Block 0346, lot 003A
101 Hyde St
- City’s use
- Commercial Office
- Built
- 1960
- Stories
- 1
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 7,505 sq ft
- Lot
- 10,632 sq ft
- Zoning
- C3G
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2024 | Completed final sign-off Apr 2024 | 101 Hyde St | change of use from food hall to catering facility (light manufacturing) with restaurant as accessory use (less than 750sf). no construction. maximum occupant load of 96 persons (which includes the cafe).Details
change of use from food hall to catering facility (light manufacturing) with restaurant as accessory use (less than 750sf). no construction. maximum occupant load of 96 persons (which includes the cafe). | ||
| Mar 27, 2024 | Completed final sign-off Mar 2024 | 101 Hyde St | to document that the building is fully sprinklered. ref pa# 201906062655Details
to document that the building is fully sprinklered. ref pa# 201906062655 | ||
| Jun 29, 2020 | Completed final sign-off Mar 2024 | 101 Hyde St | Edison Fire Extinguisher Company Inc | installation of ul300 fire system. ref app#201911207801Details
installation of ul300 fire system. ref app#201911207801 | $8,100 |
| Feb 20, 2020 | Completed final sign-off Dec 2020 | 101 Hyde St | Bcci Construction Company | revision to previously approved arch permit #201902153115. minor changes include new exit signage, new receptacles and new wiring wall. comply with mod accessibility requirements. maher naDetails
revision to previously approved arch permit #201902153115. minor changes include new exit signage, new receptacles and new wiring wall. comply with mod accessibility requirements. maher na | $50,000 |
| Dec 3, 2019 | Completed final sign-off Aug 2020 | 101 Hyde St | Bcci Construction Company | 1st fl - revision to previously approved electrical drawings. ref pa #201905231558.Details
1st fl - revision to previously approved electrical drawings. ref pa #201905231558. | |
| Nov 20, 2019 | Completed final sign-off Dec 2020 | 101 Hyde St | Bcci Construction Company | interior tenant improvement to install code compliant signage.Details
interior tenant improvement to install code compliant signage. | $1,000 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 101 Hyde St | street spaceDetails
street space | ||
| Aug 5, 2019 | Completed final sign-off Mar 2024 | 101 Hyde St | Pyro-Comm Systems, Inc. | f/a: new voluntary fire alarm system. 4 duct detectors, 5 ceiling strobes, 7 wall horn strobes, 5 ceiling horn strobes will be added. ref pa #201902153115Details
f/a: new voluntary fire alarm system. 4 duct detectors, 5 ceiling strobes, 7 wall horn strobes, 5 ceiling horn strobes will be added. ref pa #201902153115 | $15,000 |
| Jul 30, 2019 | Expired or cancelled cancelled Jan 2026 | 101 Hyde St | exterior sidewalk and concrete street restration for entry level landing on golden gate ave access. existing handrail modification on hyde st entry.Details
exterior sidewalk and concrete street restration for entry level landing on golden gate ave access. existing handrail modification on hyde st entry. | ||
| Jun 6, 2019 | Completed final sign-off Mar 2020 | 101 Hyde St | Pribuss Engineering Inc | 1st flr fire sprinkler relocate 31, add 14 ref 201902153115Details
1st flr fire sprinkler relocate 31, add 14 ref 201902153115 | $23,130 |
| May 23, 2019 | Completed final sign-off Jan 2021 | 101 Hyde St | Bcci Construction Company | first flr - mep to support approved arch. (n) exhaust hoods, exhaust fans, grease duct, lighting & plumbing. ref pa# 2019-0215-3115.Details
first flr - mep to support approved arch. (n) exhaust hoods, exhaust fans, grease duct, lighting & plumbing. ref pa# 2019-0215-3115. | $220,000 |
| Feb 15, 2019 | Completed final sign-off Dec 2020 | 101 Hyde St | Bcci Construction Company | interior renovation of the ground fl and mezzanine of an (e) post office demo of walls & ceilings, new walls, kitchen, kiosk, and renovation of restrooms. exterior lobby entrance way to be submitted under separate permit. n/a for maher.Details
interior renovation of the ground fl and mezzanine of an (e) post office demo of walls & ceilings, new walls, kitchen, kiosk, and renovation of restrooms. exterior lobby entrance way to be submitted under separate permit. n/a for maher. | $2,000,000 |
| Jun 27, 2013 | Expired or cancelled cancelled Feb 2020 | 101 Hyde St | erect (n) 8-story multi-residential & retail building.Details
erect (n) 8-story multi-residential & retail building. | $17,000,000 | |
| Jun 27, 2013 | Expired or cancelled cancelled Jan 2020 | 101 Hyde St | demolish post office buildingDetails
demolish post office building | $10,000 | |
| May 16, 2011 | Never finaled issued May 2011, no final | 101 Hyde St | streetspaceDetails
streetspace | ||
| Apr 29, 2011 | Never finaled issued Apr 2011, no final | 101 Hyde St | street spaceDetails
street space | ||
| Sep 7, 2004 | Never finaled issued Sep 2004, no final | 101 Hyde St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Jan 22, 2004 | Never finaled issued Jan 2004, no final | 101 Hyde St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (5), Edison Fire Extinguisher Company Inc, Pribuss Engineering Inc, Pyro-Comm Systems, Inc.
- Architects
- John Long (3), Albert Costa, Douglas Burnham
- Engineers
- Alexander Joseph Pacheco, Zhen Chao Xiong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.