Permit GraphShortlistSan Francisco building permits since 2000

David Herkowitz

License
492944
State contractor license record
Listed as
authorized agent-others, contractor, pmt consultant/expediter
Firm
Bcci Construction Company
Based in
San Francisco
On San Francisco permits
Jan 2000 to Oct 2026

4,270 permits since 2000 (contractor on 4,270 permits, authorized agent-others on 24 permits, pmt consultant/expediter on 1 permit): 3,336 completed, 121 in progress, 332 never finaled, 481 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

Showing the 100 most recent of 4,270.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 6, 2026In progress
filed Oct 2026, not yet issued
1 Montgomery StBcci Construction Companyt.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514.
Details
Permit
202609158114
Status
filed
Filed
Oct 6, 2026
Declared cost
$15,000,000
Address
1 Montgomery St

t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514.

Open the permit page

$15,000,000
Oct 6, 2026In progress
filed Oct 2026, not yet issued
25 Montgomery StBcci Construction Companyt.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114.
Details
Permit
202609158115
Status
filed
Filed
Oct 6, 2026
Address
25 Montgomery St

t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114.

Open the permit page

Oct 5, 2026In progress
filed Oct 2026, not yet issued
555 California StBcci Construction Company51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.
Details
Permit
202610059017
Status
filed
Filed
Oct 5, 2026
Declared cost
$1,935,000
Address
555 California St

51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.

Open the permit page

$1,935,000
Sep 22, 2026In progress
filed Sep 2026, not yet issued
555 California StBcci Construction Companydeferred mep for 202608186758
Details
Permit
202609228480
Status
filed
Filed
Sep 22, 2026
Declared cost
$350,000
Address
555 California St

deferred mep for 202608186758

Open the permit page

$350,000
Sep 16, 2026In progress
issued Sep 2026
235 02nd StBcci Construction Companyrevision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules.
Details
Permit
202609168234
Status
issued
Filed
Sep 16, 2026
Permit issued
Sep 17, 2026
Address
235 02nd St

revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules.

Open the permit page

Sep 11, 2026In progress
issued Sep 2026
353 Sacramento StBcci Construction Company16th fl revision to 202512222377. removeal and replacement of existing guardrail in terrace. guardrail shall increase in height to be code compliant. structual drawingsand calcs included
Details
Permit
202609117978
Status
issued
Filed
Sep 11, 2026
Permit issued
Sep 11, 2026
Declared cost
$27,000
Address
353 Sacramento St

16th fl revision to 202512222377. removeal and replacement of existing guardrail in terrace. guardrail shall increase in height to be code compliant. structual drawingsand calcs included

Open the permit page

$27,000
Sep 3, 2026In progress
issued Sep 2026
353 Sacramento StBcci Construction Company22nd fl: mep submittal to support approved pa: 202606253937 - new hvac and ductwork for new office layout. new lighting and power.
Details
Permit
202609037674
Status
issued
Filed
Sep 3, 2026
Permit issued
Sep 4, 2026
Declared cost
$600,000
Address
353 Sacramento St

22nd fl: mep submittal to support approved pa: 202606253937 - new hvac and ductwork for new office layout. new lighting and power.

Open the permit page

$600,000
Aug 27, 2026In progress
issued Sep 2026
555 California StBcci Construction Company50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994
Details
Permit
202608277303
Status
issued
Filed
Aug 27, 2026
Permit issued
Sep 18, 2026
Declared cost
$1,500,000
Address
555 California St

50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994

Open the permit page

$1,500,000
Aug 18, 2026In progress
issued Aug 2026
560 Mission StBcci Construction Company24th floor: mechanical and electrical revision to permits #202605097160 and #202604068938
Details
Permit
202608186799
Status
issued
Filed
Aug 18, 2026
Permit issued
Aug 20, 2026
Address
560 Mission St

24th floor: mechanical and electrical revision to permits #202605097160 and #202604068938

Open the permit page

Aug 18, 2026In progress
issued Sep 2026
555 California StBcci Construction Company51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.
Details
Permit
202608186758
Status
issued
Filed
Aug 18, 2026
Permit issued
Sep 18, 2026
Declared cost
$1,935,000
Address
555 California St

51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.

Open the permit page

$1,935,000
Aug 10, 2026In progress
issued Aug 2026
50 California StBcci Construction Companyinterior tenant improvement, demo and new interior non load bearing partitions, new doors, door frames, tempered glazing sidlelites. elec, life safety, mech and sprinkler work under sep permit
Details
Permit
202608106289
Status
issued
Filed
Aug 10, 2026
Permit issued
Aug 11, 2026
Declared cost
$75,000
Address
50 California St

interior tenant improvement, demo and new interior non load bearing partitions, new doors, door frames, tempered glazing sidlelites. elec, life safety, mech and sprinkler work under sep permit

Open the permit page

$75,000
Aug 6, 2026In progress
issued Aug 2026
525 Market StBcci Construction Companyinstallation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft
Details
Permit
202608066214
Status
issued
Filed
Aug 6, 2026
Permit issued
Aug 24, 2026
Declared cost
$35,000
Address
525 Market St

installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft

Open the permit page

$35,000
Aug 5, 2026In progress
issued Aug 2026
1455 Market StBcci Construction Company5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work.
Details
Permit
202608056144
Status
issued
Filed
Aug 5, 2026
Permit issued
Aug 25, 2026
Declared cost
$2,364,489
Address
1455 Market St

5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work.

Open the permit page

$2,364,489
Aug 4, 2026In progress
issued Aug 2026
560 Mission StBcci Construction Company5th fl - mep revision to pa 202603057034 & 202604209713
Details
Permit
202608046024
Status
issued
Filed
Aug 4, 2026
Permit issued
Aug 4, 2026
Address
560 Mission St

5th fl - mep revision to pa 202603057034 & 202604209713

Open the permit page

Aug 3, 2026In progress
issued Sep 2026
525 Market StBcci Construction Companyanchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sf
Details
Permit
202608035982
Status
issued
Filed
Aug 3, 2026
Permit issued
Sep 3, 2026
Declared cost
$8,500
Address
525 Market St

anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sf

Open the permit page

$8,500
Aug 3, 2026In progress
issued Aug 2026
560 Mission StBcci Construction Company3rd fl/ mep revision to bpa 2026-0225-6475.
Details
Permit
202608035964
Status
issued
Filed
Aug 3, 2026
Permit issued
Aug 3, 2026
Address
560 Mission St

3rd fl/ mep revision to bpa 2026-0225-6475.

Open the permit page

Jul 29, 2026In progress
issued Aug 2026
55 Spear StBcci Construction Companyadministrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007
Details
Permit
202607295764
Status
issued
Filed
Jul 29, 2026
Permit issued
Aug 4, 2026
Address
55 Spear St

administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007

Open the permit page

Jul 28, 2026In progress
issued Jul 2026
101 California StBcci Construction Company27th and 28th floors: mep submittal to support approved arch. permit. #202607175188
Details
Permit
202607285685
Status
issued
Filed
Jul 28, 2026
Permit issued
Jul 31, 2026
Declared cost
$202,000
Address
101 California St

27th and 28th floors: mep submittal to support approved arch. permit. #202607175188

Open the permit page

$202,000
Jul 21, 2026In progress
issued Jul 2026
555 California StBcci Construction Company46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.
Details
Permit
202607215354
Status
issued
Filed
Jul 21, 2026
Permit issued
Jul 29, 2026
Address
555 California St

46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.

Open the permit page

Jul 21, 2026In progress
filed Jul 2026, not yet issued
1001 Front StBcci Construction Companybasement, 1st flr, 2nd floor - demo only permit per ab017
Details
Permit
202607215349
Status
filed
Filed
Jul 21, 2026
Declared cost
$150,000
Address
1001 Front St

basement, 1st flr, 2nd floor - demo only permit per ab017

Open the permit page

$150,000
Jul 20, 2026In progress
issued Oct 2026
525 Market StBcci Construction Companyl27- office t.i. demo existing and install new non structural partitions, millwork, and finishes.
Details
Permit
202607205299
Status
issued
Filed
Jul 20, 2026
Permit issued
Oct 6, 2026
Declared cost
$2,668,000
Address
525 Market St

l27- office t.i. demo existing and install new non structural partitions, millwork, and finishes.

Open the permit page

$2,668,000
Jul 20, 2026In progress
filed Jul 2026, not yet issued
1050 Battery StBcci Construction Companybasement, 1st, 2nd, & 3rd floors: demo only permit per ab-17
Details
Permit
202607205288
Status
filed
Filed
Jul 20, 2026
Declared cost
$150,000
Address
1050 Battery St

basement, 1st, 2nd, & 3rd floors: demo only permit per ab-17

Open the permit page

$150,000
Jul 17, 2026In progress
issued Jul 2026
101 California StBcci Construction Company27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout.
Details
Permit
202607175188
Status
issued
Filed
Jul 17, 2026
Permit issued
Jul 23, 2026
Declared cost
$751,283
Address
101 California St

27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout.

Open the permit page

$751,283
Jul 15, 2026In progress
issued Jul 2026
560 Mission StBcci Construction Company3rd fl revision to 202602256475. existing toilet and associated accessories in the ada stall will be relocated
Details
Permit
202607155082
Status
issued
Filed
Jul 15, 2026
Permit issued
Jul 16, 2026
Address
560 Mission St

3rd fl revision to 202602256475. existing toilet and associated accessories in the ada stall will be relocated

Open the permit page

Jul 15, 2026In progress
issued Jul 2026
560 Mission StBcci Construction Company5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated.
Details
Permit
202607155092
Status
issued
Filed
Jul 15, 2026
Permit issued
Jul 16, 2026
Address
560 Mission St

5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated.

Open the permit page

Jul 14, 2026In progress
issued Jul 2026
555 California StBcci Construction Company50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.
Details
Permit
202607144994
Status
issued
Filed
Jul 14, 2026
Permit issued
Jul 31, 2026
Declared cost
$3,800,000
Address
555 California St

50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.

Open the permit page

$3,800,000
Jul 14, 2026In progress
issued Jul 2026
353 Sacramento StBcci Construction Company3rd floor:mep submittal to support approved architectural pert#2026-0414-9358. new ductwork and lighting and power throughout the floor.
Details
Permit
202607145028
Status
issued
Filed
Jul 14, 2026
Permit issued
Jul 21, 2026
Declared cost
$745,416
Address
353 Sacramento St

3rd floor:mep submittal to support approved architectural pert#2026-0414-9358. new ductwork and lighting and power throughout the floor.

Open the permit page

$745,416
Jul 7, 2026In progress
issued Jul 2026
4 Embarcadero CenterBcci Construction Company37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork.
Details
Permit
202607074655
Status
issued
Filed
Jul 7, 2026
Permit issued
Jul 9, 2026
Declared cost
$161,850
Address
4 Embarcadero Center

37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork.

Open the permit page

$161,850
Jul 1, 2026In progress
issued Jul 2026
560 Mission StBcci Construction Company4th fl mep plan to support approved arch 202605141273. new ducts, mech equipment, lighting and power
Details
Permit
202607014439
Status
issued
Filed
Jul 1, 2026
Permit issued
Jul 2, 2026
Declared cost
$1,615,500
Address
560 Mission St

4th fl mep plan to support approved arch 202605141273. new ducts, mech equipment, lighting and power

Open the permit page

$1,615,500
Jun 25, 2026In progress
issued Jul 2026
235 02nd StBcci Construction Companylevel 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain.
Details
Permit
202606253898
Status
issued
Filed
Jun 25, 2026
Permit issued
Jul 22, 2026
Declared cost
$2,900,000
Address
235 02nd St

level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain.

Open the permit page

$2,900,000
Jun 25, 2026In progress
issued Jun 2026
353 Sacramento StBcci Construction Companyste 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferred
Details
Permit
202606253937
Status
issued
Filed
Jun 25, 2026
Permit issued
Jun 26, 2026
Declared cost
$2,486,065
Address
353 Sacramento St

ste 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferred

Open the permit page

$2,486,065
Jun 24, 2026Completed
final sign-off Sep 2026
601 Townsend StBcci Construction Company1/f: dishwasher replacement. structural, electrical and mep drawings included.
Details
Permit
202606243840
Status
complete
Filed
Jun 24, 2026
Permit issued
Jun 25, 2026
Final sign-off
Sep 2, 2026
Declared cost
$224,342
Address
601 Townsend St

1/f: dishwasher replacement. structural, electrical and mep drawings included.

Open the permit page

$224,342
Jun 18, 2026In progress
issued Jul 2026
555 Market StBcci Construction Companydeferred submittal for pa#: 202512121719 for review of climbing walls.
Details
Permit
202606183561
Status
issued
Filed
Jun 18, 2026
Permit issued
Jul 23, 2026
Address
555 Market St

deferred submittal for pa#: 202512121719 for review of climbing walls.

Open the permit page

Jun 18, 2026In progress
issued Jul 2026
4 Embarcadero CenterBcci Construction Company28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833.
Details
Permit
202606183542
Status
issued
Filed
Jun 18, 2026
Permit issued
Jul 9, 2026
Declared cost
$500,000
Address
4 Embarcadero Center

28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833.

Open the permit page

$500,000
Jun 9, 2026In progress
issued Jun 2026
4 Embarcadero CenterBcci Construction Company28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishes
Details
Permit
202606092833
Status
issued
Filed
Jun 9, 2026
Permit issued
Jun 17, 2026
Declared cost
$7,650,300
Address
4 Embarcadero Center

28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishes

Open the permit page

$7,650,300
Jun 9, 2026In progress
issued Jun 2026
555 California StBcci Construction Company50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep.
Details
Permit
202606092855
Status
issued
Filed
Jun 9, 2026
Permit issued
Jun 10, 2026
Declared cost
$50,000
Address
555 California St

50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep.

Open the permit page

$50,000
Jun 8, 2026Completed
final sign-off Jul 2026
353 Sacramento StBcci Construction Company23/f: electrical only permit to add new lighting and controls for office tenant "white box". ref bpa 202605211746
Details
Permit
202606082723
Status
complete
Filed
Jun 8, 2026
Permit issued
Jun 8, 2026
Final sign-off
Jul 30, 2026
Declared cost
$25,000
Address
353 Sacramento St

23/f: electrical only permit to add new lighting and controls for office tenant "white box". ref bpa 202605211746

Open the permit page

$25,000
Jun 4, 2026In progress
issued Jun 2026
345 Montgomery StBcci Construction Companynon structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies.
Details
Permit
202606042510
Status
issued
Filed
Jun 4, 2026
Permit issued
Jun 9, 2026
Declared cost
$50,000
Address
345 Montgomery St

non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies.

Open the permit page

$50,000
Jun 3, 2026In progress
issued Jun 2026
560 Mission StBcci Construction Company4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures.
Details
Permit
202606032473
Status
issued
Filed
Jun 3, 2026
Permit issued
Jun 4, 2026
Declared cost
$250,000
Address
560 Mission St

4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures.

Open the permit page

$250,000
Jun 2, 2026In progress
issued Jun 2026
120 Kearny StBcci Construction Companystructural design of demantable partitions. structural supplemental package to approved application 202602125795
Details
Permit
202606022372
Status
issued
Filed
Jun 2, 2026
Permit issued
Jun 5, 2026
Declared cost
$80,000
Address
120 Kearny St

structural design of demantable partitions. structural supplemental package to approved application 202602125795

Open the permit page

$80,000
May 21, 2026Completed
final sign-off Jul 2026
353 Sacramento StBcci Construction Company23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughout
Details
Permit
202605211746
Status
complete
Filed
May 21, 2026
Permit issued
May 28, 2026
Final sign-off
Jul 30, 2026
Declared cost
$150,000
Address
353 Sacramento St

23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughout

Open the permit page

$150,000
May 14, 2026In progress
filed May 2026, not yet issued
1455 Market StBcci Construction Company4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be done
Details
Permit
202605141297
Status
filed
Filed
May 14, 2026
Address
1455 Market St

4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be done

Open the permit page

May 14, 2026In progress
issued Jun 2026
560 Mission StBcci Construction Company4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred.
Details
Permit
202605141273
Status
issued
Filed
May 14, 2026
Permit issued
Jun 29, 2026
Declared cost
$4,250,000
Address
560 Mission St

4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred.

Open the permit page

$4,250,000
May 13, 2026Completed
final sign-off Aug 2026
510 Townsend StBcci Construction Companyto obtain final inspection for work approved under pa# 202208170721, 202210214935, & 202211015646. all work is complete.
Details
Permit
202605131216
Status
complete
Filed
May 13, 2026
Permit issued
May 13, 2026
Final sign-off
Aug 13, 2026
Address
510 Townsend St

to obtain final inspection for work approved under pa# 202208170721, 202210214935, & 202211015646. all work is complete.

Open the permit page

May 13, 2026Completed
final sign-off Aug 2026
510 Townsend StBcci Construction Companyto obtain final inspection for work approved under pa# 202207188695, 202211076004, & 202208019661. all work is complete.
Details
Permit
202605131214
Status
complete
Filed
May 13, 2026
Permit issued
May 13, 2026
Final sign-off
Aug 13, 2026
Address
510 Townsend St

to obtain final inspection for work approved under pa# 202207188695, 202211076004, & 202208019661. all work is complete.

Open the permit page

May 13, 2026Completed
final sign-off Sep 2026
510 Townsend StBcci Construction Companyto obtain final inspection for work approved under pa# 202207188709, 202212239136, & 202210265240. all work is complete.
Details
Permit
202605131217
Status
complete
Filed
May 13, 2026
Permit issued
May 13, 2026
Final sign-off
Sep 2, 2026
Address
510 Townsend St

to obtain final inspection for work approved under pa# 202207188709, 202212239136, & 202210265240. all work is complete.

Open the permit page

May 5, 2026Completed
final sign-off Jun 2026
425 Market StBcci Construction Company25/f: mechanical only permit to support approved architectural permit 201908169078. (2) new heat pumps and (1) new condenser water pump is being added. ref permit 201908169078.
Details
Permit
202605050701
Status
complete
Filed
May 5, 2026
Permit issued
May 6, 2026
Final sign-off
Jun 22, 2026
Declared cost
$72,000
Address
425 Market St

25/f: mechanical only permit to support approved architectural permit 201908169078. (2) new heat pumps and (1) new condenser water pump is being added. ref permit 201908169078.

Open the permit page

$72,000
May 1, 2026Completed
final sign-off Aug 2026
353 Sacramento StBcci Construction Company12th/f: mep submittal to t.i. 202603057008, new ductwork & lighting for new office layout
Details
Permit
202605010522
Status
complete
Filed
May 1, 2026
Permit issued
May 4, 2026
Final sign-off
Aug 10, 2026
Declared cost
$250,000
Address
353 Sacramento St

12th/f: mep submittal to t.i. 202603057008, new ductwork & lighting for new office layout

Open the permit page

$250,000
Apr 14, 2026In progress
issued Jul 2026
353 Sacramento StBcci Construction Company3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred
Details
Permit
202604149358
Status
issued
Filed
Apr 14, 2026
Permit issued
Jul 1, 2026
Declared cost
$1,596,000
Address
353 Sacramento St

3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred

Open the permit page

$1,596,000
Apr 8, 2026Completed
final sign-off May 2026
353 Sacramento StBcci Construction Companynew fire smoke dampers and power ref approved mech permit: 202602236308.
Details
Permit
202604089086
Status
complete
Filed
Apr 8, 2026
Permit issued
Apr 9, 2026
Final sign-off
May 29, 2026
Declared cost
$50,000
Address
353 Sacramento St

new fire smoke dampers and power ref approved mech permit: 202602236308.

Open the permit page

$50,000
Apr 7, 2026In progress
issued Apr 2026
510 Townsend StBcci Construction Companyto obtain final inspection for work approved under pa # 202211297317, 202207128306, 202211156540. all work is complete.
Details
Permit
202604079033
Status
issued
Filed
Apr 7, 2026
Permit issued
Apr 7, 2026
Address
510 Townsend St

to obtain final inspection for work approved under pa # 202211297317, 202207128306, 202211156540. all work is complete.

Open the permit page

Apr 6, 2026In progress
issued Apr 2026
560 Mission StBcci Construction Company24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160
Details
Permit
202604068938
Status
issued
Filed
Apr 6, 2026
Permit issued
Apr 27, 2026
Declared cost
$1,400,000
Address
560 Mission St

24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160

Open the permit page

$1,400,000
Mar 30, 2026In progress
issued Mar 2026
120 Kearny StBcci Construction Company34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.
Details
Permit
202603308519
Status
issued
Filed
Mar 30, 2026
Permit issued
Mar 30, 2026
Declared cost
$150,000
Address
120 Kearny St

34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.

Open the permit page

$150,000
Mar 27, 2026In progress
issued Mar 2026
560 Mission StBcci Construction Company29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271
Details
Permit
202603278476
Status
issued
Filed
Mar 27, 2026
Permit issued
Mar 30, 2026
Address
560 Mission St

29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271

Open the permit page

Mar 27, 2026In progress
issued Mar 2026
560 Mission StBcci Construction Company8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716
Details
Permit
202603278434
Status
issued
Filed
Mar 27, 2026
Permit issued
Mar 30, 2026
Address
560 Mission St

8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716

Open the permit page

Mar 27, 2026In progress
issued Mar 2026
301 Howard StBcci Construction Companyto obtain final inspection for work approved under pa# 202501148268. all work is complete.
Details
Permit
202603278482
Status
issued
Filed
Mar 27, 2026
Permit issued
Mar 27, 2026
Address
301 Howard St

to obtain final inspection for work approved under pa# 202501148268. all work is complete.

Open the permit page

Mar 27, 2026In progress
issued Mar 2026
560 Mission StBcci Construction Company21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345
Details
Permit
202603278436
Status
issued
Filed
Mar 27, 2026
Permit issued
Mar 30, 2026
Address
560 Mission St

21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345

Open the permit page

Mar 26, 2026In progress
issued Sep 2026
1455 Market StBcci Construction Company7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required.
Details
Permit
202603268339
Status
issued
Filed
Mar 26, 2026
Permit issued
Sep 14, 2026
Declared cost
$257,580
Address
1455 Market St

7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required.

Open the permit page

$257,580
Mar 25, 2026In progress
issued Apr 2026
650 Davis StBcci Construction Company2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included
Details
Permit
202603258251
Status
issued
Filed
Mar 25, 2026
Permit issued
Apr 7, 2026
Declared cost
$2,959,528
Address
650 Davis St

2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included

Open the permit page

$2,959,528
Mar 20, 2026In progress
issued Mar 2026
353 Sacramento StBcci Construction Company16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377
Details
Permit
202603208007
Status
issued
Filed
Mar 20, 2026
Permit issued
Mar 23, 2026
Declared cost
$250,000
Address
353 Sacramento St

16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377

Open the permit page

$250,000
Mar 19, 2026In progress
issued Mar 2026
560 Mission StBcci Construction Company3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor.
Details
Permit
202603197921
Status
issued
Filed
Mar 19, 2026
Permit issued
Mar 27, 2026
Declared cost
$500,000
Address
560 Mission St

3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor.

Open the permit page

$500,000
Mar 18, 2026In progress
issued Mar 2026
1 Front StBcci Construction Companybasement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd.
Details
Permit
202603187789
Status
issued
Filed
Mar 18, 2026
Permit issued
Mar 18, 2026
Address
1 Front St

basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd.

Open the permit page

Mar 13, 2026In progress
issued Mar 2026
4 Embarcadero CenterBcci Construction Company28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017.
Details
Permit
202603137535
Status
issued
Filed
Mar 13, 2026
Permit issued
Mar 17, 2026
Declared cost
$150,000
Address
4 Embarcadero Center

28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017.

Open the permit page

$150,000
Mar 9, 2026In progress
issued Mar 2026
560 Mission StBcci Construction Company24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred.
Details
Permit
202603097160
Status
issued
Filed
Mar 9, 2026
Permit issued
Mar 10, 2026
Declared cost
$4,250,000
Address
560 Mission St

24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred.

Open the permit page

$4,250,000
Mar 5, 2026Completed
final sign-off Aug 2026
353 Sacramento StBcci Construction Company12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferred
Details
Permit
202603057008
Status
complete
Filed
Mar 5, 2026
Permit issued
Mar 12, 2026
Final sign-off
Aug 10, 2026
Declared cost
$650,000
Address
353 Sacramento St

12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferred

Open the permit page

$650,000
Mar 5, 2026In progress
issued Mar 2026
560 Mission StBcci Construction Company5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred
Details
Permit
202603057034
Status
issued
Filed
Mar 5, 2026
Permit issued
Mar 24, 2026
Declared cost
$4,250,000
Address
560 Mission St

5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred

Open the permit page

$4,250,000
Mar 2, 2026In progress
issued Mar 2026
101 California StBcci Construction Company44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting
Details
Permit
202603026741
Status
issued
Filed
Mar 2, 2026
Permit issued
Mar 18, 2026
Declared cost
$501,665
Address
101 California St

44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting

Open the permit page

$501,665
Feb 25, 2026In progress
issued Mar 2026
560 Mission StBcci Construction Company3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferred
Details
Permit
202602256475
Status
issued
Filed
Feb 25, 2026
Permit issued
Mar 10, 2026
Declared cost
$4,250,000
Address
560 Mission St

3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferred

Open the permit page

$4,250,000
Feb 24, 2026In progress
issued Feb 2026
650 Davis StBcci Construction Company2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru.
Details
Permit
202602246405
Status
issued
Filed
Feb 24, 2026
Permit issued
Feb 25, 2026
Declared cost
$110,000
Address
650 Davis St

2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru.

Open the permit page

$110,000
Feb 23, 2026Completed
final sign-off May 2026
353 Sacramento StBcci Construction Company2nd fl ref pa #2025-1215-1741: mep permit to add new lighting, power, air & ducts.
Details
Permit
202602236308
Status
complete
Filed
Feb 23, 2026
Permit issued
Feb 24, 2026
Final sign-off
May 29, 2026
Declared cost
$450,000
Address
353 Sacramento St

2nd fl ref pa #2025-1215-1741: mep permit to add new lighting, power, air & ducts.

Open the permit page

$450,000
Feb 23, 2026Completed
final sign-off May 2026
353 Sacramento StBcci Construction Companydeferred mep for 15th floor office ti. ref pa 202602176020; 202511109274
Details
Permit
202602236342
Status
complete
Filed
Feb 23, 2026
Permit issued
Feb 26, 2026
Final sign-off
May 13, 2026
Declared cost
$80,000
Address
353 Sacramento St

deferred mep for 15th floor office ti. ref pa 202602176020; 202511109274

Open the permit page

$80,000
Feb 17, 2026Completed
final sign-off May 2026
353 Sacramento StBcci Construction Companyste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274
Details
Permit
202602176020
Status
complete
Filed
Feb 17, 2026
Permit issued
Feb 18, 2026
Final sign-off
May 11, 2026
Address
353 Sacramento St

ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274

Open the permit page

Feb 12, 2026In progress
issued Mar 2026
120 Kearny StBcci Construction Companyste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled.
Details
Permit
202602125795
Status
issued
Filed
Feb 12, 2026
Permit issued
Mar 30, 2026
Declared cost
$486,000
Address
120 Kearny St

ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled.

Open the permit page

$486,000
Feb 9, 2026In progress
issued Feb 2026
560 Mission StBcci Construction Company8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air.
Details
Permit
202602095537
Status
issued
Filed
Feb 9, 2026
Permit issued
Feb 11, 2026
Declared cost
$75,000
Address
560 Mission St

8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air.

Open the permit page

$75,000
Feb 2, 2026Expired or cancelled
cancelled Apr 2026
50 Hawthorne StBcci Construction Companystair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.
Details
Permit
202602025014
Status
cancelled
Filed
Feb 2, 2026
Permit issued
Feb 3, 2026
Declared cost
$350,000
Address
50 Hawthorne St

stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.

Open the permit page

$350,000
Jan 28, 2026In progress
issued Jun 2026
345 Montgomery StBcci Construction Companychange of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23.
Details
Permit
202601143861
Status
issued
Filed
Jan 28, 2026
Permit issued
Jun 16, 2026
Declared cost
$21,000,000
Address
345 Montgomery St

change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23.

Open the permit page

$21,000,000
Jan 26, 2026In progress
issued Feb 2026
555 California StBcci Construction Companyrevision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifition
Details
Permit
202601264531
Status
issued
Filed
Jan 26, 2026
Permit issued
Feb 9, 2026
Address
555 California St

revision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifition

Open the permit page

Jan 21, 2026In progress
issued Feb 2026
560 Mission StBcci Construction Company8th floor- revision to include new partitions & door hardware. ref. pa#202507140716
Details
Permit
202601214206
Status
issued
Filed
Jan 21, 2026
Permit issued
Feb 9, 2026
Declared cost
$50,000
Address
560 Mission St

8th floor- revision to include new partitions & door hardware. ref. pa#202507140716

Open the permit page

$50,000
Jan 14, 2026In progress
issued Feb 2026
353 Sacramento StBcci Construction Company3rd/fl- structural permit submittal to reinforce 3rd floor slab
Details
Permit
202601143835
Status
issued
Filed
Jan 14, 2026
Permit issued
Feb 2, 2026
Declared cost
$50,000
Address
353 Sacramento St

3rd/fl- structural permit submittal to reinforce 3rd floor slab

Open the permit page

$50,000
Jan 12, 2026Completed
final sign-off Jun 2026
350 Bush StBcci Construction Companyinstalling and anchoring furniture phone booths on office floor 7.
Details
Permit
202601123631
Status
complete
Filed
Jan 12, 2026
Permit issued
Mar 6, 2026
Final sign-off
Jun 5, 2026
Declared cost
$20,000
Address
350 Bush St

installing and anchoring furniture phone booths on office floor 7.

Open the permit page

$20,000
Dec 22, 2025In progress
issued Dec 2025
353 Sacramento StBcci Construction Company16th fl: demolition of non structural elements. construction of new partitions, doors, finishes, ceilings, lighting and millwork. new (2) ada compliant gnrs. mep will be separate permit. pot previously approved per pa # 2025-1110-9274.
Details
Permit
202512222377
Status
issued
Filed
Dec 22, 2025
Permit issued
Dec 31, 2025
Declared cost
$1,250,000
Address
353 Sacramento St

16th fl: demolition of non structural elements. construction of new partitions, doors, finishes, ceilings, lighting and millwork. new (2) ada compliant gnrs. mep will be separate permit. pot previously approved per pa # 2025-1110-9274.

Open the permit page

$1,250,000
Dec 22, 2025Completed
final sign-off Jun 2026
650 Davis StBcci Construction Company2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740
Details
Permit
202512222386
Status
complete
Filed
Dec 22, 2025
Permit issued
Dec 23, 2025
Final sign-off
Jun 8, 2026
Declared cost
$180,000
Address
650 Davis St

2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740

Open the permit page

$180,000
Dec 22, 2025In progress
issued Mar 2026
555 California StBcci Construction Companyl45-46 interconnecting stair. new finishes & banquette platform landing
Details
Permit
202512222446
Status
issued
Filed
Dec 22, 2025
Permit issued
Mar 10, 2026
Declared cost
$125,000
Address
555 California St

l45-46 interconnecting stair. new finishes & banquette platform landing

Open the permit page

$125,000
Dec 19, 2025In progress
issued Dec 2025
415 Mission StBcci Construction Companyto obtain final inspection for work approved under pa# 202310118444 & 202401315007. all work is complete.
Details
Permit
202512192265
Status
issued
Filed
Dec 19, 2025
Permit issued
Dec 19, 2025
Address
415 Mission St

to obtain final inspection for work approved under pa# 202310118444 & 202401315007. all work is complete.

Open the permit page

Dec 19, 2025In progress
issued Dec 2025
415 Mission StBcci Construction Companyto obtain final inspection for work approved under pa# 202401023324 & 202408088259. all work is complete.
Details
Permit
202512192267
Status
issued
Filed
Dec 19, 2025
Permit issued
Dec 19, 2025
Address
415 Mission St

to obtain final inspection for work approved under pa# 202401023324 & 202408088259. all work is complete.

Open the permit page

Dec 18, 2025In progress
issued May 2026
560 Mission StBcci Construction Company4th floor: convert (e) storage room and portion of (e) server room to be new main equipment room/ups and pre action closet.
Details
Permit
202512182157
Status
issued
Filed
Dec 18, 2025
Permit issued
May 8, 2026
Declared cost
$459,800
Address
560 Mission St

4th floor: convert (e) storage room and portion of (e) server room to be new main equipment room/ups and pre action closet.

Open the permit page

$459,800
Dec 17, 2025Completed
final sign-off Aug 2026
4 Embarcadero CenterBcci Construction Company8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by .
Details
Permit
202512171991
Status
complete
Filed
Dec 17, 2025
Permit issued
Feb 11, 2026
Final sign-off
Aug 13, 2026
Declared cost
$5,793,089
Address
4 Embarcadero Center

8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by .

Open the permit page

$5,793,089
Dec 16, 2025In progress
issued Dec 2025
1 Montgomery StBcci Construction Companyrevision to 202002078837 and 202009053588 to match field conditions
Details
Permit
202512161922
Status
issued
Filed
Dec 16, 2025
Permit issued
Dec 19, 2025
Address
1 Montgomery St

revision to 202002078837 and 202009053588 to match field conditions

Open the permit page

Dec 15, 2025Completed
final sign-off May 2026
353 Sacramento StBcci Construction Company2nd flr consist of interior demolition at non structural elements. construction of new partitions, doors, finishes, ceilings, lighting, millwork, plumbing fixtures. mep on separate permit. includes restroom ada upgrades. path of travel ref: 202511109274
Details
Permit
202512151741
Status
complete
Filed
Dec 15, 2025
Permit issued
Dec 22, 2025
Final sign-off
May 29, 2026
Declared cost
$1,250,000
Address
353 Sacramento St

2nd flr consist of interior demolition at non structural elements. construction of new partitions, doors, finishes, ceilings, lighting, millwork, plumbing fixtures. mep on separate permit. includes restroom ada upgrades. path of travel ref: 202511109274

Open the permit page

$1,250,000
Dec 12, 2025In progress
issued Apr 2026
600 Battery StBcci Construction Companyinterior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy.
Details
Permit
202512121681
Status
issued
Filed
Dec 12, 2025
Permit issued
Apr 28, 2026
Declared cost
$1,079,200
Address
600 Battery St

interior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy.

Open the permit page

$1,079,200
Dec 12, 2025In progress
issued Feb 2026
555 Market StBcci Construction Company1/fl- (n) amenity bar/restaurant space, basketball court, lounge area, includes (n) conference rooms, countertop bar and island, seating, restrooms, finishes, and lighting throughout. 2/fl (n) lighting, ceilings, and finishes throughout. (n) pickleball court, fitness area, fitness, classroom, new
Details
Permit
202512121719
Status
issued
Filed
Dec 12, 2025
Permit issued
Feb 25, 2026
Declared cost
$8,361,781
Address
555 Market St

1/fl- (n) amenity bar/restaurant space, basketball court, lounge area, includes (n) conference rooms, countertop bar and island, seating, restrooms, finishes, and lighting throughout. 2/fl (n) lighting, ceilings, and finishes throughout. (n) pickleball court, fitness area, fitness, classroom, new

Open the permit page

$8,361,781
Dec 10, 2025In progress
issued May 2026
1 Market StBcci Construction Company10/fl- install of phone booth includes anchorning and adding (3) pendant light fixtures
Details
Permit
202512101423
Status
issued
Filed
Dec 10, 2025
Permit issued
May 26, 2026
Declared cost
$30,000
Address
1 Market St

10/fl- install of phone booth includes anchorning and adding (3) pendant light fixtures

Open the permit page

$30,000
Dec 2, 2025In progress
issued Dec 2025
650 Davis StBcci Construction Companypartial 2nd/f bldg #1 t.i. new partitions, conference rooms & break room, mep deferred
Details
Permit
202512020740
Status
issued
Filed
Dec 2, 2025
Permit issued
Dec 18, 2025
Declared cost
$2,659,843
Address
650 Davis St

partial 2nd/f bldg #1 t.i. new partitions, conference rooms & break room, mep deferred

Open the permit page

$2,659,843
Dec 1, 2025In progress
issued Dec 2025
555 California StBcci Construction Company45th fl - tenant improvement partitions, ceiing & finishes
Details
Permit
202512010639
Status
issued
Filed
Dec 1, 2025
Permit issued
Dec 18, 2025
Declared cost
$5,314,000
Address
555 California St

45th fl - tenant improvement partitions, ceiing & finishes

Open the permit page

$5,314,000
Nov 26, 2025Completed
final sign-off Aug 2026
101 California StBcci Construction Company43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain)
Details
Permit
202511260531
Status
complete
Filed
Nov 26, 2025
Permit issued
Dec 29, 2025
Final sign-off
Aug 21, 2026
Declared cost
$8,018,885
Address
101 California St

43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain)

Open the permit page

$8,018,885
Nov 26, 2025Completed
final sign-off Mar 2026
1 Market StBcci Construction Company3/f: empty office space to be converted into a mail room. new door with card reader added.
Details
Permit
202511260516
Status
complete
Filed
Nov 26, 2025
Permit issued
Dec 2, 2025
Final sign-off
Mar 3, 2026
Declared cost
$15,000
Address
1 Market St

3/f: empty office space to be converted into a mail room. new door with card reader added.

Open the permit page

$15,000
Nov 24, 2025In progress
issued Nov 2025
1 Montgomery StBcci Construction Companyto obtain final inspection for work approved under pa# 202002073837 + 202009053588. all work is complete.
Details
Permit
202511240357
Status
issued
Filed
Nov 24, 2025
Permit issued
Nov 24, 2025
Address
1 Montgomery St

to obtain final inspection for work approved under pa# 202002073837 + 202009053588. all work is complete.

Open the permit page

Nov 21, 2025In progress
issued Dec 2025
555 California StBcci Construction Companyrevision to bpa#: 202505096128. level 52. dph approval of food service scope and minor room wall layout.
Details
Permit
202511210204
Status
issued
Filed
Nov 21, 2025
Permit issued
Dec 2, 2025
Address
555 California St

revision to bpa#: 202505096128. level 52. dph approval of food service scope and minor room wall layout.

Open the permit page

Nov 17, 2025Completed
final sign-off Jan 2026
100 California StBcci Construction Company4th fl - add new entry door
Details
Permit
202511179807
Status
complete
Filed
Nov 17, 2025
Permit issued
Dec 1, 2025
Final sign-off
Jan 23, 2026
Declared cost
$29,000
Address
100 California St

4th fl - add new entry door

Open the permit page

$29,000
Nov 14, 2025In progress
issued Feb 2026
201 Filbert StBcci Construction Company6th fl: minor work to construct an open coffee lounge, 2 phone rooms & demised lobby/reception area. work includes new non bearing partitions. 2 new doors, new lighting flooring, millwork, sink and paint. elec & telecom outlets & fls devices will be added to accommodate reconfiguration.
Details
Permit
202511149634
Status
issued
Filed
Nov 14, 2025
Permit issued
Feb 9, 2026
Declared cost
$175,000
Address
201 Filbert St

6th fl: minor work to construct an open coffee lounge, 2 phone rooms & demised lobby/reception area. work includes new non bearing partitions. 2 new doors, new lighting flooring, millwork, sink and paint. elec & telecom outlets & fls devices will be added to accommodate reconfiguration.

Open the permit page

$175,000