Back to kitchen remodel contractors
Bcci Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2026
- Last 24 months
- 209 permits filed
4,270 permits since 2000: 3,336 completed, 121 in progress, 332 never finaled, 481 expired or cancelled.
Of the 332 never-finaled permits, 34 are 3 to 5 years old, 161 are 5 to 10 years old, 137 are over 10 years old. 7 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
30 kitchen remodel permits: 24 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 31 days from filing to permit and 437 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 555 California St | 51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.Details
51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred. | $1,935,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 555 California St | 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Details
51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. | $1,935,000 |
| May 22, 2024 | Completed final sign-off Nov 2024 | 650 California St | revision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom.Details
revision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom. | $70,000 |
| May 5, 2023 | Completed final sign-off Sep 2024 | 140 Sutter St | 1/f: revision to bpa#202103226995 & 202203099554, changes to cafe/catering kitchen, includes extension of cafe counter, removal of accoustic panel & changes to kitchen equipmentDetails
1/f: revision to bpa#202103226995 & 202203099554, changes to cafe/catering kitchen, includes extension of cafe counter, removal of accoustic panel & changes to kitchen equipment | $50,000 |
| Jul 28, 2022 | Completed final sign-off Sep 2023 | 510 Townsend St | 5th fl: office remodel, new partitions & conference rooms, mep def. new micro kitchen.Details
5th fl: office remodel, new partitions & conference rooms, mep def. new micro kitchen. | $190,000 |
| Jan 20, 2022 | Never finaled issued Jan 2022, no final | 300 Clay St | revision to 2019 1223 0299 & 2021 0407 8029 & 2021 0407 8029 . to amend cover sheet and (e) diagrams to designate a-2 assembly in the microkitchen and lounge.Details
revision to 2019 1223 0299 & 2021 0407 8029 & 2021 0407 8029 . to amend cover sheet and (e) diagrams to designate a-2 assembly in the microkitchen and lounge. | |
| Jul 15, 2020 | Completed final sign-off Dec 2021 | 444 Battery St | t.i. to construct kitchen & dinning area, (n) lighting/electric, change of occupancy from b-office to a-2-dining assembly, a-2 dining is accessory use to b-office occupancy @ maritime plaza. includes mepDetails
t.i. to construct kitchen & dinning area, (n) lighting/electric, change of occupancy from b-office to a-2-dining assembly, a-2 dining is accessory use to b-office occupancy @ maritime plaza. includes mep | $3,000,000 |
| Oct 29, 2019 | Completed final sign-off Jan 2021 | 215 Fremont St | 8/f: administrative permit to revise verbage of the scope of work on preivoulsy approved permit. change "microkitchen" to "employee cafeteria.". ref pa201907226536. maher n/a.Details
8/f: administrative permit to revise verbage of the scope of work on preivoulsy approved permit. change "microkitchen" to "employee cafeteria.". ref pa201907226536. maher n/a. | |
| Jul 22, 2019 | Completed final sign-off Dec 2020 | 215 Fremont St | 8th flr - new partitions for microkitchens, new finishes, flooring and paint mep deferred ref 201904178242Details
8th flr - new partitions for microkitchens, new finishes, flooring and paint mep deferred ref 201904178242 | $1,100,000 |
| Jun 19, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | 2nd,3rd,4th floors: deferred arch. set for microkitchens. new partitions, finishes, flooring, paint, electrical and lightng. ref app#201905100297, 201905100294 and 201905100300. n/a for maherDetails
2nd,3rd,4th floors: deferred arch. set for microkitchens. new partitions, finishes, flooring, paint, electrical and lightng. ref app#201905100297, 201905100294 and 201905100300. n/a for maher | $450,000 |
| May 10, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | 4th fl: limited demo of existing partitions, finishes, ceilings & light fixtures. micro kitchen under separate permit. n/a for maher.Details
4th fl: limited demo of existing partitions, finishes, ceilings & light fixtures. micro kitchen under separate permit. n/a for maher. | $900,000 |
| May 10, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | 2nd fl: limited demo of existing partitions, finishes, ceilings & light fixtures. new partitions, finishes, ceilings & light fixtures for offices, conference rooms, and partries. micro kitchen under separate permits. basement modification.Details
2nd fl: limited demo of existing partitions, finishes, ceilings & light fixtures. new partitions, finishes, ceilings & light fixtures for offices, conference rooms, and partries. micro kitchen under separate permits. basement modification. | $900,000 |
| May 10, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | 3rd fl - demo & ti arch build out of office space. micro kitchen & mep deferred.Details
3rd fl - demo & ti arch build out of office space. micro kitchen & mep deferred. | $900,000 |
| Mar 11, 2019 | Never finaled issued Apr 2019, no final | 345 Spear St | 6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher.Details
6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher. | $2,800,000 |
| Feb 15, 2019 | Completed final sign-off Dec 2020 | 101 Hyde St | interior renovation of the ground fl and mezzanine of an (e) post office demo of walls & ceilings, new walls, kitchen, kiosk, and renovation of restrooms. exterior lobby entrance way to be submitted under separate permit. n/a for maher.Details
interior renovation of the ground fl and mezzanine of an (e) post office demo of walls & ceilings, new walls, kitchen, kiosk, and renovation of restrooms. exterior lobby entrance way to be submitted under separate permit. n/a for maher. | $2,000,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2021 | 2 Harrison St | 3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls.Details
3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls. | $980,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2021 | 2 Harrison St | 4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area.Details
4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area. | $980,000 |
| Apr 26, 2018 | Completed final sign-off Apr 2021 | 110 Hooper St | 4th flr - mep to support approved arch ti including 12 hoods, installed in employee cafeteria kitchen. kitchen design with 4 hood zones. ul300 suppression systems on seprate permit. no fire smoke dampers in scope of work. ref 201712186746 maher naDetails
4th flr - mep to support approved arch ti including 12 hoods, installed in employee cafeteria kitchen. kitchen design with 4 hood zones. ul300 suppression systems on seprate permit. no fire smoke dampers in scope of work. ref 201712186746 maher na | $1,445,000 |
| Nov 9, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. (n) 2 hrs shaft, fire assembly area- two way communication, ul 300, sprinklers and fire alarm separate permit.Details
amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. (n) 2 hrs shaft, fire assembly area- two way communication, ul 300, sprinklers and fire alarm separate permit. | $6,000,000 |
| Jul 12, 2017 | Completed final sign-off May 2019 | 345 Spear St | for kitchen remodel. ref to pa# 201705126510Details
for kitchen remodel. ref to pa# 201705126510 | |
| May 12, 2017 | Never finaled issued Jul 2017, no final | 345 Spear St | 6th floor: renovations to the extg commercial kitchen, new dish room and food service areas, and modifications to extg mechanical, electrical and plumbing system. n/a maher refpa#201105213459Details
6th floor: renovations to the extg commercial kitchen, new dish room and food service areas, and modifications to extg mechanical, electrical and plumbing system. n/a maher refpa#201105213459 | $726,000 |
| Jan 15, 2016 | Completed final sign-off Jul 2016 | 601 Townsend St | 1st floor - structural work for kitchen hoods associated with issued, pa #201511203235 * 201511162642. n/a maher ordinanceDetails
1st floor - structural work for kitchen hoods associated with issued, pa #201511203235 * 201511162642. n/a maher ordinance | $4,500 |
| Jun 11, 2014 | Completed final sign-off Dec 2014 | 345 Spear St | cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load.Details
cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load. | $1,400,000 |
| Aug 1, 2013 | Completed final sign-off Feb 2014 | 235 Montgomery St | 12th floor-t.i office remodel-open office space-new conference room, staff kitchenette & plotter layout room. t.i include construction of new walls, ceilings, doors, finshes, plumbing, venting, lighting, custom millwork, caseworkDetails
12th floor-t.i office remodel-open office space-new conference room, staff kitchenette & plotter layout room. t.i include construction of new walls, ceilings, doors, finshes, plumbing, venting, lighting, custom millwork, casework | $350,000 |
| Apr 2, 2013 | Completed final sign-off Jul 2014 | 1455 Market St | 9th floor:work associated with approved app#201303192494. refurbish and update extg cafe space. this cafe in for employee use only. no money is collected. this work is the kitchen area only.Details
9th floor:work associated with approved app#201303192494. refurbish and update extg cafe space. this cafe in for employee use only. no money is collected. this work is the kitchen area only. | $912,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2014 | 1455 Market St | this interior tenant improvement is to include new drywall, ceiling work, doors, glazing & finishes on level 9 of an existing bldg. kitchen and servery space are under separate permit. mep under separate permitDetails
this interior tenant improvement is to include new drywall, ceiling work, doors, glazing & finishes on level 9 of an existing bldg. kitchen and servery space are under separate permit. mep under separate permit | $1,500,000 |
| Aug 10, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | approx 15,000 sf t.i. for internet tech co. improvements include construction of 3-off., 2-meeting rms., 2-phone booths & kitchenette remodel. finish upgrades incl. clgs. elect work incl. lighting, mech. work & plumbing(sep. permit); fls incl, sprinklers (sep. permit).Details
approx 15,000 sf t.i. for internet tech co. improvements include construction of 3-off., 2-meeting rms., 2-phone booths & kitchenette remodel. finish upgrades incl. clgs. elect work incl. lighting, mech. work & plumbing(sep. permit); fls incl, sprinklers (sep. permit). | $1,157,000 |
| Aug 19, 2011 | Completed final sign-off Jul 2012 | 555 California St | 51st floors-work associated with approved pa# 2011-0728-1223 for kitchen including finishes, equipment & associated mechanical & electrical workDetails
51st floors-work associated with approved pa# 2011-0728-1223 for kitchen including finishes, equipment & associated mechanical & electrical work | $10,000 |
| Aug 28, 2009 | Completed final sign-off Jan 2010 | 650 California St | office t.i. for 16th fl-incl elevator lobby,reception area& conference rm.disabled acess partial upgrade.hardship retrofit for 16th fl restrm.16th fl telecom room lift safety compliance upgrade. no work to remainder of 16th fl., 15th fl kitchen counter top install & renov of (e) wall for access.Details
office t.i. for 16th fl-incl elevator lobby,reception area& conference rm.disabled acess partial upgrade.hardship retrofit for 16th fl restrm.16th fl telecom room lift safety compliance upgrade. no work to remainder of 16th fl., 15th fl kitchen counter top install & renov of (e) wall for access. | $240,000 |
| Dec 17, 2003 | Expired or cancelled expired Oct 2004 | 625 Polk St | install new ceiling grid & tiles and e-epoxy coat sanitaray floor in kitchen areaDetails
install new ceiling grid & tiles and e-epoxy coat sanitaray floor in kitchen area | $20,000 |