Bryce Porter Harstad
- Listed as
- authorized agent-others, contractor
- Firm
- Source Planning And Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Nov 2026
820 permits since 2000 (contractor on 820 permits, authorized agent-others on 7 permits): 631 completed, 57 in progress, 123 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Ariane Lebrilla (17), Stanley H Lew (9), Scott Clement (8), Suwanty Mulia (5), Amir Kakavand (4), Ashley Miller (3), Dane Bunton (3), Eric Ibsen (3), Awa Awa, Chris Ford, Dean Macy, Marc Pfenninger, Nathan G Dison, Omied Arvin, Patrick Daly, Pelli, Clarke & Pelli, Revel Archi, Sashikala Murthy, William Hadinger, Yong Jin Pork
- Engineers
- Dean Macy (9), Sherry Chaumpluke (9), Amit Wadhwa (4), Stephen Shaffer (4), Jeffrey Taner (3), Rey T. Solidum (3), Lars P. Mortensen (2), Levi G. Abarte (2), William Hadinger (2), Alan Robinson, Alexander Joseph Pacheco, Bradley Hollub, Christopher Jordan Malabed, Edward Rivera, Eric Long, Gerald Gonzales, Glenn Friedman, Habtom Nugusse Tewelde, Jesus B Cabellon Jr, Rodolfo Bustos, Shawn Vessels, Stuart Lowe, Walter Chang, Xuong Quach
- Authorized agents
- Joyce Mizuhara (2)
- Pmt consultant/expediters
- Alan Robinson
Most recent permits
Showing the 100 most recent of 820.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 55 Spear St | Source Planning And Construction Inc | ground flr/1st flr. ref: 202610219705. mechanical for 202610219705Details
ground flr/1st flr. ref: 202610219705. mechanical for 202610219705 | $58,000 |
| Oct 29, 2026 | In progress issued Nov 2026 | 888 Brannan St | Source Planning And Construction Inc | revision to pa #202609107888 include non-structural and finish work of new all gender restrooms, egress door and path of travel upgrades. new permit revision to include change to restroom layout and relocation of proposed egress door due to on-site conflicts.Details
revision to pa #202609107888 include non-structural and finish work of new all gender restrooms, egress door and path of travel upgrades. new permit revision to include change to restroom layout and relocation of proposed egress door due to on-site conflicts. | |
| Oct 21, 2026 | In progress filed Oct 2026, not yet issued | 345 Spear St | Source Planning And Construction Inc | 1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldgDetails
1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg | $292,338 |
| Oct 21, 2026 | In progress issued Oct 2026 | 55 Spear St | Source Planning And Construction Inc | b1: demolition of (e) non-structural partitions. doors & frame, finishes, ceiling, lighting & plumbing fixtures. construction of new non-structural partitions, finishes, ceiling, lighting & plumbing fixtures. scope includes restrooms & locker room upgrades.Details
b1: demolition of (e) non-structural partitions. doors & frame, finishes, ceiling, lighting & plumbing fixtures. construction of new non-structural partitions, finishes, ceiling, lighting & plumbing fixtures. scope includes restrooms & locker room upgrades. | $650,000 |
| Oct 21, 2026 | In progress issued Oct 2026 | 55 Spear St | Source Planning And Construction Inc | grd fl: plumbing fixtures. new mail room and bike roomDetails
grd fl: plumbing fixtures. new mail room and bike room | $800,000 |
| Oct 7, 2026 | In progress filed Oct 2026, not yet issued | 221 Main St | Source Planning And Construction Inc | suite #700: mechanical sheets only in referance to permit #202401264744. relocate existing duct work and diffuser.Details
suite #700: mechanical sheets only in referance to permit #202401264744. relocate existing duct work and diffuser. | $52,000 |
| Sep 30, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494Details
46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494 | $35,000 |
| Sep 30, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369Details
39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369 | $35,000 |
| Sep 29, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884Details
10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884 | $35,000 |
| Sep 25, 2026 | In progress issued Oct 2026 | 1 Beach St | Source Planning And Construction Inc | deferred mep for pa#2026-0302-6788 suite 350.Details
deferred mep for pa#2026-0302-6788 suite 350. | $500,000 |
| Sep 25, 2026 | In progress issued Oct 2026 | 1 Beach St | Source Planning And Construction Inc | deferred mep for 202608206913 suite 150.Details
deferred mep for 202608206913 suite 150. | $187,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 300 Mission St | Source Planning And Construction Inc | 14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633Details
14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633 | $50,000 |
| Sep 15, 2026 | Completed final sign-off Oct 2026 | 300 Mission St | Source Planning And Construction Inc | 14th - floor (5) evacuation maps.Details
14th - floor (5) evacuation maps. | $3,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 888 Brannan St | Source Planning And Construction Inc | 1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuancDetails
1/fl-scope of work consist of selective interior demo of no strutural elements and new construction of all gender restrooms and new egress door from tenant suite. new ada upgrades for building path of travel. no change to building structure or exterior. please withdraw 202503202668 prior to issuanc | $250,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 101 02nd St | Source Planning And Construction Inc | 8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusersDetails
8/f suite 800: deferred mep for ref pa 202607144969. electrical - office t.i retrofit: lighting with associated circuits and controls, power and signal with associated circuits and wiring. mechanical - demo of ceiling diffusers in open area. install of ductwork where required. new sidewall diffusers | $92,450 |
| Aug 27, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits.Details
47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits. | $202,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 1 Beach St | Source Planning And Construction Inc | 1/f suite 150. including non bearing partitions, ceilings, light fixtures, doors and side lites and new finishes. mep deferred.Details
1/f suite 150. including non bearing partitions, ceilings, light fixtures, doors and side lites and new finishes. mep deferred. | $574,044 |
| Aug 17, 2026 | In progress issued Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.Details
18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review. | $37,488 |
| Aug 13, 2026 | In progress issued Aug 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 11floor: high rise common corridor, elevator lobby, restroom lighting remodel. new lighting fixtures and associated circuiting/ controls ref bpa: 202512222453Details
11floor: high rise common corridor, elevator lobby, restroom lighting remodel. new lighting fixtures and associated circuiting/ controls ref bpa: 202512222453 | $85,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 539 Bryant St | Source Planning And Construction Inc | tenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening.Details
tenant improvement remodel including new enclosure at basement level elevator hoistway opening and a new smoke draft curtain at 2nd and 4th floor elevator hoistway opening. | $89,646 |
| Jul 30, 2026 | In progress issued Sep 2026 | 1 Beach St | Source Planning And Construction Inc | 3rd fl, ste 350 - revision to pa 202603026788 includes new structural partitions, ceilings, light fixtures, doors and sidelites, millwork and finishesDetails
3rd fl, ste 350 - revision to pa 202603026788 includes new structural partitions, ceilings, light fixtures, doors and sidelites, millwork and finishes | |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491Details
39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491 | $202,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 300 Mission St | Source Planning And Construction Inc | 14th floor: electrical for pa #202605201633 project.Details
14th floor: electrical for pa #202605201633 project. | $573,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491Details
45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491 | $202,000 |
| Jul 14, 2026 | Completed final sign-off Sep 2026 | 345 Spear St | Source Planning And Construction Inc | 2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep.Details
2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep. | $30,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 101 02nd St | Source Planning And Construction Inc | 8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred.Details
8/f suite 800: tenant improvement remodel including new partitions, office door and glazing. reference plan for restrooms #202504285316 completed 11/18/2025. mep deferred. | $324,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 300 Mission St | Source Planning And Construction Inc | 14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room.Details
14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room. | $513,000 |
| Jul 9, 2026 | Completed final sign-off Nov 2026 | 114 Sansome St | Source Planning And Construction Inc | suite 1400: installation of two new phone booths, including anchoring details.Details
suite 1400: installation of two new phone booths, including anchoring details. | $2,560 |
| Jun 29, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | 17th fl structural for high density files. ref 202606032446Details
17th fl structural for high density files. ref 202606032446 | |
| Jun 23, 2026 | In progress issued Jun 2026 | 345 California St | Source Planning And Construction Inc | mep deferred. partial 24th floor office ti. demo of some interior non bearing walls, ceiling, lighting, electrical. construction of new full height partitions, doors, glazing, millwork, and finishes.Details
mep deferred. partial 24th floor office ti. demo of some interior non bearing walls, ceiling, lighting, electrical. construction of new full height partitions, doors, glazing, millwork, and finishes. | $342,850 |
| Jun 23, 2026 | In progress issued Jul 2026 | 345 California St | Source Planning And Construction Inc | 24th floor: mechanical: duct distribution to be modified to serve new space plan in area of work. 5 new vav boxes are being added. electrical: new led light fixtures and power and signal. plumbing: new plumbing in pantry. ref pa #202606233688Details
24th floor: mechanical: duct distribution to be modified to serve new space plan in area of work. 5 new vav boxes are being added. electrical: new led light fixtures and power and signal. plumbing: new plumbing in pantry. ref pa #202606233688 | $375,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 101 California St | Source Planning And Construction Inc | 46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishesDetails
46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes | $250,000 |
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 345 Spear St | Source Planning And Construction Inc | 2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep workDetails
2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep work | $30,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 550 Kearny St | Source Planning And Construction Inc | 5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141.Details
5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141. | $75,000 |
| Jun 5, 2026 | In progress filed Jun 2026, not yet issued | 550 Kearny St | Source Planning And Construction Inc | 5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528.Details
5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528. | |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | 18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.Details
18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry. | $3,279,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps.Details
spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps. | $2,199 |
| May 20, 2026 | In progress issued Jun 2026 | 300 Mission St | Source Planning And Construction Inc | 14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred.Details
14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred. | $2,000,000 |
| May 19, 2026 | Completed final sign-off Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower)Details
16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower) | $150,000 |
| May 18, 2026 | In progress issued May 2026 | 101 02nd St | Source Planning And Construction Inc | suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312Details
suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312 | $70,000 |
| May 14, 2026 | In progress issued May 2026 | 101 02nd St | Source Planning And Construction Inc | unit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312Details
unit# 350: furnish and istall one new 1-ton water source heat pump associated ductwork. piping and condensate for it room. ref 202630268312 | $54,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 101 02nd St | Source Planning And Construction Inc | (ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.Details
(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths. | |
| Apr 16, 2026 | Completed final sign-off Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbingDetails
16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing | $1,000,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 550 Kearny St | Source Planning And Construction Inc | selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.Details
selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes. | $135,000 |
| Mar 27, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house.Details
revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house. | |
| Mar 26, 2026 | In progress issued Mar 2026 | 101 02nd St | Source Planning And Construction Inc | 3/f suite 350 - work includes: new partitions, office door and glazing and mill work.Details
3/f suite 350 - work includes: new partitions, office door and glazing and mill work. | $125,000 |
| Mar 23, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered.Details
7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered. | $15,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 595 Market St | Source Planning And Construction Inc | suite 2450a: def mechanical & electrical for 202602135931.Details
suite 2450a: def mechanical & electrical for 202602135931. | $129,654 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1 Market St | Source Planning And Construction Inc | 18th fl - selective interior demo only (ab-017) ref fire 26-158Details
18th fl - selective interior demo only (ab-017) ref fire 26-158 | $70,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1 Market St | Source Planning And Construction Inc | 17th fl - selective interior demo only (ab-017) ref 26-158Details
17th fl - selective interior demo only (ab-017) ref 26-158 | $70,000 |
| Mar 12, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen.Details
20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen. | |
| Mar 10, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | 1st fl - meps for 202511260493Details
1st fl - meps for 202511260493 | $194,832 |
| Mar 6, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours."Details
revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours." | |
| Mar 3, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 19th floor. add 2 ton wshp to serve 1df room.Details
19th floor. add 2 ton wshp to serve 1df room. | |
| Feb 26, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restroomsDetails
4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restrooms | $12,000 |
| Feb 24, 2026 | Completed final sign-off Mar 2026 | 345 Spear St | Source Planning And Construction Inc | to obtain final inspection for work approved under pa # 202412116597. all work is complete.Details
to obtain final inspection for work approved under pa # 202412116597. all work is complete. | |
| Feb 17, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 11th fl - mep for pa 202511109302Details
11th fl - mep for pa 202511109302 | $350,000 |
| Feb 17, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 6/f: meps for t.i. 202511250447.Details
6/f: meps for t.i. 202511250447. | $120,000 |
| Feb 17, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 7/f: meps for t.i. 202511250451.Details
7/f: meps for t.i. 202511250451. | $450,000 |
| Feb 13, 2026 | In progress issued Feb 2026 | 595 Market St | Source Planning And Construction Inc | 24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permitDetails
24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permit | $400,000 |
| Feb 4, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 13th floor: add 3 ton wshp to serve mdf room.Details
13th floor: add 3 ton wshp to serve mdf room. | $55,000 |
| Feb 4, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 20th fl - meps for pa 202511109312Details
20th fl - meps for pa 202511109312 | $307,000 |
| Jan 21, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 18th floor: mep project. ref pa #202511048826Details
18th floor: mep project. ref pa #202511048826 | |
| Jan 21, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 4th fl - ref arch 202510288260 mep for projectDetails
4th fl - ref arch 202510288260 mep for project | $120,000 |
| Dec 22, 2025 | In progress issued May 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 11/f: interior improvements to elevator lobby, hallways, and restrooms on the 11th floor. including paint, lighting, toilet fixtures, partitions, and accessories, signage, carpet flooring, and ceramic tile. all walls to remain.Details
11/f: interior improvements to elevator lobby, hallways, and restrooms on the 11th floor. including paint, lighting, toilet fixtures, partitions, and accessories, signage, carpet flooring, and ceramic tile. all walls to remain. | $400,000 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 4 Embarcadero Center | Source Planning And Construction Inc | demo of level 28-level 29 convenience stairs & slab in-fill.Details
demo of level 28-level 29 convenience stairs & slab in-fill. | $150,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 3rd/f mep for t.i. 202510147260: mep for projectDetails
3rd/f mep for t.i. 202510147260: mep for project | $145,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | deferred mep for 17th floor ti under permit 202510217772.Details
deferred mep for 17th floor ti under permit 202510217772. | $75,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 121 Spear St | Source Planning And Construction Inc | 2nd floor: addition of 7 phone booths in office space.Details
2nd floor: addition of 7 phone booths in office space. | $20,000 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 215 Fremont St | Source Planning And Construction Inc | level 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406Details
level 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406 | $640,000 |
| Dec 1, 2025 | Completed final sign-off Nov 2026 | 655 Montgomery St | Source Planning And Construction Inc | 19/f: demo (e) toilet partitions and finishes and replace with (n). (n) bathroom finishes and fixtures and lighting.Details
19/f: demo (e) toilet partitions and finishes and replace with (n). (n) bathroom finishes and fixtures and lighting. | $67,088 |
| Nov 26, 2025 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture.Details
project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture. | $800,000 |
| Nov 25, 2025 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 6th fl - ti includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263905Details
6th fl - ti includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263905 | $1,243,215 |
| Nov 25, 2025 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 7th fl - t.i. includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263899Details
7th fl - t.i. includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263899 | $1,251,419 |
| Nov 14, 2025 | In progress issued Nov 2025 | 1 Bush St | Source Planning And Construction Inc | 8/f: new power and signal devices throughtou the space. new title 24 complaint lighting & controls. ref pa# 202510167525.Details
8/f: new power and signal devices throughtou the space. new title 24 complaint lighting & controls. ref pa# 202510167525. | $25,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered)Details
29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered) | $198,000 |
| Nov 10, 2025 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 20/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273960.Details
20/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273960. | $777,000 |
| Nov 10, 2025 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 11/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273963Details
11/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273963 | $573,000 |
| Nov 7, 2025 | In progress issued Jan 2026 | 333 Pine St | Source Planning And Construction Inc | 1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.Details
1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes. | $670,500 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514Details
15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514 | $10,000 |
| Nov 4, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 18th floor: t.i. includes building of new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted for permit seperately. building is fully sprinklered. ref demo # 202508273958.Details
18th floor: t.i. includes building of new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted for permit seperately. building is fully sprinklered. ref demo # 202508273958. | $734,582 |
| Oct 28, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 4th/fl: ti improvement includes building of new non structural partitions. all new or revised meps and life safety work will be design build and submitted seperately (bldg is fully sprinklers).Details
4th/fl: ti improvement includes building of new non structural partitions. all new or revised meps and life safety work will be design build and submitted seperately (bldg is fully sprinklers). | $537,611 |
| Oct 21, 2025 | Completed final sign-off Jan 2026 | 333 Bush St | Source Planning And Construction Inc | ref 202504164519- 25/fl- mep work only.Details
ref 202504164519- 25/fl- mep work only. | $60,000 |
| Oct 21, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 17th fl - ti includes building of new non-structural partitions. all new mep & life safety work will be design build and submitted for permit separately. bldg is fully sprinkleredDetails
17th fl - ti includes building of new non-structural partitions. all new mep & life safety work will be design build and submitted for permit separately. bldg is fully sprinklered | $959,611 |
| Oct 17, 2025 | Completed final sign-off May 2026 | 333 Bush St | Source Planning And Construction Inc | 20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical.Details
20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical. | $120,000 |
| Oct 16, 2025 | Completed final sign-off Jan 2026 | 1 Bush St | Source Planning And Construction Inc | 8th fl - ti include the demo of non-structural partition and building new non-structural partition ny new or revised electrical life safety work will bnd submitted separatelyDetails
8th fl - ti include the demo of non-structural partition and building new non-structural partition ny new or revised electrical life safety work will bnd submitted separately | $77,958 |
| Oct 14, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 3rd fl. demo under 202508213610. t.i. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design bldg and submitted. separately. (bldg is fully sprinklerd).Details
3rd fl. demo under 202508213610. t.i. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design bldg and submitted. separately. (bldg is fully sprinklerd). | $832,402 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 345 Spear St | Source Planning And Construction Inc | 6th fl- architectural only for 3 new phone booth units in office.Details
6th fl- architectural only for 3 new phone booth units in office. | $20,000 |
| Oct 6, 2025 | In progress issued Oct 2025 | 101 California St | Source Planning And Construction Inc | 8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8Details
8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8 | |
| Oct 1, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.Details
15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes. | $250,000 |
| Sep 25, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649Details
3rd, 4th, & 8th floors: new 2022 title-24 compliant lighting and controls for janitor closets. ref pa #202508213649 | $7,500 |
| Sep 15, 2025 | Completed final sign-off Jan 2026 | 333 Bush St | Source Planning And Construction Inc | 7th/f ste 700: revision to 202505196809 & 202508223701, add fsd to demo plan, fire smoke dampers, mechanical work only.Details
7th/f ste 700: revision to 202505196809 & 202508223701, add fsd to demo plan, fire smoke dampers, mechanical work only. | |
| Sep 15, 2025 | Completed final sign-off Mar 2026 | 333 Bush St | Source Planning And Construction Inc | 21st fl ref pa # 2024-1205-6265: provide new lighting & branch circuiting to existing panel. provide california title 24 complaince forms.Details
21st fl ref pa # 2024-1205-6265: provide new lighting & branch circuiting to existing panel. provide california title 24 complaince forms. | $75,000 |
| Sep 10, 2025 | Completed final sign-off Jan 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 32nd floor: infill former stair opening 11' x 13' with new floor slab.Details
32nd floor: infill former stair opening 11' x 13' with new floor slab. | $198,000 |
| Sep 4, 2025 | Completed final sign-off Jul 2026 | 333 Bush St | Source Planning And Construction Inc | floor/20- ste 2020 consist of minor demo of non structural elements including paritions doors, lighting and ceiling. construction at pantry and copy area. (n) ceiling, lighting and finishes. mep , life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel.Details
floor/20- ste 2020 consist of minor demo of non structural elements including paritions doors, lighting and ceiling. construction at pantry and copy area. (n) ceiling, lighting and finishes. mep , life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel. | $250,000 |
| Aug 27, 2025 | Completed final sign-off Mar 2026 | 88 Kearny St | Source Planning And Construction Inc | 11/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
11/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $58,000 |
| Aug 27, 2025 | Completed final sign-off Mar 2026 | 88 Kearny St | Source Planning And Construction Inc | 04/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
04/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $77,406 |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 17/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
17/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $59,000 |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 18/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
18/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $59,000 |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 20/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
20/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $59,000 |