Stanley H Lew
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Rmw
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Oct 2026
706 permits since 2000 (architect on 687 permits, engineer on 13 permits, designer on 4 permits, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 539 completed, 71 in progress, 70 never finaled, 26 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 706.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 71 Stevenson St | Marchetti Group | revision to bpa:202607014426 - interior tenant improvement demolition and new non-structural partitions, new muti-tenant corridor, new finishes and relocated lighting. mep, fire life safety under separate permit (9th floor ste900)Details
revision to bpa:202607014426 - interior tenant improvement demolition and new non-structural partitions, new muti-tenant corridor, new finishes and relocated lighting. mep, fire life safety under separate permit (9th floor ste900) | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1 Beach St | Turner Construction Co | deferred mep for 202608206913 suite 150.Details
deferred mep for 202608206913 suite 150. | $187,000 |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1 Beach St | Turner Construction Co | revision to pa#: 202509084794, to separate suites 100 to 200.Details
revision to pa#: 202509084794, to separate suites 100 to 200. | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 30 Battery St | addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.Details
addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space. | $625,000 | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | suite 1400: interior tenant improvement, demolition of non-structural partitions, finishes, ceiling and light fixtures. new non structrual patitions, finishes, ceiling & light fixtures, & millwork. mep & fire/life safety to be submitted under seperate permit.Details
suite 1400: interior tenant improvement, demolition of non-structural partitions, finishes, ceiling and light fixtures. new non structrual patitions, finishes, ceiling & light fixtures, & millwork. mep & fire/life safety to be submitted under seperate permit. | $300,000 | |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | 39/fl- interior ti to include soft demo of non structrual partitions, finishes, ceilings. lighting, and millwork. new non partitions, finishes, celilings, light fixtures, and millwork. mep and fire deferred.Details
39/fl- interior ti to include soft demo of non structrual partitions, finishes, ceilings. lighting, and millwork. new non partitions, finishes, celilings, light fixtures, and millwork. mep and fire deferred. | $150,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 201 Mission St | removal of existing building generator and installation of new building generator. expansion of existing concrete pad for generator. no new partitions, ceilings, etc.Details
removal of existing building generator and installation of new building generator. expansion of existing concrete pad for generator. no new partitions, ceilings, etc. | $286,644 | |
| Sep 11, 2026 | In progress issued Sep 2026 | 221 Main St | Richlen Construction | new lobby level security improvements-installing turnstilesDetails
new lobby level security improvements-installing turnstiles | $250,000 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 71 Stevenson St | Marchetti Group | 9/f suites 925 and 950: interior tenant improvement - demolition and new non-structural paritions, new finishes, fixtures, and relocate lighting. mep, fire life safety under separate permit.Details
9/f suites 925 and 950: interior tenant improvement - demolition and new non-structural paritions, new finishes, fixtures, and relocate lighting. mep, fire life safety under separate permit. | $569,163 |
| Sep 4, 2026 | In progress issued Sep 2026 | 180 Howard St | Metcon Ti, Inc | mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women'sDetails
mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women's | $150,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | suite 3400: interior tenant improvement, demo of non stuctual parititions, finishes, ceiling, light fixtures, millwork. new non stuctural partitions, finishes, ceiling light fixtures and millwork. mep and fire life safety to be submitted as deferred permit.Details
suite 3400: interior tenant improvement, demo of non stuctual parititions, finishes, ceiling, light fixtures, millwork. new non stuctural partitions, finishes, ceiling light fixtures and millwork. mep and fire life safety to be submitted as deferred permit. | $300,000 | |
| Sep 2, 2026 | In progress issued Sep 2026 | 575 Market St | Field Construction Inc. | 40th floor. revision to 202608196849, anchoring of 2 single occupant phone booths including structural plans and calculations. new signage to be dedicated to accessible phone room.Details
40th floor. revision to 202608196849, anchoring of 2 single occupant phone booths including structural plans and calculations. new signage to be dedicated to accessible phone room. | |
| Aug 27, 2026 | In progress issued Sep 2026 | 255 California St | Rudolph Commercial Interiors Inc, Rci | interior ti: demolition of non structual partitions, new partitions light fixtures and finishes. mechanica and electrical fire life safety deferredDetails
interior ti: demolition of non structual partitions, new partitions light fixtures and finishes. mechanica and electrical fire life safety deferred | $100,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 201 Mission St | Richlen Construction | ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.Details
ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical. | $322,135 |
| Aug 20, 2026 | In progress issued Sep 2026 | 1 Beach St | Source Planning And Construction Inc | 1/f suite 150. including non bearing partitions, ceilings, light fixtures, doors and side lites and new finishes. mep deferred.Details
1/f suite 150. including non bearing partitions, ceilings, light fixtures, doors and side lites and new finishes. mep deferred. | $574,044 |
| Aug 19, 2026 | In progress issued Aug 2026 | 575 Market St | Field Construction Inc. | revision to 202512172010. convert open office areas to private office areas to private offices, conference room reconfiguration and additional private offices to previous tenant improvement permit.Details
revision to 202512172010. convert open office areas to private office areas to private offices, conference room reconfiguration and additional private offices to previous tenant improvement permit. | |
| Aug 3, 2026 | In progress issued Aug 2026 | 180 Montgomery St | Bevilacqua & Sons | revision to 202605111055. interior tenant improvement revised layout with reduced scope. scope includes demo of non structural partitions, new partitons, finishes, relocation of light fixtures. mep, fire and life safety under sep permit.Details
revision to 202605111055. interior tenant improvement revised layout with reduced scope. scope includes demo of non structural partitions, new partitons, finishes, relocation of light fixtures. mep, fire and life safety under sep permit. | |
| Jul 30, 2026 | In progress issued Sep 2026 | 1 Beach St | Source Planning And Construction Inc | 3rd fl, ste 350 - revision to pa 202603026788 includes new structural partitions, ceilings, light fixtures, doors and sidelites, millwork and finishesDetails
3rd fl, ste 350 - revision to pa 202603026788 includes new structural partitions, ceilings, light fixtures, doors and sidelites, millwork and finishes | |
| Jul 30, 2026 | In progress issued Aug 2026 | 555 Mission St | Gci, Inc | 27th floor: revision to pa #202604028768 in suite 2725: scope revised to be white shell with lighting and fire safety required per code. removing private offices, conference rooms and break areas to previous ti permit. remove break island and pendant light in break area 2758Details
27th floor: revision to pa #202604028768 in suite 2725: scope revised to be white shell with lighting and fire safety required per code. removing private offices, conference rooms and break areas to previous ti permit. remove break island and pendant light in break area 2758 | |
| Jul 30, 2026 | In progress issued Aug 2026 | 555 Mission St | Gci, Inc | 22nd fl interior tenant including new partitions, light fixtures, ceilings, millwork, and plumbing fixtures. mep and fire/life safety under separate permitDetails
22nd fl interior tenant including new partitions, light fixtures, ceilings, millwork, and plumbing fixtures. mep and fire/life safety under separate permit | $446,192 |
| Jul 28, 2026 | In progress filed Jul 2026, not yet issued | 100 Sansome St | Novo Construction Inc | minor permit to alter: replacement of ground floor non- histroic exterior entry doors.Details
minor permit to alter: replacement of ground floor non- histroic exterior entry doors. | $140,260 |
| Jul 22, 2026 | In progress issued Jul 2026 | 180 Howard St | Metcon Ti, Inc | 2nd floor: anchoring of existing one person furniture phone booths. new signage to designated a recessible phone room and restroom upgrade per form cDetails
2nd floor: anchoring of existing one person furniture phone booths. new signage to designated a recessible phone room and restroom upgrade per form c | $10,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 655 Montgomery St | Novo Construction Inc | 10th/f ste# 1000: interior t.i. demo of non-structural partitions, new const of non-structural partitions, ceiling & lighting, millwork, and finishes, mep under separated permitDetails
10th/f ste# 1000: interior t.i. demo of non-structural partitions, new const of non-structural partitions, ceiling & lighting, millwork, and finishes, mep under separated permit | $1,800,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 100 Sansome St | Novo Construction Inc | ground floor: interior tenant improvement, new partitions, finishes & restrooms. installation and seismic anchorage of (8) phone booths. mep deferred. change of use from retail to office.Details
ground floor: interior tenant improvement, new partitions, finishes & restrooms. installation and seismic anchorage of (8) phone booths. mep deferred. change of use from retail to office. | $1,107,603 |
| Jul 14, 2026 | Completed final sign-off Sep 2026 | 345 Spear St | Source Planning And Construction Inc | 2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep.Details
2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep. | $30,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 345 California St | Kr Johnston Construction Inc | 20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm shell condition. restroom upgrades and new lighting.Details
20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm shell condition. restroom upgrades and new lighting. | $750,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 847 Sansome St | 4/f: revision to permit 202508294225. revise sheets a1.2, a2.1, a2.3 and a9.1 to reflect changes in various ceiling sheetrock details and sheetrock protection of an air shaft requested by dbi field inspector.Details
4/f: revision to permit 202508294225. revise sheets a1.2, a2.1, a2.3 and a9.1 to reflect changes in various ceiling sheetrock details and sheetrock protection of an air shaft requested by dbi field inspector. | ||
| Jul 7, 2026 | Completed final sign-off Jul 2026 | 201 California St | Richlen Construction | ste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing.Details
ste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing. | |
| Jul 1, 2026 | In progress issued Jul 2026 | 71 Stevenson St | Marchetti Group | 9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fixtures, and relocated lighting. mep, fire life safety under separate permitDetails
9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fixtures, and relocated lighting. mep, fire life safety under separate permit | $800,000 |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 888 Brannan St | Novo Construction Inc | 2nd fl interior tenant improvement to include construction of non structural non rated partition and doorDetails
2nd fl interior tenant improvement to include construction of non structural non rated partition and door | $71,725 |
| Jun 22, 2026 | In progress issued Jul 2026 | 1 California St | Singular Builders | 18th floor: #1825: interior tenant improvement, new construction of non-structural partitions, ceiling and light fixtures, finishes, & millwork. mep & fire life safety under seperate permit.Details
18th floor: #1825: interior tenant improvement, new construction of non-structural partitions, ceiling and light fixtures, finishes, & millwork. mep & fire life safety under seperate permit. | $370,336 |
| Jun 18, 2026 | In progress issued Sep 2026 | 55 Hawthorne St | Stealth Enterprises Inc. | interior t.i. addition of (3) 1 person phone booths including anchoring, anchoring of (4) existing 1 person furniture phone booths in the same location, new signage to designated accessible phone roomDetails
interior t.i. addition of (3) 1 person phone booths including anchoring, anchoring of (4) existing 1 person furniture phone booths in the same location, new signage to designated accessible phone room | $14,000 |
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 345 Spear St | Source Planning And Construction Inc | 2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep workDetails
2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep work | $30,000 |
| Jun 12, 2026 | In progress issued Jun 2026 | 847 Sansome St | revision to pa #202508294225 to specifications and details of the existing plans for roofing and wall support kicker.Details
revision to pa #202508294225 to specifications and details of the existing plans for roofing and wall support kicker. | ||
| Jun 10, 2026 | Completed final sign-off Oct 2026 | 71 Stevenson St | Marchetti Group | 19th floor: interior tenant improvement-new partitions, finishes and lighting, mechanical, electrical are deferred. fire life safety and sprinkler deferredDetails
19th floor: interior tenant improvement-new partitions, finishes and lighting, mechanical, electrical are deferred. fire life safety and sprinkler deferred | $150,000 |
| Jun 10, 2026 | In progress issued Jul 2026 | 345 California St | Skyline Construction | 10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittalDetails
10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittal | $2,000,000 |
| May 28, 2026 | In progress issued Jun 2026 | 115 Sansome St | Rudolph Commercial Interiors Inc, Rci | interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbing fixtures, and lighting, electrical plumbing, fire and life safety under sep permit no havac at 115 sansome st. building has operable windows and steam heat.Details
interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbing fixtures, and lighting, electrical plumbing, fire and life safety under sep permit no havac at 115 sansome st. building has operable windows and steam heat. | $351,895 |
| May 26, 2026 | In progress issued Jul 2026 | 1 California St | Singular Builders | 18/f -interior tenetn improvement, demo of non structural partitions, new partitoins, ceiling and light fixtures, finishes, millwork. mep, fire and life safety under sep permit.Details
18/f -interior tenetn improvement, demo of non structural partitions, new partitoins, ceiling and light fixtures, finishes, millwork. mep, fire and life safety under sep permit. | $392,975 |
| May 20, 2026 | In progress issued Jun 2026 | 300 Mission St | Source Planning And Construction Inc | 14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred.Details
14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred. | $2,000,000 |
| May 19, 2026 | In progress issued May 2026 | 180 Howard St | Metcon Ti, Inc | 9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites, selective demo & construction of non-structural partitions, new finishes lighting fixtures, & millwork. mep & fire/life safety under seprate permitDetails
9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites, selective demo & construction of non-structural partitions, new finishes lighting fixtures, & millwork. mep & fire/life safety under seprate permit | |
| May 19, 2026 | In progress issued Jun 2026 | 180 Howard St | Metcon Ti, Inc | 12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.Details
12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit. | $750,000 |
| May 15, 2026 | In progress issued Jun 2026 | 180 Howard St | Metcon Ti, Inc | 10/fl- ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.Details
10/fl- ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit. | $750,000 |
| May 14, 2026 | In progress issued May 2026 | 2 Embarcadero Center | Field Construction Inc. | 18/f: interior ti improvement - demo of non-structural partitions, finishes, fixtures, and lighting. restroom ada upgrades. mep, fire safety under separate permit.Details
18/f: interior ti improvement - demo of non-structural partitions, finishes, fixtures, and lighting. restroom ada upgrades. mep, fire safety under separate permit. | $1,150,000 |
| May 12, 2026 | Completed final sign-off Oct 2026 | 555 Mission St | Gci, Inc | 22nd fl revision to pa 202510217782 removing scope to demo certain partitions and offices throughout the floor. mep revision to accomodate removed scopeDetails
22nd fl revision to pa 202510217782 removing scope to demo certain partitions and offices throughout the floor. mep revision to accomodate removed scope | |
| May 12, 2026 | Completed final sign-off Sep 2026 | 120 Kearny St | Hp Build | 23rd fl - interior tenant improvement which includes new partitions, finishes, fixtures and lighting. mep deferredDetails
23rd fl - interior tenant improvement which includes new partitions, finishes, fixtures and lighting. mep deferred | $780,000 |
| May 11, 2026 | In progress issued Jul 2026 | 180 Montgomery St | Bevilacqua & Sons | 16th flool #1675: interior tenant improvement: demolition of non-structural partitions, new partitions, finishes and relocation of light fixtures. mep & fire life safety under separate permit.Details
16th flool #1675: interior tenant improvement: demolition of non-structural partitions, new partitions, finishes and relocation of light fixtures. mep & fire life safety under separate permit. | $250,000 |
| May 6, 2026 | In progress issued Jun 2026 | 2 Henry Adams St | Sc Builders, Inc | 4 & 5/fl-change of use and minor alterations for future tenant together computer inc. change of use from light manufactoring and wholesale sales to b-labortary use and change of use on floor 5 from wholesale sales to labortary use. minor ti to add 2 (n) windows within floor 4. no scope on floor-5.Details
4 & 5/fl-change of use and minor alterations for future tenant together computer inc. change of use from light manufactoring and wholesale sales to b-labortary use and change of use on floor 5 from wholesale sales to labortary use. minor ti to add 2 (n) windows within floor 4. no scope on floor-5. | $30,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 235 Montgomery St | Acosta And Sons Inc | 24/f - arch only refresh of restrooms & elevator lobby.Details
24/f - arch only refresh of restrooms & elevator lobby. | $400,000 |
| Apr 8, 2026 | In progress issued May 2026 | 2101 Mission St | Buildtech West | stair connection 1st and 2nd floors of office suiteDetails
stair connection 1st and 2nd floors of office suite | $30,000 |
| Apr 7, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 1st fl - interior tenant improvement to include selective demo and construction of non-structural partitions and finishes. elect/lighting under separate permitDetails
1st fl - interior tenant improvement to include selective demo and construction of non-structural partitions and finishes. elect/lighting under separate permit | $85,000 |
| Apr 2, 2026 | In progress issued Jun 2026 | 555 Mission St | Gci, Inc | 27th floor - architectural only office ti. new partitions & millwork. mep deferred.Details
27th floor - architectural only office ti. new partitions & millwork. mep deferred. | $1,200,000 |
| Mar 20, 2026 | In progress issued Mar 2026 | 2101 Mission St | Buildtech West | ste 108b ground floor: interior tenant improvement: new non-structural partitions and finishes.Details
ste 108b ground floor: interior tenant improvement: new non-structural partitions and finishes. | $400,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 1301 16th St | J Construction Solutions | 1st floor - interior tenant improvement: new partitions, finishes, and fixtures. structural drawings included for concrete slab.Details
1st floor - interior tenant improvement: new partitions, finishes, and fixtures. structural drawings included for concrete slab. | $225,000 |
| Mar 12, 2026 | In progress issued Apr 2026 | 631 Howard St | Richlen Construction | basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existingDetails
basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existing | $155,000 |
| Mar 2, 2026 | In progress issued Apr 2026 | 1 Beach St | Turner Construction Co | 3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferredDetails
3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferred | $1,809,790 |
| Feb 26, 2026 | In progress issued Mar 2026 | 2101 Mission St | Buildtech West | 1st and 2nd floor. interior t.i. for non-profit: demo of finishes, lights fixtures and millwork. new non-structural partitions, finishes, celing and light fixtures and millwork. mep deferred.Details
1st and 2nd floor. interior t.i. for non-profit: demo of finishes, lights fixtures and millwork. new non-structural partitions, finishes, celing and light fixtures and millwork. mep deferred. | $1,200,000 |
| Feb 6, 2026 | Completed final sign-off Aug 2026 | 655 Montgomery St | Novo Construction Inc | 6/f and 7/f: interior t.i. removal and construction of non-structural partitions, door assemblies, light fixtures, plumbing fixtures, millwork, electrical outlets, and new finishes. mep, fire life safety is deferred.Details
6/f and 7/f: interior t.i. removal and construction of non-structural partitions, door assemblies, light fixtures, plumbing fixtures, millwork, electrical outlets, and new finishes. mep, fire life safety is deferred. | $2,000,000 |
| Feb 5, 2026 | Completed final sign-off Mar 2026 | 201 Mission St | Richlen Construction | patio demo. remove exisitng planting beds & security fencingDetails
patio demo. remove exisitng planting beds & security fencing | $46,484 |
| Jan 20, 2026 | Completed final sign-off Mar 2026 | 680 Folsom St | Mai Construction Inc. | suite 145: demolition of concrete wall in front of glass wall. removal of wall mounted cameras and clocks. removal of fcu's above ceilings etc. ab-017 exception to requirements for disabled access to vacant spaces. suite shall remain unoccupied until tenant improvement is filed.Details
suite 145: demolition of concrete wall in front of glass wall. removal of wall mounted cameras and clocks. removal of fcu's above ceilings etc. ab-017 exception to requirements for disabled access to vacant spaces. suite shall remain unoccupied until tenant improvement is filed. | $250,000 |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 555 Mission St | Novo Construction Inc | suite 1750: interior t.i. improvement including demolition of non-structural partion, light, fixtures, finishes and phone booth. mep, fire life safety and sprinkler under separate permit.Details
suite 1750: interior t.i. improvement including demolition of non-structural partion, light, fixtures, finishes and phone booth. mep, fire life safety and sprinkler under separate permit. | $325,000 |
| Jan 7, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 4th fl - interior ti to include selective demolition and construction of non-structural partitions, finishes, ceiling and millwork. mech/elec under separate permitDetails
4th fl - interior ti to include selective demolition and construction of non-structural partitions, finishes, ceiling and millwork. mech/elec under separate permit | $350,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 71 Stevenson St | Marchetti Group | documentation and anchoring of single person phone booth (7) with new signage to accessible phone room.Details
documentation and anchoring of single person phone booth (7) with new signage to accessible phone room. | $20,000 |
| Dec 23, 2025 | In progress issued Jan 2026 | 575 Market St | Field Construction Inc. | 35/fl- suite 3500 interior ti , soft demo of non structural partitions, finishes, ceiling, light fixtures and millwork. new non structrual partitions, finishes, ceiling, light fixtures and millwork. mep and fire/life safety under separte permitsDetails
35/fl- suite 3500 interior ti , soft demo of non structural partitions, finishes, ceiling, light fixtures and millwork. new non structrual partitions, finishes, ceiling, light fixtures and millwork. mep and fire/life safety under separte permits | $300,000 |
| Dec 22, 2025 | Completed final sign-off Aug 2026 | 631 Howard St | Richlen Construction | 2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms.Details
2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms. | $112,400 |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 180 Howard St | Metcon Ti, Inc | 8th floor tenant improvement, selective demolition and construction of non structural partitions, new finishes, light fixtures, and mill work. mep and fire/life and safety under seperate permit.Details
8th floor tenant improvement, selective demolition and construction of non structural partitions, new finishes, light fixtures, and mill work. mep and fire/life and safety under seperate permit. | $750,000 |
| Dec 19, 2025 | In progress issued Feb 2026 | 631 Howard St | Richlen Construction | basement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibilityDetails
basement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibility | $275,900 |
| Dec 19, 2025 | Completed final sign-off Aug 2026 | 555 Market St | Field Construction Inc. | 20/f suite 2000: interior tenant improvement - demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep and fire/life safety under separate permit.Details
20/f suite 2000: interior tenant improvement - demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep and fire/life safety under separate permit. | $300,000 |
| Dec 18, 2025 | In progress issued Jul 2026 | 201 Mission St | Richlen Construction | 1st floor: convert 2449 sqft of retail space to office to provide tenant amenities.Details
1st floor: convert 2449 sqft of retail space to office to provide tenant amenities. | $550,000 |
| Dec 17, 2025 | In progress issued Jan 2026 | 575 Market St | Field Construction Inc. | 40/f suite 4000: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. fire and mep/life safety under separate permit.Details
40/f suite 4000: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. fire and mep/life safety under separate permit. | $300,000 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 575 Market St | Field Construction Inc. | 38/f suite 3800: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep fire/life safety under separate permit.Details
38/f suite 3800: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep fire/life safety under separate permit. | $150,000 |
| Dec 15, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | removal of mep scope of work for pa: 202503182502 and 202503242917, 202503242918. stair infill work does not require mep.Details
removal of mep scope of work for pa: 202503182502 and 202503242917, 202503242918. stair infill work does not require mep. | |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 901 Battery St | Richlen Construction | 1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.Details
1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes. | $1,000,000 |
| Dec 8, 2025 | In progress issued Jan 2026 | 100 Montgomery St | Rudolph Commercial Interiors Inc, Rci | tenant improvemet demolition of non structuctural partitions, existing breakroom, new partitions, new millwork, finishes. mep and fire life safety under sep permit.Details
tenant improvemet demolition of non structuctural partitions, existing breakroom, new partitions, new millwork, finishes. mep and fire life safety under sep permit. | $360,035 |
| Dec 4, 2025 | Completed final sign-off Aug 2026 | 33 New Montgomery St | Metcon Ti, Inc | 9th/f t.i. new partitions, offices, conference rooms, and 14 new phone booths. mep deferredDetails
9th/f t.i. new partitions, offices, conference rooms, and 14 new phone booths. mep deferred | $750,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 121 Spear St | Source Planning And Construction Inc | 2nd floor: addition of 7 phone booths in office space.Details
2nd floor: addition of 7 phone booths in office space. | $20,000 |
| Dec 4, 2025 | In progress issued Jan 2026 | 180 Howard St | Metcon Ti, Inc | 9/f: tenant improvement to include new partitions, offices, and conference rooms. mep deferred.Details
9/f: tenant improvement to include new partitions, offices, and conference rooms. mep deferred. | $750,000 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 215 Fremont St | Source Planning And Construction Inc | level 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406Details
level 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406 | $640,000 |
| Nov 24, 2025 | In progress issued Dec 2025 | 1 Beach St | Turner Construction Co | suite 300 tenant improvement. non-structural partitions, ceilings, fixtures, doors and finishes. mep deferred.Details
suite 300 tenant improvement. non-structural partitions, ceilings, fixtures, doors and finishes. mep deferred. | $1,400,000 |
| Nov 20, 2025 | Completed final sign-off Apr 2026 | 135 Main St | Skyline Construction | 7/f: architectural only office ti. new partitions, offices, and conference rooms. mep deferred.Details
7/f: architectural only office ti. new partitions, offices, and conference rooms. mep deferred. | $750,000 |
| Nov 20, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Field Construction Inc. | fls 34 & 36: fl. demo removal of non-structural ptns, light fixtures, millwork, fixtures, and fnishes. new light fixtures for minimum req'd lighting ab-017 exception to requirements for disabled access to vacant spaces, suite to remain vacant until future t.i. permit is filed. ref pa# 2025-1114-9689Details
fls 34 & 36: fl. demo removal of non-structural ptns, light fixtures, millwork, fixtures, and fnishes. new light fixtures for minimum req'd lighting ab-017 exception to requirements for disabled access to vacant spaces, suite to remain vacant until future t.i. permit is filed. ref pa# 2025-1114-9689 | $575,000 |
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 201 Mission St | Richlen Construction | 5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828.Details
5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828. | |
| Oct 31, 2025 | Completed final sign-off Sep 2026 | 140 New Montgomery St | Gci, Inc | 11th floor: interior t.i. ; demolition and construction of non-structural partitions, new lighting, finishes, and installation/anchoring of phone booths. mep and life safety under seperate permit.Details
11th floor: interior t.i. ; demolition and construction of non-structural partitions, new lighting, finishes, and installation/anchoring of phone booths. mep and life safety under seperate permit. | $1,000,000 |
| Oct 30, 2025 | Completed final sign-off Aug 2026 | 235 Montgomery St | Acosta And Sons Inc | ti: new offices & conference rooms & partitions. mep deferredDetails
ti: new offices & conference rooms & partitions. mep deferred | $203,611 |
| Oct 29, 2025 | Completed final sign-off May 2026 | 1809 Irving St | Csq Inc | interior tenant improvement, demolition sf non structural partitions, new partitions, light fixtures, ceiling assemblies, millwork, plumbing, door assemblies and finishes. mep under separate permitDetails
interior tenant improvement, demolition sf non structural partitions, new partitions, light fixtures, ceiling assemblies, millwork, plumbing, door assemblies and finishes. mep under separate permit | $300,000 |
| Oct 24, 2025 | Completed final sign-off Feb 2026 | 180 Howard St | Metcon Ti, Inc | 7th floor: revision to permit #202509044560; minor revisions to ceilings, light fixtures, millwork, and finishes.Details
7th floor: revision to permit #202509044560; minor revisions to ceilings, light fixtures, millwork, and finishes. | |
| Oct 21, 2025 | Completed final sign-off Oct 2026 | 555 Mission St | Gci, Inc | 22nd fl: office ti. new partitions, light fixtures, ceilings, millwork, ducting, power and plumbing.Details
22nd fl: office ti. new partitions, light fixtures, ceilings, millwork, ducting, power and plumbing. | $835,312 |
| Oct 20, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Field Construction Inc. | suite 3150 interior tenant improvement, removal and new non-structural partitions, doors, ceilings, light fixtures, plumbing fixtures, millwork and finishes. mep and fire/life safety under defered permitDetails
suite 3150 interior tenant improvement, removal and new non-structural partitions, doors, ceilings, light fixtures, plumbing fixtures, millwork and finishes. mep and fire/life safety under defered permit | $850,000 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 345 Spear St | Source Planning And Construction Inc | 6th fl- architectural only for 3 new phone booth units in office.Details
6th fl- architectural only for 3 new phone booth units in office. | $20,000 |
| Oct 6, 2025 | Completed final sign-off Jan 2026 | 201 Mission St | Richlen Construction | suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures.Details
suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures. | $220,000 |
| Oct 2, 2025 | Completed final sign-off Jul 2026 | 201 California St | Richlen Construction | 15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred.Details
15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred. | $601,994 |
| Sep 30, 2025 | Completed final sign-off Dec 2025 | 180 Howard St | Metcon Ti, Inc | suite 700: installation and seismic anchoring of 4 phone booths.Details
suite 700: installation and seismic anchoring of 4 phone booths. | $8,000 |
| Sep 16, 2025 | Completed final sign-off Mar 2026 | 655 Montgomery St | M C S Construction Services | 17th fl, ste 1705 arch only demo office ti build. new partitions, offices & conference room. mep deferredDetails
17th fl, ste 1705 arch only demo office ti build. new partitions, offices & conference room. mep deferred | $350,000 |
| Sep 16, 2025 | Completed final sign-off Mar 2026 | 655 Montgomery St | M C S Construction Services | 17/f suite 1700: architectural only demo and office t.i build out. new partitions, offices, and conference center. mep deferred.Details
17/f suite 1700: architectural only demo and office t.i build out. new partitions, offices, and conference center. mep deferred. | $350,000 |
| Sep 15, 2025 | Completed final sign-off Jan 2026 | 180 Howard St | Metcon Ti, Inc | lobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with asse 1070, (n) water heater, drinking fountain with bottle filter and water boxes. mep deferredDetails
lobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with asse 1070, (n) water heater, drinking fountain with bottle filter and water boxes. mep deferred | $75,000 |
| Sep 8, 2025 | In progress issued Dec 2025 | 1 Beach St | Turner Construction Co | 2/fl- ste 250- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferredDetails
2/fl- ste 250- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred | $1,469,928 |
| Sep 8, 2025 | In progress issued Dec 2025 | 1 Beach St | Turner Construction Co | 1&2/fl- ste 200/100- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred. no change of planning use from institutional to office under this permit.Details
1&2/fl- ste 200/100- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred. no change of planning use from institutional to office under this permit. | $4,266,704 |
| Sep 4, 2025 | Completed final sign-off Feb 2026 | 180 Howard St | Metcon Ti, Inc | 7th fl, ste 750 interior ti; construction of non-structural partitions, new finishes, lighting fixtures and millwork. mep and fire/life safety under separate permitDetails
7th fl, ste 750 interior ti; construction of non-structural partitions, new finishes, lighting fixtures and millwork. mep and fire/life safety under separate permit | $750,000 |
| Sep 2, 2025 | In progress issued Sep 2025 | 235 Montgomery St | Acosta And Sons Inc | 28th fl: interior ti of elevator lobby, stair vestibules, restrooms, exist passageway. demo of non structural partitions. mep deferred.Details
28th fl: interior ti of elevator lobby, stair vestibules, restrooms, exist passageway. demo of non structural partitions. mep deferred. | $300,000 |
| Aug 29, 2025 | In progress issued Mar 2026 | 1 Beach St | Turner Construction Co | g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public useDetails
g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public use | $2,620,700 |
| Aug 29, 2025 | In progress issued Oct 2025 | 847 Sansome St | Level 8 Construction Inc | interior tenant improvement including demo of a non structural partitions, new partitions light fixtures, ceiling assembles , millwork, plumbing fixtures, door assemblies, and finishes.Details
interior tenant improvement including demo of a non structural partitions, new partitions light fixtures, ceiling assembles , millwork, plumbing fixtures, door assemblies, and finishes. | $190,000 |