Douglas Booth
- Listed as
- architect, authorized agent-others
- Firm
- Nichols Booth Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Aug 2016
175 permits since 2000 (architect on 170 permits, authorized agent-others on 5 permits): 141 completed, 12 never finaled, 22 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 175.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 16, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | revision to app#2016-0726-3410. 3rd floor t.i. non-infringment statement corrected. n/a for maherDetails
revision to app#2016-0726-3410. 3rd floor t.i. non-infringment statement corrected. n/a for maher | |
| Aug 16, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | revision to app#2016-0726-3413. 1st floor t.i. non-infringment statement corrected. n/a for maherDetails
revision to app#2016-0726-3413. 1st floor t.i. non-infringment statement corrected. n/a for maher | |
| Aug 26, 2014 | Completed final sign-off Jul 2015 | 601 California St | suite #700:demolition of non-structural partitions,power and data millwork, finishes, and door planes. new non-structural patitions, door frames, millwork finishes. mep and life safety under seperate permit.Details
suite #700:demolition of non-structural partitions,power and data millwork, finishes, and door planes. new non-structural patitions, door frames, millwork finishes. mep and life safety under seperate permit. | $98,000 | |
| Jul 29, 2014 | Never finaled issued Aug 2014, no final | 601 California St | # 801:project scope consists of demolition and safe off in vacant 8th floor suite. no new construction.Details
# 801:project scope consists of demolition and safe off in vacant 8th floor suite. no new construction. | $10,750 | |
| Jul 1, 2014 | Completed final sign-off Feb 2015 | 27 Maiden Ln | 7th floor:project scope consists of selective demolition and safe off in vacant 7th floor. no new construction in this scope. n/a for the maher ordinance #155-13Details
7th floor:project scope consists of selective demolition and safe off in vacant 7th floor. no new construction in this scope. n/a for the maher ordinance #155-13 | $5,850 | |
| Jun 11, 2014 | Completed final sign-off Nov 2014 | 655 Montgomery St | Commercial Interior Builders Inc | suite #1650:demolition of select partitions. construct of new millwork and finishes. the space is currently unoccupied. mech, electrical, life safty, and sprinkler system modification are not included under this permit.Details
suite #1650:demolition of select partitions. construct of new millwork and finishes. the space is currently unoccupied. mech, electrical, life safty, and sprinkler system modification are not included under this permit. | $20,000 |
| Feb 5, 2014 | Completed final sign-off Mar 2014 | 601 California St | Peacock Construction Inc | 7th floor, suite 750: demo of non-structural partitions and associated power/data. new non-structural partitions, glazing, millwork, light fixtures. mep and life safty under seperate permit.Details
7th floor, suite 750: demo of non-structural partitions and associated power/data. new non-structural partitions, glazing, millwork, light fixtures. mep and life safty under seperate permit. | $15,400 |
| Mar 27, 2013 | Expired or cancelled cancelled Jan 2026 | 240 Stockton St | restroom voluntary upgrades. relocate door, new cieling ht partition, new door activator.Details
restroom voluntary upgrades. relocate door, new cieling ht partition, new door activator. | $10,000 | |
| Mar 14, 2013 | Completed final sign-off Jun 2013 | 250 Montgomery St | Peacock Construction Inc | new work consists of new ceiling partitions, doors, frames & hardware, new millwork, new power data, plumbing & finishes throughout. mep & life safety under separate permitDetails
new work consists of new ceiling partitions, doors, frames & hardware, new millwork, new power data, plumbing & finishes throughout. mep & life safety under separate permit | $120,000 |
| Jan 10, 2013 | Completed final sign-off May 2014 | 240 Stockton St | Howard S. Wright Constructors Lp | revision to pa# 201211305228. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating.Details
revision to pa# 201211305228. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating. | |
| Jan 10, 2013 | Completed final sign-off Jul 2013 | 240 Stockton St | Howard S. Wright Constructors Lp | revision to pa# 201211305229. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating.Details
revision to pa# 201211305229. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating. | |
| Jan 2, 2013 | Completed final sign-off Feb 2014 | 221 Main St | Gci, Inc | demo of all interior partitions, glazing, millwork,& door. restroom will receive new fixtures, lighting & finishes will be ada compliant. mech, electrial, life safety & sprinkler system mofidications are under separate permit. tenant improvement will be under separate permit.Details
demo of all interior partitions, glazing, millwork,& door. restroom will receive new fixtures, lighting & finishes will be ada compliant. mech, electrial, life safety & sprinkler system mofidications are under separate permit. tenant improvement will be under separate permit. | $150,000 |
| Nov 19, 2012 | Completed final sign-off Apr 2014 | 222 Kearny St | Bcci Construction Company | provide new control descent aparatus (davit) and associated safety/structural as required. revise non operable window to operable/access window. provide new access doors. 6th, 8th, 10th flDetails
provide new control descent aparatus (davit) and associated safety/structural as required. revise non operable window to operable/access window. provide new access doors. 6th, 8th, 10th fl | $65,000 |
| May 9, 2012 | Completed final sign-off Jan 2013 | 699 08th St | Novo Construction Inc | 6th floor-minor demolition of non load bearing partitions, new partitions, doors/frames, light fixtures & finishes. new restroom fixtures & finishes. m.e.p & life safety under seperateDetails
6th floor-minor demolition of non load bearing partitions, new partitions, doors/frames, light fixtures & finishes. new restroom fixtures & finishes. m.e.p & life safety under seperate | $200,000 |
| Mar 5, 2012 | Completed final sign-off Sep 2012 | 101 Howard St | Giampolini & Co Dba Giampolini/Courtney | various steps to mitigate the deterioration of masonry. patch holes or spall in brick or mortar, repoint, scrape and clean balcony steel at brick penetrations and recoat, fill any gaps at scuppers, removal of protruding steel, repair cracks on finish coat.Details
various steps to mitigate the deterioration of masonry. patch holes or spall in brick or mortar, repoint, scrape and clean balcony steel at brick penetrations and recoat, fill any gaps at scuppers, removal of protruding steel, repair cracks on finish coat. | $40,000 |
| Jan 27, 2012 | Completed final sign-off Mar 2012 | 222 Kearny St | Principal Builders Inc. | demolition of existing doors/frames, partitions, ceiling, light fixtures, power and tele data receptacles and finishes. new tenant suite partitions, doors/frames, power and tele data, light fixtures and minor ada upgrades to existing restrooms. mep and sprinlker modification uner separate permitDetails
demolition of existing doors/frames, partitions, ceiling, light fixtures, power and tele data receptacles and finishes. new tenant suite partitions, doors/frames, power and tele data, light fixtures and minor ada upgrades to existing restrooms. mep and sprinlker modification uner separate permit | $57,640 |
| Jan 6, 2012 | Completed final sign-off Jul 2012 | 301 Battery St | Field Construction Inc. | 1st floor-demolition of (e) finishes, electrical, abandoned hvac/lighting. construction of new catering kitchen including new partitions, doors/frames/hardware, new plumbing/electrical. lighting/ceiling & finishes throughout. m.e.p, life safety & health department under seperate permitDetails
1st floor-demolition of (e) finishes, electrical, abandoned hvac/lighting. construction of new catering kitchen including new partitions, doors/frames/hardware, new plumbing/electrical. lighting/ceiling & finishes throughout. m.e.p, life safety & health department under seperate permit | $180,000 |
| Nov 18, 2011 | Completed final sign-off Jun 2012 | 250 Montgomery St | Turner Construction Co | building entry, main lobby & elevator finish upgrades. build-out consists of new store front entrance system at same location as existing, new lighting and finish upgrades. mep and fire life safety under seprate permit.Details
building entry, main lobby & elevator finish upgrades. build-out consists of new store front entrance system at same location as existing, new lighting and finish upgrades. mep and fire life safety under seprate permit. | $250,000 |
| Sep 28, 2011 | Never finaled issued Oct 2011, no final | 447 10th St | Harrison Drywall Inc. | demo of interior partitions (offices and breakroom) mech, elec, life safety and sprinker not under this permitDetails
demo of interior partitions (offices and breakroom) mech, elec, life safety and sprinker not under this permit | $6,000 |
| Aug 25, 2011 | Never finaled issued Sep 2011, no final | 80 Francisco St | Novo Construction Inc | project consists of providing secured parking for a federal enforcement agency & new electrical connections for security cameras.Details
project consists of providing secured parking for a federal enforcement agency & new electrical connections for security cameras. | $12,000 |
| Jul 7, 2011 | Completed final sign-off Nov 2011 | 333 Bush St | Swinerton Builders | demo of partitions, doors, power and tele/data on existing multi tenant floor. new work to include construction of new partitions, doors, ceiling light fixtures, power and tele data receptacles, millwork and finishes. mep under seperate permit.Details
demo of partitions, doors, power and tele/data on existing multi tenant floor. new work to include construction of new partitions, doors, ceiling light fixtures, power and tele data receptacles, millwork and finishes. mep under seperate permit. | $515,000 |
| Jun 21, 2011 | Completed final sign-off Nov 2011 | 333 Bush St | Swinerton Builders | at 8th fl: build out of new partitions, ceiling, lighting, plumbing for standard tenant improvement. mechanical under separate permit.Details
at 8th fl: build out of new partitions, ceiling, lighting, plumbing for standard tenant improvement. mechanical under separate permit. | $750,000 |
| May 19, 2011 | Completed final sign-off Sep 2011 | 222 Kearny St | Ward Alan Emery Construction Inc. | demo of select partitions and construction of new demising partitions, new power and data, relocate lights, and minor ada upgrades. mech, elec, life safety, and sprinkler not included under this permitDetails
demo of select partitions and construction of new demising partitions, new power and data, relocate lights, and minor ada upgrades. mech, elec, life safety, and sprinkler not included under this permit | $145,000 |
| May 4, 2011 | Completed final sign-off May 2012 | 301 Battery St | Field Construction Inc. | 2nd floor-unoccupied floor-2 new 1 hour rated acoustical walls at (e) atrium window walls. mechanical, electrical, fire, life safety under seperate permitDetails
2nd floor-unoccupied floor-2 new 1 hour rated acoustical walls at (e) atrium window walls. mechanical, electrical, fire, life safety under seperate permit | $5,000 |
| May 4, 2011 | Completed final sign-off Dec 2011 | 699 08th St | Plant Construction Company Lp | 2nd & 3rd floors-revision to pa# 2010-1110-4737-revised mechanical drawings due to architectural updatesDetails
2nd & 3rd floors-revision to pa# 2010-1110-4737-revised mechanical drawings due to architectural updates | |
| Apr 28, 2011 | Completed final sign-off Dec 2011 | 699 08th St | Plant Construction Company Lp | revision to permit #201011104737. revision include changes to interior non-load bearing walls and new restroom finishes. mechanical, electrical and fire safety under seperate permit.Details
revision to permit #201011104737. revision include changes to interior non-load bearing walls and new restroom finishes. mechanical, electrical and fire safety under seperate permit. | |
| Apr 27, 2011 | Completed final sign-off Dec 2011 | 699 08th St | Plant Construction Co, Lp | floor 5 & 6 - revision to appl #201011104737: change to interior non-load bearing walls, thus changing floor exiting from original permit, new finishes in existing restrooms. mechanical, electrical, life-safety under separate permit.Details
floor 5 & 6 - revision to appl #201011104737: change to interior non-load bearing walls, thus changing floor exiting from original permit, new finishes in existing restrooms. mechanical, electrical, life-safety under separate permit. | $3,000,000 |
| Apr 7, 2011 | Completed final sign-off Aug 2011 | 221 Main St | demo of (e) partitions. construction of 2-offices,Details
demo of (e) partitions. construction of 2-offices, | $585,000 | |
| Feb 18, 2011 | Expired or cancelled withdrawn Aug 2011 | 400 Montgomery St | project consists of full path of travel certification, consisting of building entry, ground floor lobby, elevators, and restrooms on 5th & 8th floors. the restrooms on 5th & 8th floors will act as the ada complaint restroom for the building.Details
project consists of full path of travel certification, consisting of building entry, ground floor lobby, elevators, and restrooms on 5th & 8th floors. the restrooms on 5th & 8th floors will act as the ada complaint restroom for the building. | ||
| Dec 15, 2010 | Completed final sign-off May 2011 | 221 Main St | Pankow Special Projects Lp | revision to 201010062409. corridor upgrades. ceiling, lights, finishes, non rated corridor wallDetails
revision to 201010062409. corridor upgrades. ceiling, lights, finishes, non rated corridor wall | $25,000 |
| Jun 14, 2010 | Completed final sign-off Sep 2010 | 221 Main St | relocate 5 thermostats. relocate 5 return air grilles. relocate 2 supply air difussers. reference pa# 2010.05.27.3363Details
relocate 5 thermostats. relocate 5 return air grilles. relocate 2 supply air difussers. reference pa# 2010.05.27.3363 | $40,000 | |
| May 27, 2010 | Completed final sign-off Sep 2010 | 221 Main St | 13th floor project consists of demo of select partitions, construction of select partitions & new finishes. tenant space is unoccupied. mech/elec, sprinkler & life safety under separate permit.Details
13th floor project consists of demo of select partitions, construction of select partitions & new finishes. tenant space is unoccupied. mech/elec, sprinkler & life safety under separate permit. | $107,000 | |
| Apr 28, 2010 | Completed final sign-off Jul 2010 | 221 Main St | office ti on the 6th fl. demo (e) offices, construction of 14 offices, 1 conf. room, 1 storag rm and 1 switch rm. mech, elec, life safety and sprinkler under separate permitDetails
office ti on the 6th fl. demo (e) offices, construction of 14 offices, 1 conf. room, 1 storag rm and 1 switch rm. mech, elec, life safety and sprinkler under separate permit | $585,000 | |
| Mar 10, 2010 | Completed final sign-off May 2010 | 222 Kearny St | Ward Alan Emery Construction Inc. | 10th fl ti. demo 4 offices, demo and relocate electrical closet. new office and pantry/lunchroom and wall in receptionDetails
10th fl ti. demo 4 offices, demo and relocate electrical closet. new office and pantry/lunchroom and wall in reception | $120,000 |
| Mar 10, 2010 | Expired or cancelled expired Oct 2013 | 77 Beale St | C B 2 Builders Incorporated | new turnstiles for security and new ada counter at guards desk for ground floor lobby locationsDetails
new turnstiles for security and new ada counter at guards desk for ground floor lobby locations | $500,000 |
| Jan 6, 2010 | Completed final sign-off Jun 2010 | 250 Montgomery St | Bcci Construction Company | full floor tenant improvement. partial demo of partitions. new partitions, electrical, hvac. new breakroom and plumbing. fire and mep under separate permit.Details
full floor tenant improvement. partial demo of partitions. new partitions, electrical, hvac. new breakroom and plumbing. fire and mep under separate permit. | $251,588 |
| Dec 18, 2009 | Never finaled issued Feb 2010, no final | 211 Sutter St | D A Pope Inc | office ti on ground floor lobby. work to include entry improvement, new entry doors, new storefront and finishes. fire alarm and mech separate permit....Details
office ti on ground floor lobby. work to include entry improvement, new entry doors, new storefront and finishes. fire alarm and mech separate permit.... | $37,620 |
| Dec 10, 2009 | Completed final sign-off Mar 2010 | 221 Main St | 16th floor. demo & remove 1-(e) water source heat pump & corresponding ductwork. install 1-(n) watersource heat pump. thermostat & corresponding duckwork. relocate 11-(e) thermostats. install 9-(n) supply air diffuser. relocate 18-(e) supply air diffusers. relocate (e) air grilles. rebalance system.Details
16th floor. demo & remove 1-(e) water source heat pump & corresponding ductwork. install 1-(n) watersource heat pump. thermostat & corresponding duckwork. relocate 11-(e) thermostats. install 9-(n) supply air diffuser. relocate 18-(e) supply air diffusers. relocate (e) air grilles. rebalance system. | $80,000 | |
| Apr 28, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 3rd floor-new acoustical partition walls & door assemblies, corresponding electrical, hvac & new finishes.Details
3rd floor-new acoustical partition walls & door assemblies, corresponding electrical, hvac & new finishes. | $150,000 |
| Apr 28, 2009 | Completed final sign-off Jan 2010 | 50 Beale St | Peacock Construction Inc | 2nd floor-project consists of construction of new partitions, doors, ceiling, lighting & finishes on a single tenant floorDetails
2nd floor-project consists of construction of new partitions, doors, ceiling, lighting & finishes on a single tenant floor | $500,000 |
| Feb 10, 2009 | Completed final sign-off Mar 2009 | 400 California St | Niscayah Inc. | revision 200806053761, drawing to show card reader.Details
revision 200806053761, drawing to show card reader. | |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 211 Main St | demo of existing concrete window washing runway and installation of 22 new davit bases. new roof will be permitted separately (under separate permit) per plan.Details
demo of existing concrete window washing runway and installation of 22 new davit bases. new roof will be permitted separately (under separate permit) per plan. | $70,000 | |
| Jan 14, 2009 | Completed final sign-off Jan 2013 | 50 Beale St | Otis Elevator Co | install (n) elevator controls on all flrs. (n) technology that will provide equivalent facilitation for path of travel not currently defined by ca title 24. provide (n) hall stations & announcements in place of traditional call fixtures in lobbies & ea. landing.Details
install (n) elevator controls on all flrs. (n) technology that will provide equivalent facilitation for path of travel not currently defined by ca title 24. provide (n) hall stations & announcements in place of traditional call fixtures in lobbies & ea. landing. | $162,514 |
| Jan 13, 2009 | Completed final sign-off Mar 2009 | 601 California St | Teamwrkx Construction | work on 17th fl. build-out of 5 offices, 1 conference room, 1 kitchen/copy room. tenant space is currently unoccupied. all work to be done on 17th floor. mep under separate permit. fire sprinkler, life safety under separate permitDetails
work on 17th fl. build-out of 5 offices, 1 conference room, 1 kitchen/copy room. tenant space is currently unoccupied. all work to be done on 17th floor. mep under separate permit. fire sprinkler, life safety under separate permit | $91,050 |
| Jan 13, 2009 | Completed final sign-off Mar 2009 | 601 California St | Teamwrkx Construction | preparing and finishing an empty suite to market ready condition. including painting the walls furring the exposed columns and installing new ceiling grid, tile, & light. mep on seperate permit.fire, sprinkler, life safety under separate permitDetails
preparing and finishing an empty suite to market ready condition. including painting the walls furring the exposed columns and installing new ceiling grid, tile, & light. mep on seperate permit.fire, sprinkler, life safety under separate permit | $25,500 |
| Jan 13, 2009 | Completed final sign-off Mar 2009 | 601 California St | Teamwrkx Construction | build-out includes construction of a kitchen and upgrading finishes, tenant suite is currently unoccupied. all work to be completed on 10th floor. mep on seperate permit.fire sprinkler, life safety under seperate permit.Details
build-out includes construction of a kitchen and upgrading finishes, tenant suite is currently unoccupied. all work to be completed on 10th floor. mep on seperate permit.fire sprinkler, life safety under seperate permit. | $51,050 |
| Jan 7, 2009 | Completed final sign-off Apr 2009 | 50 Beale St | at basement: revision to pa #200811076061, new information technology room.Details
at basement: revision to pa #200811076061, new information technology room. | $5,000 | |
| Dec 11, 2008 | Completed final sign-off Mar 2009 | 400 California St | revision to ap#200806053761. to revise exit path of travel.Details
revision to ap#200806053761. to revise exit path of travel. | ||
| Dec 11, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | Teamwrkx Construction | revision to pa 200808048346 to provide voluntary barrier removal as stated on da check list, women & men restroom floor 5,7,11,12,14,16.Details
revision to pa 200808048346 to provide voluntary barrier removal as stated on da check list, women & men restroom floor 5,7,11,12,14,16. | |
| Dec 11, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | Teamwrkx Construction | revision to pa #200807106413, to provide voluntary barrier removal as stated on da check list, women & men restroom on floor 4,8,9 & 10.Details
revision to pa #200807106413, to provide voluntary barrier removal as stated on da check list, women & men restroom on floor 4,8,9 & 10. | |
| Dec 4, 2008 | Completed final sign-off Jun 2009 | 901 Market St | disabled access compliance status documentation ab-056. building entrance, path of travel, ground floor elevator lobby/elevationsDetails
disabled access compliance status documentation ab-056. building entrance, path of travel, ground floor elevator lobby/elevations | ||
| Nov 26, 2008 | Never finaled issued Nov 2008, no final | 33 New Montgomery St | 14th floor-revision to pa# 2008-1112-6295-provide card readers at interior entry doorsDetails
14th floor-revision to pa# 2008-1112-6295-provide card readers at interior entry doors | ||
| Nov 7, 2008 | Completed final sign-off Apr 2009 | 50 Beale St | basement level-t.i. minor demo & construction of partitions, revised power/data, lighting & finishes. m.e.p, life safety & sprinkler modifications not included under this permitDetails
basement level-t.i. minor demo & construction of partitions, revised power/data, lighting & finishes. m.e.p, life safety & sprinkler modifications not included under this permit | $40,000 | |
| Nov 7, 2008 | Completed final sign-off Feb 2010 | 901 Market St | Bevilacqua & Sons | to obtain final inspection for work approved under ap#200807156725. all work has been completed.Details
to obtain final inspection for work approved under ap#200807156725. all work has been completed. | |
| Oct 28, 2008 | Completed final sign-off Jan 2009 | 444 De Haro St | t.i. to (e) vacant space on 2nd floor. no increase in area, work includes minor demo and construction, new ceiling ht. partitions. no modification to (e) mech, elect. life safety, sprinkler or structural system. new ceiling lit partitions.Details
t.i. to (e) vacant space on 2nd floor. no increase in area, work includes minor demo and construction, new ceiling ht. partitions. no modification to (e) mech, elect. life safety, sprinkler or structural system. new ceiling lit partitions. | $38,000 | |
| Oct 24, 2008 | Completed final sign-off Mar 2009 | 33 New Montgomery St | Ward Alan Emery Construction Inc. | t.i. minor non structural demolition, new drywall partitions, acoustic ceiling repair, doors, and finishesDetails
t.i. minor non structural demolition, new drywall partitions, acoustic ceiling repair, doors, and finishes | $126,000 |
| Oct 23, 2008 | Completed final sign-off Apr 2009 | 220 Montgomery St | #321 - adding a new hvac in an extg unoccuppied server room. new hvac unit to be tied into extg mechanical system. electrical work is under seperate permitDetails
#321 - adding a new hvac in an extg unoccuppied server room. new hvac unit to be tied into extg mechanical system. electrical work is under seperate permit | $50,000 | |
| Oct 2, 2008 | Completed final sign-off Apr 2009 | 211 Main St | Bcci Construction Company | exterior window replacement from single pane to double pane, relocation of exterior entry from howard st to main st.Details
exterior window replacement from single pane to double pane, relocation of exterior entry from howard st to main st. | $40,000 |
| Sep 25, 2008 | Completed final sign-off Mar 2009 | 260 California St | Ayoob & Peery Plumbing Co Inc | 10th floor-relocate fire sprinkler heads per tenant improvements-5 relocatesDetails
10th floor-relocate fire sprinkler heads per tenant improvements-5 relocates | $1,200 |
| Sep 18, 2008 | Completed final sign-off Apr 2009 | 110 Sutter St | Bevilacqua & Sons | revision to 200708078965: as built sheet notes and details as requested by fire inspector.Details
revision to 200708078965: as built sheet notes and details as requested by fire inspector. | |
| Sep 15, 2008 | Completed final sign-off Jan 2009 | 221 Main St | 8th floor t.i. -new demising partition & rework of existing partition layout. minor demo & construction are required. mech,elec, life safety & sprinkler system modifications are not included under this permit.Details
8th floor t.i. -new demising partition & rework of existing partition layout. minor demo & construction are required. mech,elec, life safety & sprinkler system modifications are not included under this permit. | $75,000 | |
| Sep 8, 2008 | Completed final sign-off Feb 2009 | 101 Howard St | installation of new steel platform on roof for future diesel powered generator. no increase in area, unoccupied space. generator shall be installed under separate permit.Details
installation of new steel platform on roof for future diesel powered generator. no increase in area, unoccupied space. generator shall be installed under separate permit. | $15,000 | |
| Sep 5, 2008 | Completed final sign-off Mar 2009 | 343 Sansome St | Ayoob & Peery Plumbing Co Inc | 5th floor-relocate and remove fire sprinkler heads per tenant improvements-19 removed, 182 relocatedDetails
5th floor-relocate and remove fire sprinkler heads per tenant improvements-19 removed, 182 relocated | $13,000 |
| Sep 2, 2008 | Completed final sign-off Nov 2008 | 50 Beale St | ti relocation of 1 office partition and door,minor demo and construction are required. mech, elec,fire spr, life safety not included under this permit.Details
ti relocation of 1 office partition and door,minor demo and construction are required. mech, elec,fire spr, life safety not included under this permit. | $35,000 | |
| Aug 21, 2008 | Completed final sign-off Jul 2009 | 1675 Post St | installation of a protective partition and upgrade existing ada teller station, mep,elec., fire sprinklers and life safety under separate permit.Details
installation of a protective partition and upgrade existing ada teller station, mep,elec., fire sprinklers and life safety under separate permit. | $12,750 | |
| Aug 21, 2008 | Completed final sign-off May 2009 | 640 Townsend St | installation of protective partition and upgrade existing ada teller station. mech, elect, fire, sprinkler, life safety under separate permit.Details
installation of protective partition and upgrade existing ada teller station. mech, elect, fire, sprinkler, life safety under separate permit. | $12,750 | |
| Aug 4, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | 5th, 7th, 11th, 12th, 14th & 16th floors-restroom upgrades to full comply, no structural work performed, life safety under seperate permit.Details
5th, 7th, 11th, 12th, 14th & 16th floors-restroom upgrades to full comply, no structural work performed, life safety under seperate permit. | $125,000 | |
| Jul 24, 2008 | Completed final sign-off Sep 2008 | 100 Van Ness Av | 26th floor: t.i. demolition & construction of offices. no new area. mech, elect., fire alarm and sprinkler system modifications is not included. (under separate permit).Details
26th floor: t.i. demolition & construction of offices. no new area. mech, elect., fire alarm and sprinkler system modifications is not included. (under separate permit). | $200,000 | |
| Jul 10, 2008 | Completed final sign-off Feb 2009 | 250 Montgomery St | upgrade to fully comply restroom upgrade floor 4,8,9,& 10. no structural work performed.Details
upgrade to fully comply restroom upgrade floor 4,8,9,& 10. no structural work performed. | $100,000 | |
| Jul 1, 2008 | Completed final sign-off May 2009 | 211 Main St | Bcci Construction Company | g/f lecture hall, without fixed seating & accessory back of house/service use, m.e.p & finishes upgrade restroom for min plumbing fixtures. structural work to be performed under this permit.Details
g/f lecture hall, without fixed seating & accessory back of house/service use, m.e.p & finishes upgrade restroom for min plumbing fixtures. structural work to be performed under this permit. | $1,150,000 |
| Jun 20, 2008 | Completed final sign-off Sep 2008 | 650 Townsend St | Plant Construction Company Lp | 1st floor-modifications, additions & demo of (e) tenant partitions & finishes for new tenant. new work includes doors, floor coverings, painting, acoustic ceilings. life safety & fire sprinklers under seperate permits. no exterior modifications/no increase in office spaceDetails
1st floor-modifications, additions & demo of (e) tenant partitions & finishes for new tenant. new work includes doors, floor coverings, painting, acoustic ceilings. life safety & fire sprinklers under seperate permits. no exterior modifications/no increase in office space | $996,000 |
| Jun 17, 2008 | Expired or cancelled withdrawn Jun 2008 | 211 Main St | Bcci Construction Company | demolition of mezzanine & build out of new ground floor lecture hall without fixed seating including accessory backstage/service use & restroom remodel for min fixture required. structural work performedDetails
demolition of mezzanine & build out of new ground floor lecture hall without fixed seating including accessory backstage/service use & restroom remodel for min fixture required. structural work performed | $1,000,000 |
| May 20, 2008 | Never finaled issued May 2008, no final | 50 Beale St | 4th floor ti construction of 1 new office including new partitions and door on a single tenant floor. existing mech, elc, sprinkler, life safety on separate permitDetails
4th floor ti construction of 1 new office including new partitions and door on a single tenant floor. existing mech, elc, sprinkler, life safety on separate permit | $26,250 | |
| May 13, 2008 | Completed final sign-off Jun 2008 | 650 California St | Richlen Construction | 4th floor-hvac work to include: relocate vent fan, stats and vav box. install vav boxes & stats, supply grill & return grills. new duct workDetails
4th floor-hvac work to include: relocate vent fan, stats and vav box. install vav boxes & stats, supply grill & return grills. new duct work | $26,000 |
| May 2, 2008 | Expired or cancelled expired Mar 2010 | 60 Francisco St | Teamwrkx Inc. | revision to appl #200803247799 (ref #200803207577) - remove 2 private office layouts from plan to provide for larger yoga room, vault walls to remain (no door existing) added construction notes for lift.Details
revision to appl #200803247799 (ref #200803207577) - remove 2 private office layouts from plan to provide for larger yoga room, vault walls to remain (no door existing) added construction notes for lift. | |
| Apr 23, 2008 | Completed final sign-off Jun 2008 | 33 New Montgomery St | work @ suite# 990 only. 9th floor-demo of office partitions, doors, power & telephone/data receptacles abd finishes in compliance with ab-017. area to be converted to open office.Details
work @ suite# 990 only. 9th floor-demo of office partitions, doors, power & telephone/data receptacles abd finishes in compliance with ab-017. area to be converted to open office. | $4,500 | |
| Mar 24, 2008 | Expired or cancelled expired Mar 2010 | 60 Francisco St | Teamwrkx Inc. | tenant improvement on a single floor (ground), space is currently unoccupied. mech, fire & demo under separate permit. two men & women's restrooms to remain, 2 new unisex retrooms, new partitions, staircase work & finishes.Details
tenant improvement on a single floor (ground), space is currently unoccupied. mech, fire & demo under separate permit. two men & women's restrooms to remain, 2 new unisex retrooms, new partitions, staircase work & finishes. | $86,000 |
| Mar 21, 2008 | Completed final sign-off Feb 2009 | 953 Indiana St | revision to pa# 2004.12.07.0840 and compliance with violation # 200455014. demo (e) loading dock, (n) hand/guard rails, ugrade (e) men and women restrooms. no mech, fire sprinkler, elec. under this permitDetails
revision to pa# 2004.12.07.0840 and compliance with violation # 200455014. demo (e) loading dock, (n) hand/guard rails, ugrade (e) men and women restrooms. no mech, fire sprinkler, elec. under this permit | $100,000 | |
| Mar 20, 2008 | Completed final sign-off May 2008 | 60 Francisco St | Teamwrkx Inc. | demolition on single tenant ground floor including partitions, stair & 2 existing single restrooms, const plan & m.e.p. under separate permit. tenant space is currently unoccupied.Details
demolition on single tenant ground floor including partitions, stair & 2 existing single restrooms, const plan & m.e.p. under separate permit. tenant space is currently unoccupied. | $565,000 |
| Feb 28, 2008 | Never finaled issued Feb 2008, no final | 575 Market St | 20th floor: t.i. on multi-enant floor, minor demo and construction of a new conference room.Details
20th floor: t.i. on multi-enant floor, minor demo and construction of a new conference room. | $35,000 | |
| Feb 26, 2008 | Completed final sign-off Jun 2008 | 301 Battery St | Bcci Construction Company | provide maintenance accesss to top floor (7th) of elevator shaft. this elevator does not serve the 7th floor.Details
provide maintenance accesss to top floor (7th) of elevator shaft. this elevator does not serve the 7th floor. | $15,000 |
| Feb 13, 2008 | Never finaled issued Feb 2008, no final | 444 De Haro St | revision to pa# 2008.0108.2073. demo existing in suite toilet room on 2nd floor. other building elements in full compliance for da.Details
revision to pa# 2008.0108.2073. demo existing in suite toilet room on 2nd floor. other building elements in full compliance for da. | ||
| Feb 11, 2008 | Expired or cancelled expired Jun 2009 | 343 Sansome St | remove fire notes "provide emergency lighting and fire alarm. both emergency lighting & fire alarm are existing. from application number 2007/11/28/9130 that was issued.Details
remove fire notes "provide emergency lighting and fire alarm. both emergency lighting & fire alarm are existing. from application number 2007/11/28/9130 that was issued. | ||
| Feb 11, 2008 | Completed final sign-off Apr 2008 | 1265 Battery St | revision to appl. 200712110153, add power & data outlets at the new partition and revise door in conference room.Details
revision to appl. 200712110153, add power & data outlets at the new partition and revise door in conference room. | $2,000 | |
| Jan 17, 2008 | Completed final sign-off Feb 2008 | 255 California St | 4th floor: revision to appl #200701041013 - one partition changed to glazed partition, storage/office reconfigured. electrical/fire sprinkler/mechanical under separate permit. life safety sep. permit.Details
4th floor: revision to appl #200701041013 - one partition changed to glazed partition, storage/office reconfigured. electrical/fire sprinkler/mechanical under separate permit. life safety sep. permit. | ||
| Jan 8, 2008 | Completed final sign-off Mar 2008 | 444 De Haro St | minor demo and construction of new offices/breakroom.Details
minor demo and construction of new offices/breakroom. | $80,000 | |
| Dec 19, 2007 | Completed final sign-off Jan 2008 | 221 Main St | umbrella permit compliance with high rise sprinlker ord. #377-93. the facility is fully sprinklered refer to attached inspection report from f.p. engineer. work performed under pa# 200606224716, renew pa# 200711017480 (for final)Details
umbrella permit compliance with high rise sprinlker ord. #377-93. the facility is fully sprinklered refer to attached inspection report from f.p. engineer. work performed under pa# 200606224716, renew pa# 200711017480 (for final) | ||
| Dec 11, 2007 | Completed final sign-off Apr 2008 | 1265 Battery St | 5th floor: tenant improvement, minor demo & construction, mech, elec, life safety on separate permit.Details
5th floor: tenant improvement, minor demo & construction, mech, elec, life safety on separate permit. | $50,211 | |
| Nov 30, 2007 | Expired or cancelled expired Jun 2008 | 301 Battery St | Bcci Construction Company | basement: title 24 lighting & power plan for p.a. #200710256397 storage room reconfiguration - convert to exercise room.Details
basement: title 24 lighting & power plan for p.a. #200710256397 storage room reconfiguration - convert to exercise room. | $3,000 |
| Nov 28, 2007 | Expired or cancelled expired Jun 2009 | 343 Sansome St | occupant load caluclation for terrrece on the 15th floor. change occup. class o n outdoor terrace from b to a-3 per 2001 calif. bldg. code establish occupant load as 267.Details
occupant load caluclation for terrrece on the 15th floor. change occup. class o n outdoor terrace from b to a-3 per 2001 calif. bldg. code establish occupant load as 267. | $500 | |
| Nov 28, 2007 | Completed final sign-off May 2008 | 405 Howard St | build out of existing vacant office space elect and plumbing and life safety and mech on separate permitDetails
build out of existing vacant office space elect and plumbing and life safety and mech on separate permit | $26,220 | |
| Nov 19, 2007 | Expired or cancelled expired Oct 2010 | 400 Beale St | suite 101. build out 1 private office and one (n) closet in an existing vacant space including (n) sink & finishes.(no work on dwelling units). mech/electrical/ sprinklers/life safety on separate permit.Details
suite 101. build out 1 private office and one (n) closet in an existing vacant space including (n) sink & finishes.(no work on dwelling units). mech/electrical/ sprinklers/life safety on separate permit. | $18,300 | |
| Oct 25, 2007 | Expired or cancelled expired May 2009 | 221 Main St | revision to pa# 2007/0904/1674: install pocket door & smoke-controled hold-open on entry door.Details
revision to pa# 2007/0904/1674: install pocket door & smoke-controled hold-open on entry door. | ||
| Oct 11, 2007 | Completed final sign-off May 2008 | 480 Columbus Av | minor demolition and const, mechanical, electrical on separate permit.Details
minor demolition and const, mechanical, electrical on separate permit. | $75,000 | |
| Oct 3, 2007 | Completed final sign-off Apr 2008 | 350 California St | revision to app.# 200708028514,change location of closet and storage room, remove shower room. doors at (e) offices/finishes.Details
revision to app.# 200708028514,change location of closet and storage room, remove shower room. doors at (e) offices/finishes. | ||
| Oct 3, 2007 | Expired or cancelled expired Jul 2008 | 240 Stockton St | San Francisco Commercial Builders Inc | 6/f- removal of carpet & rubber base throughout, removal of reception wall & 1 office. walls will be undercut so that all ceiling elements will remian. tel/data & outlets @ demolished walls to also be removed.Details
6/f- removal of carpet & rubber base throughout, removal of reception wall & 1 office. walls will be undercut so that all ceiling elements will remian. tel/data & outlets @ demolished walls to also be removed. | $3,000 |
| Sep 13, 2007 | Never finaled issued Sep 2007, no final | 215 Fremont St | Richlen Construction | 4th floor - mechanical, electrical, & sprinkler for the t.i. reference appl. #200705100989. relocate (13) existing fire sprinkler heads.Details
4th floor - mechanical, electrical, & sprinkler for the t.i. reference appl. #200705100989. relocate (13) existing fire sprinkler heads. | $125,000 |
| Sep 4, 2007 | Completed final sign-off Nov 2007 | 600 Townsend St | revision to permit # 2007/07/31/8236. construct a tel closet and some new electrical outlets.Details
revision to permit # 2007/07/31/8236. construct a tel closet and some new electrical outlets. | ||
| Sep 4, 2007 | Expired or cancelled expired May 2009 | 221 Main St | ti a multiple tenant floor . demo a portion of demising wall to expand tenant space. remove some ex. partion wall.mechanical, electrical and life safety work will be under a separate permitDetails
ti a multiple tenant floor . demo a portion of demising wall to expand tenant space. remove some ex. partion wall.mechanical, electrical and life safety work will be under a separate permit | $38,000 | |
| Aug 30, 2007 | Completed final sign-off Dec 2007 | 250 Montgomery St | Teamwrkx Inc. | 2nd floor - demolition of approx. 100'-0" of undergrid walls, carpet & ceiling tile only. t.i. under separate permit. no exterior work.Details
2nd floor - demolition of approx. 100'-0" of undergrid walls, carpet & ceiling tile only. t.i. under separate permit. no exterior work. | $4,200 |