67 permits since 2000 (engineer on 66 permits, architect on 1 permit): 40 completed, 27 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 225 Bush St | Novo Construction Inc | mechanical and elecrical work for t.i. on the 14th flr. ref 202606263982Details
mechanical and elecrical work for t.i. on the 14th flr. ref 202606263982 | $25,000 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 225 Bush St | 15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchenDetails
15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchen | $454,138 | |
| Sep 30, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494Details
46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494 | $35,000 |
| Sep 30, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369Details
39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369 | $35,000 |
| Sep 29, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884Details
10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884 | $35,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 101 02nd St | Source Planning And Construction Inc | 8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusersDetails
8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusers | $92,450 |
| Sep 10, 2026 | In progress issued Sep 2026 | 1 California St | Singular Builders | mechanical and electrical work for t.i. at suite 1825. ref: 202606223639Details
mechanical and electrical work for t.i. at suite 1825. ref: 202606223639 | $82,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 1160 Battery St | West Coast Build Aka Fairway Constructio | 3rd floor east: deferred mechanical and electrical. bldg bpa #202606042525Details
3rd floor east: deferred mechanical and electrical. bldg bpa #202606042525 | $1,935,750 |
| Aug 28, 2026 | In progress issued Sep 2026 | 345 Spear St | B N Builders Inc | ground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep)Details
ground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep) | $100,000 |
| Aug 28, 2026 | In progress issued Aug 2026 | 3 Embarcadero Center | Vulcan Construction Inc | ste 2350- mep deferred for bpa: 202607104811. new lights, new outlets, new floor monuments, new vav to supply new offices.Details
ste 2350- mep deferred for bpa: 202607104811. new lights, new outlets, new floor monuments, new vav to supply new offices. | $75,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 405 Howard St | Novo Construction Inc | 3rd fl - electrical work ti ref pa 202607064544Details
3rd fl - electrical work ti ref pa 202607064544 | $199,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 120 Kearny St | l24 revision to pa# 202602115770: minor mep updates, corrected address in title blocks.Details
l24 revision to pa# 202602115770: minor mep updates, corrected address in title blocks. | $770 | |
| Jun 12, 2026 | Completed final sign-off Jul 2026 | 120 Kearny St | Principal Builders Inc. | revision to pa# 202602115767, level 20. various minor mep updates, corrected address on title blocks of sheets.Details
revision to pa# 202602115767, level 20. various minor mep updates, corrected address on title blocks of sheets. | $600 |
| Jun 3, 2026 | Completed final sign-off Aug 2026 | 3 Embarcadero Center | Vulcan Construction Inc | 8/f: installing transfer grills and replacing lights. (deferred mep for pa# 202603107215)Details
8/f: installing transfer grills and replacing lights. (deferred mep for pa# 202603107215) | $75,000 |
| May 26, 2026 | In progress issued May 2026 | 706 Sansome St | M C S Construction Services | deferred elec and mech. 202505216975 and 202604230002 mech 3 new exhaust fans replacement,3 new fire smoke dampers. new ductwork as needed.reconfig ductwork,air dist ddc controls and air balance. elec lighting w assoc circuits and controls, power and signal w ass circuits and wiringDetails
deferred elec and mech. 202505216975 and 202604230002 mech 3 new exhaust fans replacement,3 new fire smoke dampers. new ductwork as needed.reconfig ductwork,air dist ddc controls and air balance. elec lighting w assoc circuits and controls, power and signal w ass circuits and wiring | $150,000 |
| Apr 6, 2026 | In progress issued Apr 2026 | 650 California St | Skyline Construction | 22nd floor. mechanical and electrical for tenant improvement on the 22nd flr. ref#: 202512111537Details
22nd floor. mechanical and electrical for tenant improvement on the 22nd flr. ref#: 202512111537 | $290,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 1 Market St | Field Construction Inc. | level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331)Details
level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331) | $10,000 |
| Mar 20, 2026 | In progress issued Mar 2026 | 120 Kearny St | Mc Millan Electric | 32nd/f: deferred electrical for t.i. 202601284665. lighting, lighting controls, power & wiring devices t.i., new single use gender neutural restroomDetails
32nd/f: deferred electrical for t.i. 202601284665. lighting, lighting controls, power & wiring devices t.i., new single use gender neutural restroom | $8,500 |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 3 Embarcadero Center | Skyline Construction | 16th fl mechanical and electrical work for ti ref pa 202601214196Details
16th fl mechanical and electrical work for ti ref pa 202601214196 | $140,000 |
| Mar 10, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | 1st fl - meps for 202511260493Details
1st fl - meps for 202511260493 | $194,832 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 100 Montgomery St | West Coast Build Aka Fairway Constructio | 10/f: deferred electrical upgrade to permit 202602276645Details
10/f: deferred electrical upgrade to permit 202602276645 | $175,000 |
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 555 Mission St | Novo Construction Inc | 17th fl, ste 1750 - mech & elec work for ti ref pa 202601083478Details
17th fl, ste 1750 - mech & elec work for ti ref pa 202601083478 | $55,000 |
| Feb 17, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 6/f: meps for t.i. 202511250447.Details
6/f: meps for t.i. 202511250447. | $120,000 |
| Feb 17, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 11th fl - mep for pa 202511109302Details
11th fl - mep for pa 202511109302 | $350,000 |
| Feb 11, 2026 | In progress issued Apr 2026 | 120 Kearny St | Principal Builders Inc. | l24. ti demo of existing non-structural partitions, millwork, finishes, and new non-structural partitions, millwork, finishes, mep.Details
l24. ti demo of existing non-structural partitions, millwork, finishes, and new non-structural partitions, millwork, finishes, mep. | $1,411,768 |
| Feb 4, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 20th fl - meps for pa 202511109312Details
20th fl - meps for pa 202511109312 | $307,000 |
| Jan 21, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 4th fl - ref arch 202510288260 mep for projectDetails
4th fl - ref arch 202510288260 mep for project | $120,000 |
| Jan 13, 2026 | In progress issued Jan 2026 | 221 Main St | Mc Millan Electric | to erect projecting double face electrical signDetails
to erect projecting double face electrical sign | $10,000 |
| Dec 19, 2025 | Completed final sign-off Jan 2026 | 3 Embarcadero Center | Mc Millan Electric | suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369Details
suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369 | $80,000 |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 600 Townsend St | Kr Johnston Construction Inc | 1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996Details
1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996 | $40,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 3rd/f mep for t.i. 202510147260: mep for projectDetails
3rd/f mep for t.i. 202510147260: mep for project | $145,000 |
| Sep 26, 2025 | In progress issued Dec 2025 | 1160 Battery St | West Coast Build Aka Fairway Constructio | mep for pa#: 202506189005. 3rd floor.Details
mep for pa#: 202506189005. 3rd floor. | $480,000 |
| Sep 24, 2025 | In progress issued Dec 2025 | 150 Oak St | Related California Construction Llc | ab-004 priority: phase 1c - t.i.: mep upgrades to pa 202503172389. no associated increase to student population.Details
ab-004 priority: phase 1c - t.i.: mep upgrades to pa 202503172389. no associated increase to student population. | $13,500,000 |
| Sep 16, 2025 | Completed final sign-off May 2026 | 651 Brannan St | Novo Construction Inc | 1st fl ref pa # 2025-0422-4946: electrical work for tenant improvement.Details
1st fl ref pa # 2025-0422-4946: electrical work for tenant improvement. | $8,000 |
| Sep 11, 2025 | Completed final sign-off Mar 2026 | 1455 Market St | Bcci Construction Company | 4th fl ref pa # 2025-0626-9593: mep work to include new ducts for heating & cooling. new lighting & controls.Details
4th fl ref pa # 2025-0626-9593: mep work to include new ducts for heating & cooling. new lighting & controls. | |
| Sep 10, 2025 | Completed final sign-off Jan 2026 | 1 Market St | Dpr Construction A | level 2 - revision to pa 202506189024. minor reivisons to lighting.Details
level 2 - revision to pa 202506189024. minor reivisons to lighting. | |
| Sep 3, 2025 | Completed final sign-off Oct 2025 | 400 Montgomery St | M C S Construction Services | ref ti 202505227094- mechanical extend exhaust duct from shaft poc to restroom and terminate with ceiling mount grill . replace (e) pheonmatic lines. install (n) fire damapers for exhaust duct at shaft wall electrial ligfhting with assoc circuits and controls power and signal with circuit and wiringDetails
ref ti 202505227094- mechanical extend exhaust duct from shaft poc to restroom and terminate with ceiling mount grill . replace (e) pheonmatic lines. install (n) fire damapers for exhaust duct at shaft wall electrial ligfhting with assoc circuits and controls power and signal with circuit and wiring | $35,000 |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 1455 Market St | Bcci Construction Company | 18th fl ref pa # 2025-0711-0629. mep new ducts for heating & cooling. electrical lighting and controlsDetails
18th fl ref pa # 2025-0711-0629. mep new ducts for heating & cooling. electrical lighting and controls | $750,000 |
| Jul 2, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 22nd floor. lighting, lighting controls, power deferred electrical submittal. ref#: 202505086049.Details
22nd floor. lighting, lighting controls, power deferred electrical submittal. ref#: 202505086049. | $110,000 |
| Jun 24, 2025 | Completed final sign-off Nov 2025 | 535 Mission St | Gci, Inc | 12th fl - mep for 202501248998Details
12th fl - mep for 202501248998 | $650,000 |
| Jun 20, 2025 | In progress issued Jul 2025 | 1 Market St | Dpr Construction A | level 5. t.i. (n) partitions, finishes, lighting, restroom remodel. no exterior.Details
level 5. t.i. (n) partitions, finishes, lighting, restroom remodel. no exterior. | $693,000 |
| Jun 13, 2025 | In progress issued Jun 2025 | 475 Sansome St | Skyline Construction | 16/f: deferred mep scope for 202502190638. modifications include heat pumps, ddc control, fan cell units, lighting with associated circuits and controls, power signal, plumbing fixture update. scope or work on 16th flDetails
16/f: deferred mep scope for 202502190638. modifications include heat pumps, ddc control, fan cell units, lighting with associated circuits and controls, power signal, plumbing fixture update. scope or work on 16th fl | $1,200,000 |
| Jun 13, 2025 | In progress issued Jun 2025 | 2 Embarcadero Center | Mc Millan Electric | electrical work for new security operations center on level lobby. deferred electrical submittal ref#: 202405242925Details
electrical work for new security operations center on level lobby. deferred electrical submittal ref#: 202405242925 | $56,450 |
| Jun 3, 2025 | Completed final sign-off Dec 2025 | 1 Market St | Dpr Construction A | l 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work.Details
l 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work. | $105,000 |
| May 22, 2025 | Completed final sign-off Oct 2025 | 400 Montgomery St | M C S Construction Services | 5/f: deferred electrical permit. permit ref# 202503273213. lighting with associated circuits. power and signal with associated circuits and wiring.Details
5/f: deferred electrical permit. permit ref# 202503273213. lighting with associated circuits. power and signal with associated circuits and wiring. | $375,000 |
| May 22, 2025 | Completed final sign-off Oct 2025 | 400 Montgomery St | M C S Construction Services | deferred electric ref 202503273214. lighting with associated circuits and controls. power and signal with associated circuits and wiringDetails
deferred electric ref 202503273214. lighting with associated circuits and controls. power and signal with associated circuits and wiring | $375,000 |
| May 5, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 22/f (ste 2200): lighting, lighting controls, power, wiring devices, deferred electrical submittal. ref pa# 202503182433Details
22/f (ste 2200): lighting, lighting controls, power, wiring devices, deferred electrical submittal. ref pa# 202503182433 | $400,000 |
| May 1, 2025 | Completed final sign-off May 2026 | 1 Sansome St | Mc Millan Electric | 17th fl: lighting, lighting controls, power, wiring devices deferred electrical submital ref pa #202501289177Details
17th fl: lighting, lighting controls, power, wiring devices deferred electrical submital ref pa #202501289177 | $375,000 |
| Apr 29, 2025 | Completed final sign-off Nov 2025 | 1 California St | Gci, Inc | 18th fl- electrical: power, lighting & signal ref pa #2025-0210-0043Details
18th fl- electrical: power, lighting & signal ref pa #2025-0210-0043 | $87,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 22nd floor. suite 2250. lighting, light controls, power, wiring devices. deferred electrical submittal. ref pa# 202504224989Details
22nd floor. suite 2250. lighting, light controls, power, wiring devices. deferred electrical submittal. ref pa# 202504224989 | $150,000 |
| Apr 22, 2025 | Completed final sign-off Nov 2025 | 1 California St | Gci, Inc | 18/f: deferred mechanical and electrical. ref pa# 202502120145.Details
18/f: deferred mechanical and electrical. ref pa# 202502120145. | $10,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 14th floor. lighting, lighting controls, power, wiring devices, deferred electrical submittal ref# 202503263039Details
14th floor. lighting, lighting controls, power, wiring devices, deferred electrical submittal ref# 202503263039 | $150,000 |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 1 Market St | M C S Construction Services | 26th floor. new light fixtures at 26th floor space. interior work only. deferred electrical permit under main architectural bldg pa#: 202411215523 and 202503132220Details
26th floor. new light fixtures at 26th floor space. interior work only. deferred electrical permit under main architectural bldg pa#: 202411215523 and 202503132220 | $23,950 |
| Apr 3, 2025 | Completed final sign-off Oct 2025 | 303 02nd St | Legacy Mechanical & Energy Services, Inc | penthouse boiler and pump replacementDetails
penthouse boiler and pump replacement | $1,200,000 |
| Apr 2, 2025 | Completed final sign-off Aug 2025 | 50 Fremont St | Gci, Inc | 35th fl ref pa# 2025-0317-1773: power, lighting & signal title 24Details
35th fl ref pa# 2025-0317-1773: power, lighting & signal title 24 | $70,000 |
| Mar 13, 2025 | Completed final sign-off Jul 2025 | 350 Bush St | Principal Builders Inc. | level 15: revision to mechanical and electrical design approved under pa#202411265718 which was for a commercial t.i. including a studio popcast room, edit room, and control room.Details
level 15: revision to mechanical and electrical design approved under pa#202411265718 which was for a commercial t.i. including a studio popcast room, edit room, and control room. | $10,000 |
| Feb 25, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 15th fl - lighting, lighting controls, power outlets. reference#2025-0207-9857Details
15th fl - lighting, lighting controls, power outlets. reference#2025-0207-9857 | $28,000 |
| Feb 24, 2025 | Completed final sign-off Jul 2025 | 1160 Battery St | West Coast Build Aka Fairway Constructio | 4th fl 1160 w suite 450 - deferred mep to pa 202501098041Details
4th fl 1160 w suite 450 - deferred mep to pa 202501098041 | $50,000 |
| Sep 27, 2024 | In progress issued Sep 2024 | 1 Sansome St | Mc Millan Electric | 19th fl ref pa 2024-0408-9506 new lighting, lighting controls in elevator lobby & common corridors. deferred mech permit to be covered by another permit.Details
19th fl ref pa 2024-0408-9506 new lighting, lighting controls in elevator lobby & common corridors. deferred mech permit to be covered by another permit. | $81,000 |
| Jul 16, 2024 | Completed final sign-off May 2025 | 71 Stevenson St | Marchetti Group | 22nd and 23rd floors: installation of indoor lighting, controls, and associated power distribution. ref. approved pa #202406063908Details
22nd and 23rd floors: installation of indoor lighting, controls, and associated power distribution. ref. approved pa #202406063908 | $35,000 |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | floor 32: deferred mep for pa# 2024-0509-1774.Details
floor 32: deferred mep for pa# 2024-0509-1774. | $1,795,824 |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | floor 31: deferred mep fpr pa# 2024-0509-1774.Details
floor 31: deferred mep fpr pa# 2024-0509-1774. | $1,795,824 |
| Apr 10, 2024 | Completed final sign-off Nov 2024 | 1 Sansome St | Mc Carthy Building Companies Inc | suite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom.Details
suite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom. | $3,100,000 |
| Mar 7, 2024 | Completed final sign-off Jul 2024 | 50 Beale St | Field Construction Inc. | ref t.i. 202402055218. mech reroute (e) duct, add van & ductwork, add new transfer air. power, lighting & signal, plumbing for breakroom applicancesDetails
ref t.i. 202402055218. mech reroute (e) duct, add van & ductwork, add new transfer air. power, lighting & signal, plumbing for breakroom applicances | |
| Dec 12, 2023 | In progress issued Dec 2023 | 1 Sansome St | Mc Millan Electric | 32/f- suite 3210: tenant improvement power & lighting. ti reference pa 202307273090Details
32/f- suite 3210: tenant improvement power & lighting. ti reference pa 202307273090 | $200,000 |
| Dec 12, 2023 | In progress issued Dec 2023 | 1 Sansome St | Mc Millan Electric | 31/f-suite 3110: tenant improvement power & lighting. ti reference pa 202307273089Details
31/f-suite 3110: tenant improvement power & lighting. ti reference pa 202307273089 | $200,000 |
| Dec 12, 2023 | In progress issued Dec 2023 | 1 Sansome St | Mc Millan Electric | 31/f-suite 3150: tenant improvement power & lighting. ti reference pa 202307273129.Details
31/f-suite 3150: tenant improvement power & lighting. ti reference pa 202307273129. | $200,000 |