Wafic Hojeij
- Listed as
- engineer
- On San Francisco permits
- Aug 2024 to Aug 2024
1 permit since 2000 (engineer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2024 | Completed final sign-off Apr 2025 | 1241 Stockton St | D A Pope Inc | 1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mepDetails
1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mep | $101,814 |