Permit GraphShortlistSan Francisco building permits since 2000

Adam Murphy

License
C29238
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C29238 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer, pmt consultant/expediter
Firm
Huntsman Ag
Based in
San Francisco
On San Francisco permits
Jun 2016 to Nov 2026

168 permits since 2000 (architect on 165 permits, authorized agent-others on 2 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 101 completed, 50 in progress, 5 never finaled, 12 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Sc Builders, Inc (16), Dpr Construction A (13), Principal Builders Inc. (11), Hathaway Dinwiddie Co. (10), Bcci Construction Company (9), Gci, Inc (9), M C S Construction Services (7), Skyline Construction (5), Novo Construction Inc (4), Rossi Builders Inc. (4), Bevilacqua & Sons, Clune Construction Company L P, Kr Johnston Construction Inc, Opi Commercial Builders, Vulcan Construction Inc
Architects
Ariane Lebrilla (5), Luda Hoe (3), Victoria Salgado (2), Joseph Mendoza Szto Associates, Stephanie Grandjacques, Timothy Murphy
Engineers
Benjamin Noggle (5), James Bradshaw (5), Elisabeth Allen (4), Rodolfo Bustos (4), Amit Wadhua (3), Bradley Hollub (3), Levi Labarte (3), Clifford Dias (2), Jeffrey Ouelette (2), Marc Andrew Steyer (2), Michael Kaldas Nabih (2), Viktar Kuzmichou (2), Zack Kardon (2), Brett Brady, Christopher Jordan Malabed, David Zenor Heinzerling, Erik Elmoft, Jason Lau, Ji Hoon Kim, Joseph W. Fay, Lori Lee, Mark Koenas, Mary Katherine Vasquez, Ryan Bogart, Stephen Shaffer, Thomas William Millard, William E. Tremayne
Authorized agents
Lawrence Smith (2), Kevin O'riordan
Pmt consultant/expediters
Lawrence Smith

Most recent permits

Showing the 100 most recent of 168.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
600 Montgomery St33rd floor: tenant improvement work includes new interior non-structural partitions, power outlets, light fixtures, ceiling assembly, millwork, plumbing and finishes. no change in use or area.
Details
Permit
202611100622

33rd floor: tenant improvement work includes new interior non-structural partitions, power outlets, light fixtures, ceiling assembly, millwork, plumbing and finishes. no change in use or area.

Open the permit page

$886,170
Oct 23, 2026In progress
issued Nov 2026
1725 03rd StDpr Construction A3/f: revision to permit 202608056076. construction of demising screen on outdoor terrace.
Details
Permit
202610239805
Permit issued
Nov 6, 2026

3/f: revision to permit 202608056076. construction of demising screen on outdoor terrace.

Open the permit page

$25,000
Oct 5, 2026In progress
filed Oct 2026, not yet issued
4 Embarcadero CenterSkyline Construction19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishes
Details
Permit
202610059039

19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishes

Open the permit page

$73,320
Sep 29, 2026In progress
issued Oct 2026
600 Montgomery St33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area.
Details
Permit
202609298761
Permit issued
Oct 29, 2026

33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area.

Open the permit page

$47,583
Sep 9, 2026In progress
issued Sep 2026
555 California StSc Builders, Inc17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishes
Details
Permit
202609097828
Permit issued
Sep 14, 2026

17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishes

Open the permit page

$1,068,636
Sep 4, 2026In progress
filed Sep 2026, not yet issued
100 Montgomery St11th fl - ti of a full floor suite.
Details
Permit
202609047693

11th fl - ti of a full floor suite.

Open the permit page

$2,316,730
Aug 21, 2026Completed
final sign-off Nov 2026
555 California StSc Builders, Inc45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout.
Details
Permit
202608216985
Permit issued
Aug 27, 2026
Final sign-off
Nov 17, 2026

45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout.

Open the permit page

$581,000
Aug 21, 2026In progress
issued Aug 2026
611 Front StGci, Inct.i improvement 2nd floor.
Details
Permit
202608217005
Permit issued
Aug 26, 2026

t.i improvement 2nd floor.

Open the permit page

$150,000
Aug 12, 2026In progress
issued Aug 2026
555 California StSc Builders, Inc17th fl tenant improvment for new demising wall to create 2 suites.
Details
Permit
202608126429
Permit issued
Aug 27, 2026

17th fl tenant improvment for new demising wall to create 2 suites.

Open the permit page

$810,960
Aug 11, 2026In progress
issued Aug 2026
555 California StSc Builders, Increvision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing)
Details
Permit
202608116366
Permit issued
Aug 13, 2026

revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing)

Open the permit page

Aug 5, 2026In progress
issued Sep 2026
1725 03rd StDpr Construction Apartial floor tenant improvement of the 3rd floor.
Details
Permit
202608056076
Permit issued
Sep 10, 2026

partial floor tenant improvement of the 3rd floor.

Open the permit page

$847,440
Jul 15, 2026Completed
final sign-off Aug 2026
300 Howard StGci, Incbarrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3.
Details
Permit
202607155043
Permit issued
Aug 11, 2026
Final sign-off
Aug 31, 2026

barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3.

Open the permit page

$10,000
Jul 1, 2026Completed
final sign-off Oct 2026
555 California StSc Builders, Increvision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening
Details
Permit
202607014407
Permit issued
Jul 22, 2026
Final sign-off
Oct 8, 2026

revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening

Open the permit page

$100,000
Jun 29, 2026In progress
issued Jul 2026
505 Brannan StNovo Construction Incselective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred.
Details
Permit
202606294134
Permit issued
Jul 8, 2026

selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred.

Open the permit page

$94,000
May 28, 2026In progress
issued Aug 2026
50 California StSc Builders, Incunit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.
Details
Permit
202605282028
Permit issued
Aug 7, 2026

unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.

Open the permit page

$1,308,872
May 22, 2026Completed
final sign-off Oct 2026
555 California StSc Builders, Inc19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes.
Details
Permit
202605221774
Permit issued
Jun 1, 2026
Final sign-off
Oct 8, 2026

19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes.

Open the permit page

$1,485,000
May 4, 2026Completed
final sign-off Jun 2026
555 California StPrincipal Builders Inc.38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork.
Details
Permit
202605040579
Permit issued
May 5, 2026
Final sign-off
Jun 5, 2026

38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork.

Open the permit page

$49,000
Apr 30, 2026Completed
final sign-off Jul 2026
199 Fremont StGci, Inclevel 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7).
Details
Permit
202604300407
Permit issued
May 6, 2026
Final sign-off
Jul 9, 2026

level 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7).

Open the permit page

$10,000
Apr 29, 2026In progress
issued Nov 2026
50 California StSkyline Constructionconstruction of new roof terrace over (e) roof above 2/f.
Details
Permit
202603187790
Permit issued
Nov 3, 2026

construction of new roof terrace over (e) roof above 2/f.

Open the permit page

$1,000,000
Apr 29, 2026In progress
issued Sep 2026
50 California StSkyline Construction2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge.
Details
Permit
202604068926
Permit issued
Sep 25, 2026

2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge.

Open the permit page

$3,790,509
Apr 8, 2026In progress
issued May 2026
555 California StSc Builders, Inc11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughout
Details
Permit
202604089078
Permit issued
May 1, 2026

11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughout

Open the permit page

$990,000
Apr 6, 2026Completed
final sign-off Aug 2026
555 California StSc Builders, Inc17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes.
Details
Permit
202604068945
Permit issued
Apr 8, 2026
Final sign-off
Aug 21, 2026

17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes.

Open the permit page

$947,000
Apr 6, 2026Completed
final sign-off Oct 2026
555 California StRossi Builders Inc.ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.
Details
Permit
202604068924
Permit issued
Apr 9, 2026
Final sign-off
Oct 29, 2026

ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.

Open the permit page

$408,300
Apr 1, 2026Completed
final sign-off Oct 2026
555 California StRossi Builders Inc.ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.
Details
Permit
202604018655
Permit issued
Apr 9, 2026
Final sign-off
Oct 29, 2026

ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.

Open the permit page

$252,050
Mar 31, 2026Completed
final sign-off Oct 2026
555 California StRossi Builders Inc.23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage.
Details
Permit
202603318545
Permit issued
Apr 9, 2026
Final sign-off
Oct 29, 2026

23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage.

Open the permit page

$1,120,932
Mar 10, 2026Completed
final sign-off Aug 2026
3 Embarcadero CenterVulcan Construction Inc8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling.
Details
Permit
202603107215
Permit issued
Mar 17, 2026
Final sign-off
Aug 26, 2026

8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling.

Open the permit page

$300,000
Mar 9, 2026Completed
final sign-off Jul 2026
555 California StRossi Builders Inc.23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089.
Details
Permit
202603097120
Permit issued
Mar 26, 2026
Final sign-off
Jul 30, 2026

23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089.

Open the permit page

$1,259,852
Feb 13, 2026In progress
issued Mar 2026
535 Washington StHathaway Dinwiddie Co.revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park.
Details
Permit
202602135969
Permit issued
Mar 4, 2026

revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park.

Open the permit page

Feb 3, 2026In progress
filed Feb 2026, not yet issued
2 Embarcadero CenterM C S Construction Servicesrevision to pa #2025-0414-4331: removing deferred mechanical
Details
Permit
202602035098

revision to pa #2025-0414-4331: removing deferred mechanical

Open the permit page

Jan 27, 2026In progress
issued Sep 2026
555 California StPrincipal Builders Inc.partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.
Details
Permit
202601274584
Permit issued
Sep 16, 2026

partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.

Open the permit page

$588,286
Jan 27, 2026Completed
final sign-off Nov 2026
555 California StPrincipal Builders Inc.partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.
Details
Permit
202601274588
Permit issued
May 22, 2026
Final sign-off
Nov 2, 2026

partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.

Open the permit page

$1,170,366
Jan 20, 2026In progress
issued Sep 2026
555 California StPrincipal Builders Inc.40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas
Details
Permit
202601204120
Permit issued
Sep 18, 2026

40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas

Open the permit page

$1,198,400
Jan 16, 2026Completed
final sign-off Jul 2026
315 Montgomery StSc Builders, Inclevel 17: ti, demo of (e) & construction of (n) partitions, millwork, lighting, & finishes.
Details
Permit
202601164045
Permit issued
Feb 2, 2026
Final sign-off
Jul 23, 2026

level 17: ti, demo of (e) & construction of (n) partitions, millwork, lighting, & finishes.

Open the permit page

$958,720
Jan 14, 2026In progress
issued Sep 2026
555 California StPrincipal Builders Inc.41/fl- new communicating stair between floors 40 and 41.
Details
Permit
202601143871
Permit issued
Sep 9, 2026

41/fl- new communicating stair between floors 40 and 41.

Open the permit page

$42,600
Jan 14, 2026In progress
issued Sep 2026
555 California StPrincipal Builders Inc.39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor
Details
Permit
202601143868
Permit issued
Sep 11, 2026

39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor

Open the permit page

$15,000
Dec 16, 2025In progress
issued Sep 2026
555 California StPrincipal Builders Inc.l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.
Details
Permit
202512161909
Permit issued
Sep 18, 2026

l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.

Open the permit page

$5,419,764
Dec 9, 2025In progress
issued Dec 2025
535 Mission StGci, Inc9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen)
Details
Permit
202512091303
Permit issued
Dec 11, 2025

9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen)

Open the permit page

$186,000
Dec 4, 2025Expired or cancelled
withdrawn Feb 2026
300 Howard St2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.
Details
Permit
202512040908

2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.

Open the permit page

$2,959,620
Dec 1, 2025In progress
issued Dec 2025
555 California StBcci Construction Company45th fl - tenant improvement partitions, ceiing & finishes
Details
Permit
202512010639
Permit issued
Dec 18, 2025

45th fl - tenant improvement partitions, ceiing & finishes

Open the permit page

$5,314,000
Nov 5, 2025In progress
filed Nov 2025, not yet issued
600 Montgomery St27th floor: revision to 202406073981 for mechnical & dph review of additional piece of equipment( counter top ventless unox speed oven) at level 27 room 2705 -pantry
Details
Permit
202511058984

27th floor: revision to 202406073981 for mechnical & dph review of additional piece of equipment( counter top ventless unox speed oven) at level 27 room 2705 -pantry

Open the permit page

Oct 30, 2025Completed
final sign-off Oct 2026
555 California Stplaza level: permit to abate sffd nov 2504-0245 for permanent tent (membrane structure) adjacent to 555 california
Details
Permit
202510308516
Permit issued
Jun 23, 2026
Final sign-off
Oct 8, 2026

plaza level: permit to abate sffd nov 2504-0245 for permanent tent (membrane structure) adjacent to 555 california

Open the permit page

$150,000
Oct 17, 2025In progress
issued Oct 2025
555 California StSc Builders, Inc31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out.
Details
Permit
202510177609
Permit issued
Oct 24, 2025

31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out.

Open the permit page

$400,000
Oct 15, 2025In progress
issued Oct 2025
555 California StSc Builders, Inc23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089.
Details
Permit
202510157422
Permit issued
Oct 30, 2025

23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089.

Open the permit page

$2,891,600
Sep 26, 2025Completed
final sign-off Jan 2026
2 Embarcadero CenterM C S Construction Services23rd flr/suite 2350. t.i. includes demo of non-structure partitions, doors, bldg of new non str partions. doors and finishes. all new or revised meps, life safety work will be design-build and submitted for permit separately bldging is fully sprinkled.
Details
Permit
202509266161
Permit issued
Oct 9, 2025
Final sign-off
Jan 6, 2026

23rd flr/suite 2350. t.i. includes demo of non-structure partitions, doors, bldg of new non str partions. doors and finishes. all new or revised meps, life safety work will be design-build and submitted for permit separately bldging is fully sprinkled.

Open the permit page

$200,000
Sep 26, 2025Completed
final sign-off Dec 2025
555 California StSc Builders, Incdemo of non structural partitions glazing millwork, ceilings lighting electrical and finishes
Details
Permit
202509266221
Permit issued
Sep 29, 2025
Final sign-off
Dec 11, 2025

demo of non structural partitions glazing millwork, ceilings lighting electrical and finishes

Open the permit page

$400,000
Sep 8, 2025Completed
final sign-off Dec 2025
275 Battery StKr Johnston Construction Inc7th floor:interior tenant improvement minor alternations to existing suite 700. includes demolition and construction of non-structural partitions, doors and finishes. no change in occupancy, use or area.
Details
Permit
202509084752
Permit issued
Sep 15, 2025
Final sign-off
Dec 3, 2025

7th floor:interior tenant improvement minor alternations to existing suite 700. includes demolition and construction of non-structural partitions, doors and finishes. no change in occupancy, use or area.

Open the permit page

$204,482
Sep 5, 2025Completed
final sign-off Jan 2026
1 Embarcadero CenterM C S Construction Servicessuite 2020 on 20/f: selective demolition of wiremold. construction of non-structural partitions, doors, lights, casework and finishes. no change in occupancy, use or area.
Details
Permit
202509054625
Permit issued
Sep 15, 2025
Final sign-off
Jan 6, 2026

suite 2020 on 20/f: selective demolition of wiremold. construction of non-structural partitions, doors, lights, casework and finishes. no change in occupancy, use or area.

Open the permit page

$41,400
Aug 29, 2025In progress
issued Sep 2025
4 Embarcadero CenterM C S Construction Services26th fl- demolition of (e) non structural partitions, doors, finishes, ceiling grid & tiles, lighting & construction of (n) non structural partitions, glazing, doors, ceiling. lighting, power & finishes. no change in occupancy, use or area.
Details
Permit
202508294183
Permit issued
Sep 3, 2025

26th fl- demolition of (e) non structural partitions, doors, finishes, ceiling grid & tiles, lighting & construction of (n) non structural partitions, glazing, doors, ceiling. lighting, power & finishes. no change in occupancy, use or area.

Open the permit page

$425,000
Aug 28, 2025Completed
final sign-off Apr 2026
555 California StSc Builders, Inc23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement.
Details
Permit
202508284089
Permit issued
Sep 15, 2025
Final sign-off
Apr 16, 2026

23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement.

Open the permit page

$420,000
Aug 13, 2025In progress
issued Aug 2025
2 Embarcadero CenterM C S Construction Services22nd fl, ste 2210 revision to pa 202504144331 includes additional 410 sq ft of ti w/selective demo of non structural partitions, lights, finishes; construction of non-structural partitions, lights, doors, windows and finishes
Details
Permit
202508132892
Permit issued
Aug 14, 2025

22nd fl, ste 2210 revision to pa 202504144331 includes additional 410 sq ft of ti w/selective demo of non structural partitions, lights, finishes; construction of non-structural partitions, lights, doors, windows and finishes

Open the permit page

$35,000
Aug 7, 2025Completed
final sign-off Apr 2026
535 Mission StGci, Inc4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa.
Details
Permit
202508072540
Permit issued
Sep 12, 2025
Final sign-off
Apr 24, 2026

4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa.

Open the permit page

$1,400,000
Aug 1, 2025In progress
issued Aug 2025
180 Montgomery StBevilacqua & Sons2/f -t.i. of (e) full floor suite on the 2nd flr. demo of non-structural partitions. new non-structural partitions doors, ceilings, millwork, finishes, m.e.p., and light fixtures.
Details
Permit
202508012100
Permit issued
Aug 11, 2025

2/f -t.i. of (e) full floor suite on the 2nd flr. demo of non-structural partitions. new non-structural partitions doors, ceilings, millwork, finishes, m.e.p., and light fixtures.

Open the permit page

$1,011,466
Jul 24, 2025Completed
final sign-off Aug 2026
1750 Cesar Chavez StOpi Commercial Buildersunit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door.
Details
Permit
202507241466
Permit issued
Oct 10, 2025
Final sign-off
Aug 17, 2026

unit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door.

Open the permit page

$1,985,920
Jul 16, 2025Completed
final sign-off Apr 2026
3 Embarcadero CenterPrincipal Builders Inc.25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (life
Details
Permit
202507160935
Permit issued
Jul 24, 2025
Final sign-off
Apr 17, 2026

25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (life

Open the permit page

$3,678,028
Jul 8, 2025In progress
issued Aug 2025
1 Maritime PzGci, Inc24th/f & 23rd/f: interconnection stairs connecting 23rd & 24th fl & restroom upgrades
Details
Permit
202507080366
Permit issued
Aug 8, 2025

24th/f & 23rd/f: interconnection stairs connecting 23rd & 24th fl & restroom upgrades

Open the permit page

$100,125
Jul 8, 2025In progress
issued Aug 2025
1 Maritime PzGci, Inc24th/f: t.i. interior non-structural partitions, ceiling grid, tile, light, millwork & finishes.
Details
Permit
202507080364
Permit issued
Aug 1, 2025

24th/f: t.i. interior non-structural partitions, ceiling grid, tile, light, millwork & finishes.

Open the permit page

$2,339,876
Jun 24, 2025Completed
final sign-off Sep 2025
600 Battery StBcci Construction Companyrevision to 20241125662. additonal modification of millwork in the break room and updated outlets for the conference room. mep deferred
Details
Permit
202506249374
Permit issued
Jun 25, 2025
Final sign-off
Sep 8, 2025

revision to 20241125662. additonal modification of millwork in the break room and updated outlets for the conference room. mep deferred

Open the permit page

$5,000
Jun 23, 2025Completed
final sign-off Nov 2025
3 Embarcadero CenterPrincipal Builders Inc.26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space.
Details
Permit
202506239229
Permit issued
Jul 18, 2025
Final sign-off
Nov 21, 2025

26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space.

Open the permit page

$957,720
Jun 17, 2025Expired or cancelled
withdrawn Jul 2025
1750 Cesar Chavez Stfor suite a; t.i. of existing warehouse suite. scope includes: new non-structural partitions, ceilings, finishes, light fixtures and doors. change of occupancy.
Details
Permit
202506178811

for suite a; t.i. of existing warehouse suite. scope includes: new non-structural partitions, ceilings, finishes, light fixtures and doors. change of occupancy.

Open the permit page

$1,985,920
Jun 5, 2025Completed
final sign-off Feb 2026
600 Montgomery StPrincipal Builders Inc.25/f: tenant improvement: new interior non-structural partitions. power outlets.
Details
Permit
202506058005
Permit issued
Jul 30, 2025
Final sign-off
Feb 24, 2026

25/f: tenant improvement: new interior non-structural partitions. power outlets.

Open the permit page

$1,944,000
Jun 5, 2025Completed
final sign-off Jan 2026
535 Mission StGci, Inc3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal
Details
Permit
202506057981
Permit issued
Jul 10, 2025
Final sign-off
Jan 15, 2026

3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal

Open the permit page

$987,000
Jun 2, 2025Completed
final sign-off Oct 2025
400 Howard StSc Builders, Inc4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structural
Details
Permit
202506027719
Permit issued
Jun 13, 2025
Final sign-off
Oct 9, 2025

4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structural

Open the permit page

May 9, 2025In progress
issued Aug 2025
555 California StBcci Construction Company52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep
Details
Permit
202505096128
Permit issued
Aug 12, 2025

52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep

Open the permit page

$4,360,000
May 9, 2025Completed
final sign-off Aug 2025
4 Embarcadero CenterSkyline Construction14th fl- tenant improvements of restrooms. work includes non structural demolition and construction of new restrooms and drinking fountain. no change in occupancy, use or area. existing path of travel documentation included for current code cycle approval: bldg entry and route, parking, ground fl
Details
Permit
202505096131
Permit issued
Jun 4, 2025
Final sign-off
Aug 25, 2025

14th fl- tenant improvements of restrooms. work includes non structural demolition and construction of new restrooms and drinking fountain. no change in occupancy, use or area. existing path of travel documentation included for current code cycle approval: bldg entry and route, parking, ground fl

Open the permit page

$193,104
May 9, 2025Completed
final sign-off Aug 2025
4 Embarcadero CenterSkyline Construction13th/f: t.i. of restrooms services: construction of new restrooms. no change in occupancy, use or area. mep deferred.
Details
Permit
202505096175
Permit issued
Jun 4, 2025
Final sign-off
Aug 1, 2025

13th/f: t.i. of restrooms services: construction of new restrooms. no change in occupancy, use or area. mep deferred.

Open the permit page

$90,346
May 8, 2025In progress
issued May 2025
1725 03rd StDpr Construction A11 th floor: revision to pa#202410092681. minor lighting, electrical, mechanical and finishes updates. no impact on occupancy or exiting. ref pa #202503273175
Details
Permit
202505086072
Permit issued
May 21, 2025

11 th floor: revision to pa#202410092681. minor lighting, electrical, mechanical and finishes updates. no impact on occupancy or exiting. ref pa #202503273175

Open the permit page

May 7, 2025In progress
issued May 2025
1655 03rd StDpr Construction A7/fl- revision 2 to 202410092683. updates to trainng room. scren and niche sizes removal of room schedules modified lighting . ref 202504184789
Details
Permit
202505076027
Permit issued
May 13, 2025

7/fl- revision 2 to 202410092683. updates to trainng room. scren and niche sizes removal of room schedules modified lighting . ref 202504184789

Open the permit page

Apr 21, 2025In progress
issued May 2025
1725 03rd StDpr Construction Acafe-mb4-revision 202410092679- revised smoke control matrix and minor updated per field conditions.
Details
Permit
202504214834
Permit issued
May 2, 2025

cafe-mb4-revision 202410092679- revised smoke control matrix and minor updated per field conditions.

Open the permit page

Apr 18, 2025In progress
issued May 2025
1655 03rd StDpr Construction Aforum mb3, 7th and 8th floors: revision to pa# 202410092683: revised smoke control matrix and minor update per field conditions.
Details
Permit
202504184789
Permit issued
May 2, 2025

forum mb3, 7th and 8th floors: revision to pa# 202410092683: revised smoke control matrix and minor update per field conditions.

Open the permit page

Apr 17, 2025Completed
final sign-off Jun 2025
415 Mission StHathaway Dinwiddie Co.11th fl: new multi-faith room. new finishes, mechanical & electrical
Details
Permit
202504174648
Permit issued
Apr 29, 2025
Final sign-off
Jun 17, 2025

11th fl: new multi-faith room. new finishes, mechanical & electrical

Open the permit page

$243,000
Apr 14, 2025In progress
issued Apr 2025
2 Embarcadero CenterM C S Construction Servicestenant improvement of suite 2210 on the 22nd fl includes: selective demo of non structural partitions, lights, finishes. construction of non structural partitions, lights, doors, windows, finishes. no change in occupancy use or area.
Details
Permit
202504144331
Permit issued
Apr 17, 2025

tenant improvement of suite 2210 on the 22nd fl includes: selective demo of non structural partitions, lights, finishes. construction of non structural partitions, lights, doors, windows, finishes. no change in occupancy use or area.

Open the permit page

$75,424
Apr 9, 2025Completed
final sign-off Sep 2025
600 Battery StBcci Construction Companyrevision to 202411255662: additional roof heater & support, modification of millwork in the break room, new furred wall for updated conference room
Details
Permit
202504094017
Permit issued
Apr 24, 2025
Final sign-off
Sep 8, 2025

revision to 202411255662: additional roof heater & support, modification of millwork in the break room, new furred wall for updated conference room

Open the permit page

$14,800
Apr 2, 2025Completed
final sign-off Oct 2025
400 Howard StSc Builders, Inc4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes
Details
Permit
202504023527
Permit issued
Apr 9, 2025
Final sign-off
Oct 9, 2025

4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes

Open the permit page

$3,283,298
Mar 27, 2025In progress
issued May 2025
1725 03rd StDpr Construction A11th/fl: revision to pa#2024-1009-2681. minor adjustments to non-structrural partitions/doors, lightening, finishes and clarification of design intent. no effect on occupancy/exiting
Details
Permit
202503273175
Permit issued
May 2, 2025

11th/fl: revision to pa#2024-1009-2681. minor adjustments to non-structrural partitions/doors, lightening, finishes and clarification of design intent. no effect on occupancy/exiting

Open the permit page

Mar 25, 2025Completed
final sign-off Jul 2025
555 California StNovo Construction Incste 5200: demolition on non structural partitions, glazing, millworks, ceilings, lighting and finishes. ab-017
Details
Permit
202503252945
Permit issued
Mar 27, 2025
Final sign-off
Jul 8, 2025

ste 5200: demolition on non structural partitions, glazing, millworks, ceilings, lighting and finishes. ab-017

Open the permit page

$125,000
Mar 25, 2025Completed
final sign-off Nov 2025
555 California StNovo Construction Inc49th fl of demo of existing non structural partitions, doors, finishe, ceiling crid and tiles,lighting and power. new non structural partitions, glazing, doors, ceilings, lighting, finishes, power. no change in occupancy, use, area
Details
Permit
202503252946
Permit issued
Apr 9, 2025
Final sign-off
Nov 21, 2025

49th fl of demo of existing non structural partitions, doors, finishe, ceiling crid and tiles,lighting and power. new non structural partitions, glazing, doors, ceilings, lighting, finishes, power. no change in occupancy, use, area

Open the permit page

$662,430
Mar 4, 2025Completed
final sign-off Nov 2025
555 California StBcci Construction Company33rd fl - office ti to inlcude demo, arch & mep. partial floor buildout. 11,555 sf
Details
Permit
202503041509
Permit issued
Mar 21, 2025
Final sign-off
Nov 7, 2025

33rd fl - office ti to inlcude demo, arch & mep. partial floor buildout. 11,555 sf

Open the permit page

$2,300,000
Feb 18, 2025Completed
final sign-off Feb 2026
600 Montgomery StPrincipal Builders Inc.25/f: interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finishes, hvac, electrical lighting, plumbing equipment. per sfdbi ab-17. no change in occupancy, use, or area.
Details
Permit
202502180562
Permit issued
Mar 11, 2025
Final sign-off
Feb 24, 2026

25/f: interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finishes, hvac, electrical lighting, plumbing equipment. per sfdbi ab-17. no change in occupancy, use, or area.

Open the permit page

$25,692
Feb 12, 2025Completed
final sign-off Nov 2025
600 Montgomery StHathaway Dinwiddie Co.35/f: t.i.: demo of (e) non-structural interior partitions, ceilings & finishes. construction on (n) non-structural interior partiions, ceilings, lighting fixtures.
Details
Permit
202502120191
Permit issued
Mar 26, 2025
Final sign-off
Nov 10, 2025

35/f: t.i.: demo of (e) non-structural interior partitions, ceilings & finishes. construction on (n) non-structural interior partiions, ceilings, lighting fixtures.

Open the permit page

$906,459
Feb 7, 2025Completed
final sign-off May 2025
2 Embarcadero CenterM C S Construction Servicesste 1630: selective demo of millwork, non structural walls, power outlets, & finishes. construction of non structural partitions, doors/ store-fronts, electrical, millwork & finishes. no change in occupancy, use in area. mep deferred
Details
Permit
202502079849
Permit issued
Feb 7, 2025
Final sign-off
May 2, 2025

ste 1630: selective demo of millwork, non structural walls, power outlets, & finishes. construction of non structural partitions, doors/ store-fronts, electrical, millwork & finishes. no change in occupancy, use in area. mep deferred

Open the permit page

$498,278
Jan 31, 2025Completed
final sign-off Jul 2025
555 California StClune Construction Company L P33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use.
Details
Permit
202501319419
Permit issued
Feb 6, 2025
Final sign-off
Jul 16, 2025

33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use.

Open the permit page

$493,359
Jan 24, 2025Completed
final sign-off Nov 2025
535 Mission StGci, Inc12th fl ti includes demo of non structural partitions and build n non str partitions. all mep life safety and sprinlers will be design build and submitted separately. fully sprinklered. restroom work included.
Details
Permit
202501248998
Permit issued
Apr 4, 2025
Final sign-off
Nov 13, 2025

12th fl ti includes demo of non structural partitions and build n non str partitions. all mep life safety and sprinlers will be design build and submitted separately. fully sprinklered. restroom work included.

Open the permit page

$1,273,134
Dec 11, 2024Completed
final sign-off Feb 2025
555 California StBcci Construction Company33rd flr demo of non-structural partitions, lighting, electrical and finishes.
Details
Permit
202412116599
Permit issued
Dec 13, 2024
Final sign-off
Feb 24, 2025

33rd flr demo of non-structural partitions, lighting, electrical and finishes.

Open the permit page

$75,000
Nov 25, 2024Completed
final sign-off Sep 2025
600 Battery StBcci Construction Companynew heaters & supports @ (e) roof terrace. electrical deferred under separate permit 202009023304
Details
Permit
202411255662
Permit issued
Nov 26, 2024
Final sign-off
Sep 8, 2025

new heaters & supports @ (e) roof terrace. electrical deferred under separate permit 202009023304

Open the permit page

$5,112
Oct 24, 2024Completed
final sign-off Nov 2025
505 Brannan StNovo Construction Incti to construct partial shade structure on (e) roof deck. there is no change in occupant load, egress, occupancy, use or area. work include structural footing to support shade structure. shade structure is under separate permit.
Details
Permit
202410243607
Permit issued
Nov 1, 2024
Final sign-off
Nov 19, 2025

ti to construct partial shade structure on (e) roof deck. there is no change in occupant load, egress, occupancy, use or area. work include structural footing to support shade structure. shade structure is under separate permit.

Open the permit page

$44,872
Oct 24, 2024Completed
final sign-off Nov 2024
505 Sansome StHathaway Dinwiddie Co.revision to pa# 202407307575, change of planter layout at south east corner of building. rev3 to original pa202202077476
Details
Permit
202410243653
Permit issued
Nov 8, 2024
Final sign-off
Nov 19, 2024

revision to pa# 202407307575, change of planter layout at south east corner of building. rev3 to original pa202202077476

Open the permit page

Oct 23, 2024In progress
issued Nov 2024
1655 03rd StDpr Construction A2nd fl, mb 3 ti demo (e) & (n) non-structural partitions, doors, millwork, finishes. no mechanical work. no electrical work
Details
Permit
202410233586
Permit issued
Nov 25, 2024

2nd fl, mb 3 ti demo (e) & (n) non-structural partitions, doors, millwork, finishes. no mechanical work. no electrical work

Open the permit page

$98,832
Oct 16, 2024In progress
issued Oct 2024
600 Montgomery StHathaway Dinwiddie Co.lobby tenant improvment for new exhibition hall on the 1st flr (annex) with new non-structural partitions, floor finishes, millwork and restrooms. mep deferred.
Details
Permit
202410163073
Permit issued
Oct 31, 2024

lobby tenant improvment for new exhibition hall on the 1st flr (annex) with new non-structural partitions, floor finishes, millwork and restrooms. mep deferred.

Open the permit page

$400,000
Oct 9, 2024In progress
issued Jan 2025
1655 03rd StDpr Construction A7&8/fl-mb3- ti demo non structrual paritions. (n) non structural partitions doors glazing millwork and finishes (n) mep and (n) horizontal exit
Details
Permit
202410092683
Permit issued
Jan 9, 2025

7&8/fl-mb3- ti demo non structrual paritions. (n) non structural partitions doors glazing millwork and finishes (n) mep and (n) horizontal exit

Open the permit page

$2,328,962
Oct 9, 2024In progress
issued Jan 2025
1725 03rd StDpr Construction A6&7/fl- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. scope of remodel includes the addition of a horizontal exit. includes
Details
Permit
202410092679
Permit issued
Jan 9, 2025

6&7/fl- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. scope of remodel includes the addition of a horizontal exit. includes

Open the permit page

$2,113,464
Oct 9, 2024In progress
issued Feb 2025
1725 03rd StDpr Construction A11/fl-mb4- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. no change in occupancy, use or area
Details
Permit
202410092681
Permit issued
Feb 11, 2025

11/fl-mb4- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. no change in occupancy, use or area

Open the permit page

$1,570,332
Sep 24, 2024In progress
issued Sep 2024
1655 03rd StDpr Construction Amb3/bldg new phone booths floors 3, 4,5, 6, 9, 10, 11. parking area modifications and power door actuators.
Details
Permit
202409241447
Permit issued
Sep 30, 2024

mb3/bldg new phone booths floors 3, 4,5, 6, 9, 10, 11. parking area modifications and power door actuators.

Open the permit page

$53,000
Sep 24, 2024In progress
issued Oct 2024
1725 03rd StDpr Construction Amb4(tower 4) new furniture phone booths floors: 3, 4, 5, 8, 9, and 10.
Details
Permit
202409241449
Permit issued
Oct 8, 2024

mb4(tower 4) new furniture phone booths floors: 3, 4, 5, 8, 9, and 10.

Open the permit page

$53,000
Sep 20, 2024Completed
final sign-off Apr 2025
1275 Market StBcci Construction Companyreplacement of swinging storefront doors with sliding storefront doors. no change in occupancy, use or area. doors located at the backside of the building not street visible
Details
Permit
202409201234
Permit issued
Oct 11, 2024
Final sign-off
Apr 17, 2025

replacement of swinging storefront doors with sliding storefront doors. no change in occupancy, use or area. doors located at the backside of the building not street visible

Open the permit page

$2,840
Sep 4, 2024In progress
issued Sep 2024
50 California StBcci Construction Company24th fl - dmo of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, lights and new partitions. no change in occupancy use or area
Details
Permit
202409049993
Permit issued
Sep 16, 2024

24th fl - dmo of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, lights and new partitions. no change in occupancy use or area

Open the permit page

$1,721,466
Aug 15, 2024Completed
final sign-off Apr 2025
600 Montgomery StHathaway Dinwiddie Co.revise 202203039170 to doucment change of occupancy of transfer lobby from b to a-3.
Details
Permit
202408158785
Permit issued
Aug 28, 2024
Final sign-off
Apr 7, 2025

revise 202203039170 to doucment change of occupancy of transfer lobby from b to a-3.

Open the permit page

Aug 13, 2024Expired or cancelled
withdrawn Jul 2026
600 Montgomery StHathaway Dinwiddie Co.9/flr- interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finsihes, mep equipment
Details
Permit
202408138519

9/flr- interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finsihes, mep equipment

Open the permit page

$158,490
Aug 2, 2024Completed
final sign-off May 2025
600 Montgomery StHathaway Dinwiddie Co.48/f: revise pa #202203089486 to document a-2 occupancy load on the 48th floor for sffd operational permit and provide furniture layout for the same.
Details
Permit
202408027880
Permit issued
Aug 12, 2024
Final sign-off
May 28, 2025

48/f: revise pa #202203089486 to document a-2 occupancy load on the 48th floor for sffd operational permit and provide furniture layout for the same.

Open the permit page

Jul 30, 2024Completed
final sign-off Nov 2024
505 Sansome StHathaway Dinwiddie Co.ground fl revision to pa # 2022-0207-7476 scope of work includes planter and non structural demolition of storefront door to comply with notice of complaint # 202426441. remove demising wall to combine 2 tenant spaces into one. tenant space remains vacant
Details
Permit
202407307575
Permit issued
Oct 2, 2024
Final sign-off
Nov 19, 2024

ground fl revision to pa # 2022-0207-7476 scope of work includes planter and non structural demolition of storefront door to comply with notice of complaint # 202426441. remove demising wall to combine 2 tenant spaces into one. tenant space remains vacant

Open the permit page

Jul 24, 2024Completed
final sign-off Nov 2024
600 Montgomery StHathaway Dinwiddie Co.12th fl - interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring & other finishes. hvac, electrical (including lighting) plumbing & equipment. subject to ab-017
Details
Permit
202407247181
Permit issued
Oct 21, 2024
Final sign-off
Nov 6, 2024

12th fl - interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring & other finishes. hvac, electrical (including lighting) plumbing & equipment. subject to ab-017

Open the permit page

$486,000