Bcci Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2026
- Last 24 months
- 209 permits filed
4,270 permits since 2000: 3,336 completed, 121 in progress, 332 never finaled, 481 expired or cancelled.
Of the 332 never-finaled permits, 34 are 3 to 5 years old, 161 are 5 to 10 years old, 137 are over 10 years old. 7 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
112 stairs permits: 87 completed, 5 in progress, 13 never finaled, 7 expired or cancelled. Typically 13 days from filing to permit and 331 days from permit to final inspection.
Showing the 100 most recent of 112.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 555 California St | 46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.Details
46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening. | |
| Jul 14, 2026 | In progress issued Jul 2026 | 555 California St | 50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.Details
50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855. | $3,800,000 |
| Feb 2, 2026 | Expired or cancelled cancelled Apr 2026 | 50 Hawthorne St | stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.Details
stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings. | $350,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 555 California St | l45-46 interconnecting stair. new finishes & banquette platform landingDetails
l45-46 interconnecting stair. new finishes & banquette platform landing | $125,000 |
| Aug 14, 2025 | Completed final sign-off May 2026 | 650 California St | 30th & 31st/f: structural deferred permit for guardrail for interior staircase. ref 202412166915Details
30th & 31st/f: structural deferred permit for guardrail for interior staircase. ref 202412166915 | |
| Jul 31, 2025 | In progress issued Sep 2025 | 4 Embarcadero Center | 13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred.Details
13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred. | $300,000 |
| Jul 23, 2025 | Completed final sign-off Jul 2026 | 1455 Market St | newly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose.Details
newly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose. | |
| Apr 21, 2025 | In progress issued Oct 2025 | 201 Mission St | 1st fl - remove concrete stair #9, remove column supporting landing @ floor 2; 2nd fl - remove portion of stair #9 landing, infill guardrail wall @ stair landing removal area; refinish guardrail wall and add drink (floor 2)Details
1st fl - remove concrete stair #9, remove column supporting landing @ floor 2; 2nd fl - remove portion of stair #9 landing, infill guardrail wall @ stair landing removal area; refinish guardrail wall and add drink (floor 2) | $120,000 |
| Dec 16, 2024 | Completed final sign-off May 2026 | 650 California St | 30th & 31st fl ti: non structural partitions, ceilings, finishes & asccioated mep. work includes (n) convenience stairDetails
30th & 31st fl ti: non structural partitions, ceilings, finishes & asccioated mep. work includes (n) convenience stair | $2,200,000 |
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 505 Howard St | floors 4 and 5- removal of communicating stairs and slab infill between floorsDetails
floors 4 and 5- removal of communicating stairs and slab infill between floors | $120,000 |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | 4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only.Details
4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only. | |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | 31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.Details
31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33. | $200,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | 33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.Details
33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736. | $200,000 |
| Aug 16, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | 4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes.Details
4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes. | |
| Jun 23, 2023 | Never finaled issued Jul 2023, no final | 415 Mission St | 31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.Details
31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included. | $200,000 |
| Mar 6, 2023 | Never finaled issued Mar 2023, no final | 510 Townsend St | 6/f: rev to pa# 2022-0801-9661: build a security vestiblule at entance/exit of (e) convenience stairDetails
6/f: rev to pa# 2022-0801-9661: build a security vestiblule at entance/exit of (e) convenience stair | $95,000 |
| Feb 14, 2023 | Expired or cancelled cancelled Jan 2026 | 345 Spear St | 4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinklerDetails
4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinkler | $185,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2023 | 121 Spear St | 1st fl: revision to pa# 202203180339. changes to handrail at staircaseDetails
1st fl: revision to pa# 202203180339. changes to handrail at staircase | |
| Mar 18, 2022 | Completed final sign-off Sep 2023 | 121 Spear St | 1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.Details
1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered. | $450,000 |
| Aug 17, 2021 | Completed final sign-off Oct 2021 | 1 Market St | 18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower.Details
18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower. | $5,000 |
| Mar 10, 2021 | Never finaled issued Apr 2021, no final | 555 Mission St | flrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included.Details
flrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included. | $700,000 |
| Oct 2, 2020 | Completed final sign-off Jun 2023 | 1045 Sansome St | add a roof terrace with outdoor seating, 42"tall guardrails set back 5' from (e) bldg parapets & new stair vestibule. demolition (e) partitions & assosciated power/data & floor finishes. construct new partitions, doors, power & tele/data, lighting, millwork & finish. 2 new restrooms.Details
add a roof terrace with outdoor seating, 42"tall guardrails set back 5' from (e) bldg parapets & new stair vestibule. demolition (e) partitions & assosciated power/data & floor finishes. construct new partitions, doors, power & tele/data, lighting, millwork & finish. 2 new restrooms. | $1,400,000 |
| Aug 8, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | added a stair entrance enclosure guardrail on levels 21 thru 23 with access control swing gate at each level. level 23: guardrail height has increased to 6'-0" h, added top cap to the guardrail, increased the guardrail glass thickness.revision to bpa#2019/0924/2474.Details
added a stair entrance enclosure guardrail on levels 21 thru 23 with access control swing gate at each level. level 23: guardrail height has increased to 6'-0" h, added top cap to the guardrail, increased the guardrail glass thickness.revision to bpa#2019/0924/2474. | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | 20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | 22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | 21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | 23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Dec 23, 2019 | Completed final sign-off Sep 2022 | 555 California St | partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.Details
partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted. | $210,000 |
| Dec 23, 2019 | Completed final sign-off Oct 2020 | 1 California St | unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.Details
unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work. | $580,000 |
| Nov 26, 2019 | Completed final sign-off Mar 2022 | 1 Market St | revision to approved stair pa# 2019-0829-0178: structural calcs for stair included.Details
revision to approved stair pa# 2019-0829-0178: structural calcs for stair included. | |
| Nov 18, 2019 | Completed final sign-off Jan 2023 | 1 Maritime Pz | (3) new sets of convenience stairs. new stairs #3 & #4 connect floors 2-4. new stairs #5, #6 & #7 connect floors 10-13. new stairs #8, #9 & #10 connect floors 13-16.Details
(3) new sets of convenience stairs. new stairs #3 & #4 connect floors 2-4. new stairs #5, #6 & #7 connect floors 10-13. new stairs #8, #9 & #10 connect floors 13-16. | $4,000,000 |
| Nov 13, 2019 | Completed final sign-off May 2021 | 650 California St | demo of (e) communicating stair between floors 32-33 and floor slab infill on 33rd fl. fire and life safety system to remain in tact n/a maherDetails
demo of (e) communicating stair between floors 32-33 and floor slab infill on 33rd fl. fire and life safety system to remain in tact n/a maher | $10,000 |
| Nov 13, 2019 | Completed final sign-off Jul 2021 | 650 California St | demo of (e) stair between floors 31-32 and adjacent finishes and floor, elevations to match (e) floor elevations, fire and life safety system to remain intact n/a maherDetails
demo of (e) stair between floors 31-32 and adjacent finishes and floor, elevations to match (e) floor elevations, fire and life safety system to remain intact n/a maher | $10,000 |
| Oct 29, 2019 | Completed final sign-off Feb 2021 | 300 Clay St | structural framing of (e) stair opening. t.i. and stair permit will be submitted in the future seperately n/a maherDetails
structural framing of (e) stair opening. t.i. and stair permit will be submitted in the future seperately n/a maher | $150,000 |
| Sep 24, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | deferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab andDetails
deferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab and | $1,110,270 |
| Aug 29, 2019 | Completed final sign-off Mar 2022 | 1 Market St | 18-22 modification to (e) tenant interior convenicence stair between 18-21 with an extension to level 22. stair work include demo new handrails, finshes & construction of rated enclosure on 22. also upgrade to base bld restroomsDetails
18-22 modification to (e) tenant interior convenicence stair between 18-21 with an extension to level 22. stair work include demo new handrails, finshes & construction of rated enclosure on 22. also upgrade to base bld restrooms | $750,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2020 | 4 Embarcadero Center | construction of interconnecting stairs between 2,3 &4.Details
construction of interconnecting stairs between 2,3 &4. | $4,500,000 |
| May 23, 2019 | Completed final sign-off Dec 2019 | 1 Market St | demo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.Details
demo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher. | $5,000 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 1 Embarcadero Center | demo of (e) stair between 15 & 16, convenience stair not exit stair. in-fill floor slab on 16th fl. no change in occupancy use or area. mep, like safety, sprinklers under separate permitDetails
demo of (e) stair between 15 & 16, convenience stair not exit stair. in-fill floor slab on 16th fl. no change in occupancy use or area. mep, like safety, sprinklers under separate permit | $175,000 |
| Feb 13, 2019 | Never finaled issued Dec 2019, no final | 799 Van Ness Av | basement, 1st, 2nd & roof. new renovation of (e) building. change of use. new provide fitness center. pool, beauty spa, ancillary, restaurant etc. (mep, life safety, sprinklers, skylights, stairs, structural, guards, demo under separate permit).structural pa# 2019/02/01/1918 under review.Details
basement, 1st, 2nd & roof. new renovation of (e) building. change of use. new provide fitness center. pool, beauty spa, ancillary, restaurant etc. (mep, life safety, sprinklers, skylights, stairs, structural, guards, demo under separate permit).structural pa# 2019/02/01/1918 under review. | $3,080,000 |
| Jan 29, 2019 | Completed final sign-off Aug 2019 | 1 Embarcadero Center | demo of (e) inte-connecting stair between fls. 16 & 17, infill of floor slab on 17, no change in occupancy, use, or area, mep life safety & sprinklers on sep permitDetails
demo of (e) inte-connecting stair between fls. 16 & 17, infill of floor slab on 17, no change in occupancy, use, or area, mep life safety & sprinklers on sep permit | $100,000 |
| Sep 25, 2018 | Completed final sign-off Aug 2019 | 50 California St | remove extg interior stairs between 2nd and 3rd floor. infill stair opening at 3rd floor. infill interior stair opening at 3rd floor.Details
remove extg interior stairs between 2nd and 3rd floor. infill stair opening at 3rd floor. infill interior stair opening at 3rd floor. | $50,000 |
| Jul 31, 2018 | Completed final sign-off Aug 2019 | 345 California St | 6th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress)Details
6th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress) | $1,200,000 |
| Jul 31, 2018 | Completed final sign-off Aug 2019 | 345 California St | 7th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress)Details
7th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress) | $1,200,000 |
| Jul 20, 2018 | Completed final sign-off Aug 2019 | 345 California St | removal of floor slab and new stair connecting 6th and 7thf fls. ref#201710181527 & 201802232072. n/a for maherDetails
removal of floor slab and new stair connecting 6th and 7thf fls. ref#201710181527 & 201802232072. n/a for maher | $400,000 |
| May 22, 2018 | Completed final sign-off Jan 2020 | 123 Mission St | 4th & 5th flr - revision to approved stair permit btw 4th & 5th flr change finishes replace glass panels with steel cable. ref 201801199016 maher naDetails
4th & 5th flr - revision to approved stair permit btw 4th & 5th flr change finishes replace glass panels with steel cable. ref 201801199016 maher na | $20,000 |
| Apr 26, 2018 | Completed final sign-off Aug 2019 | 100 California St | 14th flr - revision to stair permit and approve arch. ref 201801319972 & 201802211831 maher naDetails
14th flr - revision to stair permit and approve arch. ref 201801319972 & 201802211831 maher na | |
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 300 California St | 7th flr - limited demo, enclosure of (e) communicating stair. maher n/aDetails
7th flr - limited demo, enclosure of (e) communicating stair. maher n/a | $106,337 |
| Feb 21, 2018 | Completed final sign-off Aug 2019 | 100 California St | 14th flr - new stair connecting 14th floor to roof. ref 201801319972 maher naDetails
14th flr - new stair connecting 14th floor to roof. ref 201801319972 maher na | $125,000 |
| Jan 19, 2018 | Completed final sign-off Jul 2019 | 123 Mission St | 5th flr: demo of (e) structural slab and structural support beams. new communicating stair and new structural support beams maher naDetails
5th flr: demo of (e) structural slab and structural support beams. new communicating stair and new structural support beams maher na | $300,000 |
| Dec 21, 2017 | Never finaled issued Mar 2018, no final | 415 Mission St | new communicating stair between 45th and 46th floorsDetails
new communicating stair between 45th and 46th floors | $310,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a **Details
on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a ** | $1,100,000 |
| Nov 15, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | 4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13Details
4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13 | $1,700,000 |
| Nov 2, 2017 | Completed final sign-off Jun 2025 | 415 Mission St | interior stair opening connecting level 31-35 floor, revision to #201709087307 existing permitDetails
interior stair opening connecting level 31-35 floor, revision to #201709087307 existing permit | $450,000 |
| Sep 8, 2017 | Completed final sign-off Jun 2025 | 415 Mission St | non rated stair connecting floors 34 and 35. ref . 2017-09-08-7306Details
non rated stair connecting floors 34 and 35. ref . 2017-09-08-7306 | $120,000 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 315 Montgomery St | per approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher naDetails
per approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher na | $54,000 |
| Mar 6, 2017 | Completed final sign-off May 2017 | 315 Montgomery St | 15th and 16th floor:provide power/lighting of approximately 375 sq ft if stair case. work associated with approved app#201610059555. n/a for maherDetails
15th and 16th floor:provide power/lighting of approximately 375 sq ft if stair case. work associated with approved app#201610059555. n/a for maher | $6,500 |
| Dec 5, 2016 | Completed final sign-off Sep 2017 | 350 California St | 4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain.Details
4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain. | $2,500,000 |
| Oct 5, 2016 | Completed final sign-off May 2017 | 315 Montgomery St | new metal stair extension at 15/f & 16/f, structural & non-structural demo, new interior partitions, doors and wall finishes. n/a ordinance #155-13Details
new metal stair extension at 15/f & 16/f, structural & non-structural demo, new interior partitions, doors and wall finishes. n/a ordinance #155-13 | $110,000 |
| Jan 19, 2016 | Completed final sign-off Nov 2019 | 601 Townsend St | (exterior entry) -approved pa# 2015/11/23/3300 for exterior work including the replacement of 2 stair egress doors. ** maher: n/a **Details
(exterior entry) -approved pa# 2015/11/23/3300 for exterior work including the replacement of 2 stair egress doors. ** maher: n/a ** | $7,500 |
| Sep 22, 2015 | Completed final sign-off Mar 2017 | 436 Bryant St | interior renovations to floors 1,2,3 including new partitions, code complaint egress stairs, structural reinforcement. mep and ls under sep permit. n/a for maher.Details
interior renovations to floors 1,2,3 including new partitions, code complaint egress stairs, structural reinforcement. mep and ls under sep permit. n/a for maher. | $365,000 |
| Aug 10, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | new steel stair between 6th and 7th flr including structural work and associated mechanical.Details
new steel stair between 6th and 7th flr including structural work and associated mechanical. | $519,000 |
| Jul 7, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | demolition under ab-017 on the 7th floor. construct opening in floor for new stair. arch, mep, sprinkler, and fire alarm revisions under separate applications.Details
demolition under ab-017 on the 7th floor. construct opening in floor for new stair. arch, mep, sprinkler, and fire alarm revisions under separate applications. | $68,000 |
| Jun 9, 2015 | Completed final sign-off Jan 2016 | 1 Montgomery St | structural work associated with stair included in approved app#201503312401 and 2015040125511Details
structural work associated with stair included in approved app#201503312401 and 2015040125511 | $3,650 |
| Apr 6, 2015 | Never finaled issued Apr 2015, no final | 1455 Market St | revision to app#201412194140 to change guard rail design at stairs.n/a for maher.Details
revision to app#201412194140 to change guard rail design at stairs.n/a for maher. | |
| Mar 13, 2015 | Completed final sign-off Nov 2015 | 555 California St | work associated w/approved permit # 2015 0312 0645. provide new concrete slab over metal deck infill at the 26th flr. tenant & stairs btw 25th & 26th flrs is to be removed & remaining infill opening is to be infilled. maher - not req'dDetails
work associated w/approved permit # 2015 0312 0645. provide new concrete slab over metal deck infill at the 26th flr. tenant & stairs btw 25th & 26th flrs is to be removed & remaining infill opening is to be infilled. maher - not req'd | $62,000 |
| Feb 17, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | new steel stair between 5th and 6th fl including new floor opening on 6th fl, ceiling, finishes, structural work, elec modifications. life safety under separate permitDetails
new steel stair between 5th and 6th fl including new floor opening on 6th fl, ceiling, finishes, structural work, elec modifications. life safety under separate permit | $619,000 |
| Jan 21, 2015 | Completed final sign-off Jun 2016 | 345 Spear St | structural work associated with 201411191892 for staircase detail and framing details for a shaft 5,6, and 7Details
structural work associated with 201411191892 for staircase detail and framing details for a shaft 5,6, and 7 | $125,000 |
| Dec 19, 2014 | Never finaled issued Mar 2015, no final | 1455 Market St | tenant improvement on a portion of the 6th,7th,8th,9th floors to include (n) floor opening & auditorium stair between levels 6,7 & 8 and an interconnecting stair between level 8 & level 9.Details
tenant improvement on a portion of the 6th,7th,8th,9th floors to include (n) floor opening & auditorium stair between levels 6,7 & 8 and an interconnecting stair between level 8 & level 9. | $435,000 |
| Dec 18, 2014 | Completed final sign-off Jul 2016 | 1455 Market St | 7th floor:tenant improvement on a portion of the 7th fl to include new drywall, ceiling work, doors, glazing, finishes. mep, sprinkler, fire alarm, standpipe removal & stairs under sep permit. n/a maherDetails
7th floor:tenant improvement on a portion of the 7th fl to include new drywall, ceiling work, doors, glazing, finishes. mep, sprinkler, fire alarm, standpipe removal & stairs under sep permit. n/a maher | $2,881,130 |
| Nov 19, 2014 | Completed final sign-off Jun 2016 | 345 Spear St | 3rd floor - revision to appl #2014.0818.4059 to reconfigure work spaces & to eliminate the demolitoin of the interconnecting staircase. mechanical & electrical work under separate permit.Details
3rd floor - revision to appl #2014.0818.4059 to reconfigure work spaces & to eliminate the demolitoin of the interconnecting staircase. mechanical & electrical work under separate permit. | |
| Aug 18, 2014 | Expired or cancelled cancelled Jul 2016 | 345 Spear St | interior demolition of convenient stair connecting levels 2 to 3 floor & 3 to 4 floor. demolition of associated partitions. structural infill of openings on levels 3 to 4 floor. n/a ordinance #155-13Details
interior demolition of convenient stair connecting levels 2 to 3 floor & 3 to 4 floor. demolition of associated partitions. structural infill of openings on levels 3 to 4 floor. n/a ordinance #155-13 | $250,000 |
| Jun 11, 2014 | Completed final sign-off Dec 2014 | 345 Spear St | cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load.Details
cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load. | $1,400,000 |
| Apr 21, 2014 | Completed final sign-off Jan 2015 | 50 Hawthorne St | new roof deck on existing roof, extension of existing stairs & new elevator from 3rd floor to roof, structural work under seperate permit.Details
new roof deck on existing roof, extension of existing stairs & new elevator from 3rd floor to roof, structural work under seperate permit. | $696,300 |
| Apr 18, 2014 | Completed final sign-off Jan 2015 | 50 Hawthorne St | structural work associated with approved app#201404082673 and 201404082675 including stair and platform.Details
structural work associated with approved app#201404082673 and 201404082675 including stair and platform. | $625,000 |
| Sep 4, 2013 | Completed final sign-off Oct 2014 | 1045 Bryant St | structural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17Details
structural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17 | $125,000 |
| Aug 9, 2013 | Completed final sign-off Feb 2015 | 101 Post St | inter connecting stair between 2 & 3 floors. 2nd floor t.i. conference and break room build out. new lighting and electrical. demo restroom finishes, partial removal of slab above to 3rd floor for new stair. construct non-structural partitions, doors. mepDetails
inter connecting stair between 2 & 3 floors. 2nd floor t.i. conference and break room build out. new lighting and electrical. demo restroom finishes, partial removal of slab above to 3rd floor for new stair. construct non-structural partitions, doors. mep | $500,000 |
| Apr 16, 2013 | Completed final sign-off Aug 2015 | 145 Jefferson St | core & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaionDetails
core & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaion | $500,000 |
| Mar 26, 2013 | Completed final sign-off Mar 2014 | 564 06th St | demo rear stairs, demo ramp, install folding partition supports, infill one opening, install framing and support for skylights and ac units. this structural only work associcated with approved app#201303182441Details
demo rear stairs, demo ramp, install folding partition supports, infill one opening, install framing and support for skylights and ac units. this structural only work associcated with approved app#201303182441 | $100,000 |
| Aug 19, 2011 | Completed final sign-off Jul 2012 | 555 California St | 50th & 51st floors-work associated with approved pa# 2011-0721-0717 & 2011-0728-1223 including a communicating stair between 50th & 51st floors & structural support for av wall & platform on rooftopDetails
50th & 51st floors-work associated with approved pa# 2011-0721-0717 & 2011-0728-1223 including a communicating stair between 50th & 51st floors & structural support for av wall & platform on rooftop | $10,000 |
| Jun 1, 2011 | Completed final sign-off Oct 2011 | 2 Harrison St | preconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairwayDetails
preconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairway | $35,000 |
| May 20, 2011 | Completed final sign-off Jul 2012 | 2 Harrison St | structural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.)Details
structural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.) | $220,000 |
| Sep 20, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | creation of common corridor on 2nd floor. new ada compliant stair hand and guard railsDetails
creation of common corridor on 2nd floor. new ada compliant stair hand and guard rails | $80,000 |
| Mar 15, 2010 | Never finaled issued Mar 2010, no final | 650 California St | 28th floor-fire evacuation interior signage consisting of emergency evacuation information sign plaques to be located at elevator lobbyand stairs.Details
28th floor-fire evacuation interior signage consisting of emergency evacuation information sign plaques to be located at elevator lobbyand stairs. | $3,000 |
| Jul 30, 2009 | Completed final sign-off Jul 2010 | 575 Market St | maintain 2-existing stair vestibule assemblies; new rated elevator lobby doors the rest of elevator lobby to remain as existing. all access control devices & doors along hallway have been removed from scope of work-mechanical & work included addendum to pa#200906301693Details
maintain 2-existing stair vestibule assemblies; new rated elevator lobby doors the rest of elevator lobby to remain as existing. all access control devices & doors along hallway have been removed from scope of work-mechanical & work included addendum to pa#200906301693 | |
| Aug 21, 2008 | Completed final sign-off Nov 2009 | 211 Main St | revision to application 200807187030 & 200807187032 for intervening stairs.Details
revision to application 200807187030 & 200807187032 for intervening stairs. | $38,000 |
| May 22, 2008 | Completed final sign-off Dec 2008 | 1 Embarcadero Center | 33rd & 34th floor: structural work associated with approved pa #200805192359, work includes a tenant stair between floors.Details
33rd & 34th floor: structural work associated with approved pa #200805192359, work includes a tenant stair between floors. | $30,000 |
| May 19, 2008 | Completed final sign-off Dec 2008 | 1 Embarcadero Center | interior tenant improvement on the 33rd fl. including demo, new walls,ceiling work,doors,millwork and finishes; mech,elec,new and relocated ducting,power,signal, new lighting, stair for tenant convinience to be under separate permit.Details
interior tenant improvement on the 33rd fl. including demo, new walls,ceiling work,doors,millwork and finishes; mech,elec,new and relocated ducting,power,signal, new lighting, stair for tenant convinience to be under separate permit. | $1,026,000 |
| May 14, 2008 | Completed final sign-off Aug 2009 | 50 Fremont St | revision to pa# 2008-0208-4345 to include (shop drawings) stair edge detailDetails
revision to pa# 2008-0208-4345 to include (shop drawings) stair edge detail | $500 |
| Dec 7, 2007 | Completed final sign-off Feb 2009 | 580 California St | removal of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor.Details
removal of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor. | $60,000 |
| Sep 24, 2007 | Never finaled issued Sep 2007, no final | 3 Embarcadero Center | 24th floor ti- add partition at convience stair to 25th floor- change hardware on 1 doorDetails
24th floor ti- add partition at convience stair to 25th floor- change hardware on 1 door | $1,500 |
| Sep 18, 2007 | Completed final sign-off Jul 2008 | 600 Montgomery St | interior tenant improvement on 22nd floor including demo, new drywall. ceiling work. doors, finishes, new tenant stair connecting with floor 23. hvac. lighting. sprinklers & life safety under seperate permit.Details
interior tenant improvement on 22nd floor including demo, new drywall. ceiling work. doors, finishes, new tenant stair connecting with floor 23. hvac. lighting. sprinklers & life safety under seperate permit. | $1,030,000 |
| Aug 7, 2007 | Completed final sign-off Dec 2007 | 4 Embarcadero Center | revision to approved appl. 2007 0731 8264: infill stair opening at the 22nd floor.Details
revision to approved appl. 2007 0731 8264: infill stair opening at the 22nd floor. | $32,000 |
| Apr 17, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | structural revision to app #200612280699. alterate stair detail.Details
structural revision to app #200612280699. alterate stair detail. | $1,500 |
| Dec 28, 2006 | Completed final sign-off Nov 2007 | 301 Battery St | structural work stairs on floors 6 & 7 ( creating communicating stairs between floors 6 & 7)Details
structural work stairs on floors 6 & 7 ( creating communicating stairs between floors 6 & 7) | $30,000 |
| Oct 24, 2006 | Expired or cancelled expired Oct 2007 | 1 Embarcadero Center | replace door locks tied to life safety system on the exit stairs on floors 2,9,15,16,17,18,19,25,26,29,30,31,40,41,&42Details
replace door locks tied to life safety system on the exit stairs on floors 2,9,15,16,17,18,19,25,26,29,30,31,40,41,&42 | $500 |
| Jun 23, 2006 | Expired or cancelled expired Jan 2008 | 333 Market St | structural revision to pa#2006/05/11/1422: infill (e) floor opening near previous floor/stair opening infill on 33rd floorDetails
structural revision to pa#2006/05/11/1422: infill (e) floor opening near previous floor/stair opening infill on 33rd floor | $25,000 |
| Apr 27, 2006 | Completed final sign-off Oct 2006 | 505 Montgomery St | strucutral work on 8th, 9th & 10th floors. the scope is reinforcement for high density files & an interconnecting stair. this work is associated with oti-1 pa# 2006/04/12/8801 & pa# 2006/04/13/8894. fire alarm & sprinkler on seperate permit. no increase in office.Details
strucutral work on 8th, 9th & 10th floors. the scope is reinforcement for high density files & an interconnecting stair. this work is associated with oti-1 pa# 2006/04/12/8801 & pa# 2006/04/13/8894. fire alarm & sprinkler on seperate permit. no increase in office. | $85,000 |
| Oct 19, 2005 | Completed final sign-off Oct 2006 | 1 Maritime Pz | pre construction, pre haz. material abatement, non-structural demolition, stair enclosure on each floor is being built back immediately for fire protection only on floor 20, 21 & 22Details
pre construction, pre haz. material abatement, non-structural demolition, stair enclosure on each floor is being built back immediately for fire protection only on floor 20, 21 & 22 | $220,000 |
| Dec 20, 2004 | Completed final sign-off Jul 2005 | 201 Mission St | infill stair that goes between floor 5 & 6,stair is tenant convinence stair and does not affect exitDetails
infill stair that goes between floor 5 & 6,stair is tenant convinence stair and does not affect exit | $25,000 |