Lawrence Smith
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Oct 2026
178 permits since 2000 (architect on 163 permits, authorized agent-others on 6 permits, engineer on 5 permits, pmt consultant/expediter on 3 permits, designer on 1 permit): 121 completed, 45 in progress, 8 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 178.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 275 Battery St | Kr Johnston Construction Inc | first floor: revision to permt#202606032400 tenant improvement . modificator to new kitchen equipment & placement per health department.Details
first floor: revision to permt#202606032400 tenant improvement . modificator to new kitchen equipment & placement per health department. | $25,938 |
| Sep 18, 2026 | In progress issued Sep 2026 | 301 Howard St | Hathaway Dinwiddie Co. | rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout.Details
rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout. | $1,500 |
| Sep 17, 2026 | In progress issued Sep 2026 | 50 California St | Richlen Construction | existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom.Details
existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom. | $3,942,870 |
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 505 Howard St | 4th floor: alterations to walls at existing full floor tenant interior office.Details
4th floor: alterations to walls at existing full floor tenant interior office. | $15,194 | |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 1 Market St | 6/fl- soft demo of (e) non structural partitions, finishes, lighting celiings, millwork, and plumbing fixtures ab-17Details
6/fl- soft demo of (e) non structural partitions, finishes, lighting celiings, millwork, and plumbing fixtures ab-17 | $512,352 | |
| Aug 20, 2026 | In progress issued Sep 2026 | 50 California St | Richlen Construction | suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.Details
suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures. | $859,574 |
| Aug 6, 2026 | In progress issued Aug 2026 | 301 Howard St | Hathaway Dinwiddie Co. | suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred.Details
suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred. | $256,025 |
| Aug 4, 2026 | In progress issued Aug 2026 | 1 California St | R.M.R. Construction Company | 30th fl, ste 3050 interior ti including selective demo and construction of non-structural partitions, doors, glazing, electrical outlets, finishes and lightingDetails
30th fl, ste 3050 interior ti including selective demo and construction of non-structural partitions, doors, glazing, electrical outlets, finishes and lighting | $139,810 |
| Jul 29, 2026 | Completed final sign-off Aug 2026 | 1 California St | R.M.R. Construction Company | 22nd floor: restroom upgrade consisting of demo and construction of selective fixtures, finishes and accessories.Details
22nd floor: restroom upgrade consisting of demo and construction of selective fixtures, finishes and accessories. | $15,870 |
| Jul 23, 2026 | In progress issued Sep 2026 | 1 California St | Rudolph Commercial Interiors Inc, Rci | 31st floor: restroom upgrade consisting of demo and construction of non-structural partitions, finishes, accessories, plumbing fixtures and light fixtures.Details
31st floor: restroom upgrade consisting of demo and construction of non-structural partitions, finishes, accessories, plumbing fixtures and light fixtures. | $112,286 |
| Jul 20, 2026 | In progress issued Aug 2026 | 3 Embarcadero Center | M C S Construction Services | 27/f: (e) full fl office suite demised into 2 suites. scope includes: demo and construction of common area and restroom, non-structural partitions, ceilings, doors, millwork and finishes. no change in occupancy, use or area.Details
27/f: (e) full fl office suite demised into 2 suites. scope includes: demo and construction of common area and restroom, non-structural partitions, ceilings, doors, millwork and finishes. no change in occupancy, use or area. | $300,000 |
| Jul 17, 2026 | In progress issued Aug 2026 | 2 Embarcadero Center | Vulcan Construction Inc | 22nd fl, ste 2220 construction of a new demising wall to divide an existing vacant office suite into 2 vacant office suitesDetails
22nd fl, ste 2220 construction of a new demising wall to divide an existing vacant office suite into 2 vacant office suites | $6,800 |
| Jul 10, 2026 | In progress issued Jul 2026 | 3 Embarcadero Center | Vulcan Construction Inc | suite 2350. remodel existing tenant suite, demo of lighting and finishes, construction of non structural partitions, ceilings, lighting, and finishes. no new plumbing fixtures. mep deferred.Details
suite 2350. remodel existing tenant suite, demo of lighting and finishes, construction of non structural partitions, ceilings, lighting, and finishes. no new plumbing fixtures. mep deferred. | $95,282 |
| Jul 6, 2026 | In progress issued Jul 2026 | 405 Howard St | Novo Construction Inc | 3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred.Details
3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred. | $1,714,000 |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 4 Embarcadero Center | construction of new security gates and screens to the existing stairways. interior exit.Details
construction of new security gates and screens to the existing stairways. interior exit. | $31,500 | |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 2 Embarcadero Center | construction of new security gates and screens to the existing stairways. interior exit.Details
construction of new security gates and screens to the existing stairways. interior exit. | $31,500 | |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 3 Embarcadero Center | construction of new security gates and screens to the existing stairways. interior exit.Details
construction of new security gates and screens to the existing stairways. interior exit. | $31,500 | |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 1 Embarcadero Center | construction of new security gates and screens to the existing stairways. interior exit.Details
construction of new security gates and screens to the existing stairways. interior exit. | $31,500 | |
| Jun 30, 2026 | In progress issued Jul 2026 | 1 California St | R.M.R. Construction Company | 31st fl - demo only of non-structural partitions, doors, glazing, flooring, millwork, finishes, ceilings and light fixtures. no build backDetails
31st fl - demo only of non-structural partitions, doors, glazing, flooring, millwork, finishes, ceilings and light fixtures. no build back | $127,035 |
| Jun 26, 2026 | In progress issued Jul 2026 | 225 Bush St | Novo Construction Inc | 14th floor ti: remodel office spaceincluding break rooms, open and private offices, and conference rooms.new ceilings, 2 new single-user restrooms an new finishes. mep deferredDetails
14th floor ti: remodel office spaceincluding break rooms, open and private offices, and conference rooms.new ceilings, 2 new single-user restrooms an new finishes. mep deferred | $637,369 |
| Jun 25, 2026 | In progress issued Oct 2026 | 680 Folsom St | Skyline Construction | 8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work includedDetails
8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work included | $120,000 |
| Jun 18, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee stationDetails
rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee station | $19,596 |
| Jun 3, 2026 | In progress issued Jul 2026 | 275 Battery St | Kr Johnston Construction Inc | tenant improvment remodel of existing cafe at ground fl. minor millwork, flooring, and finish alterationsDetails
tenant improvment remodel of existing cafe at ground fl. minor millwork, flooring, and finish alterations | $25,938 |
| May 21, 2026 | Completed final sign-off Jun 2026 | 400 Howard St | Sc Builders, Inc | 4th fl - interior office improvement including demoing 1 wall to combine 2 offices into 1. new gyp board header and patching (e) finishes. no mepDetails
4th fl - interior office improvement including demoing 1 wall to combine 2 offices into 1. new gyp board header and patching (e) finishes. no mep | $7,050 |
| May 12, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred.Details
6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred. | $1,965,424 |
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $365,040 |
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $215,720 |
| Apr 21, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall.Details
4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall. | $235,100 |
| Apr 9, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | 43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, glazing doors ceilings, lighting, finishes, and power.Details
43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, glazing doors ceilings, lighting, finishes, and power. | $717,438 |
| Apr 6, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.Details
ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power. | $408,300 |
| Apr 2, 2026 | In progress issued Apr 2026 | 400 Howard St | Novo Construction Inc | 5th & 6th/f men's & women's restroom remodel, floors are currently unoccupied, no changes to mech, sprinkler, or fire alarm system. electrical deferredDetails
5th & 6th/f men's & women's restroom remodel, floors are currently unoccupied, no changes to mech, sprinkler, or fire alarm system. electrical deferred | $741,472 |
| Apr 1, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.Details
ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical. | $252,050 |
| Mar 31, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | 23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage.Details
23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage. | $1,120,932 |
| Feb 19, 2026 | Completed final sign-off Sep 2026 | 400 Howard St | Rudolph Commercial Interiors Inc, Rci | 4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred.Details
4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred. | $473,200 |
| Dec 9, 2025 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | M C S Construction Services | 8th fl - interior demo non-structural partitions, doors, millwork, ceilings flooring, finishes, hvac, electrical, plumbing and equipment; build back of restroom remodel, new demising partitions and tenant doors and new common corridor and elevator lobby finishes and ceilingsDetails
8th fl - interior demo non-structural partitions, doors, millwork, ceilings flooring, finishes, hvac, electrical, plumbing and equipment; build back of restroom remodel, new demising partitions and tenant doors and new common corridor and elevator lobby finishes and ceilings | $476,317 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 760 Market St | Kr Johnston Construction Inc | 9/fl- structrual anchoring of 7 (e) phone booths all other elements are (e) to remain. no proposed changes.Details
9/fl- structrual anchoring of 7 (e) phone booths all other elements are (e) to remain. no proposed changes. | $17,500 |
| Dec 3, 2025 | In progress filed Dec 2025, not yet issued | 575 Market St | updates to path of travel to make code compliant. scope includes parking area detectable warning stripe and new striping for accessible vehicle charging stations, in the lobbyof 575 market st. install new elevator jamb "star" signs.Details
updates to path of travel to make code compliant. scope includes parking area detectable warning stripe and new striping for accessible vehicle charging stations, in the lobbyof 575 market st. install new elevator jamb "star" signs. | $7,400 | |
| Nov 4, 2025 | In progress filed Nov 2025, not yet issued | 1 California St | ground fl - commercial partial interior ti of building lobby. non-structural partitions, doords/frames, ceiling, finishes and millwork. partial exterior refront alteration repairs. mep deferredDetails
ground fl - commercial partial interior ti of building lobby. non-structural partitions, doords/frames, ceiling, finishes and millwork. partial exterior refront alteration repairs. mep deferred | $432,816 | |
| Oct 7, 2025 | Completed final sign-off Jan 2026 | 301 Howard St | Hathaway Dinwiddie Co. | 17th & 18th fl: deferred mep for pa # 202508062394Details
17th & 18th fl: deferred mep for pa # 202508062394 | $101,415 |
| Sep 18, 2025 | Completed final sign-off Mar 2026 | 100 Pine St | Mayco Commercial Construction Inc | 25th/fl: interior tenant improvement scope includes: demolition and construction of non-structural partitions, door frames, floor finishes, millwork, light fixtures, and 5 new phone booths. deferred mep and life & safety.Details
25th/fl: interior tenant improvement scope includes: demolition and construction of non-structural partitions, door frames, floor finishes, millwork, light fixtures, and 5 new phone booths. deferred mep and life & safety. | $418,888 |
| Sep 15, 2025 | Expired or cancelled withdrawn Feb 2026 | 301 Howard St | 1st floor: interior t.i. to ground floor tenant lounge, building lobby, and restrooms, scope includes: demo and construction of selective finishes, ceilings, walls, doors, and light fixtures.Details
1st floor: interior t.i. to ground floor tenant lounge, building lobby, and restrooms, scope includes: demo and construction of selective finishes, ceilings, walls, doors, and light fixtures. | $185,200 | |
| Sep 10, 2025 | Completed final sign-off Mar 2026 | 301 Howard St | Skyline Construction | 8/f suite 830: install (3) new freestanding phone booths.Details
8/f suite 830: install (3) new freestanding phone booths. | $18,000 |
| Aug 19, 2025 | Completed final sign-off Mar 2026 | 3565 California St | Skyline Construction | exterior building shell renovation of north and south facades. scope includes new exterior walls, storefronts, and trash enclosure and new interior structural columns, beams, and foundations.Details
exterior building shell renovation of north and south facades. scope includes new exterior walls, storefronts, and trash enclosure and new interior structural columns, beams, and foundations. | $712,000 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 301 Howard St | Hathaway Dinwiddie Co. | 17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred.Details
17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceilings and lighting in area of new stairs. rework finishes mep deferred. | $378,295 |
| Aug 1, 2025 | Completed final sign-off Aug 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 1st floor: demolition of existing cafe including commercial kitchen equipment and associated plumbing and mechanical equipment, construction of new building amenity space conference counter inlcuding non-structural partitions, lighting, millwork, and finishes.Details
1st floor: demolition of existing cafe including commercial kitchen equipment and associated plumbing and mechanical equipment, construction of new building amenity space conference counter inlcuding non-structural partitions, lighting, millwork, and finishes. | $547,894 |
| Jul 17, 2025 | In progress filed Jul 2025, not yet issued | 1 California St | 31'st/fl: partial interior demolition of existing 31st floor. includes demolition of non-structural partitions, doors, and frames, ceiling and lighting, fixtures, and finishes and millwork. (no mep)Details
31'st/fl: partial interior demolition of existing 31st floor. includes demolition of non-structural partitions, doors, and frames, ceiling and lighting, fixtures, and finishes and millwork. (no mep) | $15,606 | |
| Jul 3, 2025 | Completed final sign-off Dec 2025 | 301 Howard St | Hathaway Dinwiddie Co. | 5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferredDetails
5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferred | $887,826 |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 301 Howard St | Bcci Construction Company | revision to 20024-1203-5984 to document balcony railings will not be refurbished as previously shown but will be replaced fully in a similar manner.Details
revision to 20024-1203-5984 to document balcony railings will not be refurbished as previously shown but will be replaced fully in a similar manner. | $11,000 |
| Jul 1, 2025 | Completed final sign-off Apr 2026 | 301 Howard St | Bcci Construction Company | suite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes.Details
suite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes. | $65,000 |
| Jun 27, 2025 | In progress issued Jul 2025 | 50 California St | R.M.R. Construction Company | 26/f tenant improvment of existing suite 2670 including demo of non structural partitions, new non-structural partitions, door, ceilings, millwork, finishes, and light fixturesDetails
26/f tenant improvment of existing suite 2670 including demo of non structural partitions, new non-structural partitions, door, ceilings, millwork, finishes, and light fixtures | $432,708 |
| Jun 11, 2025 | In progress issued Jun 2025 | 1 California St | R.M.R. Construction Company | demolition of non structural walls, doors, glazing, flooring, electrical, millwork, finishes, ceilings, light fixtures, demo only. no build back.Details
demolition of non structural walls, doors, glazing, flooring, electrical, millwork, finishes, ceilings, light fixtures, demo only. no build back. | $127,035 |
| May 30, 2025 | Completed final sign-off Jan 2026 | 400 Howard St | Rudolph Commercial Interiors Inc, Rci | 5th floor. interior non structural demolition of select partitions, ceilings, light fixtures, millwork, and finishes, unoccupied floor. the suite will remain unoccupied at the completion of the project. demo only, no build back.Details
5th floor. interior non structural demolition of select partitions, ceilings, light fixtures, millwork, and finishes, unoccupied floor. the suite will remain unoccupied at the completion of the project. demo only, no build back. | $20,000 |
| May 16, 2025 | In progress filed May 2025, not yet issued | 50 California St | ste #3150 31st/f: t.i. demo of non structural partitions, new non structural paritions, doors, ceilings, millwork, finishes, hvav, plumbing fixtures, electrical outlets, finishes, & light fixtures. no change in use or occupancy & no change in fl area. no structural workDetails
ste #3150 31st/f: t.i. demo of non structural partitions, new non structural paritions, doors, ceilings, millwork, finishes, hvav, plumbing fixtures, electrical outlets, finishes, & light fixtures. no change in use or occupancy & no change in fl area. no structural work | $1,120,520 | |
| May 5, 2025 | Completed final sign-off Jul 2026 | 150 California St | Mayco Commercial Construction Inc | 6th, 9th, & 16th floors: remodel of existing restrooms.Details
6th, 9th, & 16th floors: remodel of existing restrooms. | $410,400 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 615 Battery St | Hathaway Dinwiddie Co. | revision to pa 202503212723 change to restroom layout no fixture changesDetails
revision to pa 202503212723 change to restroom layout no fixture changes | |
| Apr 22, 2025 | Completed final sign-off Aug 2025 | 301 Howard St | Bcci Construction Company | 14th fl, ste 1440 2 new free standing phone booths in tenant suite 1440. all other elements are existing to remain with no proposed changesDetails
14th fl, ste 1440 2 new free standing phone booths in tenant suite 1440. all other elements are existing to remain with no proposed changes | $16,000 |
| Apr 8, 2025 | In progress issued Apr 2025 | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | suite #1050: interior tenant improvement- break room remodel and addition of 1 private offic to existing suite. new millwork, finishes and restroom upgrades.Details
suite #1050: interior tenant improvement- break room remodel and addition of 1 private offic to existing suite. new millwork, finishes and restroom upgrades. | $180,244 |
| Mar 24, 2025 | Completed final sign-off Aug 2025 | 301 Howard St | Bcci Construction Company | 2nd fl- architectural office ti. new partitions & millwork. mep deferredDetails
2nd fl- architectural office ti. new partitions & millwork. mep deferred | $79,520 |
| Mar 21, 2025 | Completed final sign-off Nov 2025 | 615 Battery St | Hathaway Dinwiddie Co. | 6th fl: interior alteration of (e) office suite. new non structural partitions, millwork, ceilings, finishes. remodel of (e) restrooms, (n) accessible platform lift & alterations to portions of the 5th & 6th fl stairwell.Details
6th fl: interior alteration of (e) office suite. new non structural partitions, millwork, ceilings, finishes. remodel of (e) restrooms, (n) accessible platform lift & alterations to portions of the 5th & 6th fl stairwell. | $484,753 |
| Mar 21, 2025 | Completed final sign-off Apr 2025 | 275 Battery St | Kr Johnston Construction Inc | 7th/f ste 710: demo & construction of non strutural partitions, doors, & finishes, monor alterationsDetails
7th/f ste 710: demo & construction of non strutural partitions, doors, & finishes, monor alterations | $89,735 |
| Mar 7, 2025 | In progress issued Mar 2025 | 50 California St | R.M.R. Construction Company | 26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment.Details
26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment. | $440,198 |
| Feb 19, 2025 | Completed final sign-off Dec 2025 | 400 Howard St | Rudolph Commercial Interiors Inc, Rci | 4th fl - (e) unoccupied floor to be demised into 2 office suite. scope includes: demo of partition, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non-structural partitions, lighting, ceiling assembly and fixtures.Details
4th fl - (e) unoccupied floor to be demised into 2 office suite. scope includes: demo of partition, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non-structural partitions, lighting, ceiling assembly and fixtures. | $210,586 |
| Feb 12, 2025 | Completed final sign-off Sep 2025 | 1 California St | Gci, Inc | ste 1800a - interior ti including, selective demo and construction of non-structural partitions, doors, glazing, electrical, millwork, finishes and lighting. mep deferrDetails
ste 1800a - interior ti including, selective demo and construction of non-structural partitions, doors, glazing, electrical, millwork, finishes and lighting. mep deferr | $1,112,286 |
| Feb 10, 2025 | Completed final sign-off Nov 2025 | 1 California St | Gci, Inc | 18/f: interior tenant improvement including - new suite demissing walls, hallways, finishes, and restroom alterations. mep deferredDetails
18/f: interior tenant improvement including - new suite demissing walls, hallways, finishes, and restroom alterations. mep deferred | $205,146 |
| Feb 7, 2025 | In progress issued Feb 2025 | 50 California St | Richlen Construction | 2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes.Details
2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes. | $14,000 |
| Jan 17, 2025 | Completed final sign-off Mar 2025 | 275 Battery St | Kr Johnston Construction Inc | 7 fl: interior tenant improvement. demo and construction of non structural partitions, doors, ceilings, glazing, and finishes. no change in occupancy,use, area. mep deferredDetails
7 fl: interior tenant improvement. demo and construction of non structural partitions, doors, ceilings, glazing, and finishes. no change in occupancy,use, area. mep deferred | $129,728 |
| Jan 16, 2025 | Completed final sign-off Jul 2025 | 1 California St | Richlen Construction | hvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783Details
hvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783 | $871,153 |
| Jan 10, 2025 | Completed final sign-off Jul 2025 | 150 California St | Mayco Commercial Construction Inc | 8/fl-interior ti altering 2 suites into 3 suites. work includes demo and construct of partitions, doors, ceilings, lighting and finishes. mep deferred.Details
8/fl-interior ti altering 2 suites into 3 suites. work includes demo and construct of partitions, doors, ceilings, lighting and finishes. mep deferred. | $1,233,496 |
| Dec 16, 2024 | Completed final sign-off Nov 2025 | 633 Battery St | Hathaway Dinwiddie Co. | new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861Details
new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861 | |
| Dec 16, 2024 | Completed final sign-off Nov 2025 | 615 Battery St | Hathaway Dinwiddie Co. | new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountainDetails
new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain | $38,500 |
| Dec 3, 2024 | Completed final sign-off Mar 2026 | 301 Howard St | Bcci Construction Company | 18th fl - ti including demo and construction of selective partitions, cabinets, plumbing fixtures, ceilings and light ixtures, restroom accessibility upgrades. refurbish and modify (e) balcony railings, new floor finishes throughout suite. mep deferred. work not visible from street.Details
18th fl - ti including demo and construction of selective partitions, cabinets, plumbing fixtures, ceilings and light ixtures, restroom accessibility upgrades. refurbish and modify (e) balcony railings, new floor finishes throughout suite. mep deferred. work not visible from street. | $225,200 |
| Oct 29, 2024 | Completed final sign-off Mar 2025 | 150 California St | Mayco Commercial Construction Inc | 5/fl- remodel of (e) common corridor, elevator lobby and restroomsDetails
5/fl- remodel of (e) common corridor, elevator lobby and restrooms | $211,864 |
| Oct 25, 2024 | Completed final sign-off Jul 2025 | 1 California St | Richlen Construction | 2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrades, new drinking fountain. mep deferredDetails
2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrades, new drinking fountain. mep deferred | $1,816,064 |
| Oct 16, 2024 | Completed final sign-off Jan 2025 | 150 California St | Mayco Commercial Construction Inc | work on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical deferredDetails
work on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical deferred | |
| Sep 27, 2024 | Completed final sign-off Mar 2025 | 301 Howard St | Bcci Construction Company | 17th flr suite 1700: interior tenant improvement to include: removal of selective finishes. light fixturs and 1 partition. installation of new finishes, millwork, light fixtures, and equipment. new drinking fountain, relocation of restroom accessories and faucet.Details
17th flr suite 1700: interior tenant improvement to include: removal of selective finishes. light fixturs and 1 partition. installation of new finishes, millwork, light fixtures, and equipment. new drinking fountain, relocation of restroom accessories and faucet. | $278,295 |
| Sep 25, 2024 | Completed final sign-off Mar 2025 | 301 Howard St | Bcci Construction Company | 14th fl, ste 1440 - interior ti including new millwork and plumbing fixtures to replace existing in break area; new flushometers in restrooms, new finishes throughout suiteDetails
14th fl, ste 1440 - interior ti including new millwork and plumbing fixtures to replace existing in break area; new flushometers in restrooms, new finishes throughout suite | $158,000 |
| Sep 19, 2024 | Completed final sign-off Apr 2026 | 301 Howard St | Bcci Construction Company | 11th floor: interior tenant improvement, scope of work includes: (n) millwork, fixtures, and lighting to replace (e) in break area, (n) bike rack, (n) flushometers in restrooms and relcoation of select fixtures, (n) floor finishes throughout suite.Details
11th floor: interior tenant improvement, scope of work includes: (n) millwork, fixtures, and lighting to replace (e) in break area, (n) bike rack, (n) flushometers in restrooms and relcoation of select fixtures, (n) floor finishes throughout suite. | $185,800 |
| Sep 18, 2024 | Completed final sign-off May 2025 | 301 Howard St | Bcci Construction Company | 10/f ste 1050: interior ti - scope includes: selective millwork, electrical, and plumbing remodel at break area. finishes and lighting upgrades at ste 1050, common corridor and elevator lobby. restrooms upgrade.Details
10/f ste 1050: interior ti - scope includes: selective millwork, electrical, and plumbing remodel at break area. finishes and lighting upgrades at ste 1050, common corridor and elevator lobby. restrooms upgrade. | $103,200 |
| Sep 17, 2024 | Completed final sign-off May 2025 | 301 Howard St | Bcci Construction Company | interior improvement, scope of work includes millwork, lighting, and finishes remodel of breakrooms 803 and 815. replace shushometers in restrooms, finish upgrades throughout suiteDetails
interior improvement, scope of work includes millwork, lighting, and finishes remodel of breakrooms 803 and 815. replace shushometers in restrooms, finish upgrades throughout suite | $69,790 |
| Sep 13, 2024 | In progress filed Sep 2024, not yet issued | 1 California St | 3rd fl - sub dividing suite 300 into 3 suites: ste 300, 325 and 375 remodel of elevator lobby common corridor and restrooms, work includes demo & construction of non-structural partitions, ceilings, doors, glazing, millwork finishes, lighting and plumbing fixtures. mep deferredDetails
3rd fl - sub dividing suite 300 into 3 suites: ste 300, 325 and 375 remodel of elevator lobby common corridor and restrooms, work includes demo & construction of non-structural partitions, ceilings, doors, glazing, millwork finishes, lighting and plumbing fixtures. mep deferred | $1,213,248 | |
| Aug 30, 2024 | Completed final sign-off Jan 2025 | 150 California St | Mayco Commercial Construction Inc | 22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred.Details
22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred. | $190,275 |
| Aug 29, 2024 | Completed final sign-off Apr 2025 | 1241 Stockton St | D A Pope Inc | 1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mepDetails
1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mep | $101,814 |
| Aug 29, 2024 | Completed final sign-off Dec 2024 | 301 Howard St | Bcci Construction Company | interior t.i. includes 2 additonal meeting rooms, and 1 new wellness room, new non-structural partitions, doors, frames and hardware, new finishes mep deferredDetails
interior t.i. includes 2 additonal meeting rooms, and 1 new wellness room, new non-structural partitions, doors, frames and hardware, new finishes mep deferred | $45,440 |
| Aug 23, 2024 | In progress issued Aug 2025 | 851 Howard St | change of use from office space to place of assembly (a3/a2). no work or alteration to buliding.Details
change of use from office space to place of assembly (a3/a2). no work or alteration to buliding. | ||
| Aug 8, 2024 | Completed final sign-off Sep 2024 | 1 California St | R.M.R. Construction Company | ground floor: removal of non bearing concrete walls at vault.Details
ground floor: removal of non bearing concrete walls at vault. | $9,500 |
| Aug 7, 2024 | Completed final sign-off May 2025 | 50 California St | Richlen Construction | 24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferredDetails
24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferred | $195,721 |
| Aug 5, 2024 | Completed final sign-off Dec 2024 | 1 California St | Richlen Construction | 12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (d.a. checklist)Details
12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (d.a. checklist) | $115,538 |
| Jul 26, 2024 | Completed final sign-off Nov 2024 | 1 California St | Hp Build | 27/f ste# 2775: subdivide (e) office into 2 offices. scope includes: new wall, door relocation of lighting & mechanicalDetails
27/f ste# 2775: subdivide (e) office into 2 offices. scope includes: new wall, door relocation of lighting & mechanical | $24,000 |
| Jul 2, 2024 | Completed final sign-off Jul 2024 | 575 Market St | Gci, Inc | 20/f suite 2080: revision to permit 202308154413. combine storage and idf rooms into one large idf room.Details
20/f suite 2080: revision to permit 202308154413. combine storage and idf rooms into one large idf room. | |
| Jun 24, 2024 | In progress issued Jul 2024 | 50 California St | Richlen Construction | 35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.Details
35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17. | $192,560 |
| Jun 10, 2024 | Completed final sign-off Nov 2024 | 275 Battery St | Richlen Construction | existing suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation of (e) light fixtures and related elctrical workDetails
existing suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation of (e) light fixtures and related elctrical work | $98,103 |
| Jun 7, 2024 | In progress filed Jun 2024, not yet issued | 1 Daniel Burnham Ct | 2 electrical vehicle charging stations added to an existing private parking garage. no change in occupancy or use.Details
2 electrical vehicle charging stations added to an existing private parking garage. no change in occupancy or use. | $65,000 | |
| May 30, 2024 | Completed final sign-off Oct 2024 | 301 Howard St | Truebeck Construction | 14/f: commmercial interior tenant improvement including - demo of walls, doors, millwork, and finishes and build back of walls, doors, finishes, and acoustical ceiling.Details
14/f: commmercial interior tenant improvement including - demo of walls, doors, millwork, and finishes and build back of walls, doors, finishes, and acoustical ceiling. | $177,500 |
| May 22, 2024 | Completed final sign-off Jan 2025 | 999 Green St | Nob Hill Construction | unit #2504: remodel extg main bath and extg guest bath, new fixtures and finishes. no increase in size, no structural.Details
unit #2504: remodel extg main bath and extg guest bath, new fixtures and finishes. no increase in size, no structural. | $38,000 |
| Apr 2, 2024 | In progress filed Apr 2024, not yet issued | 50 California St | 30th floor- office ti to include soft demo to remove and replace partitions, ceiling tile replace in kind, fixtures and finishes. upgrade restrooms to ada requirements.Details
30th floor- office ti to include soft demo to remove and replace partitions, ceiling tile replace in kind, fixtures and finishes. upgrade restrooms to ada requirements. | $272,650 | |
| Feb 5, 2024 | Completed final sign-off May 2024 | 300 Mission St | Field Construction Inc. | 12/f: interior ti: demo and construction of non-structural partitions, ceilings, lighting, millwork, and finishes.Details
12/f: interior ti: demo and construction of non-structural partitions, ceilings, lighting, millwork, and finishes. | $189,000 |
| Jan 29, 2024 | Completed final sign-off Aug 2024 | 1 California St | Hp Build | 12/f-ste 1225: minor selective demo & constructionof non-structural partitions, glazing, electrical outlets, millwork and lighting, new drinking fountain. no change in occupancy use or area.Details
12/f-ste 1225: minor selective demo & constructionof non-structural partitions, glazing, electrical outlets, millwork and lighting, new drinking fountain. no change in occupancy use or area. | $185,538 |
| Jan 9, 2024 | Completed final sign-off Jun 2024 | 650 California St | Gci, Inc | 10th & 11th /f: t.i. to (e) office: 7 new phone booths on fl 10. electricalf outlets alteration on 10 & 11 fl. light fixture replacement. no change in occupancyDetails
10th & 11th /f: t.i. to (e) office: 7 new phone booths on fl 10. electricalf outlets alteration on 10 & 11 fl. light fixture replacement. no change in occupancy | $42,000 |
| Dec 19, 2023 | Completed final sign-off Apr 2024 | 555 Mission St | Bcci Construction Company | 15th fl: demo and construction of new interior only partitions, doors, glazing, millwork, ceiling and finishes. new conference room. mep deferred.Details
15th fl: demo and construction of new interior only partitions, doors, glazing, millwork, ceiling and finishes. new conference room. mep deferred. | $539,600 |
| Sep 19, 2023 | Completed final sign-off Apr 2024 | 301 Howard St | Bcci Construction Company | 9/f. demo and build back of flooring, ceilings, lighting and finishes. minor accessibility upgrades to restrooms.Details
9/f. demo and build back of flooring, ceilings, lighting and finishes. minor accessibility upgrades to restrooms. | $213,994 |