upright because of removal of lower ceiling under pa 2018-1130-7087

Open the permit page

$35,000
Nov 7, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp6th floor - mep only arch approved under pa# 201808298666 - installation of dining area grease duct term on 4th floor fire alarm & sprinklers under seperate permit. ** maher: n/a **
Details
Permit
201811075286
Permit issued
Feb 6, 2019
Final sign-off
May 18, 2021

6th floor - mep only arch approved under pa# 201808298666 - installation of dining area grease duct term on 4th floor fire alarm & sprinklers under seperate permit. ** maher: n/a **

Open the permit page

$10,000
Nov 7, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th floor - mep only arch approved under pa# 201808298664 - installation of dining area & servery for employee use. ** maher: n/a **
Details
Permit
201811075285
Permit issued
Feb 6, 2019
Final sign-off
May 18, 2021

5th floor - mep only arch approved under pa# 201808298664 - installation of dining area & servery for employee use. ** maher: n/a **

Open the permit page

$10,000